Course: Project | By: Ahmad Qureshi 1
2
Projects Benefits
Revamping Dust
Recovery &
Pneumatic System
of Cigarette factory
to hit the Energy
and efficient and
quality feed of
tobacco to ‘Making
machines’. 39
individual fans
replaced by two
dust and pneumatic
fans
Who has
done this
Project?
My Role in
the
Organization
EEFs OPAs
3
4
5
Requirements
Documentation
Management
Plan
Traceability
Matrix
6



7

8
Scope
Baseline
Stakeholder

9
10
11

12
13
ProcurementStatementofWork
The work to be done on each
procurement is called procurement
statement of work. The procurement
statement of work must be clear,
complete and as concise as possible. It
should also describe the work and
activities that the seller is required to
complete. The activities also include
meetings, reports and
communications.
14
ProcurementStatementofWork
Types Design
Equipment Purchasing
|Cardwell
Functional
Functional
requirements | Local
Contractors
15
ContractType|Selected
Fixed price | EPA
Design procurement
FP|AF
Functional
Procurement
RFP
IFB
RFQ
16
17
No of years in
business
Financial stability
Ability to complete
work on time
Price or lifecycle of
product
Technical ability
Quality of past
performance
Selection
Criteria
Selected
Sellers
Seller
Ratting
System
Independent
Estimates
18

Más contenido relacionado

La actualidad más candente

Enterprise Mobile Solution for Field Services
Enterprise Mobile Solution for Field ServicesEnterprise Mobile Solution for Field Services
Enterprise Mobile Solution for Field ServicesnicheBees Technosolutions
 
Lean manufacturing case study
  Lean manufacturing case study  Lean manufacturing case study
Lean manufacturing case studymallicknazrul
 
Engineering Services Capabilities
Engineering Services CapabilitiesEngineering Services Capabilities
Engineering Services Capabilitiessenthilkumaran
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1Dave Thompson
 
WCM 2016 Presentation Sam Sharan
WCM 2016 Presentation Sam SharanWCM 2016 Presentation Sam Sharan
WCM 2016 Presentation Sam SharanSam Sharan
 
Part sbumission warrant from hi precision
Part sbumission warrant from hi precisionPart sbumission warrant from hi precision
Part sbumission warrant from hi precisionHuang Simon
 
Changepond Engineering Services Experiences
Changepond Engineering Services ExperiencesChangepond Engineering Services Experiences
Changepond Engineering Services Experiencessenthilkumaran
 
From Specs To App 10X Faster Using Reactive Programming
From Specs To App 10X Faster Using Reactive ProgrammingFrom Specs To App 10X Faster Using Reactive Programming
From Specs To App 10X Faster Using Reactive ProgrammingEspresso Logic
 
AMBREESH DHANURE_Pu_300615
AMBREESH DHANURE_Pu_300615AMBREESH DHANURE_Pu_300615
AMBREESH DHANURE_Pu_300615Ambreesh Dhanure
 
MARINEW Resume
MARINEW ResumeMARINEW Resume
MARINEW Resumemari muthu
 
CamundaCon 2018: Rule-Based Data Processing with DMN and Camunda (GVL)
CamundaCon 2018: Rule-Based Data Processing with DMN and Camunda (GVL)CamundaCon 2018: Rule-Based Data Processing with DMN and Camunda (GVL)
CamundaCon 2018: Rule-Based Data Processing with DMN and Camunda (GVL)camunda services GmbH
 

La actualidad más candente (20)

Enterprise Mobile Solution for Field Services
Enterprise Mobile Solution for Field ServicesEnterprise Mobile Solution for Field Services
Enterprise Mobile Solution for Field Services
 
Lean manufacturing case study
  Lean manufacturing case study  Lean manufacturing case study
Lean manufacturing case study
 
Joe Bollig-Resume-E
Joe Bollig-Resume-EJoe Bollig-Resume-E
Joe Bollig-Resume-E
 
Joe Bollig-Resume
Joe Bollig-ResumeJoe Bollig-Resume
Joe Bollig-Resume
 
Engineering Services Capabilities
Engineering Services CapabilitiesEngineering Services Capabilities
Engineering Services Capabilities
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
WCM 2016 Presentation Sam Sharan
WCM 2016 Presentation Sam SharanWCM 2016 Presentation Sam Sharan
WCM 2016 Presentation Sam Sharan
 
