SlideShare una empresa de Scribd logo
1 de 1
1A. Opportunity: Elimination of Planning Downtime

A3 Report

Team Member
Names:

Site/Plant: Manaus

Date:22/08/2012

Group/Workcell/Site: STB

Leader: Thiego Silva

Annual Savings (US$):

1B. CLARIFY THE PROBLEM:

Rodrigo Marques

Downtime IM / FA

Root Causes

Problem Identification:
High

Where:

IM/FA
Wk 25 ~ Wk 28

How much:

-100% of planning
Downtime is related
to Lack of available
package in the
process.

What:

When:

2. BREAKDOWN THE PROBLEM:

Mentor: Thiego Silva

5 & 6. DEVELOP & IMPLEMENT COUNTERMEASURES:

Key Metric to Impact:

High Downtime:
IM / FA

Nattyer Nunes

Selected Countermeasure

Who

Finish

IC Team

WK 1229

WK 1229

Thiego Silva

WK 1229

WK 1229

Providing area for packaging in shelves

15%

There is no
standardization at
location of packages by
size and model.

Separation and standardization of packages location
according to the type
Visual identification of each location for packages

Rodrigo Marques

Data collection – After improvement

Waste(s) Identified

Target

7. EVALUATE RESULTS:

Transportation:

WK 1229

WK 1229

Nattyer Nunes

Planning Downtime
Eliminated

WK 1229

Before

WK 1229

A fter

Inventory:

Savings

Motion:
Waiting:

MVA – Material Value Added
per unit

US$ 6 / unit

MVA / Hour (MVA x Rate)

X

US$ 1422 / h

- 15% of Average
Downtime IM/FA is
related to Planning.

Overproduction:

Defects

Plannig Downtime

5 Hours / Week

- Average Downtime
is 5 hours per week.

Skills Unused

Total Saving/WK

US$ 7110/ Week

Total Saving/Month

US$ 28440 / Month

Over processing

3. SET A TARGET (The challenge):

8. STANDARDIZE:

Eliminate Planning Downtime from 5 Hours per Week to 0 Hours per Week by July 2012.

4. ANALYZE THE ROOT CAUSE:

Environment
- Lack of organization of the location of packages
- The location of packages is not standardized

Planning
Downtime: Lack
of available
package
- Operator loses time when looking for packages

- Employees not trained about how organize the place of package

Method

Means of Standardization:
Standard Work

-Why planning Downtime?
Due lack of available package in the
process
-Why?
Because the packages were not available
when the process was requested.
-Why?
Because operator loses time looking for
packages
-Why?
Due lack of organization of the packages
-Why?
There is no standardization at location of
packages by size and model.

Visual Aids

Global Document /Procedures

Training

Other

X

Process Audits:
LPA

TPM Checklist

5S Audit

X

Other

Next challenge:
- Eliminate buffer and other wastes that can be solved by Planning Team.
Sharing with others:
- Share this project with production leaders and stock area employees.
Lessons Learned:
Visual Management is an important tool. It makes problems visible.
Form #: F-108 - Revision Date: 02/17/2012

Más contenido relacionado

La actualidad más candente

A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...TKMG, Inc.
 
Lean six sigma green belt project improvement
Lean six sigma  green belt project improvementLean six sigma  green belt project improvement
Lean six sigma green belt project improvementAnkurSharma820
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management SystemsTKMG, Inc.
 
A3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSAA3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSATKMG, Inc.
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & PerformanceTKMG, Inc.
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping ProcessAnand Subramaniam
 
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)TKMG, Inc.
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTRIrfan Rasheed Rana
 
Process improvement techniques
Process improvement techniquesProcess improvement techniques
Process improvement techniquesHakeem-Ur- Rehman
 

La actualidad más candente (20)

7 waste in the production
7 waste in the production7 waste in the production
7 waste in the production
 
A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...A3 Management - From Structured Problem-Solving to Workplace Development (Par...
A3 Management - From Structured Problem-Solving to Workplace Development (Par...
 
