SlideShare una empresa de Scribd logo
1 de 5
MGT 702: Total Quality Management
International Case Study: Harley – Davidson
Case Study:
Introduction:
Harley – Davidson Motorcycle Company was established in the year 1903. It soon became a
leading manufacturer of motorbikes in the US and neighboring countries. After World War
II, Harley – Davidson had a monopoly in the motorbikes market due to the closure of its
main rivals. It was easy, therefore, for the company to increase its market share and
production, but the quality of the product became a secondary consideration.
Problems faced by Harley - Davidson
The problems for Harley – Davidson started only when Honda entered the US market and
started to cut into its market share. Using the TQM principles of Edward Deming, Honda’s
products were increasingly in better terms of quality at a time when Harley – Davidson’s
products were low on the quality front. By 1981, Honda almost pushed Harley – Davidson
on the verge of closure. The management of Harley – Davidson was wondering how Honda
was able to manufacture motorbikes much better in quality and at a much lesser cost
compared to its products.
Initially it attributed this to the cheap Japanese labor, huge advertising budgets, and
dumping practices on part of Honda. Over the period of time, Harley officials found that the
3 reasons for Hondas success: - kaizen (improvement), just – in – time (JIT), and extensive
use of statistical methods to measure quality.
Kaizen: (improvement) – 1000ventures.com/businessguide
Management has two major components:
1.maintenance, and
2.improvement.
The objective of the maintenance function is to maintain current technological,
managerial, and operating standards. The improvement function is aimed at improving
current standards.
Under the maintenance function, the management must first establish policies, rules,
directives and standard operating procedures (SOPs) and then work towards ensuring
that everybody follows SOP. The latter is achieved through a combination of discipline
and human resource development measures.
Under the improvement function, management works continuously towards revising
the current standards, once they have been mastered, and establishing higher ones.
Improvement can be broken down between innovation and Kaizen. Innovation involves a
drastic improvement in the existing process and requires large investments. Kaizen
signifies small improvements as a result of coordinated continuous efforts by all
employees.
Methods to measure quality:
Some of the methods used to measure quality are:
- pareto charts: ranks related measures in decreasing order of occurrence.The
purpose of a Pareto diagram is to separate the significant aspects of a problem from
the trivial ones. By graphically separating the aspects of a problem, a team will know
where to direct its improvement efforts. Reducing the largest bars identified in the
diagram will do more for overall improvement than reducing the smaller ones.
- cause and effects diagram : Cause and effect analysis is a technique for identifying
the possible causes affecting a project/problem. A cause and effect diagram is a
visually effective way of recording the possible causes as they are suggested. It helps
define a problem, identify possible data requirements and possible causes, develop
objectives for solutions and narrowing down the causes.
- Flowcharts: is an illustrative and useful technique to allow a person or team to visualize a
process. They are a simple and effective tool and are made even more powerful during
a Kaizen activity in a group setting, whereby the teams are either designing a new, or
‘ walking’ an existing process. In quality movements, they are a good tool to
understand possible escape points; that is identifying the points in the process where
easy mistakes can be made or indeed pass through without being detected.
- check sheets:
- histogram: is merely a way of showing that frequency on a bar chart format.
- scatter diagrams
Just – in –time: Tutorialpoints website
Just-in-time manufacturing goes hand in hand with concepts such as Kanban, continuous
improvement and total quality management (TQM).
Just-in-time production requires intricate planning, in terms of procurement policies and
the manufacturing process, if its implementation is to be a success.
Highly advanced technological support systems provide the necessary back-up that Just-in-
time manufacturing demands, with production scheduling software and electronic data
interchange being the most sought after.
Using JIT, Honda was turning its inventory 20 – 30 times per year compared to Harley –
Davidson and other American Companies at that time, who were turning their inventory
only 4 times per year. Harley had by now understood how less inventory turns ef+fect the
product cost and quality. Earlier in 1978, it had tried to implement the quality circles
concepts in its organization, but could not sustain it for a long time, in complete contrast to
kaizen’s continuous improvement concept evolved and successfully implemented by the
Japanese companies.
The top management of Harley – Davidson was very conscious of employee involvement
programmes having had a bad experience with quality circles. They did not want to thrust
upon their workers various types of programmmes for inventory reduction, quality
improvement, work methods improvement, cost reduction, etc. simultaneously leading to
confusion.
Solution to the problems faced by Harley - Davidson
Instead, they focused on a single most important agenda – quality. They felt that this
umbrella term contained in an implicit way all other improvement programmes. This
simple goal of achieving quality in all the spheres of activity was something every worker
could relate to easily. Improving the quality in everything you do gives a sense of pride and
commitment. Harley – Davidson’s managers were so focused on their goal of quality that
they were not opposed to making investments in order to improve their product. If new
equipment can provide increase in productivity and quality in addition to fostering a
climate of continuous improvement, the company would go for it even without financial
justification.
Another important decision on part of Harley – Davidson officials was to avoid sending
rigid rules and regulations to their multiple facilities with diverse manufacturing
environments. It was felt that doing so will kill employee participation in the quality
initiative. The management gave only the direction to the plant managers in which the
company was willing to go and told them the principles and concepts to be applied, but
gave them the freedom to do it on their own way. This was the drastic shift from the white
collar and blue collar discrimination existing in the American companies at that time.
A typical example of this radical change in the thinking of the top management can be
demonstrated with an example of the company’s plant at York. The company wanted to
have the paint facility at the plant enclosed to keep it cleaner and have proper lighting. The
employees made the designs of the enclosures themselves and asked the management if
they could choose the color of its walls. The usual response would have been that they have
to follow the standard color scheme, but the management responded with consent to the
worker’s request. This resulted in a clear demonstration of the management’s commitment
to change and the worker’s reciprocated in the same way.
Harley – Davidson started employee involvement groups (EIG) in order to solve the quality
problems. It was the same quality circles programme which was a disaster earlier. This
time the company gave liberty to the workers to choose a suitable name for the concept.
The employees at Milwaukee engine plant opted for ‘quality circles’, while York assembly
plant workers decided to call this ‘employee involvement groups’.
Conclusion
Now, the company has a full-fledged employee involvement programme, in which the
company gives formal training to the employees in problem – solving, through
participation is voluntary. Harley – Davidson does not quantify the cost benefits as a result
of these employee involvement groups as it does not want to shift the company’s focus
form quality to cost reduction.
Harley’s turn around has been highlighted in a big way in terms of its financial recovery
and manufacturing improvements, through what is unreported is the vision of Harley –
Davidson in promoting employee involvement.
Source:
Bed, K. (2006). Quality Management. New Delhi: Oxford University Press.