Ramonito Jalando-On- Concised
Ramonito Jalando-On- ConcisedRamonito Jalando-On- Concised
Ramonito Jalando-On- Concised
 
Joe Bollig-Resume-E
Joe Bollig-Resume-EJoe Bollig-Resume-E
Joe Bollig-Resume-E
 
Part sbumission warrant from hi precision
Part sbumission warrant from hi precisionPart sbumission warrant from hi precision
Part sbumission warrant from hi precision
 
Changepond Engineering Services Experiences
Changepond Engineering Services ExperiencesChangepond Engineering Services Experiences
Changepond Engineering Services Experiences
 
From Specs To App 10X Faster Using Reactive Programming
From Specs To App 10X Faster Using Reactive ProgrammingFrom Specs To App 10X Faster Using Reactive Programming
From Specs To App 10X Faster Using Reactive Programming
 
Implementation of kaizen in ashok leyland
Implementation of kaizen in ashok leylandImplementation of kaizen in ashok leyland
Implementation of kaizen in ashok leyland
 
AMBREESH DHANURE_Pu_300615
AMBREESH DHANURE_Pu_300615AMBREESH DHANURE_Pu_300615
AMBREESH DHANURE_Pu_300615
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
anchal
anchalanchal
anchal
 
MARINEW Resume
MARINEW ResumeMARINEW Resume
MARINEW Resume
 
CV_Sachin Naik
CV_Sachin NaikCV_Sachin Naik
CV_Sachin Naik
 
Auto Industrija_EN (1)
Auto Industrija_EN (1)Auto Industrija_EN (1)
Auto Industrija_EN (1)
 
CamundaCon 2018: Rule-Based Data Processing with DMN and Camunda (GVL)
CamundaCon 2018: Rule-Based Data Processing with DMN and Camunda (GVL)CamundaCon 2018: Rule-Based Data Processing with DMN and Camunda (GVL)
CamundaCon 2018: Rule-Based Data Processing with DMN and Camunda (GVL)
 

Similar a Single Dust Recovery and Pneumatic Fan (SNDP

CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docxCONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docxaidaclewer
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)Giselle Duran
 
Customer journey mapping in an industrial context
Customer journey mapping in an industrial contextCustomer journey mapping in an industrial context
Customer journey mapping in an industrial contextShaun West
 
On-site Generation: Nine steps to successls.pdf
On-site Generation: Nine steps to successls.pdfOn-site Generation: Nine steps to successls.pdf
On-site Generation: Nine steps to successls.pdfTrident Utilities
 
RFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docxRFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docxhealdkathaleen
 
Selecting ERP for Oil and Gas industry contractors and vendors
Selecting ERP for Oil and Gas industry contractors and vendorsSelecting ERP for Oil and Gas industry contractors and vendors
Selecting ERP for Oil and Gas industry contractors and vendorscthomassen
 
procurement slides.pptx
procurement slides.pptxprocurement slides.pptx
procurement slides.pptxJessicaPolig1
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptxxego1
 
Shahbaz Ahmad CV - Procurement Mechanical.pdf
Shahbaz Ahmad CV - Procurement Mechanical.pdfShahbaz Ahmad CV - Procurement Mechanical.pdf
Shahbaz Ahmad CV - Procurement Mechanical.pdfShahbazAhmad953994
 
purchasing and contracting for projects
 purchasing and contracting for projects purchasing and contracting for projects
purchasing and contracting for projectsSomashekar S.M
 
Vendor Selection Process
Vendor Selection ProcessVendor Selection Process
Vendor Selection Processgrinehart
 
Prioritised Engineering Design Requirements of Gas Turbine Engine by QFD
Prioritised Engineering Design Requirements of Gas Turbine Engine by QFDPrioritised Engineering Design Requirements of Gas Turbine Engine by QFD
Prioritised Engineering Design Requirements of Gas Turbine Engine by QFDIRJET Journal
 
ProTech training presentation
ProTech training presentationProTech training presentation
ProTech training presentationGiselle Duran
 
Anyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You HowAnyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You HowLeveragePoint Innovations
 
