INTRODUCTION
TV STUDIO EARTH STATION
TRANSMISSION
2
GLIMPSE OF DDK PATNA
INTRODUCTION
 Process of sending information to a distant place is
called Broadcasting.
 DOORDARSHAN = Distant + Show
 Means of Broadcasting in India:
1.Terrestrial.
2.Satellite.
3.Internet.
 Both AIR and DD make use of both Terrestrial and
Satellite.
 Doordarshan is a public broadcast terrestrial
Channel run by Prasar bharati.
DOORDARSHAN NETWORK
TELEVISION STANDARDS
• NTSC-National television standards
committee(US) (525 Horizontal & 60 vertical
lines)
• SECAM-System electronics for colour avec
memory(FRANCE)(625 vertical & 50horizantal
lines)
• PAL- Phase Alternating lines(GERMANY)(625
horizontal & 50 vertical line)
Television standards used in India is PAL
PAL ENCODER & DECODER
• Input is the primary colour (i.e. red, green,
blue) into matrix circuit as Y, R-Y, B-Y.
• Y=0.30R+0.59G+.11B
• U=0.477(R-Y)
• V=0.895(B-Y)
• Out of 625 horizontal line only 575 are active
• 50 vertical lines
ADDITIVE COLOUR MIXING
Y=0.30R+0.59G+0.11B
U=0.477(R-Y)
V=0.895(B-Y)
RESOLUTION
 Resolution refers to the number of pixels in an image. Resolution
is sometimes identified by the width and height of the image as
well as the total number of pixels in the image.
BRIGHTNESS
• Mixing Of Black and White at a contrast ratio 20:1
CONTRAST
• Relative Difference Between Black and White.
TELEVISION COMMUNICATION
SYSTEM
AUDIO
AMPLIFIER
FM MODULATOR
FM SOUND
TRANSMITTER
MIC.
CRYSTAL
OSCILLATOR RF AMPLIFIER
POWER
AMPLIFIER
SCANNING CIRCUIT
COMBINING
NETWORK
DEPLEXER
CAME
RA
VIDEO
AMPLIFIER
AM
MODULATION
AMPLIFIER
•Studio - A (Main)
Four Camera Digital set up
For recording of programmes and other major activities.
•Studio - B (News)
Two Camera digital set up
For News & Regional transmissions
•OB VAN
Six Camera digital set up
For outdoor coverage
•Earth Station
•ENG (Electronic News Gathering)
•With 12 portable ENG units for the purpose of day to day News
and outdoor programmes coverage.
•Post production facilities
•Computer based 3D Graphics facility.
•Separate studio for audio dubbing.
STUDIO SETUP
12
• A television studio, is an installation room in which video productions take
place, either for the recording of live television to video tape, or for the
acquisition of raw footage for post-production.
• Studio hall contains many devices for shooting. Like lighting , microphone,
makeup room, Furniture, Cameras and sound absorbers
• DDK patna produce their own programs like “Bihar Bihan” and “Fursat
Ghar”.
Components of TV studio
• Camera
• Lighting
• Microphones
• Vision mixer and Audio consoles
• MSR
• VTR
• Acoustics
• Post production and video effects
• Supporting services like AC, UPS
13
CAMERA
 camera is an optical instrument that records images that can be stored
directly, transmitted to another location, or both. These images may be
still photographs or moving images such as videos or movies.
 A TV camera consist of three section.
 Optical part - To form optical image.
 Transducer - To convert optical image in to electrical signal.
 Electronic part - To process output of a transducer to get a
CCVS ( colour composite video signal).
 CCD Camera are used for recording.
14
Types
 Hard lighting
 Soft lighting
Use gels to control the which in
beyond control to match it.
Never avoid the lighting
mismatch
TYPE
INTENSITY OF
LIGHTING
KEY LIGHT 100%
FILL LIGHT 80%
BACK LIGHT 110%
Sound is important for establishing mood and
intensifying an event
The sound track helps us to connect the visual
fragments of the relatively small, low-definition
television image to form a meaningful whole
Major types
 Dynamic/moving coil
microphones
 Condenser microphones
 Ribbon/velocity microphones
VISION MIXER
• A vision mixer (also called video
switcher, video mixer or production
switcher) is a device used to select
between several different video sources and
in some cases mix video sources together
and add special effects.
