SlideShare una empresa de Scribd logo
1 de 18
Descargar para leer sin conexión
Knowledge to solutions – a water company perspective
Expert Forum January 2012
Miles Foulger
Environment Strategy Manager
Yorkshire Water
“Water is not a commercial product like any other but, rather, a heritage which must be protected…”
What was our experience of the first
river basin plan?
And what was our response?
Substantial investment in daughter directives
• Fresh Water Fisheries Directive
• Groundwater Directive
• Bathing Beach Directive
Innovation
1. Heavily modified water bodies
2. Catchment Management
3. Water quality investigations
4. Communication
1 Heavily Modified Water Bodies Investigations
….aka reservoirs
All YWS Reservoirs designated as HMWB under WFD
Must achieve ‘Good Ecological Potential’ GEP - compliance
GEP = presence of Mitigation Measures
• Driver 1: Impact on fish movement
• Driver 2: Impact on downstream river flows
• Driver 3: Impact on morphology of river
• Driver 4: Impact on water quality of downstream
river
• Driver 5: Impacts on lake level regime
YW HMWB Investigation
Measures to deliver GEP potentially impact on operations and
yield
Aim of investigation:
• ensure any measures are technically feasible and not
disproportionately costly
How?
• trialling the effectiveness of mitigation measures:
• physical constraints – what can we do ?
• determine costs (capex, water, opex) ?
• determine benefits?
2 Catchment Management
• 2 years comprehensive monitoring pre-intervention
• 5 more years post-implementation monitoring
Peatlands take time to change – long term protection
Restore the hydrology through physical intervention: grip &
gully blocking/ reprofiling. Identification and blocking of
sub-surface peat pipes.
Red gullies will be targeted
Yellow gullies will be left
Blue peat pipes blocked with plastic piling & peat dams
Coloured dots show location of existing WQ monitoring
points
Taking R&D into practice
Using knowledge to guide SSSI Recovery project
Oppose new heather
on deep peatRestrict burning on
blanket bog
Permit new heather on
“safe” mineral soils
Endorse grip blocking
to re-wet peat
Encourage alternative DSH to
reduce burn area frequency
Water Quality
Grouse
Farming
Landscape
Carbon
Flooding
Access
Biodiversity
Water
resources
RBWD
Developing (& implementing) integrated catchment
management
• Multiple objectives
• and interests…..
Rivers
& fish
3 Water quality investigations
• Understand the impact of the
Company’s discharges on the
receiving environment
• Where we are the cause of
adverse impacts, identify
appropriate solutions
• Put forward solutions for future
AMP investment
Investigation groups
• Generics
• Urban Pollution Management
• Revised Bathing Water Directive
• Eutrophication
• Chemistry
The Don Network
4 Communication4 Communication
The Don Network
The Don Network
The EA and YWS are leading a partnership project to pilot
ways of meeting WFD requirements in the Don catchment
The objective of the Don Network
Trial new methods of engagement to develop a ‘Catchment Action
Plan’ for the Don catchment
To meet the requirements of the Water Framework Directive: to
achieve ‘good ecological status’ in all waterbodies by 2027
Form the basis of the next River Basin Management Plan
Cycle 2 planning
‘The river basin management plans from catchment
level information, presenting much of the detail and
supporting information required by the Directive in
easily accessible electronic formats, rather than the
24000 pages of PDFs which form the current plans’
To conclude…
We aim to address the risks and uncertainties from RBMP1 by building our
technical understanding and modelling to be able to predict and test solution
scenarios.
WFD can not be delivered by conventional engineering solutions alone – we
need innovation
We will play a fuller role in RBMP2 and aim to invest wisely on our
customers behalf to make a real difference to the environment of Yorkshire.
• Science is key
• Integration & engagement are challenges
Miles foulger Yorkshire Water

