PRESENTED BY:
SAMEER VISHWAKARMA
M.Tech.( Production )
Contents
 Definition
 Relationship with Maintainability and Reliability
 Classification
 Availability and Number of Nine
 Component Availability Flow Chart
 Calculationa of Total Availability
 Improving Techniques
 References
Consider a Situation-
1. Today, you are in an industry
2. The shift is of 8 hours(10:00 am to 6:00 pm)
3. It has so many machines
4. Consider one machine –A Lathe Machine
5. The machine should work for 8 continuous hours
6. Suppose a component fails at 12:00 noon and it stops working
7. It took 30 minutes in maintenance of that machine
8. Again it stopped working for 30 minutes at 3:30pm.
How long the Lathe Machine did actually work in a given shift?
Is that 7 hours?
 Exactly 7 hours is the actual time when machine worked without
any kind of failure.
 The machine worked for 7 hours with zero failure
 Failure and maintenance time 1 hour
 Total Time = 7+1=8 hours
What will you call the ratio 7/8?
It is Availability.
Definition of Availability
 From Situation given, during 8 hours of shift, 1 hour is considered for any
kind of failure and its maintenance, the Availability of that machine will be 7/8
or 0.875 or 87.5% for that particular shift on specified date.
 Availability is the probability that the system/component is
operational at a given time, without any kind of failure.
 Availability could also be understood with ‘Readiness’.
 Availability does not show how many times the maintenance
was performed.
Relationship between Reliability, Availability and
Maintainability
Its good if you are thinking of your Smartphone smartly.
Classification of Availability
Availability can be classified as followings-
1. Inherent Availability
2. Achieved Availability
3. Operational Availability
Inherent Availability
 The steady state availability when considering only the corrective
downtime of the system.
 For a single component, this can be computed by:
- For a system, the Mean Time Between Failures, or MTBF, is used to
compute inherent availability:
9
Achieved Availability
 Achieved Availability is similar to Inherent Availability except Preventive
Maintenance (PM) is also included.
 The steady state availability when considering the corrective and preventive
downtime of the system computed by looking at the Mean Time Between
Maintenance actions, MTBM and the Mean Maintenance Downtime:
10
Operational Availability
 Operational Availability is the percentage of calendar time to which one can
expect a system to work properly when it is required.
 Expression of User Need rather than just Design Need.
 Operational Availability is the ratio of the system Uptime and Total time.
Mathematically, it is:
DowntimeUptime
Uptime
Ao


• Includes all experienced sources of downtime, such as administrative downtime and
logistic downtime to restore the system.
• It is also called Operational Readiness.
11
Basic System of Availability
 Inherent Availability and Achieved Availability are controlled by the system
designer/manufacturer.
 Operational Availability is not solely controlled by the manufacturer due to
variations in location, resources and logistics factors under the province of
the end user of the product.
Availability and Number of 9
 Availability is typically described in nines notation.
 For Example- Availability of a system is considered over one year.
Factors Affecting Total Availability
 Hardware
 Hardware failures like File System Full error, Kernel In-Memory Table Full error, disk
full, power spike, power failure, and LAN infrastructure problem.
 Software
 Complexity of software, Size of software, Experience of team developer, Percentage
of the code which is used before in a stable project, How much test/debug is done
before releasing the product.
 Environment
 These fault can be occur by power outages, fires, earthquakes, tornadoes and other
events.
 The point is that these events cannot be predicted and when encountering with
them, the whole system becomes down for some hours or even months depending
on the damages they impose.
 Human Errors
Component Availability Flow Chart
Calculation of Availability
 Total availability calculations
are same as calculation of
Reliability.
 There are three systems-
 Parallel
 Series
 Mixed
Parallel System
Total Availability = 1-[(1-A1)(1-A2)]
=1 − [(1− 0.005)(1-0.005)]
= 0.999975
Series System
Total Availability = A1xA2
=0.995x0.995
=0.990025
Improving Techniques
 Proper training of plant employees
 Consistent cleaning of machines and equipments
 Proper maintenance scheduling
 Good quality lubricants
 The 5S
 Safety measures
 Automation
 Monitoring availability
 Uninterrupted Power Supplies (UPS)
 Standby Systems
 Logistics
References
 Elsayed, E., Reliability Engineering, Addison Wesley, Reading, MA, 1996.
 Hoda Rohani, Azad Kamali Roosta, Information Services Organization
KLM-Air France, Amsterdam
 Wendai Wang et al.,2002, IEEE, USA
THANK YOU!