• It has many input sources such as cameras,
VCR/ server, Graphics/Character
Generators,etc.
• Out of these input, any source can be taken
as output.
• Sources can be changed as cut to cut,
dissolve, wipe and other special effects.
PRODUCTION CONTROL ROOM
• MONITOR
PROGRAM AND
GRAPHICS
• VISION MIXER
(to select video
sources)
• Audio console
• Add video
effect
MSR
• It is the heart of the studio.
• Most of the switching electronics is
kept e.g. camera base stations,
switcher main frame, SPG, Satellite
receivers, MW link, DDA & most of
the patch panels.
• Signal is routed through MSR.
• Signal can be Monitored at various
stages
MASTER CONTROL ROOM
It connect the of following equipment
• Camera control unit
• VTRs
• Patch panel
• Vision mixer
• CHARCTER GENERATORS
Names and graphics inserted into programs
• CONTROL APPARATUS ROOM
Includes the power supply unit
UPS room
Generator
• VIDEO TAPE RECORDER
Consists of recorded materials i.e. v.c.r
Acoustic System
24
 It is derived from a Greek word “akoustos” which means
“hearing”.
It is use to prevent sounds from it’s echo.
In Doordarshan studio , all the sound must have to be
done Acoustic treatment to preserve the originality of the
sound along with extending maximum pleasure to the
listener.
EARTH STATION
EARTH STATION
• Earth Station is a very important part of satellite
communication system for broadcasting of signals.
• It is an uplink center from which the signals are fed to
Satellite for distribution in a specified area covered by the
Satellite.
• The signal is up-linked from the Earth Station and
received by many down link centers in TV broad casting
via PDA.
• Two Types: 1) Analog, 2) Digital
• Digital Earth Stations are widely used because of various
advantages over analog.
Major Components of Digital Earth
Station
• PDA (Parabolic Dish Antenna)
• FEED
• Wave Guide / Low Loss Cable
• HPA (TWTA, Klystrons)
• Up converter
• Modulator
• Encoder
• Multiplexer
• IRD (Integrated Receiver Decoder)
EARTH STATION
Up linking process
EARTH STATION
Down Linking Process
EARTH
STATION TANSMITTER/RECEIVER
SATELLITE
DTH
RECEIVER
TV
UPLINKING
DOWNLINKING
THE PROCESS OF TRANSMISSION
30
OB Van
 Outside broadcasting (OB) is the
electronic field production (EFP) of
television or radio programmes
(typically to cover television news and
sports television events) from a
mobile remote broadcast television
studio.
31
OB VAN
OB Van & DSNG
• A typical OB Van is usually
divided into 4 parts.
• The first and largest part is the
production area or sitting area
for all directors & producers.
• The second part of a van is for
the audio engineer.
• The 3rd part of the van is video
tape.
• The 4th part is transmission where the signal is monitored
by and engineered for quality control purposes and is
transmitted or sent to other trucks.
• DSNG is a portable uplinking centre.
ANTENNA & SATELLITE
• An antenna (or aerial) is a transducer
designed to transmit or receive
electromagnetic waves. In other words,
antennas convert electromagnetic
waves into electrical currents and vice
versa.
TRANSMITTER
 A television transmitter is a
device which broadcasts
an electromagnetic signal to
the television receivers.
 Television transmitters may
be analog or digital.
 Types of Transmitters
 (1)VLPT’s
 (2)LPT’s
 (3)HPT’s
 DDK Patna Has 6 HPT’s, 24
LPT’s ,2 VLPT’s.
36
DD Free Dish is India's only Free Direct-To-Home Service previously
known as DD Direct +. This service was launched in December,
2004. DD Free Dish DTH service is owned and operated by Public
Service Broadcaster Prasar Bharati (Doordarshan).
DIGITAL TERRESTRIAL TV
Digital terrestrial television (DTTV or DTT) is a technological evolution of broadcast
television and an advancement over analog television. DTTV broadcasts land-based (terrestrial)
signals.
39
T V STUDIO PCR
Tx Room
MSR
Tx E/S
DTH Service
O B Van
DSNG
Van
Rx cable TV
Rx E/S H P Tx
Rx dish
TV
DD Archives
SAT
Feed Room
CONCLUSION
40