Más contenido relacionado

La actualidad más candente

10. Greening our towns and cities using Green Infrastructure - John Stack, Du...
10. Greening our towns and cities using Green Infrastructure - John Stack, Du...10. Greening our towns and cities using Green Infrastructure - John Stack, Du...
10. Greening our towns and cities using Green Infrastructure - John Stack, Du...Environmental Protection Agency, Ireland
 
Farm Business Update 2014: Aylsham, EA and Water Framework Directive
Farm Business Update 2014: Aylsham, EA and Water Framework DirectiveFarm Business Update 2014: Aylsham, EA and Water Framework Directive
Farm Business Update 2014: Aylsham, EA and Water Framework DirectiveCLA - East
 
3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...
3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...
3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...Environmental Protection Agency, Ireland
 
Beach Glass Swana Presen.
Beach Glass Swana Presen.Beach Glass Swana Presen.
Beach Glass Swana Presen.Phil Bresee
 
Alastair Driver Multiple Benefits
Alastair Driver Multiple BenefitsAlastair Driver Multiple Benefits
Alastair Driver Multiple Benefitsobjectiveassociates
 
Gef p acific iwrm gw integration dialogue pres
Gef p acific iwrm gw integration dialogue presGef p acific iwrm gw integration dialogue pres
Gef p acific iwrm gw integration dialogue presgroundwatercop
 
6. Implementing the WFD, heritage projects and planning policy bernadette ...
6. Implementing the WFD, heritage projects and planning policy    bernadette ...6. Implementing the WFD, heritage projects and planning policy    bernadette ...
6. Implementing the WFD, heritage projects and planning policy bernadette ...Environmental Protection Agency, Ireland
 
Catchment Services - Connecting and progressing Water Framework Directive & B...
Catchment Services - Connecting and progressing Water Framework Directive & B...Catchment Services - Connecting and progressing Water Framework Directive & B...
Catchment Services - Connecting and progressing Water Framework Directive & B...Environmental Protection Agency, Ireland
 
13. The BRIDE project: working for multiple benefits - Donal Sheehan, BRIDE P...
13. The BRIDE project: working for multiple benefits - Donal Sheehan, BRIDE P...13. The BRIDE project: working for multiple benefits - Donal Sheehan, BRIDE P...
13. The BRIDE project: working for multiple benefits - Donal Sheehan, BRIDE P...Environmental Protection Agency, Ireland
 
14. Funding communities to engage in protecting waters - Fran Igoe, LAWPRO
14. Funding communities to engage in protecting waters - Fran Igoe, LAWPRO14. Funding communities to engage in protecting waters - Fran Igoe, LAWPRO
14. Funding communities to engage in protecting waters - Fran Igoe, LAWPROEnvironmental Protection Agency, Ireland
 

La actualidad más candente (20)

EPA Water Conference 2021 Posters
EPA Water Conference 2021 PostersEPA Water Conference 2021 Posters
EPA Water Conference 2021 Posters
 
10. Greening our towns and cities using Green Infrastructure - John Stack, Du...
10. Greening our towns and cities using Green Infrastructure - John Stack, Du...10. Greening our towns and cities using Green Infrastructure - John Stack, Du...
10. Greening our towns and cities using Green Infrastructure - John Stack, Du...
 
13. Lessons from abroad - Jenny Deakin, EPA Catchments
13. Lessons from abroad - Jenny Deakin, EPA Catchments13. Lessons from abroad - Jenny Deakin, EPA Catchments
13. Lessons from abroad - Jenny Deakin, EPA Catchments
 
Farm Business Update 2014: Aylsham, EA and Water Framework Directive
Farm Business Update 2014: Aylsham, EA and Water Framework DirectiveFarm Business Update 2014: Aylsham, EA and Water Framework Directive
Farm Business Update 2014: Aylsham, EA and Water Framework Directive
 
3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...
3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...
3. Catchment Management of Irish rivers and the role of hydromorphology - Emm...
 
