Project Management Tool – Kanban Board
S.Sudha Velan B.E (Civil)
• Kanban (Japanese: 看板, meaning signboard or billboard)
• Kanban is a visual system used to manage and keep track of work
as it moves through a process. The word kanban is Japanese and
roughly translated means “card you can see.”
Kanban board
• A kanban board is an agile project management tool
designed to help visualize work, limit work-in-progress,
and maximize efficiency (or flow).
Kanban Visual System
• Kanban is a visual system for managing work as it moves
through a process. The goal of Kanban is to identify potential
bottlenecks in your process and fix them so work can flow
through it cost-effectively at an optimal speed or throughput.
•
The following are the six most common types of Kanban cards :
1. Withdrawal or Conveyance Kanban Cards. ...
2. Supplier Kanban Cards. ...
3. Emergency Kanban Cards. ...
4. Express Kanban Cards. ...
5. Production Kanban Cards. ...
6. Through Kanban Cards
The Six General Practices of Kanban
• 1. Visualize the process.
• This is where Kanban cards come into play. Once you can actually see work, the
number of requests, the amount of time it takes to deliver on a request, who is
making the requests, and risks, you can take steps to manage them better
individually and as a team. Cards are placed on a Kanban board so all team
members can follow the current workflow.
• 2. Control work in progress (WIP).
• This is a cornerstone of Kanban. One should limit the WIP. Thus, it forces the
team to focus on a limited number of tasks and work to completion. Also, it
spotlights where work is being obstructed in the delivery pipeline before a
situation becomes critical.
• 3. Manage flow
• Based on the data gathered on cycle time and other agreed upon metrics, and
using information about the current state of work on the board, Kanban helps
visually track and manage tasks to deliver maximum value
• 4. Communicate policies explicitly
• Kanban teams work together to create basic rules about workflows for
different items, when to move an item into the next lane or row, and how
to note and manage blocked work tasks. These items are near the board,
and the team works toward improvement.
• 5. Implement feedback
• Most Kanban teams do daily standup meetings in front of their Kanban
board. They discuss ways to improve task delivery and overall process.
Also, they check for elimination of waste .
• 6. Collaborate for improvement, evolve experimentally.
• A Kanban system shines a light on the areas that call for improvement.
Once highlighted, workgroups develop a way to solve the problem,
hypothesize, and test solutions.
Advantages
• Versatility
• Kanban is versatile, and as such spans industries and job roles, meaning that it
can be used right across your company.
• Continuous improvement
• The visual aspect of Kanban means that progress is simple to monitor and
review. This means that changes can be made easily if waste is identified.
• Responsiveness
• The “just-in-time” delivery origin means that inventory can be matched with
demand, enabling more agile responses to business needs.
• Higher output
• As WIP is limited, the team is encouraged to work collaboratively to complete
tasks, increasing focus and reducing the risk of distractions, such as multi-
tasking.
• Team empowerment
• Ownership and responsibility of the process is shared amongst the whole team,
allowing innovative and efficient decisions.
• Product perfection
• The focus on continuous improvement and quality control throughout the
process reduces the number of errors and means less rework. The product will
therefore be more accurate.
Disadvantages
• Kanban board misuse
• You must ensure that the tasks on the Kanban board are kept up-to-date
to ensure that the process continues to flow smoothly with no backlog of
tasks.
• The Kanban board can be as complicated as you make it, so keep it
simple and avoid overcomplication.
• Unspecific timelines
• The continuous shift of tasks on the Kanban board mean that predicting
timelines of completion becomes difficult. This is due to the pull
production system.
• Unsuitable for dynamic projects
• Kanban assumes that the project is somewhat stable and consistent,
meaning that it is ineffective in industries where projects aren’t static.
• Potential bottlenecks
• If one card becomes blocked, due to a lack of action on another card then
the process may become stuck. The emphasis on cards in this process
makes scheduling difficult and presents a greater risk than other
methodologies
Thanks & Regards
S.Sudha Velan