Más contenido relacionado

La actualidad más candente

Supply Chain of Nescafe in India
Supply Chain of Nescafe in IndiaSupply Chain of Nescafe in India
Supply Chain of Nescafe in Indiabhaskar kumar
 
American Connector Company
American Connector CompanyAmerican Connector Company
American Connector CompanySubhradeep Mitra
 
Marketing strategies of haldiram’s
Marketing strategies of haldiram’sMarketing strategies of haldiram’s
Marketing strategies of haldiram’sMayank Gupta
 
ALDI: A Low Cost Retailer's Business Practices
ALDI: A Low Cost Retailer's Business PracticesALDI: A Low Cost Retailer's Business Practices
ALDI: A Low Cost Retailer's Business PracticesDipesh Pandey
 
Patanjali Dant Kanti-Marketing Presentation
Patanjali Dant Kanti-Marketing PresentationPatanjali Dant Kanti-Marketing Presentation
Patanjali Dant Kanti-Marketing PresentationShaminder Saini
 
Malabar Gold and Diamonds - Case Study - Marketing Strategies
Malabar Gold and Diamonds - Case Study - Marketing StrategiesMalabar Gold and Diamonds - Case Study - Marketing Strategies
Malabar Gold and Diamonds - Case Study - Marketing StrategiesYashaswini Agarwal
 
Sales and Distribution Channel of HUL
Sales and Distribution Channel of HULSales and Distribution Channel of HUL
Sales and Distribution Channel of HULPranay Rajas
 