Beach Glass Swana Presen.
Beach Glass Swana Presen.Beach Glass Swana Presen.
Beach Glass Swana Presen.
 
Adding water supply to rehab projects surface
Adding water supply to rehab projects   surfaceAdding water supply to rehab projects   surface
Adding water supply to rehab projects surface
 
Alastair Driver Multiple Benefits
Alastair Driver Multiple BenefitsAlastair Driver Multiple Benefits
Alastair Driver Multiple Benefits
 
12. Pearl Mussel Project EIP - Derek McLoughlin, Pearl Mussel Project
12. Pearl Mussel Project EIP - Derek McLoughlin, Pearl Mussel Project12. Pearl Mussel Project EIP - Derek McLoughlin, Pearl Mussel Project
12. Pearl Mussel Project EIP - Derek McLoughlin, Pearl Mussel Project
 
Gef p acific iwrm gw integration dialogue pres
Gef p acific iwrm gw integration dialogue presGef p acific iwrm gw integration dialogue pres
Gef p acific iwrm gw integration dialogue pres
 
6. Implementing the WFD, heritage projects and planning policy bernadette ...
6. Implementing the WFD, heritage projects and planning policy    bernadette ...6. Implementing the WFD, heritage projects and planning policy    bernadette ...
6. Implementing the WFD, heritage projects and planning policy bernadette ...
 
Greg claydon mdb plan overview nov 2010
Greg claydon mdb plan overview nov 2010Greg claydon mdb plan overview nov 2010
Greg claydon mdb plan overview nov 2010
 
Catchment Services - Connecting and progressing Water Framework Directive & B...
Catchment Services - Connecting and progressing Water Framework Directive & B...Catchment Services - Connecting and progressing Water Framework Directive & B...
Catchment Services - Connecting and progressing Water Framework Directive & B...
 
Presentation 4: Mitigation Strategies
Presentation 4: Mitigation StrategiesPresentation 4: Mitigation Strategies
Presentation 4: Mitigation Strategies
 
Overview - CLLAMM technical briefing
Overview - CLLAMM technical briefingOverview - CLLAMM technical briefing
Overview - CLLAMM technical briefing
 
13. The BRIDE project: working for multiple benefits - Donal Sheehan, BRIDE P...
13. The BRIDE project: working for multiple benefits - Donal Sheehan, BRIDE P...13. The BRIDE project: working for multiple benefits - Donal Sheehan, BRIDE P...
13. The BRIDE project: working for multiple benefits - Donal Sheehan, BRIDE P...
 
14. Funding communities to engage in protecting waters - Fran Igoe, LAWPRO
14. Funding communities to engage in protecting waters - Fran Igoe, LAWPRO14. Funding communities to engage in protecting waters - Fran Igoe, LAWPRO
14. Funding communities to engage in protecting waters - Fran Igoe, LAWPRO
 
MN Clean Water Land & Legacy
MN Clean Water Land & LegacyMN Clean Water Land & Legacy
MN Clean Water Land & Legacy
 
Moving Forward on Agricultural Water Conservation in the Colorado River Basin
Moving Forward on Agricultural Water Conservation in the Colorado River BasinMoving Forward on Agricultural Water Conservation in the Colorado River Basin
Moving Forward on Agricultural Water Conservation in the Colorado River Basin
 
National Water Quality Initiative
National Water Quality InitiativeNational Water Quality Initiative
National Water Quality Initiative
 

Similar a Miles foulger Yorkshire Water

The Water Imperative: New Standards in Corporate Water Leadership
The Water Imperative:  New Standards in Corporate Water LeadershipThe Water Imperative:  New Standards in Corporate Water Leadership
The Water Imperative: New Standards in Corporate Water LeadershipCoro Strandberg
 
Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License Society of Petroleum Engineers
 