Más contenido relacionado

La actualidad más candente

Nemo handy s-3.60_display_guide_for_n97_c503_c504_c7_e7_500
Nemo handy s-3.60_display_guide_for_n97_c503_c504_c7_e7_500Nemo handy s-3.60_display_guide_for_n97_c503_c504_c7_e7_500
Nemo handy s-3.60_display_guide_for_n97_c503_c504_c7_e7_500Serkan Kahveci
 
Pioneer AV Receivers 2013 - VSX series features explained
Pioneer AV Receivers 2013 - VSX series features explainedPioneer AV Receivers 2013 - VSX series features explained
Pioneer AV Receivers 2013 - VSX series features explainedPioneer Europe
 
Pioneer AV Receivers 2012 - features of the LX Series
Pioneer AV Receivers 2012 - features of the LX SeriesPioneer AV Receivers 2012 - features of the LX Series
Pioneer AV Receivers 2012 - features of the LX SeriesPioneer Europe
 
RAM Audio Catalogue - Premium Audio Power Amplifiers
RAM Audio Catalogue - Premium Audio Power AmplifiersRAM Audio Catalogue - Premium Audio Power Amplifiers
RAM Audio Catalogue - Premium Audio Power Amplifiersproaudioindia
 
TV (Television) A Brief Depiction of the internal Mechanism
TV (Television) A Brief Depiction of the internal MechanismTV (Television) A Brief Depiction of the internal Mechanism
TV (Television) A Brief Depiction of the internal MechanismMuhammad Safeer Aabbasi
 
Pioneer AV Receivers 2014 - features explained (Europe)
Pioneer AV Receivers 2014 - features explained (Europe)Pioneer AV Receivers 2014 - features explained (Europe)
Pioneer AV Receivers 2014 - features explained (Europe)Pioneer Europe
 
Pioneer AV Receivers 2014 - features explained (Singapore)
Pioneer AV Receivers 2014 - features explained (Singapore)Pioneer AV Receivers 2014 - features explained (Singapore)
Pioneer AV Receivers 2014 - features explained (Singapore)Pioneer Europe
 
Nemo server manual_v1
Nemo server manual_v1Nemo server manual_v1
Nemo server manual_v1ZIZI Yahia
 
Pioneer AV Receivers 2014 - features explained (Vietnam, Philippines, Hong Ko...
Pioneer AV Receivers 2014 - features explained (Vietnam, Philippines, Hong Ko...Pioneer AV Receivers 2014 - features explained (Vietnam, Philippines, Hong Ko...
Pioneer AV Receivers 2014 - features explained (Vietnam, Philippines, Hong Ko...Pioneer Europe
 
PAM2 MK2 Audio Monitoring system training 2014
PAM2 MK2 Audio Monitoring system training 2014 PAM2 MK2 Audio Monitoring system training 2014
PAM2 MK2 Audio Monitoring system training 2014 Anoushka Farouk
 
Analysis and reporting
Analysis and reportingAnalysis and reporting
Analysis and reportingKadar setiawan
 
Pioneer AV Receivers 2014 - features explained (Thailand)
Pioneer AV Receivers 2014 - features explained (Thailand)Pioneer AV Receivers 2014 - features explained (Thailand)
Pioneer AV Receivers 2014 - features explained (Thailand)Pioneer Europe
 
Pioneer AV Receivers 2013 - features explained
Pioneer AV Receivers 2013 - features explainedPioneer AV Receivers 2013 - features explained
Pioneer AV Receivers 2013 - features explainedPioneer Europe
 
Pioneer AV Receivers 2014 - features explained (Gulf, Malaysia and Israel)
Pioneer AV Receivers 2014 - features explained (Gulf, Malaysia and Israel)Pioneer AV Receivers 2014 - features explained (Gulf, Malaysia and Israel)
Pioneer AV Receivers 2014 - features explained (Gulf, Malaysia and Israel)Pioneer Europe
 