Case Study : Eco7-Launching a New Motor Oil
Case Study : Eco7-Launching a New Motor OilCase Study : Eco7-Launching a New Motor Oil
Case Study : Eco7-Launching a New Motor OilHafizullah Mohd Amin
 
Distributor push and customer pull @ hul project report mba marketing
Distributor push and customer pull @ hul project report mba marketingDistributor push and customer pull @ hul project report mba marketing
Distributor push and customer pull @ hul project report mba marketingBabasab Patil
 
Ppt on zara
Ppt on zaraPpt on zara
Ppt on zararoyji
 
Harley davidson _india_basic marketing__problems__possible solutions
Harley davidson _india_basic marketing__problems__possible solutionsHarley davidson _india_basic marketing__problems__possible solutions
Harley davidson _india_basic marketing__problems__possible solutionsDev Karan Singh Maletia
 
Zara Case Study (Value Chain Management)
Zara Case Study (Value Chain Management)Zara Case Study (Value Chain Management)
Zara Case Study (Value Chain Management)Syed Ali Roshaan Raza
 
distribution channel of dabur
distribution channel of daburdistribution channel of dabur
distribution channel of daburMj Payal
 

La actualidad más candente (20)

failure products
failure productsfailure products
failure products
 
Supply Chain of Nescafe in India
Supply Chain of Nescafe in IndiaSupply Chain of Nescafe in India
Supply Chain of Nescafe in India
 
American Connector Company
American Connector CompanyAmerican Connector Company
American Connector Company
 
Marketing strategies of haldiram’s
Marketing strategies of haldiram’sMarketing strategies of haldiram’s
Marketing strategies of haldiram’s
 
Haldira ms (2)
Haldira ms (2)Haldira ms (2)
Haldira ms (2)
 
ALDI: A Low Cost Retailer's Business Practices
ALDI: A Low Cost Retailer's Business PracticesALDI: A Low Cost Retailer's Business Practices
ALDI: A Low Cost Retailer's Business Practices
 
Workshop 2 presentation (1)
Workshop 2 presentation (1)Workshop 2 presentation (1)
Workshop 2 presentation (1)
 
Patanjali Dant Kanti-Marketing Presentation
Patanjali Dant Kanti-Marketing PresentationPatanjali Dant Kanti-Marketing Presentation
Patanjali Dant Kanti-Marketing Presentation
 
Haier: Taking a Chinese Company Global
Haier: Taking a Chinese Company Global Haier: Taking a Chinese Company Global
Haier: Taking a Chinese Company Global
 
Malabar Gold and Diamonds - Case Study - Marketing Strategies
Malabar Gold and Diamonds - Case Study - Marketing StrategiesMalabar Gold and Diamonds - Case Study - Marketing Strategies
Malabar Gold and Diamonds - Case Study - Marketing Strategies
 
Sales and Distribution Channel of HUL
Sales and Distribution Channel of HULSales and Distribution Channel of HUL
Sales and Distribution Channel of HUL
 
Case Study : Eco7-Launching a New Motor Oil
Case Study : Eco7-Launching a New Motor OilCase Study : Eco7-Launching a New Motor Oil
Case Study : Eco7-Launching a New Motor Oil
 
Haldi-Ram (Case Study)
Haldi-Ram (Case Study)Haldi-Ram (Case Study)
Haldi-Ram (Case Study)
 
Hul
HulHul
Hul
 
Distributor push and customer pull @ hul project report mba marketing
Distributor push and customer pull @ hul project report mba marketingDistributor push and customer pull @ hul project report mba marketing
Distributor push and customer pull @ hul project report mba marketing
 
Ppt on zara
Ppt on zaraPpt on zara
Ppt on zara
 
ITC- Distribution Channel
ITC- Distribution ChannelITC- Distribution Channel
ITC- Distribution Channel
 
Harley davidson _india_basic marketing__problems__possible solutions
Harley davidson _india_basic marketing__problems__possible solutionsHarley davidson _india_basic marketing__problems__possible solutions
Harley davidson _india_basic marketing__problems__possible solutions
 
Zara Case Study (Value Chain Management)
Zara Case Study (Value Chain Management)Zara Case Study (Value Chain Management)
Zara Case Study (Value Chain Management)
 
distribution channel of dabur
distribution channel of daburdistribution channel of dabur
distribution channel of dabur
 