Más contenido relacionado

La actualidad más candente

Ch13 Reliability
Ch13  ReliabilityCh13  Reliability
Ch13 Reliability
zacksazu
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
Akanksha Gupta
 
CONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATIONCONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATION
Ignesias Tsotetsi
 

La actualidad más candente (20)

Maintenance strategies
Maintenance strategiesMaintenance strategies
Maintenance strategies
 
Ch13 Reliability
Ch13  ReliabilityCh13  Reliability
Ch13 Reliability
 
Reliability centered maintenance
Reliability centered maintenanceReliability centered maintenance
Reliability centered maintenance
 
Scheduling and sequencing
Scheduling and sequencingScheduling and sequencing
Scheduling and sequencing
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenance
 
Maintenance planning systems
Maintenance planning  systemsMaintenance planning  systems
Maintenance planning systems
 
Unit 1 - PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
Unit 1 - PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNINGUnit 1 - PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
Unit 1 - PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
 
Corrective maintenance
Corrective maintenanceCorrective maintenance
Corrective maintenance
 
Reliability engineering chapter-1csi
Reliability engineering chapter-1csiReliability engineering chapter-1csi
Reliability engineering chapter-1csi
 
3...work study
3...work study3...work study
3...work study
 
Maintenance Management (presentation)
Maintenance Management (presentation)Maintenance Management (presentation)
Maintenance Management (presentation)
 
Cmms
CmmsCmms
Cmms
 
Preventive maintenance
Preventive maintenance Preventive maintenance
Preventive maintenance
 
CONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATIONCONDITION BASED MONITORING PRESENTATION
CONDITION BASED MONITORING PRESENTATION
 
Maintenance Management
Maintenance ManagementMaintenance Management
Maintenance Management
 
17.maintenance and reliability
17.maintenance and reliability17.maintenance and reliability
17.maintenance and reliability
 
Reliability
ReliabilityReliability
Reliability
 
Maintanance management
Maintanance managementMaintanance management
Maintanance management
 
Computerized maintenance management system (cmms)
Computerized maintenance management system (cmms)Computerized maintenance management system (cmms)
Computerized maintenance management system (cmms)
 
Introduction to maintenance and safety management
Introduction to maintenance and safety managementIntroduction to maintenance and safety management
Introduction to maintenance and safety management
 

Similar a Availability

Critical System Specification in Software Engineering SE17
Critical System Specification in Software Engineering SE17Critical System Specification in Software Engineering SE17
Critical System Specification in Software Engineering SE17
koolkampus
 
RTOS_GROUP_activity which is for the 7th sem e
RTOS_GROUP_activity which is for  the 7th sem eRTOS_GROUP_activity which is for  the 7th sem e
RTOS_GROUP_activity which is for the 7th sem e
RajeshKotian11
 
Performance Test Plan - Sample 1
Performance Test Plan - Sample 1Performance Test Plan - Sample 1
Performance Test Plan - Sample 1
Atul Pant
 

Similar a Availability (20)

WS010_Dr. Shakuntla Singla.pptx
WS010_Dr. Shakuntla Singla.pptxWS010_Dr. Shakuntla Singla.pptx
WS010_Dr. Shakuntla Singla.pptx
 
Ch11 reliability engineering
Ch11 reliability engineeringCh11 reliability engineering
Ch11 reliability engineering
 
Ch11 - Reliability Engineering
Ch11 - Reliability EngineeringCh11 - Reliability Engineering
Ch11 - Reliability Engineering
 
basic concepts of reliability
basic concepts of reliabilitybasic concepts of reliability
basic concepts of reliability
 
An Investigation of Fault Tolerance Techniques in Cloud Computing
An Investigation of Fault Tolerance Techniques in Cloud ComputingAn Investigation of Fault Tolerance Techniques in Cloud Computing
An Investigation of Fault Tolerance Techniques in Cloud Computing
 
PPT TARUNA.pptx
PPT TARUNA.pptxPPT TARUNA.pptx
PPT TARUNA.pptx
 
Designing High Available Cloud Applications
Designing High Available Cloud ApplicationsDesigning High Available Cloud Applications
Designing High Available Cloud Applications
 
Critical System Specification in Software Engineering SE17
Critical System Specification in Software Engineering SE17Critical System Specification in Software Engineering SE17
Critical System Specification in Software Engineering SE17
 
Guidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBFGuidelines to Understanding to estimate MTBF
Guidelines to Understanding to estimate MTBF
 
Availability
AvailabilityAvailability
Availability
 
RTOS_GROUP_activity which is for the 7th sem e
RTOS_GROUP_activity which is for  the 7th sem eRTOS_GROUP_activity which is for  the 7th sem e
RTOS_GROUP_activity which is for the 7th sem e
 
Predict Software Reliability Before the Code is Written
Predict Software Reliability Before the Code is WrittenPredict Software Reliability Before the Code is Written
Predict Software Reliability Before the Code is Written
 
Embedded system software
Embedded system softwareEmbedded system software
Embedded system software
 
Software Reliability_CS-3059_VISHAL_PADME.pptx
Software Reliability_CS-3059_VISHAL_PADME.pptxSoftware Reliability_CS-3059_VISHAL_PADME.pptx
Software Reliability_CS-3059_VISHAL_PADME.pptx
 
VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...
VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...
VTU 5TH SEM CSE SOFTWARE ENGINEERING SOLVED PAPERS - JUN13 DEC13 JUN14 DEC14 ...
 
chapter 8 discussabout reliability .pptx
chapter 8 discussabout reliability .pptxchapter 8 discussabout reliability .pptx
chapter 8 discussabout reliability .pptx
 
Performance testing basics
Performance testing basicsPerformance testing basics
Performance testing basics
 
Design approach for fault
Design approach for faultDesign approach for fault
Design approach for fault
 
Performance Test Plan - Sample 1
Performance Test Plan - Sample 1Performance Test Plan - Sample 1
Performance Test Plan - Sample 1
 
Real Time Systems & RTOS
Real Time Systems & RTOSReal Time Systems & RTOS
Real Time Systems & RTOS
 

Más de SAMEER VISHWAKARMA

Más de SAMEER VISHWAKARMA (18)

MATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTS
MATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTSMATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTS
MATERIAL SCIENCE LECTURE NOTES FOR DIPLOMA STUDENTS
 
MATERIAL SCIENCE LECTURE NOTES.pptx
MATERIAL SCIENCE LECTURE NOTES.pptxMATERIAL SCIENCE LECTURE NOTES.pptx
MATERIAL SCIENCE LECTURE NOTES.pptx
 
CAM AND FOLLOWER MECHANISM.pptx
CAM AND FOLLOWER MECHANISM.pptxCAM AND FOLLOWER MECHANISM.pptx
CAM AND FOLLOWER MECHANISM.pptx
 
Power steering system
Power steering systemPower steering system
Power steering system
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Field Ion - Infrared- Raman Spectroscopy
Field Ion - Infrared- Raman SpectroscopyField Ion - Infrared- Raman Spectroscopy
Field Ion - Infrared- Raman Spectroscopy
 
Robot sensors
Robot sensorsRobot sensors
Robot sensors
 
Robot kinematics
Robot kinematicsRobot kinematics
Robot kinematics
 
Product life cycle
Product life cycleProduct life cycle
Product life cycle
 
Animation
AnimationAnimation
Animation
 
Dme 5201 tom lecture zero
Dme 5201 tom lecture zeroDme 5201 tom lecture zero
Dme 5201 tom lecture zero
 
Dme 5201 tom lecture 9 12 clutches
Dme 5201 tom lecture 9 12 clutchesDme 5201 tom lecture 9 12 clutches
Dme 5201 tom lecture 9 12 clutches
 
Dme 5201 tom lecture 5 8 kchains, mechanisms and inversions
Dme 5201 tom lecture 5 8 kchains, mechanisms and inversionsDme 5201 tom lecture 5 8 kchains, mechanisms and inversions
Dme 5201 tom lecture 5 8 kchains, mechanisms and inversions
 
Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...
Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...
Dme 5201 tom lecture 3 4 constrained motion, types of joints, kutzback, joint...
 
