SlideShare una empresa de Scribd logo
1 de 3
Descargar para leer sin conexión
Ramiz Siddiq
Project Engineer at Flowtronix (pvt) ltd
Electrical engineer with a total of 4 years professional work experience. Worked with
foreign engineers and managers. Have suitable training as an engineer to carry out
complete project E&I activites in any given time span with quality control and cost
management. My major interests are in services like installations of E&I equipment,
their testing, inspection and commissioning. I can work with an existing team as a
member and increase it's productivity or lead to extract required results.
Contact Info
+923422113368
ramizsiddiq@gmail.com✉
https://pk.linkedin.com/in/ramiz-
siddiq-27962842

124, Ata Turk Block, New Garden Town.
Passport# FC5460801
Lahore, Pakistan

Strengths & Skills
✔ Team player ✔ Detail Oriented ✔ Communication Skills
✔ Analytical Approch ✔ Desire to learn and be trained ✔ Project Management
Academics
Title Institute Date
BSc. Electronics Engineering Sir Syed University Of Engg. &
Technology, Karachi
2012
FSc. Pre-Engineering DHA SKBZ College, Karachi 2008
SSc. Computer Sciences DHA SKBZ College, Karachi 2006
Awards
Title Authority Date
First Aid Training National Training Bureau (Govt.) 2015
Experience 4 years
2.3 years
1.3 years
1 month
Company Designation Duration
Flowtronix (pvt) ltd E&I Projects Engineer - Lahore Jul 2014 - Present
Flowtronix (pvt) Ltd Project Cost Estimation Engineer -
Lahore
Apr 2013 - Jul 2014
Siemens Pakistan Engineering Co. Ltd. Internee - Karachi Jan 2011 - Feb 2011
Work History
Flowtronix (pvt) ltd Jul 2014 - Present (2.3 years)
E&I Projects Engineer - Lahore Lahore, Pakistan
Reported To: Site Manager
Major Responsibilites:​​​​​​
Proficient in meeting Project deadlines and removing laggy obsticles.
Responsible for setting of weekly milestones for project teams.
Organizing detailed Meetings with Client, Owner and Subcon representatives
Skillful in Manpower selection and efficieny monitoring.
Assistance to Project Design department for situational changes and alrterations in E&I Construction works.
Assistance in procuring and arranging required tools and consumables for current & upcoming work scopes.
Training of new Engineers and giving hiring approvals.
ISO documentation work for Project internal and external Audits.
Flowtronix (pvt) Ltd Apr 2013 - Jul 2014 (1.3 years)
Project Cost Estimation Engineer - Lahore Lahore, Pakistan
Reported To: Proposals Manager
Major Responsibilites:
Responsible for producing complete proposal documentation (Commercial/Technical) of Electrical and Instrumentation
Projects including Oil & Gas, Energy sectors and various other production industries.
Proficient in pricing and estimation for both supply and services related Projects.
Quality Pre-Bid meetings with client and extracting required information critical for competitive Bids.
Excellent at communication with Clients and Suppliers from discounts/negotiations to immediate quotations.
Proficient in producing Project Plans, Mob/Demob schedules, SOPs, Priced BOQs, Covering Letters, Annexures, Kick-Off
Presentations and other related documents.
Skillful in Cable calculations, Panel Calculation, Bus Bar Calculations and extracting required information from
received Electrical & Instrumentation Drawings.
Siemens Pakistan Engineering Co. Ltd. Jan 2011 - Feb 2011 (1 month)
Internee - Karachi Karachi, Pakistan
Worked in Business Unit, Infrastructure Cities & Smart Grid Department