Destacado

Mgt 607 research presentation
Mgt 607 research presentationMgt 607 research presentation
Mgt 607 research presentationRedchick
 
Local case study
Local case studyLocal case study
Local case studyRedchick
 
STORAGE, TREATMENT AND TRANSMISSION METHODS OF PORTABLE WATER SUPPLY - ASSIGN...
STORAGE, TREATMENT AND TRANSMISSION METHODS OF PORTABLE WATER SUPPLY - ASSIGN...STORAGE, TREATMENT AND TRANSMISSION METHODS OF PORTABLE WATER SUPPLY - ASSIGN...
STORAGE, TREATMENT AND TRANSMISSION METHODS OF PORTABLE WATER SUPPLY - ASSIGN...Redchick
 
HRM 702 Negotiations, Bargaining and Advocacy
HRM 702 Negotiations, Bargaining and AdvocacyHRM 702 Negotiations, Bargaining and Advocacy
HRM 702 Negotiations, Bargaining and AdvocacyRedchick
 
Law 604 presentation
Law 604 presentationLaw 604 presentation
Law 604 presentationRedchick
 
International case study presentation
International case study presentationInternational case study presentation
International case study presentationRedchick
 
Hrm 603 major assign
Hrm 603 major assignHrm 603 major assign
Hrm 603 major assignRedchick
 
Hrm 704 IHRM Fiji National University
Hrm 704 IHRM Fiji National UniversityHrm 704 IHRM Fiji National University
Hrm 704 IHRM Fiji National UniversityRedchick
 
The Swiss Center for Strategic Studies, Lucerne, SCSS
The Swiss Center for Strategic Studies, Lucerne, SCSSThe Swiss Center for Strategic Studies, Lucerne, SCSS
The Swiss Center for Strategic Studies, Lucerne, SCSSHossam El-Shazly
 
Sudhir telang machinery components
Sudhir telang machinery componentsSudhir telang machinery components
Sudhir telang machinery componentsRuchira Panigrahy
 
Nike Strategic Case Analysis
Nike Strategic Case AnalysisNike Strategic Case Analysis
Nike Strategic Case AnalysisWilliam Greene
 
Online Marketing - Case study
Online Marketing - Case studyOnline Marketing - Case study
Online Marketing - Case studyAfsheen Khan
 
The alignment of e commerce strategies with corporate strategy a case study
The alignment of e commerce strategies with corporate strategy a case studyThe alignment of e commerce strategies with corporate strategy a case study
The alignment of e commerce strategies with corporate strategy a case studyHamideh Iraj
 
Consumers’ Behaviour on Sony Xperia: A Case Study on Bangladesh
Consumers’ Behaviour on Sony Xperia: A Case Study on BangladeshConsumers’ Behaviour on Sony Xperia: A Case Study on Bangladesh
Consumers’ Behaviour on Sony Xperia: A Case Study on Bangladeshiosrjce
 
Introduction To Industrial Relation
Introduction To Industrial RelationIntroduction To Industrial Relation
Introduction To Industrial Relationsatyam mishra
 
Da merton truck company case study
Da   merton truck company case studyDa   merton truck company case study
Da merton truck company case studyRajendra Inani
 
Application of the Cutting Stock Problem to a Construction Company: A Case Study
Application of the Cutting Stock Problem to a Construction Company: A Case StudyApplication of the Cutting Stock Problem to a Construction Company: A Case Study
Application of the Cutting Stock Problem to a Construction Company: A Case Studyertekg
 
Implementing Software Metrics at a Telecommunications Company -- A Case Study
Implementing Software Metrics at a Telecommunications Company -- A Case StudyImplementing Software Metrics at a Telecommunications Company -- A Case Study
Implementing Software Metrics at a Telecommunications Company -- A Case Studydheimann5
 
Fra coca - cola case study
Fra   coca - cola case studyFra   coca - cola case study
Fra coca - cola case studyRajendra Inani
 

Destacado (20)

Mgt 607 research presentation
Mgt 607 research presentationMgt 607 research presentation
Mgt 607 research presentation
 
Local case study
Local case studyLocal case study
Local case study
 
STORAGE, TREATMENT AND TRANSMISSION METHODS OF PORTABLE WATER SUPPLY - ASSIGN...
STORAGE, TREATMENT AND TRANSMISSION METHODS OF PORTABLE WATER SUPPLY - ASSIGN...STORAGE, TREATMENT AND TRANSMISSION METHODS OF PORTABLE WATER SUPPLY - ASSIGN...
STORAGE, TREATMENT AND TRANSMISSION METHODS OF PORTABLE WATER SUPPLY - ASSIGN...
 
