PEARL COMMUNITY
• FOR LARGE COMMUNITIES
• ADEQUATE FOR DEVELOPMENTS OF MORE
THAN 75,000 m2
PEARL BUILDING
• FOR BUILDINGS
• ADEQUATE FOR ONE OR MORE BUILDING
WITH A TOTAL AREA OF LESS THAN 75,000 m2
PEARLVILLA
• FORVILLAS
• ADEQUATE FOR INDIVIDUAL HOMES AND
VILLAS
DESIGN RATING
CONSTRUCTION
RATING
OPERATIONAL
RATING ??
Design rating
ensures all the
credits submitted at
the design stage are
achievable
Construction rating
ensures that all credits
submitted in design stage
are achieved at the end of
construction
Design rating
ensures all the
credits submitted at
the design stage are
achievable
Operational rating ensures building
continue to achieve the intent of design
throughout its life
(this rating is not yet implemented)
Construction rating
ensures that all credits
submitted in design stage
are achieved at the end of
construction
Design rating
ensures all the
credits submitted at
the design stage are
achievable
Consideration
for local
weather
Consideration for
the precious water
Consideration
for the
particular
nature
Consideration for
the cultural
heritage
Consideration
for the
Emirate urban
development
Integration
within Abu
Dhabi’s
vision 2030
Lower energy demand
means lower energy cost
Better
maintenance
plan means
lower running
cost
Healthier environment
means higher
productivity
Leadership in
environmental
friendliness
Promotion of
environmental
awareness
WINDOWS
SHADES
TRANSPARENT SPACES
(OUTSIDEVUE)
NATURAL LIGHTING
RE-R1 MINIMUM ENERGY
REQUIRMENTS
RE-1 IMPROVED ENERGY
PERFORMANCE
RE-2 COOL BUILDING
STRATEGY
MANDATORY – RE-R1 #B-8:
• COMPLY WITH ABU DHABI IECC 502, 503, 505 AND AN OPTION
OF 506
• ACHIEVE ENERGY PERFORMANCE 12 % BETTERTHAN ASHRAE
90.1:2007 REQUIREMENTS
MUNICIPALITY MINIMUM PROGRAM:
• ACHIEVE GLASS PANEL UVALUE OF 1.8 W/m2K AND AN
ASSEMBLY UVALUE OF 2.2W/m2K
ENERGY PERFORMANCE CREDIT POINTS – RE-1:
• DEMONSTRATE ENERGY PERFORMANCE 14% TO 60% BETTER
THAN ASHRAE 90.1:2007 REQUIREMENTS TO ACHIEVE CREDIT
POINTS 1 TO 15
COOL BUILDING STRATEGIS CREDIT POINTS – RE-2:
• DEMONSTRATE PASSIVE DESIGN MEASURTES LEADTO HEAT
REDUCTION OF 10%TO 50% COMPARED TO BASELINETO
ACHIEVE CREDIT POINTS 1 TO 5 THROUGH:
1. ORIENTATION
2. GLAZING RATIO
3. SHGC
4. SHADING
5. AIRTIGHTNESS
6. INSULATION
7. ANY OTHER PASSIVE METHOD
• USE COOL ROOF TO ACHIEVE AN ADDITION CREDIT POINT
LBi-7 / LV-8
DAYLIGHT & GLARE
Lbi-8VIEWS
DAYLIGHT CREDIT POINTS – LBi-7 AND LV-8:
• DEMONSTRATE AT 10AM, 12PM, 2PM ON THE EQUINOX AND