Farm Business Update 2014: Lavenham, Environment Agency
Farm Business Update 2014: Lavenham, Environment AgencyFarm Business Update 2014: Lavenham, Environment Agency
Farm Business Update 2014: Lavenham, Environment AgencyCLA - East
 
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...ICIMOD
 
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...ICIMOD
 
Green week presentation eu rivers - Chris Baker
Green week presentation eu rivers - Chris BakerGreen week presentation eu rivers - Chris Baker
Green week presentation eu rivers - Chris BakerRESTORE
 
120509 Iasi RESTORE - Toni Scarr
120509 Iasi  RESTORE - Toni Scarr120509 Iasi  RESTORE - Toni Scarr
120509 Iasi RESTORE - Toni ScarrRESTORE
 
Mr. Steven Visser IEWP @ Workshop on River Basin Management Planning and Gove...
Mr. Steven Visser IEWP @ Workshop on River Basin Management Planning and Gove...Mr. Steven Visser IEWP @ Workshop on River Basin Management Planning and Gove...
Mr. Steven Visser IEWP @ Workshop on River Basin Management Planning and Gove...India-EU Water Partnership
 
Private Managed Forest Land Council Update — June 2013
Private Managed Forest Land Council Update — June 2013Private Managed Forest Land Council Update — June 2013
Private Managed Forest Land Council Update — June 2013BCPFLA
 
The Rivers Trust Autumn Conference: Day 2 - Session 1
The Rivers Trust Autumn Conference: Day 2 - Session 1The Rivers Trust Autumn Conference: Day 2 - Session 1
The Rivers Trust Autumn Conference: Day 2 - Session 1Westcountry Rivers Trust
 
BC's Proposed Water Sustainability Act
BC's Proposed Water Sustainability ActBC's Proposed Water Sustainability Act
BC's Proposed Water Sustainability Actfnfnlands
 
Principles and Lessons Learned from Wetlands and Carbon Projects
Principles and Lessons Learned from Wetlands and Carbon ProjectsPrinciples and Lessons Learned from Wetlands and Carbon Projects
Principles and Lessons Learned from Wetlands and Carbon ProjectsCIFOR-ICRAF
 
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...Michael F. Bloom PE, ENV SP, CFM, BCEE
 
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...CaBASupport
 
Integrated Natural Resource Management and the GEF- Reconciling Global Enviro...
Integrated Natural Resource Management and the GEF- Reconciling Global Enviro...Integrated Natural Resource Management and the GEF- Reconciling Global Enviro...
Integrated Natural Resource Management and the GEF- Reconciling Global Enviro...Iwl Pcu
 

Similar a Miles foulger Yorkshire Water (20)

The Water Imperative: New Standards in Corporate Water Leadership
The Water Imperative:  New Standards in Corporate Water LeadershipThe Water Imperative:  New Standards in Corporate Water Leadership
The Water Imperative: New Standards in Corporate Water Leadership
 
Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License Oil and Gas Operations – Integrating the Realities of the Social License
Oil and Gas Operations – Integrating the Realities of the Social License
 
Farm Business Update 2014: Lavenham, Environment Agency
Farm Business Update 2014: Lavenham, Environment AgencyFarm Business Update 2014: Lavenham, Environment Agency
Farm Business Update 2014: Lavenham, Environment Agency
 
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
 
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...
 
The Victorian Environmental Watering Program - by Denis Flett
The Victorian Environmental Watering Program - by Denis FlettThe Victorian Environmental Watering Program - by Denis Flett
The Victorian Environmental Watering Program - by Denis Flett
 
WRR and Sustainable Development - Gwyn Rees, UKCEH
WRR and Sustainable Development - Gwyn Rees, UKCEHWRR and Sustainable Development - Gwyn Rees, UKCEH
WRR and Sustainable Development - Gwyn Rees, UKCEH
 
Joel Brammeier, Alliance for the Great Lakes
Joel Brammeier, Alliance for the Great LakesJoel Brammeier, Alliance for the Great Lakes
Joel Brammeier, Alliance for the Great Lakes
 