HRM 702 Negotiations, Bargaining and Advocacy
HRM 702 Negotiations, Bargaining and AdvocacyHRM 702 Negotiations, Bargaining and Advocacy
HRM 702 Negotiations, Bargaining and Advocacy
 
Law 604 presentation
Law 604 presentationLaw 604 presentation
Law 604 presentation
 
International case study presentation
International case study presentationInternational case study presentation
International case study presentation
 
Hrm 603 major assign
Hrm 603 major assignHrm 603 major assign
Hrm 603 major assign
 
Hrm 704 IHRM Fiji National University
Hrm 704 IHRM Fiji National UniversityHrm 704 IHRM Fiji National University
Hrm 704 IHRM Fiji National University
 
The Swiss Center for Strategic Studies, Lucerne, SCSS
The Swiss Center for Strategic Studies, Lucerne, SCSSThe Swiss Center for Strategic Studies, Lucerne, SCSS
The Swiss Center for Strategic Studies, Lucerne, SCSS
 
Sudhir telang machinery components
Sudhir telang machinery componentsSudhir telang machinery components
Sudhir telang machinery components
 
Sony tablets project(relaunching)
Sony tablets project(relaunching)Sony tablets project(relaunching)
Sony tablets project(relaunching)
 
Nike Strategic Case Analysis
Nike Strategic Case AnalysisNike Strategic Case Analysis
Nike Strategic Case Analysis
 
Online Marketing - Case study
Online Marketing - Case studyOnline Marketing - Case study
Online Marketing - Case study
 
The alignment of e commerce strategies with corporate strategy a case study
The alignment of e commerce strategies with corporate strategy a case studyThe alignment of e commerce strategies with corporate strategy a case study
The alignment of e commerce strategies with corporate strategy a case study
 
Consumers’ Behaviour on Sony Xperia: A Case Study on Bangladesh
Consumers’ Behaviour on Sony Xperia: A Case Study on BangladeshConsumers’ Behaviour on Sony Xperia: A Case Study on Bangladesh
Consumers’ Behaviour on Sony Xperia: A Case Study on Bangladesh
 
Introduction To Industrial Relation
Introduction To Industrial RelationIntroduction To Industrial Relation
Introduction To Industrial Relation
 
Da merton truck company case study
Da   merton truck company case studyDa   merton truck company case study
Da merton truck company case study
 
Application of the Cutting Stock Problem to a Construction Company: A Case Study
Application of the Cutting Stock Problem to a Construction Company: A Case StudyApplication of the Cutting Stock Problem to a Construction Company: A Case Study
Application of the Cutting Stock Problem to a Construction Company: A Case Study
 
Implementing Software Metrics at a Telecommunications Company -- A Case Study
Implementing Software Metrics at a Telecommunications Company -- A Case StudyImplementing Software Metrics at a Telecommunications Company -- A Case Study
Implementing Software Metrics at a Telecommunications Company -- A Case Study
 
Fra coca - cola case study
Fra   coca - cola case studyFra   coca - cola case study
Fra coca - cola case study
 

Similar a International case study

Apply Strategic Plan EvaluationRefer back to the Week 2 compa.docx
Apply Strategic Plan EvaluationRefer back to the Week 2 compa.docxApply Strategic Plan EvaluationRefer back to the Week 2 compa.docx
Apply Strategic Plan EvaluationRefer back to the Week 2 compa.docxjewisonantone
 
BUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point PresentationBUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point PresentationChaturvediAnay
 