Construction of Switchboards, panels, control panels, generators, motors, alternators and power transformers.
Factory Acceptance Test of MV Panels for clients like KESC and WAPDA
Study of SCADA and PLC systems for industrial automation with Siemens representatives.
Projects
Engro Plant-II Shutdown - Daharki Apr 2016 - May 2016 (1 month)
Company: Flowtronix (pvt) Ltd / Engro Fertilizers Limited
Tools: All tools required for carrying out complete Shutdown Activities related to Control Valves
Designation: Shutdown Incharge (Control Valves Overhauling & Calibrations)
Reported to: Inter-Pakistan Projects Head
Major Responsibilites:
​​​​​Hired & Managed a specialized shutdown team of 2 instrument supervisors with 10 Instrument technicians, 10
Instrument Fitters and 20 Assitant Technicians.
Responsible for prepared Budgetary sheet with efficiency forcasts and resource allocation.
Efficiently ran a 2 shift (24 hour) working plan for achieving given targets and deadlines.
Regular meetings with client for upcoming work scopes and their planing with scheduling.
Responsible for complete Mob/Demob of company assests and manpower.
Submitted a detailed technical report that included critical information regarding each valve.
Achievements:
Achieved targetted job within time span.
Made valuable contacts and relations with Engro management for business development purposes.
Secured more than sufficient amount of revenue for my company.
Extremely appreciated our team performance and invited for upcoming shutdown of Plant-I by Client.
Attock Oil Refinery Upgradation Project - Rawalpindi Apr 2014 - Apr 2016 (2 years)
Company: Flowtronix (pvt) Ltd / Hyundai Engineering & Construction Korea
Tools: Complete range of tools required for carrying out all E&I activities from initiation to commissioning of Project
Designation: E&I Engineer
Reported To: Site Manager
Major Responsibilites:
Directly responsible for E&I construction of major refinery upgradation areas as Contractor's E&I Engineer.
Responsible for sufficient daily progress through providing continuous work front to deployed teams and Facilitating
strong communications between cross-functional teams and personnel.
Responsible for Daily Planning, monitoring and assigning of worker teams alongwith their supervisors in respective
areas and their situational redirections.
Technicall-Management of porject teams in accordance with specialized work fronts.
Produced doccumentation for regular Client meetings with Hyundai representatives and maintaing MOM logs for later
use.
Prepared forecasts including (3 weeks plan, acceleration plan, Lag evaluation plan) with reference to project master
schedule.
Responisble for preparing resouce and risk analysis.
Achievements:
Led squad to achieve 5 Million Safe LTI free Manhours for Flowtronix till the end of project.
Promoted to Acting Construction Manager in case of inavailablitiy.
Completed Project with appreciaiton from foreign engineers and managers.
Experienced a complete life cycle of an O&G Project.
Functioned in project-management role.
Built Valuble relations with Hyundai and ARL representatives.
Industries
Power/Energy
Mining/Oil & Gas/Petroleum
Food & Beverages
Agriculture/Fertilizer/Pesticide
Chemicals
Functional Areas*
Valve Calibration/Overhauling
Fire Alarm & Gas Detection System Installation
CCTV System Installation
Earthing & Lightning Protection
Cable Laying & Termination
Solar Power (Off/On Grid)
Languages
English - Native
Urdu - Native
Punjabi - Medium
Sindhi - Beginner
Hobbies
Meeting Professionals
Researching and Learning
Generel Experimentation