Green week presentation eu rivers - Chris Baker
Green week presentation eu rivers - Chris BakerGreen week presentation eu rivers - Chris Baker
Green week presentation eu rivers - Chris Baker
 
120509 Iasi RESTORE - Toni Scarr
120509 Iasi  RESTORE - Toni Scarr120509 Iasi  RESTORE - Toni Scarr
120509 Iasi RESTORE - Toni Scarr
 
Mr. Steven Visser IEWP @ Workshop on River Basin Management Planning and Gove...
Mr. Steven Visser IEWP @ Workshop on River Basin Management Planning and Gove...Mr. Steven Visser IEWP @ Workshop on River Basin Management Planning and Gove...
Mr. Steven Visser IEWP @ Workshop on River Basin Management Planning and Gove...
 
Private Managed Forest Land Council Update — June 2013
Private Managed Forest Land Council Update — June 2013Private Managed Forest Land Council Update — June 2013
Private Managed Forest Land Council Update — June 2013
 
The Rivers Trust Autumn Conference: Day 2 - Session 1
The Rivers Trust Autumn Conference: Day 2 - Session 1The Rivers Trust Autumn Conference: Day 2 - Session 1
The Rivers Trust Autumn Conference: Day 2 - Session 1
 
BC's Proposed Water Sustainability Act
BC's Proposed Water Sustainability ActBC's Proposed Water Sustainability Act
BC's Proposed Water Sustainability Act
 
Principles and Lessons Learned from Wetlands and Carbon Projects
Principles and Lessons Learned from Wetlands and Carbon ProjectsPrinciples and Lessons Learned from Wetlands and Carbon Projects
Principles and Lessons Learned from Wetlands and Carbon Projects
 
SuRCASE1
SuRCASE1SuRCASE1
SuRCASE1
 
LCRC Presentation
LCRC PresentationLCRC Presentation
LCRC Presentation
 
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
NRC\'s Urban Stormwater Management in the United States: Implications for MS4...
 
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...
10. CaBA Conference 2017 United Utilities and CaBA - Glynn Haworth uu ca ba s...
 
Integrated Natural Resource Management and the GEF- Reconciling Global Enviro...
Integrated Natural Resource Management and the GEF- Reconciling Global Enviro...Integrated Natural Resource Management and the GEF- Reconciling Global Enviro...
Integrated Natural Resource Management and the GEF- Reconciling Global Enviro...
 

Más de RebeccaSlack

Más de RebeccaSlack (16)

Tim Allott
Tim AllottTim Allott
Tim Allott
 
Janine White
Janine WhiteJanine White
Janine White
 
Harriet Orr
Harriet OrrHarriet Orr
Harriet Orr
 
Mark Reed
Mark Reed Mark Reed
Mark Reed
 
Simon Thorp
Simon Thorp Simon Thorp
Simon Thorp
 
Martin Ross
Martin RossMartin Ross
Martin Ross
 
Martin Furness
Martin Furness Martin Furness
Martin Furness
 
Andrew Walker
Andrew Walker Andrew Walker
Andrew Walker
 
Martin Ortega
Martin OrtegaMartin Ortega
Martin Ortega
 
Michael Payne
Michael Payne Michael Payne
Michael Payne
 
Katherine Pygott ARUP
Katherine Pygott ARUPKatherine Pygott ARUP
Katherine Pygott ARUP
 
Glen Cooper Natural England
Glen Cooper Natural EnglandGlen Cooper Natural England
Glen Cooper Natural England
 
Dave Baxter EA
Dave Baxter EADave Baxter EA
Dave Baxter EA
 
Claire McCamphill Defra
Claire McCamphill DefraClaire McCamphill Defra
Claire McCamphill Defra
 
