SlideShare una empresa de Scribd logo
1 de 2
Descargar para leer sin conexión
TPW/LEAF/CUKGFPPKA26/eng/COMTPW/02.13/FR/7773 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No repre-
sentation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited. Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.
Alstom has been awarded a contract by Carrington Power Limited, for the supply of the
power island (Gas Turbine, Steam Turbine and heat recovery steam generator (HRSG))
for the new Carrington Power gas-fired power station. The contract was signed in
consortium with Duro Felguera, a Spanish company specialising in the construction of
power plants.
The new 880 MW power plant will be located on the site of the old Carrington power
station in Trafford, next to the Manchester Shipping Canal and the River Mersey,
United Kingdom. It will be built under an Engineering, Procurement and Construction
(EPC) contract. Duro Felguera is responsible for civil works, construction and balance
of plant equipment. Alstom’s scope includes the supply of two GT26 gas turbines and
other key components, including two steam turbines, two HRSG’s and the associated
turbogenerators. Additionally, Alstom has been awarded a Long-Term Service Agreement
(LTSA) to maintain the power train and ancillaries once it enters commercial operation.
The power station will be capable of providing enough power for around a million homes.
In the UK, Alstom has built and now maintains and operates over half of the country’s
gas-fired power generation capacity. Recent gas-fired plants constructed in the UK
include the 1,650 MW Staythorpe plant in Nottinghamshire, the 2,160 MW Pembroke
power plant in South Wales, the 900 MW Langage power plant in Devon and the 1,275
MW Grain power plant on the Isle of Grain.
With the Carrington project, Alstom will have supplied twenty-two GT26 units to the UK.
Customer:...................................... Carrington Power Ltd, 100% owned by ESB
Scope of supply:............................ 2 x KA26-1 SS
+ 12 years Long-Term Service Agreement (LTSA)
Electrical output:........................... 880 MW
Fuel:............................................... Natural gas
Cooling System:............................. Hybrid cooling tower
Application:.................................... Power generation
The ninth major KA26
contract for a new
gas-fired power station
in the UK.
CASE STUDY: GAS PRODUCT SOLUTIONS
Carrington – United Kingdom
KA26 combined-cycle power plant
Advantages
•	Prominent operational
and fuel flexibility
•	High reliability
•	Superior part-load
performance
•	Low NOx emissions over
a wide load range
With its environmental and
economic advantages, this
plant is another example of
Alstom’s capability to deliver
clean integrated power
solutions
TPW/LEAF/CUKGFPPKA26/eng/COMTPW/02.13/FR/7773 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No repre-
sentation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial
circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited. Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper.
Case study: GAS PRODUCT SOLUTIONS
Carrington – United Kingdom
For more information
please contact Alstom Power:
ALSTOM (Switzerland) Ltd.
Brown Boveri Strasse 7
5401 Baden
Switzerland
Visit us online: www.alstom.com
Our Plant Integrator™ approach offers more value for customers
The Plant Integrator™ concept is Alstom’s unique way of creating more value for
customers. We combine outstanding expertise at both component and plant levels,
as we are both an equipment designer and a manufacturer. In addition, we are an
Engineering, Procurement and Construction (EPC) contractor with proven worldwide
references. Through close collaboration, we assure that our customers meet their
business objectives and serve their market more effectively. There are four Plant
Integrator™ factors that help increase the Net Present Value for our customers.
Plant Integrator™ Factors Customer Benefits
INVESTMENT •	Optimised capital investment
LEAD TIME •	Shorter lead times to produce electricity faster
PERFORMANCE
•	Higher power plant efficiency for increased power output over
a wide range of operational modes
•	Reduced emissions to meet environmental responsibility
•	Lower Operation  Maintenance (OM) cost
AVAILABILITY  FLEXIBILITY •	Better reliability, availability and flexibility
PROJECT FEATURES
The Carrington Project benefits from the superior integration resulting from Alstom’s
project management skills, EPC capabilities and state-of-the-art key components:
•	2 Alstom highly flexible and clean-power producing GT26 gas turbines with unique
sequential combustion
•	2 Alstom horizontal triple-pressure heat recovery steam generators for high plant
efficiency
•	2 Alstom STF15C steam turbines with axial exhaust for flexible, highly efficient operation
•	2 Alstom TOPGAS hydrogen-cooled turbogenerators, for high efficiency and availability
•	Alstom plant Distributed Control System (DCS), Alspa Series 6.
Arrangement
An environmentally
friendly plant with high
efficiency and high
flexibility.