THE SUMMER SOLSTICE:
• OFFICES: 250 Lux ON WORK PLANE: 1CREDIT 50%, 2
CREDITS 75%
• RESIDENTIAL: 200 Lux ON LIVING AREAS FLOOR: 1CREDIT
50%, 2 CREDITS 75%
• SCHOOLS: 300 Lux ON WORK PLANE: 1CREDIT 75%, 2
CREDITS 90%
• PROVIDE OCCUPANCY SENSORS AS REQUIRED
GLARE (REQUIRED FORTHIS CREDIT)– LBi-7:
• DEMONSTRATE GLARE CONTROL DEVICES ARE INSTALLED, IF
AUTOMATED, IT MUST BE CONNECTED TO THE BMS.
NOTE: RETAIL IS NOT ELIGIBLE FOR THIS CREDIT
SM-4 (BUILDING) DESIGN FOR
DISASSEMBLY
SM-6 (BUILDING) & SM-2 (VILLA) DESIGN
FOR DURABILITY
SM-8 (BUILDING) MATERIAL REUSE
SM-9 (BUILDING) & SM-4 (VILLA) & IB#11
REGIONAL MATERIALS
SM-10 (BUILDING) & SM-5 (VILLA)
RECYCLED MATERIALS
SM-4 (BUILDING) DESIGN FOR DISASSEMBLY
• 1 CREDIT: DEMONSTRATE 75% OF FAÇADE AREA CAN BE
DISASSEMBLED
SM-6 (BUILDING) & SM-2 (VILLA) DESIGN FOR DURABILITY
• 1 CREDIT: PROVIDE A DURABILITY PLAN DEMONSTRATING
IMPROVED DURABILITY FOR FAÇADE ELEMENTS AMONG OTHER
ELEMENTS AND ENSURE MAINTENANCE IS EASY.
SM-8 (BUILDING) MATERIAL REUSE
• 1 CREDIT: DEMONSTRATETHAT THE TOTAL MATERIAL COST OF
REUSED AND SALVAGED MATERIALS REPRESENTS 3% OF THE
TOTAL MATERIAL COST, INCLUDING GLASS PANELS.
SM-9 (BUILDING) & SM-4 (VILLA) & IB#11 REGIONAL
MATERIALS
• 1 CREDIT: COST OF REGIONAL MATERIALS IS 5% OF TOTAL COST
• 2 CREDITS: COST OF REGIONAL MATERIALS IS 10% OF TOTAL
COST
REGIONAL MATERIAL IS DEFINEDTO BE ORIGINATINGWITHING 500
KM OR MANUFACTURED WITHINTHE UAE BOUNDARIES. SIMPLE
ASSEMBLY DOES NOT QUALIFY.
SM-10 (BUILDING) & SM-5 (VILLA) RECYCLED MATERIALS
• 1 CREDIT: COST OF RECYCLED MATERIALS IS 10% OF TOTAL COST.
ACCEPTED COMBINATIONS OF THE FOLLOWING:
• MINIMUM 30% POST-CONSUMER RECYCLED CONTENT
• MINIMUM OF 80% POST-INDUSTRIAL CONTENT
• 50% AGRICULTURALWASTE BY-PRODUCT
3RD PARTY
TESTING
ENVELOPE U-
VALUE
U-VALUETHIRD PARTY
TESTING
• THIRD-PARTYTEST
CERTIFICATE
DEMONSTRATING
THERMAL PROPERTIES OF
ELEMENTS
ENVELOPE U-VALUE
• SHOP DRAWINGS HIGHLIGHTING ENVELOPE ELEMENTSWITH
DIFFERENT U-VALUES
FERTIL NON-PROCESS BUILDINGS
6 3-PEARL RATED BUILDINGS
1ST EVER 3 PEARL RATED MOSQUE
1ST EVER 3 PEARL RATED
WAREHOUSE
a
a
a
a
FERTIL NON-PROCESS BUILDINGS
GLASS USED:
SHGC: 28%
SC: 0.22
UVALUE: 1.09W/M2k
ARGON FILLED
ASSEMBLY:6mm / 20 mm / 6mm
FRAMES USED:
THERMALLY BROKEN POWDER
COATED ALUMINIUM SECTION
ACHIEVEMENT:
ACHIEVEDVIEWS POINT
14% ENERGY REDUCTION
FULLY ACHIEVED COOL
BUILDING STRATEGY (5
POINTS)
Designing with glass to achieve estidama pearl ratings