Más contenido relacionado

La actualidad más candente

Kanban boards step by step
Kanban boards step by stepKanban boards step by step
Kanban boards step by stepGiulio Roggero
 
Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)Scrum & Kanban
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Controlguy_davis
 
Intro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 KeynoteIntro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 KeynoteChileAgil
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation ChecklistAnand Subramaniam
 
Agile vs Waterfall Project management
Agile vs Waterfall  Project management Agile vs Waterfall  Project management
Agile vs Waterfall Project management Kostiantyn Trefiak
 
Kanban introduction
Kanban introductionKanban introduction
Kanban introductionAhmed Hammad
 
Kanban maturity model visualization examples
Kanban maturity model   visualization examplesKanban maturity model   visualization examples
Kanban maturity model visualization examplesRajesh Viswanathan
 
Introduction of Kanban metrics
Introduction of Kanban metricsIntroduction of Kanban metrics
Introduction of Kanban metricsChuck Durfee
 
Kanban Basics for Beginners
Kanban Basics for BeginnersKanban Basics for Beginners
Kanban Basics for BeginnersZsolt Fabok
 
Advantages & Benefits of Kanban for Software Teams - Part 2 of "How to build ...
Advantages & Benefits of Kanban for Software Teams - Part 2 of "How to build ...Advantages & Benefits of Kanban for Software Teams - Part 2 of "How to build ...
Advantages & Benefits of Kanban for Software Teams - Part 2 of "How to build ...Blossom IO Inc.
 
Gemba Walk Questions
Gemba Walk QuestionsGemba Walk Questions
Gemba Walk QuestionsTom Curtis
 

La actualidad más candente (20)

Kanban boards step by step
Kanban boards step by stepKanban boards step by step
Kanban boards step by step
 
Pmp study-notes
Pmp study-notesPmp study-notes
Pmp study-notes
 
Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
Intro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 KeynoteIntro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 Keynote
 
Lets kanban
Lets kanbanLets kanban
Lets kanban
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation Checklist
 
Agile vs Waterfall Project management
Agile vs Waterfall  Project management Agile vs Waterfall  Project management
Agile vs Waterfall Project management
 
Kanban step bystep
Kanban step bystepKanban step bystep
Kanban step bystep
 
Approaches to scaling agile
Approaches to scaling agileApproaches to scaling agile
Approaches to scaling agile
 
Kanban introduction
Kanban introductionKanban introduction
Kanban introduction
 
Kanban Workshop
Kanban WorkshopKanban Workshop
Kanban Workshop
 
Agile
AgileAgile
Agile
 
Kanban maturity model visualization examples
Kanban maturity model   visualization examplesKanban maturity model   visualization examples
Kanban maturity model visualization examples
 
Kanban Basics
Kanban BasicsKanban Basics
Kanban Basics
 
Introduction of Kanban metrics
Introduction of Kanban metricsIntroduction of Kanban metrics
Introduction of Kanban metrics
 
Kanban in Action
Kanban in ActionKanban in Action
Kanban in Action
 
Kanban Basics for Beginners
Kanban Basics for BeginnersKanban Basics for Beginners
Kanban Basics for Beginners
 
Advantages & Benefits of Kanban for Software Teams - Part 2 of "How to build ...
Advantages & Benefits of Kanban for Software Teams - Part 2 of "How to build ...Advantages & Benefits of Kanban for Software Teams - Part 2 of "How to build ...
Advantages & Benefits of Kanban for Software Teams - Part 2 of "How to build ...
 