Más contenido relacionado

La actualidad más candente

tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-planttanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plantChristopher Gray
 
Slide 13 Veijo Huusko Vattenfall Invest In Renewables V Sent May 18
Slide 13 Veijo Huusko Vattenfall Invest In Renewables V Sent May 18Slide 13 Veijo Huusko Vattenfall Invest In Renewables V Sent May 18
Slide 13 Veijo Huusko Vattenfall Invest In Renewables V Sent May 18fundingrenewables
 
Aurora Battery Storage and Flexibility Conference 2017
Aurora Battery Storage and Flexibility Conference 2017Aurora Battery Storage and Flexibility Conference 2017
Aurora Battery Storage and Flexibility Conference 2017Alexander Marshall
 
Energy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyondEnergy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyondEMEX
 
South Africa's Eskom secures loan from EIB for solar power plant | Reuters
South Africa's Eskom secures loan from EIB for solar power plant
| ReutersSouth Africa's Eskom secures loan from EIB for solar power plant
| Reuters
South Africa's Eskom secures loan from EIB for solar power plant | Reutersupsetcapture9458
 
2011 07 Aberthaw Coal Fired Power Station – Mark Picton
2011 07 Aberthaw Coal Fired Power Station – Mark Picton 2011 07 Aberthaw Coal Fired Power Station – Mark Picton
2011 07 Aberthaw Coal Fired Power Station – Mark Picton SevernEstuary
 
12 frédéric petit - siemens
12   frédéric petit - siemens12   frédéric petit - siemens
12 frédéric petit - siemensjohannaparans
 
Solar Energy Applications
Solar Energy ApplicationsSolar Energy Applications
Solar Energy ApplicationsAvish Thakral
 
TransGrid's Renewable Energy Hub
TransGrid's Renewable Energy Hub TransGrid's Renewable Energy Hub
TransGrid's Renewable Energy Hub TransGrid AU
 
Energy Storage: 1 - Sir David King keynote speech
Energy Storage: 1 - Sir David King keynote speechEnergy Storage: 1 - Sir David King keynote speech
Energy Storage: 1 - Sir David King keynote speechBritish Embassy Paris
 
Km23 power generation from silencer exhorts gasses (wecompress)
Km23 power generation from silencer exhorts gasses (wecompress)Km23 power generation from silencer exhorts gasses (wecompress)
Km23 power generation from silencer exhorts gasses (wecompress)1000kv technologies
 
Wisselwerking industrie en ontwikkeling energienetten
Wisselwerking industrie en ontwikkeling energienettenWisselwerking industrie en ontwikkeling energienetten
Wisselwerking industrie en ontwikkeling energienettenDutch Power
 
Local Energy & Microgrids Conference 2016
Local Energy & Microgrids Conference  2016 Local Energy & Microgrids Conference  2016
Local Energy & Microgrids Conference 2016 TransGrid AU
 
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
Power LifeMax* - Solutions forB/E Gas Turbine FleetPower LifeMax* - Solutions forB/E Gas Turbine Fleet
Power LifeMax* - Solutions for B/E Gas Turbine FleetGE_India
 
Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windCCILVN
 
CTCI news
CTCI newsCTCI news
CTCI newsRex Xie
 

La actualidad más candente (20)

tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-planttanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
tanjung-bin-malaysia-ultra-supercritical-coal-fired-power-plant
 
The role of Hydrogen storage in a clean responsive power system, Den Gammer, ...
The role of Hydrogen storage in a clean responsive power system, Den Gammer, ...The role of Hydrogen storage in a clean responsive power system, Den Gammer, ...
The role of Hydrogen storage in a clean responsive power system, Den Gammer, ...
 