Más contenido relacionado

La actualidad más candente

Dissertation report on underwater structures with proposal
Dissertation report on underwater structures with proposalDissertation report on underwater structures with proposal
Dissertation report on underwater structures with proposal
Adiba Nisar
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre final
JYOTSNA MISHRA
 
Al hamra arts complex Lahore complete Plans,Sections & Elevations
Al hamra arts complex Lahore complete Plans,Sections & ElevationsAl hamra arts complex Lahore complete Plans,Sections & Elevations
Al hamra arts complex Lahore complete Plans,Sections & Elevations
Saqib Haroon
 

La actualidad más candente (20)

convention and exhibition litrature
convention and exhibition litratureconvention and exhibition litrature
convention and exhibition litrature
 
NATIONAL INSTITUTE OF BANK MANAGEMENT (NIBM), PUNE
NATIONAL INSTITUTE OF BANK MANAGEMENT (NIBM), PUNENATIONAL INSTITUTE OF BANK MANAGEMENT (NIBM), PUNE
NATIONAL INSTITUTE OF BANK MANAGEMENT (NIBM), PUNE
 
Data collection convention center
Data collection convention center  Data collection convention center
Data collection convention center
 
kala-academy
kala-academykala-academy
kala-academy
 
Renzo piano POMPIDOU CENTRE PARIS
Renzo piano POMPIDOU CENTRE PARIS Renzo piano POMPIDOU CENTRE PARIS
Renzo piano POMPIDOU CENTRE PARIS
 
Sabarmati Riverfront Development Project
Sabarmati Riverfront Development ProjectSabarmati Riverfront Development Project
Sabarmati Riverfront Development Project
 
Dissertation report on underwater structures with proposal
Dissertation report on underwater structures with proposalDissertation report on underwater structures with proposal
Dissertation report on underwater structures with proposal
 
Auroville: City Planning
Auroville: City PlanningAuroville: City Planning
Auroville: City Planning
 
Thesis Report
Thesis ReportThesis Report
Thesis Report
 
9 11 memorial museum
9 11 memorial museum9 11 memorial museum
9 11 memorial museum
 
Performing Arts Centre final
Performing Arts Centre finalPerforming Arts Centre final
Performing Arts Centre final
 
Ar. Raj Rewal
Ar. Raj RewalAr. Raj Rewal
Ar. Raj Rewal
 
Case study hastha shilpa heritage village
Case study hastha shilpa heritage villageCase study hastha shilpa heritage village
Case study hastha shilpa heritage village
 
Al hamra arts complex Lahore complete Plans,Sections & Elevations
Al hamra arts complex Lahore complete Plans,Sections & ElevationsAl hamra arts complex Lahore complete Plans,Sections & Elevations
Al hamra arts complex Lahore complete Plans,Sections & Elevations
 
Darpana academy performing arts, Ahemdabad vernacular ARCHITECTURE
Darpana academy performing arts, Ahemdabad vernacular ARCHITECTUREDarpana academy performing arts, Ahemdabad vernacular ARCHITECTURE
Darpana academy performing arts, Ahemdabad vernacular ARCHITECTURE
 
Acoustic case study
Acoustic case studyAcoustic case study
Acoustic case study
 
Proscenium theatre
Proscenium theatreProscenium theatre
Proscenium theatre
 
GROUP HOUSING CASE STUDY(COM)
GROUP HOUSING CASE STUDY(COM)GROUP HOUSING CASE STUDY(COM)
GROUP HOUSING CASE STUDY(COM)
 
INTERNATIONAL CRUISE TERMINAL -THESIS REPORT
INTERNATIONAL CRUISE TERMINAL -THESIS REPORTINTERNATIONAL CRUISE TERMINAL -THESIS REPORT
INTERNATIONAL CRUISE TERMINAL -THESIS REPORT
 
Sheikh sarai housing complex
Sheikh sarai housing complexSheikh sarai housing complex
Sheikh sarai housing complex
 

Destacado

Destacado (20)

Architype - Adopting BIM - An Architect's Perspective
Architype - Adopting BIM - An Architect's PerspectiveArchitype - Adopting BIM - An Architect's Perspective
Architype - Adopting BIM - An Architect's Perspective
 
Architype - Delivering Radical Low Energy Performance with BIM
Architype - Delivering Radical Low Energy Performance with BIMArchitype - Delivering Radical Low Energy Performance with BIM
Architype - Delivering Radical Low Energy Performance with BIM
 
M Simpson coursework
M Simpson courseworkM Simpson coursework
M Simpson coursework
 
Passivhaus primary schools and how architects can drive their adoption
Passivhaus primary schools and how architects can drive their adoptionPassivhaus primary schools and how architects can drive their adoption
Passivhaus primary schools and how architects can drive their adoption
 
HPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal PresentationHPR Integrated Design - BIM/IPD Proposal Presentation
HPR Integrated Design - BIM/IPD Proposal Presentation
 
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.
PASSIVHAUS IN PLAIN ENGLISH & MORE. The story behind the blog.
 