Pioneer AV Receivers 2014 - features explained (Australia)
Pioneer AV Receivers 2014 - features explained (Australia)Pioneer AV Receivers 2014 - features explained (Australia)
Pioneer AV Receivers 2014 - features explained (Australia)Pioneer Europe
 

La actualidad más candente (20)

Ece 131
Ece 131Ece 131
Ece 131
 
Nemo handy s-3.60_display_guide_for_n97_c503_c504_c7_e7_500
Nemo handy s-3.60_display_guide_for_n97_c503_c504_c7_e7_500Nemo handy s-3.60_display_guide_for_n97_c503_c504_c7_e7_500
Nemo handy s-3.60_display_guide_for_n97_c503_c504_c7_e7_500
 
Nemo fsr1 scanner user manual
Nemo fsr1 scanner user manualNemo fsr1 scanner user manual
Nemo fsr1 scanner user manual
 
MaxEye SDR System Level Testing
MaxEye SDR System Level TestingMaxEye SDR System Level Testing
MaxEye SDR System Level Testing
 
Pioneer AV Receivers 2013 - VSX series features explained
Pioneer AV Receivers 2013 - VSX series features explainedPioneer AV Receivers 2013 - VSX series features explained
Pioneer AV Receivers 2013 - VSX series features explained
 
Pioneer AV Receivers 2012 - features of the LX Series
Pioneer AV Receivers 2012 - features of the LX SeriesPioneer AV Receivers 2012 - features of the LX Series
Pioneer AV Receivers 2012 - features of the LX Series
 
RAM Audio Catalogue - Premium Audio Power Amplifiers
RAM Audio Catalogue - Premium Audio Power AmplifiersRAM Audio Catalogue - Premium Audio Power Amplifiers
RAM Audio Catalogue - Premium Audio Power Amplifiers
 
TV (Television) A Brief Depiction of the internal Mechanism
TV (Television) A Brief Depiction of the internal MechanismTV (Television) A Brief Depiction of the internal Mechanism
TV (Television) A Brief Depiction of the internal Mechanism
 
Pioneer AV Receivers 2014 - features explained (Europe)
Pioneer AV Receivers 2014 - features explained (Europe)Pioneer AV Receivers 2014 - features explained (Europe)
Pioneer AV Receivers 2014 - features explained (Europe)
 
Pioneer AV Receivers 2014 - features explained (Singapore)
Pioneer AV Receivers 2014 - features explained (Singapore)Pioneer AV Receivers 2014 - features explained (Singapore)
Pioneer AV Receivers 2014 - features explained (Singapore)
 
Nemo server manual_v1
Nemo server manual_v1Nemo server manual_v1
Nemo server manual_v1
 
Pioneer AV Receivers 2014 - features explained (Vietnam, Philippines, Hong Ko...
Pioneer AV Receivers 2014 - features explained (Vietnam, Philippines, Hong Ko...Pioneer AV Receivers 2014 - features explained (Vietnam, Philippines, Hong Ko...
Pioneer AV Receivers 2014 - features explained (Vietnam, Philippines, Hong Ko...
 
PAM2 MK2 Audio Monitoring system training 2014
PAM2 MK2 Audio Monitoring system training 2014 PAM2 MK2 Audio Monitoring system training 2014
PAM2 MK2 Audio Monitoring system training 2014
 
digital_set_top_box
digital_set_top_boxdigital_set_top_box
digital_set_top_box
 
Analysis and reporting
Analysis and reportingAnalysis and reporting
Analysis and reporting
 
Pioneer AV Receivers 2014 - features explained (Thailand)
Pioneer AV Receivers 2014 - features explained (Thailand)Pioneer AV Receivers 2014 - features explained (Thailand)
Pioneer AV Receivers 2014 - features explained (Thailand)
 
Pioneer AV Receivers 2013 - features explained
Pioneer AV Receivers 2013 - features explainedPioneer AV Receivers 2013 - features explained
Pioneer AV Receivers 2013 - features explained
 