STAT Part 3: Failure at CTO (anonymized) mindful action without performance o...
STAT Part 3: Failure at CTO (anonymized) mindful action without performance o...STAT Part 3: Failure at CTO (anonymized) mindful action without performance o...
STAT Part 3: Failure at CTO (anonymized) mindful action without performance o...David Denyer
 
9MGMT640-1601B-01Roderick Deon GoodrumWendy Arrignton.docx
9MGMT640-1601B-01Roderick Deon GoodrumWendy Arrignton.docx9MGMT640-1601B-01Roderick Deon GoodrumWendy Arrignton.docx
9MGMT640-1601B-01Roderick Deon GoodrumWendy Arrignton.docxransayo
 
Project delivery standardization framework innovate vancouver
Project delivery standardization framework  innovate vancouverProject delivery standardization framework  innovate vancouver
Project delivery standardization framework innovate vancouverInnovate Vancouver
 
Lean Journey At C1
Lean Journey At C1Lean Journey At C1
Lean Journey At C1Beth Johnson
 
Uhy Lean Core
Uhy Lean CoreUhy Lean Core
Uhy Lean Corealanlund
 
How operational innovation can transform your company.
How operational innovation can transform  your company.How operational innovation can transform  your company.
How operational innovation can transform your company.Bibek Prajapati
 
Ray Magnan - Lean Instructional Design
Ray Magnan - Lean Instructional DesignRay Magnan - Lean Instructional Design
Ray Magnan - Lean Instructional DesignRay Magnan
 
Chapter 4 benchmarking (1)
Chapter   4 benchmarking (1)Chapter   4 benchmarking (1)
Chapter 4 benchmarking (1)Abhinav Anand
 
Creating a Lean Business System white paper
Creating a Lean Business System white paperCreating a Lean Business System white paper
Creating a Lean Business System white paperPeterHines
 
Lean Manufacturing Research
Lean Manufacturing ResearchLean Manufacturing Research
Lean Manufacturing ResearchDeAndria Hardy
 
Strategic plans for addressing challenges in BUGATTI
Strategic plans for addressing challenges inBUGATTIStrategic plans for addressing challenges inBUGATTI
Strategic plans for addressing challenges in BUGATTIAkshay Mittal
 
Lean management applied by nike
Lean management applied by nikeLean management applied by nike
Lean management applied by nikeSATISH TRIPATHY
 
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayIncreasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayAlison Reed
 
Executive Development Programs (EDP)
Executive Development Programs (EDP)Executive Development Programs (EDP)
Executive Development Programs (EDP)Venkadesh Narayanan
 
Six sigma of ford Motors
Six sigma of ford MotorsSix sigma of ford Motors
Six sigma of ford MotorsNili Jana
 

Similar a International case study (20)

Apply Strategic Plan EvaluationRefer back to the Week 2 compa.docx
Apply Strategic Plan EvaluationRefer back to the Week 2 compa.docxApply Strategic Plan EvaluationRefer back to the Week 2 compa.docx
Apply Strategic Plan EvaluationRefer back to the Week 2 compa.docx
 
BUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point PresentationBUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point Presentation
 
STAT Part 3: Failure at CTO (anonymized) mindful action without performance o...
STAT Part 3: Failure at CTO (anonymized) mindful action without performance o...STAT Part 3: Failure at CTO (anonymized) mindful action without performance o...
STAT Part 3: Failure at CTO (anonymized) mindful action without performance o...
 
3.unit 11(sqsm)
3.unit 11(sqsm)3.unit 11(sqsm)
3.unit 11(sqsm)
 
Six Sigma Cases
Six Sigma CasesSix Sigma Cases
Six Sigma Cases
 
Tools guide
Tools guideTools guide
Tools guide
 
9MGMT640-1601B-01Roderick Deon GoodrumWendy Arrignton.docx
9MGMT640-1601B-01Roderick Deon GoodrumWendy Arrignton.docx9MGMT640-1601B-01Roderick Deon GoodrumWendy Arrignton.docx
9MGMT640-1601B-01Roderick Deon GoodrumWendy Arrignton.docx
 
Project delivery standardization framework innovate vancouver
Project delivery standardization framework  innovate vancouverProject delivery standardization framework  innovate vancouver
Project delivery standardization framework innovate vancouver
 
Lean Journey At C1
Lean Journey At C1Lean Journey At C1
Lean Journey At C1
 
Uhy Lean Core
Uhy Lean CoreUhy Lean Core
Uhy Lean Core
 
How operational innovation can transform your company.
How operational innovation can transform  your company.How operational innovation can transform  your company.
How operational innovation can transform your company.
 