Designing & Learning from Passivhaus Education Buildings
Designing & Learning from Passivhaus Education BuildingsDesigning & Learning from Passivhaus Education Buildings
Designing & Learning from Passivhaus Education Buildings
 
Bim and integrated design
Bim and integrated designBim and integrated design
Bim and integrated design
 
5 things to know about Passivhaus
5 things to know about Passivhaus5 things to know about Passivhaus
5 things to know about Passivhaus
 
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?Passivhaus: Sacrificing Natural Materials for Energy Efficiency?
Passivhaus: Sacrificing Natural Materials for Energy Efficiency?
 
Architype - Passive Beyond The House
Architype - Passive Beyond The HouseArchitype - Passive Beyond The House
Architype - Passive Beyond The House
 
Designing with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratingsDesigning with glass to achieve estidama pearl ratings
Designing with glass to achieve estidama pearl ratings
 
Mind the Gap - What can Passive House Design teach us about closing the build...
Mind the Gap - What can Passive House Design teach us about closing the build...Mind the Gap - What can Passive House Design teach us about closing the build...
Mind the Gap - What can Passive House Design teach us about closing the build...
 
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
Architype - Standardised Passivhaus Schools, Ecobuild UK 2014
 
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
Architype - Green BIM UK Perspective, NTU Taipei, 13 February 2014
 
Designign fully glazed buildings that can be easily cleaned and maintained
Designign fully glazed buildings that can be easily cleaned and maintainedDesignign fully glazed buildings that can be easily cleaned and maintained
Designign fully glazed buildings that can be easily cleaned and maintained
 
International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5International BIM Implementation for The Saudi Big 5
International BIM Implementation for The Saudi Big 5
 
RIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + ApplicationRIBA Part 3 Course: BIM Overview + Application
RIBA Part 3 Course: BIM Overview + Application
 
BIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuctionBIM process adoption for integrated design and constuction
BIM process adoption for integrated design and constuction
 
Sustainable Passivhaus School Design
Sustainable Passivhaus School DesignSustainable Passivhaus School Design
Sustainable Passivhaus School Design
 

Similar a Designing with glass to achieve estidama pearl ratings

Presentation_LeedCD_245
Presentation_LeedCD_245Presentation_LeedCD_245
Presentation_LeedCD_245
Adam Carducci
 
CURRICULUM____VITAE CIVIL ENGIMEER
CURRICULUM____VITAE CIVIL ENGIMEERCURRICULUM____VITAE CIVIL ENGIMEER
CURRICULUM____VITAE CIVIL ENGIMEER
Riaz Mohammad
 
Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2
Ernesto Correa
 

Similar a Designing with glass to achieve estidama pearl ratings (20)

LEED Introduction & Naked Stables
LEED Introduction & Naked StablesLEED Introduction & Naked Stables
LEED Introduction & Naked Stables
 
Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"
 
Moving to High Performance Design
Moving to High Performance DesignMoving to High Performance Design
Moving to High Performance Design
 
Green buildings
Green buildings  Green buildings
Green buildings
 
Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429Leed v4-view-from-mep-seats-140429
Leed v4-view-from-mep-seats-140429
 
Presentation_LeedCD_245
Presentation_LeedCD_245Presentation_LeedCD_245
Presentation_LeedCD_245
 
Integrate Early; Integrate Often
Integrate Early; Integrate OftenIntegrate Early; Integrate Often
Integrate Early; Integrate Often
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSF
 
Griha - green rating for integrated habitat assesment
Griha - green rating for integrated habitat assesmentGriha - green rating for integrated habitat assesment
Griha - green rating for integrated habitat assesment
 
Ghassan al otaibi cv
Ghassan al otaibi cvGhassan al otaibi cv
Ghassan al otaibi cv
 
greenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdfgreenbuildingppt-161123093000.pdf
greenbuildingppt-161123093000.pdf
 