Topfield
TopfieldTopfield
Topfield
 
Pioneer AV Receivers 2014 - features explained (Gulf, Malaysia and Israel)
Pioneer AV Receivers 2014 - features explained (Gulf, Malaysia and Israel)Pioneer AV Receivers 2014 - features explained (Gulf, Malaysia and Israel)
Pioneer AV Receivers 2014 - features explained (Gulf, Malaysia and Israel)
 
Pioneer AV Receivers 2014 - features explained (Australia)
Pioneer AV Receivers 2014 - features explained (Australia)Pioneer AV Receivers 2014 - features explained (Australia)
Pioneer AV Receivers 2014 - features explained (Australia)
 

Similar a DOORDARSHAN KENDRA PATNA SUMMER TRAINING

DOORDARSHAN KENDRA PATNA SUMMER TRAINING
DOORDARSHAN KENDRA PATNA SUMMER TRAININGDOORDARSHAN KENDRA PATNA SUMMER TRAINING
DOORDARSHAN KENDRA PATNA SUMMER TRAININGRavi Shankar Kumar
 
Inplant training report doordarshan
Inplant training report doordarshanInplant training report doordarshan
Inplant training report doordarshanAbhishek Prasad
 
Ddk(niraj) ppt on summer training from ddk patna
Ddk(niraj) ppt on summer training from ddk patnaDdk(niraj) ppt on summer training from ddk patna
Ddk(niraj) ppt on summer training from ddk patnaNIRAJ KUMAR
 
industrial training at doordarshan
industrial training at doordarshanindustrial training at doordarshan
industrial training at doordarshanNISHCHAY SINGH
 
summer training,doordarshan kendra lucknow
summer training,doordarshan kendra lucknowsummer training,doordarshan kendra lucknow
summer training,doordarshan kendra lucknowMangleshwar Prajapati
 
Summer training at Doordarshan presentation
Summer training at Doordarshan presentationSummer training at Doordarshan presentation
Summer training at Doordarshan presentationSushil Mishra
 
SUMMER TRAINING ON DOORDARSHAN {PPT]
SUMMER TRAINING ON DOORDARSHAN {PPT]SUMMER TRAINING ON DOORDARSHAN {PPT]
SUMMER TRAINING ON DOORDARSHAN {PPT]ashray kumar
 
Doordarshan Presentation
Doordarshan Presentation  Doordarshan Presentation
Doordarshan Presentation Yash Verma
 
Doordarshan Implant Training Report
Doordarshan Implant Training ReportDoordarshan Implant Training Report
Doordarshan Implant Training ReportRehan Fazal
 
Doordarshan Indore,Summer Training ppt
Doordarshan Indore,Summer Training pptDoordarshan Indore,Summer Training ppt
Doordarshan Indore,Summer Training pptAayush Shah
 
Doordarshan mumbai ppt on television broadcasting and transmission
Doordarshan mumbai ppt  on television broadcasting and transmissionDoordarshan mumbai ppt  on television broadcasting and transmission
Doordarshan mumbai ppt on television broadcasting and transmissionRahulBagal4
 
Final presentation of DDK
Final presentation of DDKFinal presentation of DDK
Final presentation of DDKkkupadhyayvns
 
DDK ALLAHABD PPT BY UZMA AZHAR 4th YEAR
DDK ALLAHABD PPT BY UZMA AZHAR 4th YEARDDK ALLAHABD PPT BY UZMA AZHAR 4th YEAR
DDK ALLAHABD PPT BY UZMA AZHAR 4th YEARuzma azhar
 
DDK Delhi -Vocational training by Raisaket
DDK Delhi -Vocational training by RaisaketDDK Delhi -Vocational training by Raisaket
DDK Delhi -Vocational training by RaisaketSAKET RAI
 
Vocational training at DDK Delhi by SAKET RAI
Vocational training at DDK Delhi by SAKET RAIVocational training at DDK Delhi by SAKET RAI
Vocational training at DDK Delhi by SAKET RAISAKET RAI
 
Doorsdarshan and All India Radio Summer Training
Doorsdarshan and All India Radio Summer TrainingDoorsdarshan and All India Radio Summer Training
Doorsdarshan and All India Radio Summer TrainingNibedan Bhawsinka
 