Gemba Walk Questions
Gemba Walk QuestionsGemba Walk Questions
Gemba Walk Questions
 

Similar a Project Management Tool – Kanban Board

Kanban Development
Kanban DevelopmentKanban Development
Kanban Developmentdcsunu
 
Scrum Bangalore 18th Meetup - October 15, 2016 - Elasticity of Kanban - Saika...
Scrum Bangalore 18th Meetup - October 15, 2016 - Elasticity of Kanban - Saika...Scrum Bangalore 18th Meetup - October 15, 2016 - Elasticity of Kanban - Saika...
Scrum Bangalore 18th Meetup - October 15, 2016 - Elasticity of Kanban - Saika...Scrum Bangalore
 
Kanban
KanbanKanban
Kanbanbramoe
 
KanBan approach to project management
KanBan approach to project management KanBan approach to project management
KanBan approach to project management Craig
 
Kanban_230916
Kanban_230916Kanban_230916
Kanban_230916Ram Kumar
 
Agile Marketing Methodologies: Scrum and Kanban
Agile Marketing Methodologies: Scrum and KanbanAgile Marketing Methodologies: Scrum and Kanban
Agile Marketing Methodologies: Scrum and KanbanMarsden Marketing
 
Kanban for Beginners - AgileEE 2011
Kanban for Beginners - AgileEE 2011Kanban for Beginners - AgileEE 2011
Kanban for Beginners - AgileEE 2011Robert Wiechmann
 
WebCamp: Project Management Day: World of Agile: Kanban - Евгений Андрушко
WebCamp: Project Management Day: World of Agile: Kanban - Евгений АндрушкоWebCamp: Project Management Day: World of Agile: Kanban - Евгений Андрушко
WebCamp: Project Management Day: World of Agile: Kanban - Евгений АндрушкоGeeksLab Odessa
 
Kanban India 2022 | Saikat Das |Kanbanizing your Business Agility
Kanban India 2022 | Saikat Das |Kanbanizing your Business AgilityKanban India 2022 | Saikat Das |Kanbanizing your Business Agility
Kanban India 2022 | Saikat Das |Kanbanizing your Business AgilityLeanKanbanIndia
 
What is Kanban in Agile?
What is Kanban in Agile?What is Kanban in Agile?
What is Kanban in Agile?Advance Agility
 
Kanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum pptKanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum pptSabaKhalid48
 

Similar a Project Management Tool – Kanban Board (20)

Kanban Development
Kanban DevelopmentKanban Development
Kanban Development
 
Scrum Bangalore 18th Meetup - October 15, 2016 - Elasticity of Kanban - Saika...
Scrum Bangalore 18th Meetup - October 15, 2016 - Elasticity of Kanban - Saika...Scrum Bangalore 18th Meetup - October 15, 2016 - Elasticity of Kanban - Saika...
Scrum Bangalore 18th Meetup - October 15, 2016 - Elasticity of Kanban - Saika...
 
Kanban
KanbanKanban
Kanban
 
Kan ban
Kan banKan ban
Kan ban
 
Introduction to Kanban
Introduction  to Kanban Introduction  to Kanban
Introduction to Kanban
 
KanBan approach to project management
KanBan approach to project management KanBan approach to project management
KanBan approach to project management
 
Kanban_230916
Kanban_230916Kanban_230916
Kanban_230916
 
Kanban
KanbanKanban
Kanban
 
Kanban Methodology
Kanban MethodologyKanban Methodology
Kanban Methodology
 
Agile Marketing Methodologies: Scrum and Kanban
Agile Marketing Methodologies: Scrum and KanbanAgile Marketing Methodologies: Scrum and Kanban
Agile Marketing Methodologies: Scrum and Kanban
 
Patton kanban
Patton kanbanPatton kanban
Patton kanban
 
Kanban for Beginners - AgileEE 2011
Kanban for Beginners - AgileEE 2011Kanban for Beginners - AgileEE 2011
Kanban for Beginners - AgileEE 2011
 
WebCamp: Project Management Day: World of Agile: Kanban - Евгений Андрушко
WebCamp: Project Management Day: World of Agile: Kanban - Евгений АндрушкоWebCamp: Project Management Day: World of Agile: Kanban - Евгений Андрушко
WebCamp: Project Management Day: World of Agile: Kanban - Евгений Андрушко
 
Kanban India 2022 | Saikat Das |Kanbanizing your Business Agility
Kanban India 2022 | Saikat Das |Kanbanizing your Business AgilityKanban India 2022 | Saikat Das |Kanbanizing your Business Agility
Kanban India 2022 | Saikat Das |Kanbanizing your Business Agility
 
What is Kanban in Agile?
What is Kanban in Agile?What is Kanban in Agile?
What is Kanban in Agile?
 