Slide 13 Veijo Huusko Vattenfall Invest In Renewables V Sent May 18
Slide 13 Veijo Huusko Vattenfall Invest In Renewables V Sent May 18Slide 13 Veijo Huusko Vattenfall Invest In Renewables V Sent May 18
Slide 13 Veijo Huusko Vattenfall Invest In Renewables V Sent May 18
 
Bentley Case Study
Bentley Case StudyBentley Case Study
Bentley Case Study
 
Aurora Battery Storage and Flexibility Conference 2017
Aurora Battery Storage and Flexibility Conference 2017Aurora Battery Storage and Flexibility Conference 2017
Aurora Battery Storage and Flexibility Conference 2017
 
Energy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyondEnergy Storage Innovation – Li-ion and beyond
Energy Storage Innovation – Li-ion and beyond
 
South Africa's Eskom secures loan from EIB for solar power plant | Reuters
South Africa's Eskom secures loan from EIB for solar power plant
| ReutersSouth Africa's Eskom secures loan from EIB for solar power plant
| Reuters
South Africa's Eskom secures loan from EIB for solar power plant | Reuters
 
2011 07 Aberthaw Coal Fired Power Station – Mark Picton
2011 07 Aberthaw Coal Fired Power Station – Mark Picton 2011 07 Aberthaw Coal Fired Power Station – Mark Picton
2011 07 Aberthaw Coal Fired Power Station – Mark Picton
 
12 frédéric petit - siemens
12   frédéric petit - siemens12   frédéric petit - siemens
12 frédéric petit - siemens
 
Solar Energy Applications
Solar Energy ApplicationsSolar Energy Applications
Solar Energy Applications
 
Top ten biggest onshore wind farms in Europe
Top ten biggest onshore wind farms in Europe Top ten biggest onshore wind farms in Europe
Top ten biggest onshore wind farms in Europe
 
TransGrid's Renewable Energy Hub
TransGrid's Renewable Energy Hub TransGrid's Renewable Energy Hub
TransGrid's Renewable Energy Hub
 
Energy Storage: 1 - Sir David King keynote speech
Energy Storage: 1 - Sir David King keynote speechEnergy Storage: 1 - Sir David King keynote speech
Energy Storage: 1 - Sir David King keynote speech
 
Km23 power generation from silencer exhorts gasses (wecompress)
Km23 power generation from silencer exhorts gasses (wecompress)Km23 power generation from silencer exhorts gasses (wecompress)
Km23 power generation from silencer exhorts gasses (wecompress)
 
Wisselwerking industrie en ontwikkeling energienetten
Wisselwerking industrie en ontwikkeling energienettenWisselwerking industrie en ontwikkeling energienetten
Wisselwerking industrie en ontwikkeling energienetten
 
Alpha Storion Series OF5
Alpha Storion Series OF5Alpha Storion Series OF5
Alpha Storion Series OF5
 
Local Energy & Microgrids Conference 2016
Local Energy & Microgrids Conference  2016 Local Energy & Microgrids Conference  2016
Local Energy & Microgrids Conference 2016
 
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
Power LifeMax* - Solutions forB/E Gas Turbine FleetPower LifeMax* - Solutions forB/E Gas Turbine Fleet
Power LifeMax* - Solutions for B/E Gas Turbine Fleet
 
Visite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore windVisite du parc éolien Thorntonbank - Introduction to offshore wind
Visite du parc éolien Thorntonbank - Introduction to offshore wind
 