Similar a DOORDARSHAN KENDRA PATNA SUMMER TRAINING (20)

DOORDARSHAN KENDRA BHOPAL
DOORDARSHAN KENDRA BHOPALDOORDARSHAN KENDRA BHOPAL
DOORDARSHAN KENDRA BHOPAL
 
DOORDARSHAN KENDRA PATNA SUMMER TRAINING
DOORDARSHAN KENDRA PATNA SUMMER TRAININGDOORDARSHAN KENDRA PATNA SUMMER TRAINING
DOORDARSHAN KENDRA PATNA SUMMER TRAINING
 
Inplant training report doordarshan
Inplant training report doordarshanInplant training report doordarshan
Inplant training report doordarshan
 
Ddk(niraj) ppt on summer training from ddk patna
Ddk(niraj) ppt on summer training from ddk patnaDdk(niraj) ppt on summer training from ddk patna
Ddk(niraj) ppt on summer training from ddk patna
 
industrial training at doordarshan
industrial training at doordarshanindustrial training at doordarshan
industrial training at doordarshan
 
Doordarshan
DoordarshanDoordarshan
Doordarshan
 
summer training,doordarshan kendra lucknow
summer training,doordarshan kendra lucknowsummer training,doordarshan kendra lucknow
summer training,doordarshan kendra lucknow
 
Summer training at Doordarshan presentation
Summer training at Doordarshan presentationSummer training at Doordarshan presentation
Summer training at Doordarshan presentation
 
SUMMER TRAINING ON DOORDARSHAN {PPT]
SUMMER TRAINING ON DOORDARSHAN {PPT]SUMMER TRAINING ON DOORDARSHAN {PPT]
SUMMER TRAINING ON DOORDARSHAN {PPT]
 
Doordarshan Presentation
Doordarshan Presentation  Doordarshan Presentation
Doordarshan Presentation
 
Doordarshan Implant Training Report
Doordarshan Implant Training ReportDoordarshan Implant Training Report
Doordarshan Implant Training Report
 
Doordarshan Indore,Summer Training ppt
Doordarshan Indore,Summer Training pptDoordarshan Indore,Summer Training ppt
Doordarshan Indore,Summer Training ppt
 
Doordarshan mumbai ppt on television broadcasting and transmission
Doordarshan mumbai ppt  on television broadcasting and transmissionDoordarshan mumbai ppt  on television broadcasting and transmission
Doordarshan mumbai ppt on television broadcasting and transmission
 
Final presentation of DDK
Final presentation of DDKFinal presentation of DDK
Final presentation of DDK
 
DDK ALLAHABD PPT BY UZMA AZHAR 4th YEAR
DDK ALLAHABD PPT BY UZMA AZHAR 4th YEARDDK ALLAHABD PPT BY UZMA AZHAR 4th YEAR
DDK ALLAHABD PPT BY UZMA AZHAR 4th YEAR
 
DDK Delhi -Vocational training by Raisaket
DDK Delhi -Vocational training by RaisaketDDK Delhi -Vocational training by Raisaket
DDK Delhi -Vocational training by Raisaket
 
Vocational training at DDK Delhi by SAKET RAI
Vocational training at DDK Delhi by SAKET RAIVocational training at DDK Delhi by SAKET RAI
Vocational training at DDK Delhi by SAKET RAI
 
Dynya news report
Dynya news reportDynya news report
Dynya news report
 
Doorsdarshan and All India Radio Summer Training
Doorsdarshan and All India Radio Summer TrainingDoorsdarshan and All India Radio Summer Training
Doorsdarshan and All India Radio Summer Training
 