Kanban in sw development
Kanban in sw developmentKanban in sw development
Kanban in sw development
 
kanban.ppt
kanban.pptkanban.ppt
kanban.ppt
 
Patton kanban 1
Patton kanban 1Patton kanban 1
Patton kanban 1
 
Patton kanban fr
Patton kanban frPatton kanban fr
Patton kanban fr
 
Kanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum pptKanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum ppt
 

Más de SSudhaVelan

THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYTHUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYSSudhaVelan
 
Structural Glazing Works – Glass (Commercial & Residential Projects)
Structural Glazing Works – Glass (Commercial & Residential Projects)Structural Glazing Works – Glass (Commercial & Residential Projects)
Structural Glazing Works – Glass (Commercial & Residential Projects)SSudhaVelan
 
Statutory Approvals For Construction Projects In India (Residential & Commerc...
Statutory Approvals For Construction Projects In India (Residential & Commerc...Statutory Approvals For Construction Projects In India (Residential & Commerc...
Statutory Approvals For Construction Projects In India (Residential & Commerc...SSudhaVelan
 
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...SSudhaVelan
 
Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity SSudhaVelan
 
Basics Of Electrical Wires & Cables - Residential & Commercial Projects
Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects
Basics Of Electrical Wires & Cables - Residential & Commercial Projects SSudhaVelan
 
Basics of Colour Theory & Psychology
Basics of Colour Theory &  Psychology  Basics of Colour Theory &  Psychology
Basics of Colour Theory & Psychology SSudhaVelan
 
Basics of Electrical Busbar - Residential & Commercial Projects
Basics of  Electrical  Busbar  - Residential & Commercial Projects Basics of  Electrical  Busbar  - Residential & Commercial Projects
Basics of Electrical Busbar - Residential & Commercial Projects SSudhaVelan
 
Light Transmitting Concrete (LTC)
Light Transmitting Concrete (LTC)Light Transmitting Concrete (LTC)
Light Transmitting Concrete (LTC)SSudhaVelan
 
Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)SSudhaVelan
 
Superstar Rajinikanth’s Favourite Airports
Superstar Rajinikanth’s Favourite AirportsSuperstar Rajinikanth’s Favourite Airports
Superstar Rajinikanth’s Favourite AirportsSSudhaVelan
 
Fire Protection System - Automatic Fire Detectors
Fire Protection System - Automatic Fire DetectorsFire Protection System - Automatic Fire Detectors
Fire Protection System - Automatic Fire DetectorsSSudhaVelan
 
3D Printing Concrete Building Constructions
3D Printing Concrete Building Constructions3D Printing Concrete Building Constructions
3D Printing Concrete Building ConstructionsSSudhaVelan
 
Fire Fighting Works – Fire Blanket
Fire Fighting Works – Fire Blanket Fire Fighting Works – Fire Blanket
Fire Fighting Works – Fire Blanket SSudhaVelan
 
Construction Software – Design , Analysis , Estimate & ERP
Construction Software – Design , Analysis , Estimate & ERPConstruction Software – Design , Analysis , Estimate & ERP
Construction Software – Design , Analysis , Estimate & ERPSSudhaVelan
 
Structural Glazing System- Electrochromic (“Smart Glass”) Facade (Commercial...
Structural Glazing  System- Electrochromic (“Smart Glass”) Facade (Commercial...Structural Glazing  System- Electrochromic (“Smart Glass”) Facade (Commercial...
Structural Glazing System- Electrochromic (“Smart Glass”) Facade (Commercial...SSudhaVelan
 