Case studies-Promotional supply optimization, procurement transformation
Case studies-Promotional supply optimization, procurement transformationCase studies-Promotional supply optimization, procurement transformation
Case studies-Promotional supply optimization, procurement transformationJohn William
 
Chapter 18 Contract and Relationship Management
Chapter 18 Contract and Relationship ManagementChapter 18 Contract and Relationship Management
Chapter 18 Contract and Relationship ManagementTran Thang
 
Case Studies - Promotional supply optimization; procurement transformation
Case Studies - Promotional supply optimization; procurement transformationCase Studies - Promotional supply optimization; procurement transformation
Case Studies - Promotional supply optimization; procurement transformationJohn William
 

Similar a Single Dust Recovery and Pneumatic Fan (SNDP (20)

CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docxCONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
CONTEMPORARY PROJECT MANAGEMENT, 4ETimothy J. KloppenborgVit.docx
 
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)ProTech an introduction (client) v1.3 8jun2017ml (lowres)
ProTech an introduction (client) v1.3 8jun2017ml (lowres)
 
Customer journey mapping in an industrial context
Customer journey mapping in an industrial contextCustomer journey mapping in an industrial context
Customer journey mapping in an industrial context
 
On-site Generation: Nine steps to successls.pdf
On-site Generation: Nine steps to successls.pdfOn-site Generation: Nine steps to successls.pdf
On-site Generation: Nine steps to successls.pdf
 
RFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docxRFP1. Project Initiation Phase The purpose of the RFP document.docx
RFP1. Project Initiation Phase The purpose of the RFP document.docx
 
Selecting ERP for Oil and Gas industry contractors and vendors
Selecting ERP for Oil and Gas industry contractors and vendorsSelecting ERP for Oil and Gas industry contractors and vendors
Selecting ERP for Oil and Gas industry contractors and vendors
 
procurement slides.pptx
procurement slides.pptxprocurement slides.pptx
procurement slides.pptx
 
Refrigeration Maintenance - ACR Today_ Croydon
Refrigeration Maintenance - ACR Today_ CroydonRefrigeration Maintenance - ACR Today_ Croydon
Refrigeration Maintenance - ACR Today_ Croydon
 
Procurement management
Procurement managementProcurement management
Procurement management
 
Oman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendationsOman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendations
 
MRM-16 (2020).pptx
MRM-16 (2020).pptxMRM-16 (2020).pptx
MRM-16 (2020).pptx
 
Shahbaz Ahmad CV - Procurement Mechanical.pdf
Shahbaz Ahmad CV - Procurement Mechanical.pdfShahbaz Ahmad CV - Procurement Mechanical.pdf
Shahbaz Ahmad CV - Procurement Mechanical.pdf
 
purchasing and contracting for projects
 purchasing and contracting for projects purchasing and contracting for projects
purchasing and contracting for projects
 
Vendor Selection Process
Vendor Selection ProcessVendor Selection Process
Vendor Selection Process
 
Prioritised Engineering Design Requirements of Gas Turbine Engine by QFD
Prioritised Engineering Design Requirements of Gas Turbine Engine by QFDPrioritised Engineering Design Requirements of Gas Turbine Engine by QFD
Prioritised Engineering Design Requirements of Gas Turbine Engine by QFD
 
ProTech training presentation
ProTech training presentationProTech training presentation
ProTech training presentation
 
Anyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You HowAnyone Can Build a Value Model: Let Me Show You How
Anyone Can Build a Value Model: Let Me Show You How
 
Case studies-Promotional supply optimization, procurement transformation
Case studies-Promotional supply optimization, procurement transformationCase studies-Promotional supply optimization, procurement transformation
Case studies-Promotional supply optimization, procurement transformation
 
Chapter 18 Contract and Relationship Management
Chapter 18 Contract and Relationship ManagementChapter 18 Contract and Relationship Management
Chapter 18 Contract and Relationship Management
 
Case Studies - Promotional supply optimization; procurement transformation
Case Studies - Promotional supply optimization; procurement transformationCase Studies - Promotional supply optimization; procurement transformation
Case Studies - Promotional supply optimization; procurement transformation
 

Single Dust Recovery and Pneumatic Fan (SNDP