Dth slideshare.pptx
Dth slideshare.pptxDth slideshare.pptx
Dth slideshare.pptx
 

Último

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 

Último (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 

DOORDARSHAN KENDRA PATNA SUMMER TRAINING

  • 1. GOVERNMENT ENGINEERING COLLEGE JHALAWAR INDUSTRIAL TRAINING FROM DOORDARSHAN KENDRA, PATNA ON TOPIC TELEVISION BROADCAST SYSTEM SUBMITTED BY:- RAVI SHANKAR KUMAR B.TECH (FINAL YEAR) ROLL NO- 14EEJEC014
  • 2. INTRODUCTION TV STUDIO EARTH STATION TRANSMISSION 2
  • 4. INTRODUCTION  Process of sending information to a distant place is called Broadcasting.  DOORDARSHAN = Distant + Show  Means of Broadcasting in India: 1.Terrestrial. 2.Satellite. 3.Internet.  Both AIR and DD make use of both Terrestrial and Satellite.  Doordarshan is a public broadcast terrestrial Channel run by Prasar bharati.
  • 6. TELEVISION STANDARDS • NTSC-National television standards committee(US) (525 Horizontal & 60 vertical lines) • SECAM-System electronics for colour avec memory(FRANCE)(625 vertical & 50horizantal lines) • PAL- Phase Alternating lines(GERMANY)(625 horizontal & 50 vertical line) Television standards used in India is PAL
  • 7. PAL ENCODER & DECODER • Input is the primary colour (i.e. red, green, blue) into matrix circuit as Y, R-Y, B-Y. • Y=0.30R+0.59G+.11B • U=0.477(R-Y) • V=0.895(B-Y) • Out of 625 horizontal line only 575 are active • 50 vertical lines
  • 9. RESOLUTION  Resolution refers to the number of pixels in an image. Resolution is sometimes identified by the width and height of the image as well as the total number of pixels in the image. BRIGHTNESS • Mixing Of Black and White at a contrast ratio 20:1 CONTRAST • Relative Difference Between Black and White.
  • 10. TELEVISION COMMUNICATION SYSTEM AUDIO AMPLIFIER FM MODULATOR FM SOUND TRANSMITTER MIC. CRYSTAL OSCILLATOR RF AMPLIFIER POWER AMPLIFIER SCANNING CIRCUIT COMBINING NETWORK DEPLEXER CAME RA VIDEO AMPLIFIER AM MODULATION AMPLIFIER
  • 11. •Studio - A (Main) Four Camera Digital set up For recording of programmes and other major activities. •Studio - B (News) Two Camera digital set up For News & Regional transmissions •OB VAN Six Camera digital set up For outdoor coverage •Earth Station •ENG (Electronic News Gathering) •With 12 portable ENG units for the purpose of day to day News and outdoor programmes coverage. •Post production facilities •Computer based 3D Graphics facility. •Separate studio for audio dubbing. STUDIO SETUP
  • 12. 12 • A television studio, is an installation room in which video productions take place, either for the recording of live television to video tape, or for the acquisition of raw footage for post-production. • Studio hall contains many devices for shooting. Like lighting , microphone, makeup room, Furniture, Cameras and sound absorbers • DDK patna produce their own programs like “Bihar Bihan” and “Fursat Ghar”.
  • 13. Components of TV studio • Camera • Lighting • Microphones • Vision mixer and Audio consoles • MSR • VTR • Acoustics • Post production and video effects • Supporting services like AC, UPS 13
  • 14. CAMERA  camera is an optical instrument that records images that can be stored directly, transmitted to another location, or both. These images may be still photographs or moving images such as videos or movies.  A TV camera consist of three section.  Optical part - To form optical image.  Transducer - To convert optical image in to electrical signal.  Electronic part - To process output of a transducer to get a CCVS ( colour composite video signal).  CCD Camera are used for recording. 14
  • 15. Types  Hard lighting  Soft lighting Use gels to control the which in beyond control to match it. Never avoid the lighting mismatch
  • 16. TYPE INTENSITY OF LIGHTING KEY LIGHT 100% FILL LIGHT 80% BACK LIGHT 110%
  • 17. Sound is important for establishing mood and intensifying an event The sound track helps us to connect the visual fragments of the relatively small, low-definition television image to form a meaningful whole
  • 18. Major types  Dynamic/moving coil microphones  Condenser microphones  Ribbon/velocity microphones