Water quality 2010abstract booklet
Water quality 2010abstract bookletWater quality 2010abstract booklet
Water quality 2010abstract booklet
 
water@leeds
water@leedswater@leeds
water@leeds
 

Último

Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.pptRamjanShidvankar
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 

Último (20)

Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 

Miles foulger Yorkshire Water

  • 1. Knowledge to solutions – a water company perspective Expert Forum January 2012 Miles Foulger Environment Strategy Manager Yorkshire Water “Water is not a commercial product like any other but, rather, a heritage which must be protected…”
  • 2.
  • 3. What was our experience of the first river basin plan? And what was our response? Substantial investment in daughter directives • Fresh Water Fisheries Directive • Groundwater Directive • Bathing Beach Directive Innovation 1. Heavily modified water bodies 2. Catchment Management 3. Water quality investigations 4. Communication
  • 4.
  • 5. 1 Heavily Modified Water Bodies Investigations ….aka reservoirs All YWS Reservoirs designated as HMWB under WFD Must achieve ‘Good Ecological Potential’ GEP - compliance GEP = presence of Mitigation Measures • Driver 1: Impact on fish movement • Driver 2: Impact on downstream river flows • Driver 3: Impact on morphology of river • Driver 4: Impact on water quality of downstream river • Driver 5: Impacts on lake level regime
  • 6. YW HMWB Investigation Measures to deliver GEP potentially impact on operations and yield Aim of investigation: • ensure any measures are technically feasible and not disproportionately costly How? • trialling the effectiveness of mitigation measures: • physical constraints – what can we do ? • determine costs (capex, water, opex) ? • determine benefits?
  • 8. • 2 years comprehensive monitoring pre-intervention • 5 more years post-implementation monitoring Peatlands take time to change – long term protection
  • 9. Restore the hydrology through physical intervention: grip & gully blocking/ reprofiling. Identification and blocking of sub-surface peat pipes. Red gullies will be targeted Yellow gullies will be left Blue peat pipes blocked with plastic piling & peat dams Coloured dots show location of existing WQ monitoring points
  • 10. Taking R&D into practice Using knowledge to guide SSSI Recovery project Oppose new heather on deep peatRestrict burning on blanket bog Permit new heather on “safe” mineral soils Endorse grip blocking to re-wet peat Encourage alternative DSH to reduce burn area frequency
  • 11. Water Quality Grouse Farming Landscape Carbon Flooding Access Biodiversity Water resources RBWD Developing (& implementing) integrated catchment management • Multiple objectives • and interests….. Rivers & fish
  • 12. 3 Water quality investigations • Understand the impact of the Company’s discharges on the receiving environment • Where we are the cause of adverse impacts, identify appropriate solutions • Put forward solutions for future AMP investment
  • 13. Investigation groups • Generics • Urban Pollution Management • Revised Bathing Water Directive • Eutrophication • Chemistry
  • 14. The Don Network 4 Communication4 Communication
  • 15.
  • 16. The Don Network The Don Network The EA and YWS are leading a partnership project to pilot ways of meeting WFD requirements in the Don catchment The objective of the Don Network Trial new methods of engagement to develop a ‘Catchment Action Plan’ for the Don catchment To meet the requirements of the Water Framework Directive: to achieve ‘good ecological status’ in all waterbodies by 2027 Form the basis of the next River Basin Management Plan
  • 17. Cycle 2 planning ‘The river basin management plans from catchment level information, presenting much of the detail and supporting information required by the Directive in easily accessible electronic formats, rather than the 24000 pages of PDFs which form the current plans’ To conclude… We aim to address the risks and uncertainties from RBMP1 by building our technical understanding and modelling to be able to predict and test solution scenarios. WFD can not be delivered by conventional engineering solutions alone – we need innovation We will play a fuller role in RBMP2 and aim to invest wisely on our customers behalf to make a real difference to the environment of Yorkshire. • Science is key • Integration & engagement are challenges