Ramiz Siddiq is a project engineer with 4 years of experience working in electrical engineering and project management. He currently works at Flowtronix (pvt) ltd as an E&I Projects Engineer, where he is responsible for meeting project deadlines, organizing meetings, and ensuring quality control. Prior to this, he worked as a Project Cost Estimation Engineer and interned at Siemens Pakistan Engineering Co. Ltd. Ramiz has experience managing electrical installation projects in industries like oil and gas, energy, and agriculture.
1. Ramiz Siddiq
Project Engineer at Flowtronix (pvt) ltd
Electrical engineer with a total of 4 years professional work experience. Worked with
foreign engineers and managers. Have suitable training as an engineer to carry out
complete project E&I activites in any given time span with quality control and cost
management. My major interests are in services like installations of E&I equipment,
their testing, inspection and commissioning. I can work with an existing team as a
member and increase it's productivity or lead to extract required results.
Contact Info
+923422113368
ramizsiddiq@gmail.com✉
https://pk.linkedin.com/in/ramiz-
siddiq-27962842
124, Ata Turk Block, New Garden Town.
Passport# FC5460801
Lahore, Pakistan
Strengths & Skills
✔ Team player ✔ Detail Oriented ✔ Communication Skills
✔ Analytical Approch ✔ Desire to learn and be trained ✔ Project Management
Academics
Title Institute Date
BSc. Electronics Engineering Sir Syed University Of Engg. &
Technology, Karachi
2012
FSc. Pre-Engineering DHA SKBZ College, Karachi 2008
SSc. Computer Sciences DHA SKBZ College, Karachi 2006
Awards
Title Authority Date
First Aid Training National Training Bureau (Govt.) 2015
Experience 4 years
2.3 years
1.3 years
1 month
Company Designation Duration
Flowtronix (pvt) ltd E&I Projects Engineer - Lahore Jul 2014 - Present
Flowtronix (pvt) Ltd Project Cost Estimation Engineer -
Lahore
Apr 2013 - Jul 2014
Siemens Pakistan Engineering Co. Ltd. Internee - Karachi Jan 2011 - Feb 2011
Work History
Flowtronix (pvt) ltd Jul 2014 - Present (2.3 years)
E&I Projects Engineer - Lahore Lahore, Pakistan
Reported To: Site Manager
Major Responsibilites:
Proficient in meeting Project deadlines and removing laggy obsticles.
Responsible for setting of weekly milestones for project teams.
Organizing detailed Meetings with Client, Owner and Subcon representatives
Skillful in Manpower selection and efficieny monitoring.
Assistance to Project Design department for situational changes and alrterations in E&I Construction works.
Assistance in procuring and arranging required tools and consumables for current & upcoming work scopes.
Training of new Engineers and giving hiring approvals.
ISO documentation work for Project internal and external Audits.
2. Flowtronix (pvt) Ltd Apr 2013 - Jul 2014 (1.3 years)
Project Cost Estimation Engineer - Lahore Lahore, Pakistan
Reported To: Proposals Manager
Major Responsibilites:
Responsible for producing complete proposal documentation (Commercial/Technical) of Electrical and Instrumentation
Projects including Oil & Gas, Energy sectors and various other production industries.
Proficient in pricing and estimation for both supply and services related Projects.
Quality Pre-Bid meetings with client and extracting required information critical for competitive Bids.
Excellent at communication with Clients and Suppliers from discounts/negotiations to immediate quotations.
Proficient in producing Project Plans, Mob/Demob schedules, SOPs, Priced BOQs, Covering Letters, Annexures, Kick-Off
Presentations and other related documents.
Skillful in Cable calculations, Panel Calculation, Bus Bar Calculations and extracting required information from
received Electrical & Instrumentation Drawings.
Siemens Pakistan Engineering Co. Ltd. Jan 2011 - Feb 2011 (1 month)
Internee - Karachi Karachi, Pakistan
Worked in Business Unit, Infrastructure Cities & Smart Grid Department
Construction of Switchboards, panels, control panels, generators, motors, alternators and power transformers.
Factory Acceptance Test of MV Panels for clients like KESC and WAPDA
Study of SCADA and PLC systems for industrial automation with Siemens representatives.
Projects
Engro Plant-II Shutdown - Daharki Apr 2016 - May 2016 (1 month)
Company: Flowtronix (pvt) Ltd / Engro Fertilizers Limited
Tools: All tools required for carrying out complete Shutdown Activities related to Control Valves
Designation: Shutdown Incharge (Control Valves Overhauling & Calibrations)
Reported to: Inter-Pakistan Projects Head
Major Responsibilites:
Hired & Managed a specialized shutdown team of 2 instrument supervisors with 10 Instrument technicians, 10
Instrument Fitters and 20 Assitant Technicians.
Responsible for prepared Budgetary sheet with efficiency forcasts and resource allocation.
Efficiently ran a 2 shift (24 hour) working plan for achieving given targets and deadlines.
Regular meetings with client for upcoming work scopes and their planing with scheduling.
Responsible for complete Mob/Demob of company assests and manpower.
Submitted a detailed technical report that included critical information regarding each valve.
Achievements:
Achieved targetted job within time span.
Made valuable contacts and relations with Engro management for business development purposes.
Secured more than sufficient amount of revenue for my company.
Extremely appreciated our team performance and invited for upcoming shutdown of Plant-I by Client.
Attock Oil Refinery Upgradation Project - Rawalpindi Apr 2014 - Apr 2016 (2 years)
Company: Flowtronix (pvt) Ltd / Hyundai Engineering & Construction Korea
Tools: Complete range of tools required for carrying out all E&I activities from initiation to commissioning of Project
Designation: E&I Engineer
3. Reported To: Site Manager
Major Responsibilites:
Directly responsible for E&I construction of major refinery upgradation areas as Contractor's E&I Engineer.
Responsible for sufficient daily progress through providing continuous work front to deployed teams and Facilitating
strong communications between cross-functional teams and personnel.
Responsible for Daily Planning, monitoring and assigning of worker teams alongwith their supervisors in respective
areas and their situational redirections.
Technicall-Management of porject teams in accordance with specialized work fronts.
Produced doccumentation for regular Client meetings with Hyundai representatives and maintaing MOM logs for later
use.
Prepared forecasts including (3 weeks plan, acceleration plan, Lag evaluation plan) with reference to project master
schedule.
Responisble for preparing resouce and risk analysis.
Achievements:
Led squad to achieve 5 Million Safe LTI free Manhours for Flowtronix till the end of project.
Promoted to Acting Construction Manager in case of inavailablitiy.
Completed Project with appreciaiton from foreign engineers and managers.
Experienced a complete life cycle of an O&G Project.
Functioned in project-management role.
Built Valuble relations with Hyundai and ARL representatives.
Industries
Power/Energy
Mining/Oil & Gas/Petroleum
Food & Beverages
Agriculture/Fertilizer/Pesticide
Chemicals
Functional Areas*
Valve Calibration/Overhauling
Fire Alarm & Gas Detection System Installation
CCTV System Installation
Earthing & Lightning Protection
Cable Laying & Termination
Solar Power (Off/On Grid)
Languages
English - Native
Urdu - Native
Punjabi - Medium
Sindhi - Beginner
Hobbies
Meeting Professionals
Researching and Learning
Generel Experimentation