  • 19. VISION MIXER • A vision mixer (also called video switcher, video mixer or production switcher) is a device used to select between several different video sources and in some cases mix video sources together and add special effects. • It has many input sources such as cameras, VCR/ server, Graphics/Character Generators,etc. • Out of these input, any source can be taken as output. • Sources can be changed as cut to cut, dissolve, wipe and other special effects.
  • 20. PRODUCTION CONTROL ROOM • MONITOR PROGRAM AND GRAPHICS • VISION MIXER (to select video sources) • Audio console • Add video effect
  • 21. MSR • It is the heart of the studio. • Most of the switching electronics is kept e.g. camera base stations, switcher main frame, SPG, Satellite receivers, MW link, DDA & most of the patch panels. • Signal is routed through MSR. • Signal can be Monitored at various stages
  • 22. MASTER CONTROL ROOM It connect the of following equipment • Camera control unit • VTRs • Patch panel • Vision mixer
  • 23. • CHARCTER GENERATORS Names and graphics inserted into programs • CONTROL APPARATUS ROOM Includes the power supply unit UPS room Generator • VIDEO TAPE RECORDER Consists of recorded materials i.e. v.c.r
  • 24. Acoustic System 24  It is derived from a Greek word “akoustos” which means “hearing”. It is use to prevent sounds from it’s echo. In Doordarshan studio , all the sound must have to be done Acoustic treatment to preserve the originality of the sound along with extending maximum pleasure to the listener.
  • 26. EARTH STATION • Earth Station is a very important part of satellite communication system for broadcasting of signals. • It is an uplink center from which the signals are fed to Satellite for distribution in a specified area covered by the Satellite. • The signal is up-linked from the Earth Station and received by many down link centers in TV broad casting via PDA. • Two Types: 1) Analog, 2) Digital • Digital Earth Stations are widely used because of various advantages over analog.
  • 27. Major Components of Digital Earth Station • PDA (Parabolic Dish Antenna) • FEED • Wave Guide / Low Loss Cable • HPA (TWTA, Klystrons) • Up converter • Modulator • Encoder • Multiplexer • IRD (Integrated Receiver Decoder)
  • 31. OB Van  Outside broadcasting (OB) is the electronic field production (EFP) of television or radio programmes (typically to cover television news and sports television events) from a mobile remote broadcast television studio. 31
  • 33. OB Van & DSNG • A typical OB Van is usually divided into 4 parts. • The first and largest part is the production area or sitting area for all directors & producers. • The second part of a van is for the audio engineer. • The 3rd part of the van is video tape.
  • 34. • The 4th part is transmission where the signal is monitored by and engineered for quality control purposes and is transmitted or sent to other trucks. • DSNG is a portable uplinking centre.
  • 35. ANTENNA & SATELLITE • An antenna (or aerial) is a transducer designed to transmit or receive electromagnetic waves. In other words, antennas convert electromagnetic waves into electrical currents and vice versa.
  • 36. TRANSMITTER  A television transmitter is a device which broadcasts an electromagnetic signal to the television receivers.  Television transmitters may be analog or digital.  Types of Transmitters  (1)VLPT’s  (2)LPT’s  (3)HPT’s  DDK Patna Has 6 HPT’s, 24 LPT’s ,2 VLPT’s. 36
  • 37. DD Free Dish is India's only Free Direct-To-Home Service previously known as DD Direct +. This service was launched in December, 2004. DD Free Dish DTH service is owned and operated by Public Service Broadcaster Prasar Bharati (Doordarshan).
  • 38. DIGITAL TERRESTRIAL TV Digital terrestrial television (DTTV or DTT) is a technological evolution of broadcast television and an advancement over analog television. DTTV broadcasts land-based (terrestrial) signals.
  • 39. 39 T V STUDIO PCR Tx Room MSR Tx E/S DTH Service O B Van DSNG Van Rx cable TV Rx E/S H P Tx Rx dish TV DD Archives SAT Feed Room CONCLUSION
  • 40. 40

Notas del editor

  1. Use a section header for each of the topics, so there is a clear transition to the audience.
  2. Add slides to each topic section as necessary, including slides with tables, graphs, and images. See next section for sample table, graph, image, and video layouts.
  3. Keep it brief. Make your text as brief as possible to maintain a larger font size.