CTCI news
CTCI newsCTCI news
CTCI news
 

Destacado

Presentación merkint
Presentación merkintPresentación merkint
Presentación merkintE Leon
 
Avedas orcid outreach_meeting_20130523
Avedas orcid outreach_meeting_20130523Avedas orcid outreach_meeting_20130523
Avedas orcid outreach_meeting_20130523ORCID, Inc
 
30 receitas com_creme_de_leite
30 receitas com_creme_de_leite30 receitas com_creme_de_leite
30 receitas com_creme_de_leiteedson soares
 
Cv Jo Devisch 2010 Event Coordinator
Cv Jo Devisch 2010 Event CoordinatorCv Jo Devisch 2010 Event Coordinator
Cv Jo Devisch 2010 Event Coordinatorjodevisch
 
CURRICULLUM VITAE ernest
CURRICULLUM VITAE ernestCURRICULLUM VITAE ernest
CURRICULLUM VITAE ernestMakia Elad
 
S.t.a.r. interveiwing 5 7-12 email copy
S.t.a.r. interveiwing 5 7-12 email copyS.t.a.r. interveiwing 5 7-12 email copy
S.t.a.r. interveiwing 5 7-12 email copyRegina Seeley
 
Allplan Engineering 2016
Allplan Engineering 2016Allplan Engineering 2016
Allplan Engineering 2016Allplan
 
Niveles de servicio y el soporte que ofrece el CENAM
Niveles de servicio y el soporte que ofrece el CENAMNiveles de servicio y el soporte que ofrece el CENAM
Niveles de servicio y el soporte que ofrece el CENAMJazmin Glez.
 
Building a Drupal 8 theme with new-fangled awesomeness
Building a Drupal 8 theme with new-fangled awesomenessBuilding a Drupal 8 theme with new-fangled awesomeness
Building a Drupal 8 theme with new-fangled awesomenessHeather Brooke Drummond
 
02 folleto seibag 2012
02 folleto seibag 201202 folleto seibag 2012
02 folleto seibag 2012Seinec s.a.
 
Trabajo de que es un administrador de red
Trabajo de que es un administrador de redTrabajo de que es un administrador de red
Trabajo de que es un administrador de redCarina Manzano
 
Catalohue Montre Maserati 2014
Catalohue Montre Maserati 2014Catalohue Montre Maserati 2014
Catalohue Montre Maserati 2014bijouterie_monaco
 
En manipulación y sociopatía
En manipulación y sociopatíaEn manipulación y sociopatía
En manipulación y sociopatíaJavier Genero
 
Andhashraddha Nirmoolan Samiti Newsletter for September 2011 (VastuShastra Sp...
Andhashraddha Nirmoolan Samiti Newsletter for September 2011 (VastuShastra Sp...Andhashraddha Nirmoolan Samiti Newsletter for September 2011 (VastuShastra Sp...
Andhashraddha Nirmoolan Samiti Newsletter for September 2011 (VastuShastra Sp...MaharashtraANiS
 
mapping wilderness in Europe
mapping wilderness in Europemapping wilderness in Europe
mapping wilderness in EuropeZoltan Kun
 
I - CIEF 2015
I - CIEF 2015I - CIEF 2015
I - CIEF 2015juliaca
 
Lesiones musculares
Lesiones muscularesLesiones musculares
Lesiones muscularesyesesv
 

Destacado (20)

Code lyoko
Code lyokoCode lyoko
Code lyoko
 
Presentación merkint
Presentación merkintPresentación merkint
Presentación merkint
 
Avedas orcid outreach_meeting_20130523
Avedas orcid outreach_meeting_20130523Avedas orcid outreach_meeting_20130523
Avedas orcid outreach_meeting_20130523
 
Sistema financiero
Sistema financieroSistema financiero
Sistema financiero
 
30 receitas com_creme_de_leite
30 receitas com_creme_de_leite30 receitas com_creme_de_leite
30 receitas com_creme_de_leite
 