Lean six sigma green belt project improvement
Lean six sigma  green belt project improvementLean six sigma  green belt project improvement
Lean six sigma green belt project improvement
 
8 Wastes of Lean
8 Wastes of Lean8 Wastes of Lean
8 Wastes of Lean
 
Daily Management
Daily ManagementDaily Management
Daily Management
 
TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)TPM: Quality Maintenance (Hinshitsu Hozen)
TPM: Quality Maintenance (Hinshitsu Hozen)
 
A3 thinking
A3 thinkingA3 thinking
A3 thinking
 
Daily Management Systems
Daily Management SystemsDaily Management Systems
Daily Management Systems
 
A3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSAA3 Management: Effective Problem Solving via PDSA
A3 Management: Effective Problem Solving via PDSA
 
Clarity First: Process & Performance
Clarity First: Process & PerformanceClarity First: Process & Performance
Clarity First: Process & Performance
 
Dmaic
DmaicDmaic
Dmaic
 
Lean transformation
Lean transformationLean transformation
Lean transformation
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
Metrics-Based Process Mapping - Part 3 of 3 (Product Demo)
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTR
 
Process improvement techniques
Process improvement techniquesProcess improvement techniques
Process improvement techniques
 
Six Sigma Sample Project
Six Sigma Sample ProjectSix Sigma Sample Project
Six Sigma Sample Project
 
A3 Problem Solving Process & Tools
A3 Problem Solving Process & ToolsA3 Problem Solving Process & Tools
A3 Problem Solving Process & Tools
 
Operational Excellence Roadmap
Operational Excellence RoadmapOperational Excellence Roadmap
Operational Excellence Roadmap
 

Similar a Lean A3 Report for Planning Downtime Elimination

Avoiding Common Pitfalls in the DMAIC Methodology
Avoiding Common Pitfalls in the DMAIC MethodologyAvoiding Common Pitfalls in the DMAIC Methodology
Avoiding Common Pitfalls in the DMAIC MethodologyKaiNexus
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summaryguest524810
 
Presentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BEPresentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BECATHERINE NGUYEN
 
Achieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationAchieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationApril Bright
 
Enterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management InformationEnterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management InformationAjay Kumar Uppal
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniquesAhsan Saleem
 
Gamification in outsourcing company: experience report.
Gamification in outsourcing company: experience report.Gamification in outsourcing company: experience report.
Gamification in outsourcing company: experience report.Mikalai Alimenkou
 
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"Fwdays
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)Steve Nails
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management FrameworkRahul Sudame
 
Storyboard_SPS_Payroll
Storyboard_SPS_PayrollStoryboard_SPS_Payroll
Storyboard_SPS_PayrollBalaguru SP
 
Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...Kubilay Balci
 
Manual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizenManual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizenvikymail
 
Lean applied in Project Management
Lean applied in Project ManagementLean applied in Project Management
Lean applied in Project ManagementAlvaro Plaza
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxCanberra Institute of technology
 

Similar a Lean A3 Report for Planning Downtime Elimination (20)

Avoiding Common Pitfalls in the DMAIC Methodology
Avoiding Common Pitfalls in the DMAIC MethodologyAvoiding Common Pitfalls in the DMAIC Methodology
Avoiding Common Pitfalls in the DMAIC Methodology
 
Baskaren Accomplishments Summary
Baskaren Accomplishments SummaryBaskaren Accomplishments Summary
Baskaren Accomplishments Summary
 
Presentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BEPresentation Reduce Safety Stock of packaging BE
Presentation Reduce Safety Stock of packaging BE
 
Achieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationAchieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and Implementation
 
Enterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management InformationEnterprise DataWarehousing + Management Information
Enterprise DataWarehousing + Management Information
 
Problem solving techniques
Problem solving techniquesProblem solving techniques
Problem solving techniques
 
Gamification in outsourcing company: experience report.
Gamification in outsourcing company: experience report.Gamification in outsourcing company: experience report.
Gamification in outsourcing company: experience report.
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"
Николай Алименков "Геймификация в аутсорсинговых компаниях: практический отчет"
 
Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07Six sigma green belt project roadmap in 10 deliverables 2013 07
Six sigma green belt project roadmap in 10 deliverables 2013 07
 
8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)8-step Problem Solving (Management)V2 (2)
8-step Problem Solving (Management)V2 (2)
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Storyboard_SPS_Payroll
Storyboard_SPS_PayrollStoryboard_SPS_Payroll
Storyboard_SPS_Payroll
 
Six sigma presentation
Six sigma presentationSix sigma presentation
Six sigma presentation
 
Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...Are project tracking tools helping or complicating Continuous Improvement Pro...
Are project tracking tools helping or complicating Continuous Improvement Pro...
 
Manual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizenManual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizen
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
 
Lean applied in Project Management
Lean applied in Project ManagementLean applied in Project Management
Lean applied in Project Management
 
Work Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docxWork Effectively and Sustainably_Student Practical Assessment.docx
Work Effectively and Sustainably_Student Practical Assessment.docx
 
Oscar Padilla, PMP
Oscar Padilla, PMPOscar Padilla, PMP
Oscar Padilla, PMP
 

Último

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...pujan9679
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 

Último (20)

The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 

Lean A3 Report for Planning Downtime Elimination

  • 1. 1A. Opportunity: Elimination of Planning Downtime A3 Report Team Member Names: Site/Plant: Manaus Date:22/08/2012 Group/Workcell/Site: STB Leader: Thiego Silva Annual Savings (US$): 1B. CLARIFY THE PROBLEM: Rodrigo Marques Downtime IM / FA Root Causes Problem Identification: High Where: IM/FA Wk 25 ~ Wk 28 How much: -100% of planning Downtime is related to Lack of available package in the process. What: When: 2. BREAKDOWN THE PROBLEM: Mentor: Thiego Silva 5 & 6. DEVELOP & IMPLEMENT COUNTERMEASURES: Key Metric to Impact: High Downtime: IM / FA Nattyer Nunes Selected Countermeasure Who Finish IC Team WK 1229 WK 1229 Thiego Silva WK 1229 WK 1229 Providing area for packaging in shelves 15% There is no standardization at location of packages by size and model. Separation and standardization of packages location according to the type Visual identification of each location for packages Rodrigo Marques Data collection – After improvement Waste(s) Identified Target 7. EVALUATE RESULTS: Transportation: WK 1229 WK 1229 Nattyer Nunes Planning Downtime Eliminated WK 1229 Before WK 1229 A fter Inventory: Savings Motion: Waiting: MVA – Material Value Added per unit US$ 6 / unit MVA / Hour (MVA x Rate) X US$ 1422 / h - 15% of Average Downtime IM/FA is related to Planning. Overproduction: Defects Plannig Downtime 5 Hours / Week - Average Downtime is 5 hours per week. Skills Unused Total Saving/WK US$ 7110/ Week Total Saving/Month US$ 28440 / Month Over processing 3. SET A TARGET (The challenge): 8. STANDARDIZE: Eliminate Planning Downtime from 5 Hours per Week to 0 Hours per Week by July 2012. 4. ANALYZE THE ROOT CAUSE: Environment - Lack of organization of the location of packages - The location of packages is not standardized Planning Downtime: Lack of available package - Operator loses time when looking for packages - Employees not trained about how organize the place of package Method Means of Standardization: Standard Work -Why planning Downtime? Due lack of available package in the process -Why? Because the packages were not available when the process was requested. -Why? Because operator loses time looking for packages -Why? Due lack of organization of the packages -Why? There is no standardization at location of packages by size and model. Visual Aids Global Document /Procedures Training Other X Process Audits: LPA TPM Checklist 5S Audit X Other Next challenge: - Eliminate buffer and other wastes that can be solved by Planning Team. Sharing with others: - Share this project with production leaders and stock area employees. Lessons Learned: Visual Management is an important tool. It makes problems visible. Form #: F-108 - Revision Date: 02/17/2012