Green building ppt
Green building pptGreen building ppt
Green building ppt
 
TRAINING PROGRAM FOR SITE MANAGERS.ppt
TRAINING PROGRAM FOR SITE MANAGERS.pptTRAINING PROGRAM FOR SITE MANAGERS.ppt
TRAINING PROGRAM FOR SITE MANAGERS.ppt
 
03 USGBC 090816
03 USGBC 09081603 USGBC 090816
03 USGBC 090816
 
CURRICULUM____VITAE CIVIL ENGIMEER
CURRICULUM____VITAE CIVIL ENGIMEERCURRICULUM____VITAE CIVIL ENGIMEER
CURRICULUM____VITAE CIVIL ENGIMEER
 
Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2Development Proposal Shanghai Group 2
Development Proposal Shanghai Group 2
 
Hussein Khalil CV
Hussein Khalil CVHussein Khalil CV
Hussein Khalil CV
 
Regulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in BangaloreRegulatory Requisites & Development Cost Analysis in Bangalore
Regulatory Requisites & Development Cost Analysis in Bangalore
 
Rak precast vs sustainability
Rak precast vs sustainability   Rak precast vs sustainability
Rak precast vs sustainability
 
Leed
LeedLeed
Leed
 

Último

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Último (20)

Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 

Designing with glass to achieve estidama pearl ratings

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6. PEARL COMMUNITY • FOR LARGE COMMUNITIES • ADEQUATE FOR DEVELOPMENTS OF MORE THAN 75,000 m2 PEARL BUILDING • FOR BUILDINGS • ADEQUATE FOR ONE OR MORE BUILDING WITH A TOTAL AREA OF LESS THAN 75,000 m2 PEARLVILLA • FORVILLAS • ADEQUATE FOR INDIVIDUAL HOMES AND VILLAS
  • 8. Design rating ensures all the credits submitted at the design stage are achievable
  • 9. Construction rating ensures that all credits submitted in design stage are achieved at the end of construction Design rating ensures all the credits submitted at the design stage are achievable
  • 10. Operational rating ensures building continue to achieve the intent of design throughout its life (this rating is not yet implemented) Construction rating ensures that all credits submitted in design stage are achieved at the end of construction Design rating ensures all the credits submitted at the design stage are achievable
  • 11.
  • 12.
  • 13. Consideration for local weather Consideration for the precious water Consideration for the particular nature Consideration for the cultural heritage Consideration for the Emirate urban development
  • 14. Integration within Abu Dhabi’s vision 2030 Lower energy demand means lower energy cost Better maintenance plan means lower running cost Healthier environment means higher productivity Leadership in environmental friendliness Promotion of environmental awareness
  • 15.
  • 16.
  • 19. RE-R1 MINIMUM ENERGY REQUIRMENTS RE-1 IMPROVED ENERGY PERFORMANCE RE-2 COOL BUILDING STRATEGY
  • 20. MANDATORY – RE-R1 #B-8: • COMPLY WITH ABU DHABI IECC 502, 503, 505 AND AN OPTION OF 506 • ACHIEVE ENERGY PERFORMANCE 12 % BETTERTHAN ASHRAE 90.1:2007 REQUIREMENTS MUNICIPALITY MINIMUM PROGRAM: • ACHIEVE GLASS PANEL UVALUE OF 1.8 W/m2K AND AN ASSEMBLY UVALUE OF 2.2W/m2K ENERGY PERFORMANCE CREDIT POINTS – RE-1: • DEMONSTRATE ENERGY PERFORMANCE 14% TO 60% BETTER THAN ASHRAE 90.1:2007 REQUIREMENTS TO ACHIEVE CREDIT POINTS 1 TO 15