Dme 5201 tom lecture 1 2 types of links n pairs
Dme 5201 tom lecture 1 2 types of links n pairsDme 5201 tom lecture 1 2 types of links n pairs
Dme 5201 tom lecture 1 2 types of links n pairs
 
Explosive forming
Explosive formingExplosive forming
Explosive forming
 
Maintenace policy
Maintenace policyMaintenace policy
Maintenace policy
 
Energy conservation
Energy conservationEnergy conservation
Energy conservation
 

Último

Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 

Último (20)

Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 

Availability

  • 2. Contents  Definition  Relationship with Maintainability and Reliability  Classification  Availability and Number of Nine  Component Availability Flow Chart  Calculationa of Total Availability  Improving Techniques  References
  • 3. Consider a Situation- 1. Today, you are in an industry 2. The shift is of 8 hours(10:00 am to 6:00 pm) 3. It has so many machines 4. Consider one machine –A Lathe Machine 5. The machine should work for 8 continuous hours 6. Suppose a component fails at 12:00 noon and it stops working 7. It took 30 minutes in maintenance of that machine 8. Again it stopped working for 30 minutes at 3:30pm. How long the Lathe Machine did actually work in a given shift?
  • 4. Is that 7 hours?  Exactly 7 hours is the actual time when machine worked without any kind of failure.  The machine worked for 7 hours with zero failure  Failure and maintenance time 1 hour  Total Time = 7+1=8 hours What will you call the ratio 7/8? It is Availability.
  • 5. Definition of Availability  From Situation given, during 8 hours of shift, 1 hour is considered for any kind of failure and its maintenance, the Availability of that machine will be 7/8 or 0.875 or 87.5% for that particular shift on specified date.  Availability is the probability that the system/component is operational at a given time, without any kind of failure.  Availability could also be understood with ‘Readiness’.  Availability does not show how many times the maintenance was performed.
  • 6. Relationship between Reliability, Availability and Maintainability Its good if you are thinking of your Smartphone smartly.
  • 7. Classification of Availability Availability can be classified as followings- 1. Inherent Availability 2. Achieved Availability 3. Operational Availability
  • 8. Inherent Availability  The steady state availability when considering only the corrective downtime of the system.  For a single component, this can be computed by: - For a system, the Mean Time Between Failures, or MTBF, is used to compute inherent availability:
  • 9. 9 Achieved Availability  Achieved Availability is similar to Inherent Availability except Preventive Maintenance (PM) is also included.  The steady state availability when considering the corrective and preventive downtime of the system computed by looking at the Mean Time Between Maintenance actions, MTBM and the Mean Maintenance Downtime:
  • 10. 10 Operational Availability  Operational Availability is the percentage of calendar time to which one can expect a system to work properly when it is required.  Expression of User Need rather than just Design Need.  Operational Availability is the ratio of the system Uptime and Total time. Mathematically, it is: DowntimeUptime Uptime Ao   • Includes all experienced sources of downtime, such as administrative downtime and logistic downtime to restore the system. • It is also called Operational Readiness.
  • 11. 11 Basic System of Availability  Inherent Availability and Achieved Availability are controlled by the system designer/manufacturer.  Operational Availability is not solely controlled by the manufacturer due to variations in location, resources and logistics factors under the province of the end user of the product.
  • 12. Availability and Number of 9  Availability is typically described in nines notation.  For Example- Availability of a system is considered over one year.
  • 13. Factors Affecting Total Availability  Hardware  Hardware failures like File System Full error, Kernel In-Memory Table Full error, disk full, power spike, power failure, and LAN infrastructure problem.  Software  Complexity of software, Size of software, Experience of team developer, Percentage of the code which is used before in a stable project, How much test/debug is done before releasing the product.  Environment  These fault can be occur by power outages, fires, earthquakes, tornadoes and other events.  The point is that these events cannot be predicted and when encountering with them, the whole system becomes down for some hours or even months depending on the damages they impose.  Human Errors
  • 15. Calculation of Availability  Total availability calculations are same as calculation of Reliability.  There are three systems-  Parallel  Series  Mixed Parallel System Total Availability = 1-[(1-A1)(1-A2)] =1 − [(1− 0.005)(1-0.005)] = 0.999975 Series System Total Availability = A1xA2 =0.995x0.995 =0.990025
  • 16. Improving Techniques  Proper training of plant employees  Consistent cleaning of machines and equipments  Proper maintenance scheduling  Good quality lubricants  The 5S  Safety measures  Automation  Monitoring availability  Uninterrupted Power Supplies (UPS)  Standby Systems  Logistics
  • 17. References  Elsayed, E., Reliability Engineering, Addison Wesley, Reading, MA, 1996.  Hoda Rohani, Azad Kamali Roosta, Information Services Organization KLM-Air France, Amsterdam  Wendai Wang et al.,2002, IEEE, USA