Ray Magnan - Lean Instructional Design
Ray Magnan - Lean Instructional DesignRay Magnan - Lean Instructional Design
Ray Magnan - Lean Instructional Design
 
Chapter 4 benchmarking (1)
Chapter   4 benchmarking (1)Chapter   4 benchmarking (1)
Chapter 4 benchmarking (1)
 
Creating a Lean Business System white paper
Creating a Lean Business System white paperCreating a Lean Business System white paper
Creating a Lean Business System white paper
 
Lean Manufacturing Research
Lean Manufacturing ResearchLean Manufacturing Research
Lean Manufacturing Research
 
Strategic plans for addressing challenges in BUGATTI
Strategic plans for addressing challenges inBUGATTIStrategic plans for addressing challenges inBUGATTI
Strategic plans for addressing challenges in BUGATTI
 
Lean management applied by nike
Lean management applied by nikeLean management applied by nike
Lean management applied by nike
 
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) EssayIncreasing Vehicle Outsourcing ( % Of Car Value ) Essay
Increasing Vehicle Outsourcing ( % Of Car Value ) Essay
 
Executive Development Programs (EDP)
Executive Development Programs (EDP)Executive Development Programs (EDP)
Executive Development Programs (EDP)
 
Six sigma of ford Motors
Six sigma of ford MotorsSix sigma of ford Motors
Six sigma of ford Motors
 

Último

Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxCynthia Clay
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowranineha57744
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSkajalroy875762
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 

Último (20)

Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 

International case study

  • 1. MGT 702: Total Quality Management International Case Study: Harley – Davidson Case Study: Introduction: Harley – Davidson Motorcycle Company was established in the year 1903. It soon became a leading manufacturer of motorbikes in the US and neighboring countries. After World War II, Harley – Davidson had a monopoly in the motorbikes market due to the closure of its main rivals. It was easy, therefore, for the company to increase its market share and production, but the quality of the product became a secondary consideration. Problems faced by Harley - Davidson The problems for Harley – Davidson started only when Honda entered the US market and started to cut into its market share. Using the TQM principles of Edward Deming, Honda’s products were increasingly in better terms of quality at a time when Harley – Davidson’s products were low on the quality front. By 1981, Honda almost pushed Harley – Davidson on the verge of closure. The management of Harley – Davidson was wondering how Honda was able to manufacture motorbikes much better in quality and at a much lesser cost compared to its products. Initially it attributed this to the cheap Japanese labor, huge advertising budgets, and dumping practices on part of Honda. Over the period of time, Harley officials found that the 3 reasons for Hondas success: - kaizen (improvement), just – in – time (JIT), and extensive use of statistical methods to measure quality. Kaizen: (improvement) – 1000ventures.com/businessguide Management has two major components: 1.maintenance, and 2.improvement.
  • 2. The objective of the maintenance function is to maintain current technological, managerial, and operating standards. The improvement function is aimed at improving current standards. Under the maintenance function, the management must first establish policies, rules, directives and standard operating procedures (SOPs) and then work towards ensuring that everybody follows SOP. The latter is achieved through a combination of discipline and human resource development measures. Under the improvement function, management works continuously towards revising the current standards, once they have been mastered, and establishing higher ones. Improvement can be broken down between innovation and Kaizen. Innovation involves a drastic improvement in the existing process and requires large investments. Kaizen signifies small improvements as a result of coordinated continuous efforts by all employees. Methods to measure quality: Some of the methods used to measure quality are: - pareto charts: ranks related measures in decreasing order of occurrence.The purpose of a Pareto diagram is to separate the significant aspects of a problem from the trivial ones. By graphically separating the aspects of a problem, a team will know where to direct its improvement efforts. Reducing the largest bars identified in the diagram will do more for overall improvement than reducing the smaller ones. - cause and effects diagram : Cause and effect analysis is a technique for identifying the possible causes affecting a project/problem. A cause and effect diagram is a visually effective way of recording the possible causes as they are suggested. It helps define a problem, identify possible data requirements and possible causes, develop objectives for solutions and narrowing down the causes. - Flowcharts: is an illustrative and useful technique to allow a person or team to visualize a process. They are a simple and effective tool and are made even more powerful during a Kaizen activity in a group setting, whereby the teams are either designing a new, or ‘ walking’ an existing process. In quality movements, they are a good tool to
  • 3. understand possible escape points; that is identifying the points in the process where easy mistakes can be made or indeed pass through without being detected. - check sheets: - histogram: is merely a way of showing that frequency on a bar chart format. - scatter diagrams Just – in –time: Tutorialpoints website Just-in-time manufacturing goes hand in hand with concepts such as Kanban, continuous improvement and total quality management (TQM). Just-in-time production requires intricate planning, in terms of procurement policies and the manufacturing process, if its implementation is to be a success. Highly advanced technological support systems provide the necessary back-up that Just-in- time manufacturing demands, with production scheduling software and electronic data interchange being the most sought after. Using JIT, Honda was turning its inventory 20 – 30 times per year compared to Harley – Davidson and other American Companies at that time, who were turning their inventory only 4 times per year. Harley had by now understood how less inventory turns ef+fect the product cost and quality. Earlier in 1978, it had tried to implement the quality circles concepts in its organization, but could not sustain it for a long time, in complete contrast to kaizen’s continuous improvement concept evolved and successfully implemented by the Japanese companies. The top management of Harley – Davidson was very conscious of employee involvement programmes having had a bad experience with quality circles. They did not want to thrust upon their workers various types of programmmes for inventory reduction, quality improvement, work methods improvement, cost reduction, etc. simultaneously leading to confusion.
  • 4. Solution to the problems faced by Harley - Davidson Instead, they focused on a single most important agenda – quality. They felt that this umbrella term contained in an implicit way all other improvement programmes. This simple goal of achieving quality in all the spheres of activity was something every worker could relate to easily. Improving the quality in everything you do gives a sense of pride and commitment. Harley – Davidson’s managers were so focused on their goal of quality that they were not opposed to making investments in order to improve their product. If new equipment can provide increase in productivity and quality in addition to fostering a climate of continuous improvement, the company would go for it even without financial justification. Another important decision on part of Harley – Davidson officials was to avoid sending rigid rules and regulations to their multiple facilities with diverse manufacturing environments. It was felt that doing so will kill employee participation in the quality initiative. The management gave only the direction to the plant managers in which the company was willing to go and told them the principles and concepts to be applied, but gave them the freedom to do it on their own way. This was the drastic shift from the white collar and blue collar discrimination existing in the American companies at that time. A typical example of this radical change in the thinking of the top management can be demonstrated with an example of the company’s plant at York. The company wanted to have the paint facility at the plant enclosed to keep it cleaner and have proper lighting. The employees made the designs of the enclosures themselves and asked the management if they could choose the color of its walls. The usual response would have been that they have to follow the standard color scheme, but the management responded with consent to the worker’s request. This resulted in a clear demonstration of the management’s commitment to change and the worker’s reciprocated in the same way. Harley – Davidson started employee involvement groups (EIG) in order to solve the quality problems. It was the same quality circles programme which was a disaster earlier. This time the company gave liberty to the workers to choose a suitable name for the concept.
  • 5. The employees at Milwaukee engine plant opted for ‘quality circles’, while York assembly plant workers decided to call this ‘employee involvement groups’. Conclusion Now, the company has a full-fledged employee involvement programme, in which the company gives formal training to the employees in problem – solving, through participation is voluntary. Harley – Davidson does not quantify the cost benefits as a result of these employee involvement groups as it does not want to shift the company’s focus form quality to cost reduction. Harley’s turn around has been highlighted in a big way in terms of its financial recovery and manufacturing improvements, through what is unreported is the vision of Harley – Davidson in promoting employee involvement. Source: Bed, K. (2006). Quality Management. New Delhi: Oxford University Press.