CONSTRUCTIONCONSTRUCTION
Escalante Grand Staircase NationalEscalante Grand Staircase National
MonumentMonument
Big Water Visitor Center ProjectBig Water Visitor Center Project
September 24September 24thth
2001 thru May 242001 thru May 24thth
20022002
Project Manager: Kevin AbernathyProject Manager: Kevin Abernathy
Superintendent: Raymond RankinSuperintendent: Raymond Rankin
3. The key to any successful project is to start right and stay right.
7. Surveyed marks on top of the footings gave the center of stem wall.
That combined with radius points allowed the precise location of the
building foundation walls.
8. All the cooling ducts and most of the electrical work is located under
the building.
9. There are no square corners and very few straight lines.
34. Because the flow of water is towards the building, catch basins and daylight
drains had to be placed in strategic locations throughout the courtyard and
around the building for flood control. Precise survey was required.
35. Roughly 70% of the floors inside
the building are sealed concrete
with radiant floor heating.