Cv Jo Devisch 2010 Event Coordinator
Cv Jo Devisch 2010 Event CoordinatorCv Jo Devisch 2010 Event Coordinator
Cv Jo Devisch 2010 Event Coordinator
 
CURRICULLUM VITAE ernest
CURRICULLUM VITAE ernestCURRICULLUM VITAE ernest
CURRICULLUM VITAE ernest
 
S.t.a.r. interveiwing 5 7-12 email copy
S.t.a.r. interveiwing 5 7-12 email copyS.t.a.r. interveiwing 5 7-12 email copy
S.t.a.r. interveiwing 5 7-12 email copy
 
Allplan Engineering 2016
Allplan Engineering 2016Allplan Engineering 2016
Allplan Engineering 2016
 
Niveles de servicio y el soporte que ofrece el CENAM
Niveles de servicio y el soporte que ofrece el CENAMNiveles de servicio y el soporte que ofrece el CENAM
Niveles de servicio y el soporte que ofrece el CENAM
 
Building a Drupal 8 theme with new-fangled awesomeness
Building a Drupal 8 theme with new-fangled awesomenessBuilding a Drupal 8 theme with new-fangled awesomeness
Building a Drupal 8 theme with new-fangled awesomeness
 
02 folleto seibag 2012
02 folleto seibag 201202 folleto seibag 2012
02 folleto seibag 2012
 
Trabajo de que es un administrador de red
Trabajo de que es un administrador de redTrabajo de que es un administrador de red
Trabajo de que es un administrador de red
 
Catalohue Montre Maserati 2014
Catalohue Montre Maserati 2014Catalohue Montre Maserati 2014
Catalohue Montre Maserati 2014
 
Symfony2 revealed
Symfony2 revealedSymfony2 revealed
Symfony2 revealed
 
En manipulación y sociopatía
En manipulación y sociopatíaEn manipulación y sociopatía
En manipulación y sociopatía
 
Andhashraddha Nirmoolan Samiti Newsletter for September 2011 (VastuShastra Sp...
Andhashraddha Nirmoolan Samiti Newsletter for September 2011 (VastuShastra Sp...Andhashraddha Nirmoolan Samiti Newsletter for September 2011 (VastuShastra Sp...
Andhashraddha Nirmoolan Samiti Newsletter for September 2011 (VastuShastra Sp...
 
mapping wilderness in Europe
mapping wilderness in Europemapping wilderness in Europe
mapping wilderness in Europe
 
I - CIEF 2015
I - CIEF 2015I - CIEF 2015
I - CIEF 2015
 
Lesiones musculares
Lesiones muscularesLesiones musculares
Lesiones musculares
 

Similar a Carrington

Colongra fact sheet
Colongra fact sheetColongra fact sheet
Colongra fact sheetJens Schulz
 
ITM Power Hydrogen Solutions/ Case Studies
ITM Power Hydrogen Solutions/ Case StudiesITM Power Hydrogen Solutions/ Case Studies
ITM Power Hydrogen Solutions/ Case StudiesRebecca Markillie
 
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...ARAaus
 
Comprehensive Power Introduction Nov2013
Comprehensive Power Introduction Nov2013Comprehensive Power Introduction Nov2013
Comprehensive Power Introduction Nov2013Jeff Sable
 
2017 11-15 why hywind oslo exchange
2017 11-15 why hywind oslo exchange2017 11-15 why hywind oslo exchange
2017 11-15 why hywind oslo exchangeXynteo
 
Wasco Engineering Newsletter Q4 2017
Wasco Engineering Newsletter Q4 2017Wasco Engineering Newsletter Q4 2017
Wasco Engineering Newsletter Q4 2017Steven Grundy
 