Más contenido relacionado

La actualidad más candente

Resume_Omkar Palit
Resume_Omkar PalitResume_Omkar Palit
Resume_Omkar Palit
Omkar Palit
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
KHAJA Raheemuddin
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
ramiz reyad
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
Shehreyar Khan
 
SIYA RAHMAN RESUME
SIYA RAHMAN RESUMESIYA RAHMAN RESUME
SIYA RAHMAN RESUME
Siya Rahman
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY AROKIAM
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
Shane Elcoate
 

La actualidad más candente (20)

Resume_Omkar Palit
Resume_Omkar PalitResume_Omkar Palit
Resume_Omkar Palit
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
CV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning EngineerCV Khaja Raheemuddin Sr. Planning Engineer
CV Khaja Raheemuddin Sr. Planning Engineer
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
Sr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
 
Robert W Self Resume 2009
Robert W Self Resume 2009Robert W Self Resume 2009
Robert W Self Resume 2009
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
Shehreyar planning & Costing Engr
Shehreyar planning & Costing EngrShehreyar planning & Costing Engr
Shehreyar planning & Costing Engr
 
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
Sanad samir Project Quality Control, Electrical, Instrumentation Construction...
 
Henry CV
Henry CVHenry CV
Henry CV
 
Mahesh - Resume (3)
Mahesh -   Resume (3)Mahesh -   Resume (3)
Mahesh - Resume (3)
 
Resumexpte
ResumexpteResumexpte
Resumexpte
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
SIYA RAHMAN RESUME
SIYA RAHMAN RESUMESIYA RAHMAN RESUME
SIYA RAHMAN RESUME
 
KINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABDKINGSLY M PIPING-PROJECT CV ABD
KINGSLY M PIPING-PROJECT CV ABD
 
Planning Engineer
Planning EngineerPlanning Engineer
Planning Engineer
 
engg hamid
engg hamidengg hamid
engg hamid
 
shane-michael-elcoate-CV
shane-michael-elcoate-CVshane-michael-elcoate-CV
shane-michael-elcoate-CV
 
Khaled Hubaisheh Resume
Khaled Hubaisheh ResumeKhaled Hubaisheh Resume
Khaled Hubaisheh Resume
 

Similar a CV Ramiz Siddiq 6.5 (20)

cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
Resume 1
Resume 1Resume 1
Resume 1
 
Resume 1
Resume 1Resume 1
Resume 1
 
Vikram Prabhakar Updated Resume
Vikram Prabhakar Updated ResumeVikram Prabhakar Updated Resume
Vikram Prabhakar Updated Resume
 
Cv Anirudh
Cv AnirudhCv Anirudh
Cv Anirudh
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
Mari cv - office
Mari cv - officeMari cv - office
Mari cv - office
 
Resume of SSK
Resume of SSKResume of SSK
Resume of SSK
 
Ravi Ranjan_CV
Ravi Ranjan_CVRavi Ranjan_CV
Ravi Ranjan_CV
 
Sayantan resume
Sayantan resumeSayantan resume
Sayantan resume
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
siva CV
siva CVsiva CV
siva CV
 
Siva cv
Siva cvSiva cv
Siva cv
 
Anson 090316
Anson 090316Anson 090316
Anson 090316
 
Ravi CV 2016
Ravi CV 2016Ravi CV 2016
Ravi CV 2016
 
Ghafran-Electrical Engineer final
Ghafran-Electrical Engineer finalGhafran-Electrical Engineer final
Ghafran-Electrical Engineer final
 
Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
 
Abdul Hai-11 CV
Abdul Hai-11 CVAbdul Hai-11 CV
Abdul Hai-11 CV
 
Instrumentation Engineer
Instrumentation EngineerInstrumentation Engineer
Instrumentation Engineer
 