  • 21. COOL BUILDING STRATEGIS CREDIT POINTS – RE-2: • DEMONSTRATE PASSIVE DESIGN MEASURTES LEADTO HEAT REDUCTION OF 10%TO 50% COMPARED TO BASELINETO ACHIEVE CREDIT POINTS 1 TO 5 THROUGH: 1. ORIENTATION 2. GLAZING RATIO 3. SHGC 4. SHADING 5. AIRTIGHTNESS 6. INSULATION 7. ANY OTHER PASSIVE METHOD • USE COOL ROOF TO ACHIEVE AN ADDITION CREDIT POINT
  • 22. LBi-7 / LV-8 DAYLIGHT & GLARE Lbi-8VIEWS
  • 23. DAYLIGHT CREDIT POINTS – LBi-7 AND LV-8: • DEMONSTRATE AT 10AM, 12PM, 2PM ON THE EQUINOX AND THE SUMMER SOLSTICE: • OFFICES: 250 Lux ON WORK PLANE: 1CREDIT 50%, 2 CREDITS 75% • RESIDENTIAL: 200 Lux ON LIVING AREAS FLOOR: 1CREDIT 50%, 2 CREDITS 75% • SCHOOLS: 300 Lux ON WORK PLANE: 1CREDIT 75%, 2 CREDITS 90% • PROVIDE OCCUPANCY SENSORS AS REQUIRED GLARE (REQUIRED FORTHIS CREDIT)– LBi-7: • DEMONSTRATE GLARE CONTROL DEVICES ARE INSTALLED, IF AUTOMATED, IT MUST BE CONNECTED TO THE BMS. NOTE: RETAIL IS NOT ELIGIBLE FOR THIS CREDIT
  • 24. SM-4 (BUILDING) DESIGN FOR DISASSEMBLY SM-6 (BUILDING) & SM-2 (VILLA) DESIGN FOR DURABILITY SM-8 (BUILDING) MATERIAL REUSE SM-9 (BUILDING) & SM-4 (VILLA) & IB#11 REGIONAL MATERIALS SM-10 (BUILDING) & SM-5 (VILLA) RECYCLED MATERIALS
  • 25. SM-4 (BUILDING) DESIGN FOR DISASSEMBLY • 1 CREDIT: DEMONSTRATE 75% OF FAÇADE AREA CAN BE DISASSEMBLED SM-6 (BUILDING) & SM-2 (VILLA) DESIGN FOR DURABILITY • 1 CREDIT: PROVIDE A DURABILITY PLAN DEMONSTRATING IMPROVED DURABILITY FOR FAÇADE ELEMENTS AMONG OTHER ELEMENTS AND ENSURE MAINTENANCE IS EASY. SM-8 (BUILDING) MATERIAL REUSE • 1 CREDIT: DEMONSTRATETHAT THE TOTAL MATERIAL COST OF REUSED AND SALVAGED MATERIALS REPRESENTS 3% OF THE TOTAL MATERIAL COST, INCLUDING GLASS PANELS.
  • 26. SM-9 (BUILDING) & SM-4 (VILLA) & IB#11 REGIONAL MATERIALS • 1 CREDIT: COST OF REGIONAL MATERIALS IS 5% OF TOTAL COST • 2 CREDITS: COST OF REGIONAL MATERIALS IS 10% OF TOTAL COST REGIONAL MATERIAL IS DEFINEDTO BE ORIGINATINGWITHING 500 KM OR MANUFACTURED WITHINTHE UAE BOUNDARIES. SIMPLE ASSEMBLY DOES NOT QUALIFY. SM-10 (BUILDING) & SM-5 (VILLA) RECYCLED MATERIALS • 1 CREDIT: COST OF RECYCLED MATERIALS IS 10% OF TOTAL COST. ACCEPTED COMBINATIONS OF THE FOLLOWING: • MINIMUM 30% POST-CONSUMER RECYCLED CONTENT • MINIMUM OF 80% POST-INDUSTRIAL CONTENT • 50% AGRICULTURALWASTE BY-PRODUCT
  • 29. ENVELOPE U-VALUE • SHOP DRAWINGS HIGHLIGHTING ENVELOPE ELEMENTSWITH DIFFERENT U-VALUES
  • 30. FERTIL NON-PROCESS BUILDINGS 6 3-PEARL RATED BUILDINGS 1ST EVER 3 PEARL RATED MOSQUE 1ST EVER 3 PEARL RATED WAREHOUSE a a a a
  • 31. FERTIL NON-PROCESS BUILDINGS GLASS USED: SHGC: 28% SC: 0.22 UVALUE: 1.09W/M2k ARGON FILLED ASSEMBLY:6mm / 20 mm / 6mm FRAMES USED: THERMALLY BROKEN POWDER COATED ALUMINIUM SECTION ACHIEVEMENT: ACHIEVEDVIEWS POINT 14% ENERGY REDUCTION FULLY ACHIEVED COOL BUILDING STRATEGY (5 POINTS)