Comprehensive Power Introduction Oct2013
Comprehensive Power Introduction Oct2013Comprehensive Power Introduction Oct2013
Comprehensive Power Introduction Oct2013Jeff Sable
 
SmartPower-August 2015-Newsletter
SmartPower-August 2015-NewsletterSmartPower-August 2015-Newsletter
SmartPower-August 2015-NewsletterFergus Wheatley
 
Repowering and Used Wind Turbined
Repowering and Used Wind TurbinedRepowering and Used Wind Turbined
Repowering and Used Wind TurbinedLeonardo ENERGY
 
Bringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserBringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserEMEX
 
Latest presentation wind 2010 eng luk
Latest presentation wind 2010 eng lukLatest presentation wind 2010 eng luk
Latest presentation wind 2010 eng lukEuropages2
 

Similar a Carrington (20)

Samra
SamraSamra
Samra
 
Colongra fact sheet
Colongra fact sheetColongra fact sheet
Colongra fact sheet
 
ALSTOM report
ALSTOM reportALSTOM report
ALSTOM report
 
Gas power-plants
Gas power-plantsGas power-plants
Gas power-plants
 
Wind power
Wind powerWind power
Wind power
 
2015 Skipsavis no 1v2
2015 Skipsavis no 1v22015 Skipsavis no 1v2
2015 Skipsavis no 1v2
 
ITM Power Hydrogen Solutions/ Case Studies
ITM Power Hydrogen Solutions/ Case StudiesITM Power Hydrogen Solutions/ Case Studies
ITM Power Hydrogen Solutions/ Case Studies
 
Aoil wind power ppt 2015
Aoil wind power ppt 2015Aoil wind power ppt 2015
Aoil wind power ppt 2015
 
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...
Sam czyczelis emscap presentation hvacr energy effeciency seminar 2016 format...
 
Comprehensive Power Introduction Nov2013
Comprehensive Power Introduction Nov2013Comprehensive Power Introduction Nov2013
Comprehensive Power Introduction Nov2013
 
2017 11-15 why hywind oslo exchange
2017 11-15 why hywind oslo exchange2017 11-15 why hywind oslo exchange
2017 11-15 why hywind oslo exchange
 
Wasco Engineering Newsletter Q4 2017
Wasco Engineering Newsletter Q4 2017Wasco Engineering Newsletter Q4 2017
Wasco Engineering Newsletter Q4 2017
 
Comprehensive Power Introduction Oct2013
Comprehensive Power Introduction Oct2013Comprehensive Power Introduction Oct2013
Comprehensive Power Introduction Oct2013
 
SmartPower-August 2015-Newsletter
SmartPower-August 2015-NewsletterSmartPower-August 2015-Newsletter
SmartPower-August 2015-Newsletter
 
Repowering and Used Wind Turbined
Repowering and Used Wind TurbinedRepowering and Used Wind Turbined
Repowering and Used Wind Turbined
 
Marlec direct-2013
Marlec direct-2013Marlec direct-2013
Marlec direct-2013
 
Heat exchangers
Heat exchangersHeat exchangers
Heat exchangers
 
Bringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the UserBringing Energy Cost Control Back to the User
Bringing Energy Cost Control Back to the User
 
GREC wood gasification brochure
GREC wood gasification brochureGREC wood gasification brochure
GREC wood gasification brochure
 
Latest presentation wind 2010 eng luk
Latest presentation wind 2010 eng lukLatest presentation wind 2010 eng luk
Latest presentation wind 2010 eng luk
 