CV Ramiz Siddiq 6.5

  • 1. Ramiz Siddiq Project Engineer at Flowtronix (pvt) ltd Electrical engineer with a total of 4 years professional work experience. Worked with foreign engineers and managers. Have suitable training as an engineer to carry out complete project E&I activites in any given time span with quality control and cost management. My major interests are in services like installations of E&I equipment, their testing, inspection and commissioning. I can work with an existing team as a member and increase it's productivity or lead to extract required results. Contact Info +923422113368 ramizsiddiq@gmail.com✉ https://pk.linkedin.com/in/ramiz- siddiq-27962842  124, Ata Turk Block, New Garden Town. Passport# FC5460801 Lahore, Pakistan  Strengths & Skills ✔ Team player ✔ Detail Oriented ✔ Communication Skills ✔ Analytical Approch ✔ Desire to learn and be trained ✔ Project Management Academics Title Institute Date BSc. Electronics Engineering Sir Syed University Of Engg. & Technology, Karachi 2012 FSc. Pre-Engineering DHA SKBZ College, Karachi 2008 SSc. Computer Sciences DHA SKBZ College, Karachi 2006 Awards Title Authority Date First Aid Training National Training Bureau (Govt.) 2015 Experience 4 years 2.3 years 1.3 years 1 month Company Designation Duration Flowtronix (pvt) ltd E&I Projects Engineer - Lahore Jul 2014 - Present Flowtronix (pvt) Ltd Project Cost Estimation Engineer - Lahore Apr 2013 - Jul 2014 Siemens Pakistan Engineering Co. Ltd. Internee - Karachi Jan 2011 - Feb 2011 Work History Flowtronix (pvt) ltd Jul 2014 - Present (2.3 years) E&I Projects Engineer - Lahore Lahore, Pakistan Reported To: Site Manager Major Responsibilites:​​​​​​ Proficient in meeting Project deadlines and removing laggy obsticles. Responsible for setting of weekly milestones for project teams. Organizing detailed Meetings with Client, Owner and Subcon representatives Skillful in Manpower selection and efficieny monitoring. Assistance to Project Design department for situational changes and alrterations in E&I Construction works. Assistance in procuring and arranging required tools and consumables for current & upcoming work scopes. Training of new Engineers and giving hiring approvals. ISO documentation work for Project internal and external Audits.
  • 2. Flowtronix (pvt) Ltd Apr 2013 - Jul 2014 (1.3 years) Project Cost Estimation Engineer - Lahore Lahore, Pakistan Reported To: Proposals Manager Major Responsibilites: Responsible for producing complete proposal documentation (Commercial/Technical) of Electrical and Instrumentation Projects including Oil & Gas, Energy sectors and various other production industries. Proficient in pricing and estimation for both supply and services related Projects. Quality Pre-Bid meetings with client and extracting required information critical for competitive Bids. Excellent at communication with Clients and Suppliers from discounts/negotiations to immediate quotations. Proficient in producing Project Plans, Mob/Demob schedules, SOPs, Priced BOQs, Covering Letters, Annexures, Kick-Off Presentations and other related documents. Skillful in Cable calculations, Panel Calculation, Bus Bar Calculations and extracting required information from received Electrical & Instrumentation Drawings. Siemens Pakistan Engineering Co. Ltd. Jan 2011 - Feb 2011 (1 month) Internee - Karachi Karachi, Pakistan Worked in Business Unit, Infrastructure Cities & Smart Grid Department Construction of Switchboards, panels, control panels, generators, motors, alternators and power transformers. Factory Acceptance Test of MV Panels for clients like KESC and WAPDA Study of SCADA and PLC systems for industrial automation with Siemens representatives. Projects Engro Plant-II Shutdown - Daharki Apr 2016 - May 2016 (1 month) Company: Flowtronix (pvt) Ltd / Engro Fertilizers Limited Tools: All tools required for carrying out complete Shutdown Activities related to Control Valves Designation: Shutdown Incharge (Control Valves Overhauling & Calibrations) Reported to: Inter-Pakistan Projects Head Major Responsibilites: ​​​​​Hired & Managed a specialized shutdown team of 2 instrument supervisors with 10 Instrument technicians, 10 Instrument Fitters and 20 Assitant Technicians. Responsible for prepared Budgetary sheet with efficiency forcasts and resource allocation. Efficiently ran a 2 shift (24 hour) working plan for achieving given targets and deadlines. Regular meetings with client for upcoming work scopes and their planing with scheduling. Responsible for complete Mob/Demob of company assests and manpower. Submitted a detailed technical report that included critical information regarding each valve. Achievements: Achieved targetted job within time span. Made valuable contacts and relations with Engro management for business development purposes. Secured more than sufficient amount of revenue for my company. Extremely appreciated our team performance and invited for upcoming shutdown of Plant-I by Client. Attock Oil Refinery Upgradation Project - Rawalpindi Apr 2014 - Apr 2016 (2 years) Company: Flowtronix (pvt) Ltd / Hyundai Engineering & Construction Korea Tools: Complete range of tools required for carrying out all E&I activities from initiation to commissioning of Project Designation: E&I Engineer
  • 3. Reported To: Site Manager Major Responsibilites: Directly responsible for E&I construction of major refinery upgradation areas as Contractor's E&I Engineer. Responsible for sufficient daily progress through providing continuous work front to deployed teams and Facilitating strong communications between cross-functional teams and personnel. Responsible for Daily Planning, monitoring and assigning of worker teams alongwith their supervisors in respective areas and their situational redirections. Technicall-Management of porject teams in accordance with specialized work fronts. Produced doccumentation for regular Client meetings with Hyundai representatives and maintaing MOM logs for later use. Prepared forecasts including (3 weeks plan, acceleration plan, Lag evaluation plan) with reference to project master schedule. Responisble for preparing resouce and risk analysis. Achievements: Led squad to achieve 5 Million Safe LTI free Manhours for Flowtronix till the end of project. Promoted to Acting Construction Manager in case of inavailablitiy. Completed Project with appreciaiton from foreign engineers and managers. Experienced a complete life cycle of an O&G Project. Functioned in project-management role. Built Valuble relations with Hyundai and ARL representatives. Industries Power/Energy Mining/Oil & Gas/Petroleum Food & Beverages Agriculture/Fertilizer/Pesticide Chemicals Functional Areas* Valve Calibration/Overhauling Fire Alarm & Gas Detection System Installation CCTV System Installation Earthing & Lightning Protection Cable Laying & Termination Solar Power (Off/On Grid) Languages English - Native Urdu - Native Punjabi - Medium Sindhi - Beginner Hobbies Meeting Professionals Researching and Learning Generel Experimentation