Carrington

  • 1. TPW/LEAF/CUKGFPPKA26/eng/COMTPW/02.13/FR/7773 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No repre- sentation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper. Alstom has been awarded a contract by Carrington Power Limited, for the supply of the power island (Gas Turbine, Steam Turbine and heat recovery steam generator (HRSG)) for the new Carrington Power gas-fired power station. The contract was signed in consortium with Duro Felguera, a Spanish company specialising in the construction of power plants. The new 880 MW power plant will be located on the site of the old Carrington power station in Trafford, next to the Manchester Shipping Canal and the River Mersey, United Kingdom. It will be built under an Engineering, Procurement and Construction (EPC) contract. Duro Felguera is responsible for civil works, construction and balance of plant equipment. Alstom’s scope includes the supply of two GT26 gas turbines and other key components, including two steam turbines, two HRSG’s and the associated turbogenerators. Additionally, Alstom has been awarded a Long-Term Service Agreement (LTSA) to maintain the power train and ancillaries once it enters commercial operation. The power station will be capable of providing enough power for around a million homes. In the UK, Alstom has built and now maintains and operates over half of the country’s gas-fired power generation capacity. Recent gas-fired plants constructed in the UK include the 1,650 MW Staythorpe plant in Nottinghamshire, the 2,160 MW Pembroke power plant in South Wales, the 900 MW Langage power plant in Devon and the 1,275 MW Grain power plant on the Isle of Grain. With the Carrington project, Alstom will have supplied twenty-two GT26 units to the UK. Customer:...................................... Carrington Power Ltd, 100% owned by ESB Scope of supply:............................ 2 x KA26-1 SS + 12 years Long-Term Service Agreement (LTSA) Electrical output:........................... 880 MW Fuel:............................................... Natural gas Cooling System:............................. Hybrid cooling tower Application:.................................... Power generation The ninth major KA26 contract for a new gas-fired power station in the UK. CASE STUDY: GAS PRODUCT SOLUTIONS Carrington – United Kingdom KA26 combined-cycle power plant Advantages • Prominent operational and fuel flexibility • High reliability • Superior part-load performance • Low NOx emissions over a wide load range With its environmental and economic advantages, this plant is another example of Alstom’s capability to deliver clean integrated power solutions
  • 2. TPW/LEAF/CUKGFPPKA26/eng/COMTPW/02.13/FR/7773 © ALSTOM 2013. All rights reserved. Information contained in this document is indicative only. No repre- sentation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Alstom contributes to the protection of the environment. This leaflet is printed on environmentally-friendly paper. Case study: GAS PRODUCT SOLUTIONS Carrington – United Kingdom For more information please contact Alstom Power: ALSTOM (Switzerland) Ltd. Brown Boveri Strasse 7 5401 Baden Switzerland Visit us online: www.alstom.com Our Plant Integrator™ approach offers more value for customers The Plant Integrator™ concept is Alstom’s unique way of creating more value for customers. We combine outstanding expertise at both component and plant levels, as we are both an equipment designer and a manufacturer. In addition, we are an Engineering, Procurement and Construction (EPC) contractor with proven worldwide references. Through close collaboration, we assure that our customers meet their business objectives and serve their market more effectively. There are four Plant Integrator™ factors that help increase the Net Present Value for our customers. Plant Integrator™ Factors Customer Benefits INVESTMENT • Optimised capital investment LEAD TIME • Shorter lead times to produce electricity faster PERFORMANCE • Higher power plant efficiency for increased power output over a wide range of operational modes • Reduced emissions to meet environmental responsibility • Lower Operation Maintenance (OM) cost AVAILABILITY FLEXIBILITY • Better reliability, availability and flexibility PROJECT FEATURES The Carrington Project benefits from the superior integration resulting from Alstom’s project management skills, EPC capabilities and state-of-the-art key components: • 2 Alstom highly flexible and clean-power producing GT26 gas turbines with unique sequential combustion • 2 Alstom horizontal triple-pressure heat recovery steam generators for high plant efficiency • 2 Alstom STF15C steam turbines with axial exhaust for flexible, highly efficient operation • 2 Alstom TOPGAS hydrogen-cooled turbogenerators, for high efficiency and availability • Alstom plant Distributed Control System (DCS), Alspa Series 6. Arrangement An environmentally friendly plant with high efficiency and high flexibility.