Concrete Canvas – Surface & Slope Protection Works
Concrete Canvas – Surface & Slope Protection WorksConcrete Canvas – Surface & Slope Protection Works
Concrete Canvas – Surface & Slope Protection WorksSSudhaVelan
 
Smart Concrete Sensors - Temperature and Strength Monitoring-Early Project C...
Smart Concrete Sensors  - Temperature and Strength Monitoring-Early Project C...Smart Concrete Sensors  - Temperature and Strength Monitoring-Early Project C...
Smart Concrete Sensors - Temperature and Strength Monitoring-Early Project C...SSudhaVelan
 
Ground Penetrating Radar Survey
Ground Penetrating Radar Survey Ground Penetrating Radar Survey
Ground Penetrating Radar Survey SSudhaVelan
 
Construction Contracts – Hybrid Annuity Model
Construction Contracts – Hybrid Annuity ModelConstruction Contracts – Hybrid Annuity Model
Construction Contracts – Hybrid Annuity ModelSSudhaVelan
 

Más de SSudhaVelan (20)

THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITYTHUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
THUMB RULE FOR CIVIL WORKS LABOUR PRODUCTIVITY
 
Structural Glazing Works – Glass (Commercial & Residential Projects)
Structural Glazing Works – Glass (Commercial & Residential Projects)Structural Glazing Works – Glass (Commercial & Residential Projects)
Structural Glazing Works – Glass (Commercial & Residential Projects)
 
Statutory Approvals For Construction Projects In India (Residential & Commerc...
Statutory Approvals For Construction Projects In India (Residential & Commerc...Statutory Approvals For Construction Projects In India (Residential & Commerc...
Statutory Approvals For Construction Projects In India (Residential & Commerc...
 
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...Labour Contract Work Rates – Miscellaneous  Works (Residential & Commercial P...
Labour Contract Work Rates – Miscellaneous Works (Residential & Commercial P...
 
Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity Heavy Construction Equipment Productivity
Heavy Construction Equipment Productivity
 
Basics Of Electrical Wires & Cables - Residential & Commercial Projects
Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects
Basics Of Electrical Wires & Cables - Residential & Commercial Projects
 
Basics of Colour Theory & Psychology
Basics of Colour Theory &  Psychology  Basics of Colour Theory &  Psychology
Basics of Colour Theory & Psychology
 
Basics of Electrical Busbar - Residential & Commercial Projects
Basics of  Electrical  Busbar  - Residential & Commercial Projects Basics of  Electrical  Busbar  - Residential & Commercial Projects
Basics of Electrical Busbar - Residential & Commercial Projects
 
Light Transmitting Concrete (LTC)
Light Transmitting Concrete (LTC)Light Transmitting Concrete (LTC)
Light Transmitting Concrete (LTC)
 
Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)Roller - Compacted Concrete (RCC)
Roller - Compacted Concrete (RCC)
 
Superstar Rajinikanth’s Favourite Airports
Superstar Rajinikanth’s Favourite AirportsSuperstar Rajinikanth’s Favourite Airports
Superstar Rajinikanth’s Favourite Airports
 
Fire Protection System - Automatic Fire Detectors
Fire Protection System - Automatic Fire DetectorsFire Protection System - Automatic Fire Detectors
Fire Protection System - Automatic Fire Detectors
 
3D Printing Concrete Building Constructions
3D Printing Concrete Building Constructions3D Printing Concrete Building Constructions
3D Printing Concrete Building Constructions
 
Fire Fighting Works – Fire Blanket
Fire Fighting Works – Fire Blanket Fire Fighting Works – Fire Blanket
Fire Fighting Works – Fire Blanket
 
Construction Software – Design , Analysis , Estimate & ERP
Construction Software – Design , Analysis , Estimate & ERPConstruction Software – Design , Analysis , Estimate & ERP
Construction Software – Design , Analysis , Estimate & ERP
 
Structural Glazing System- Electrochromic (“Smart Glass”) Facade (Commercial...
Structural Glazing  System- Electrochromic (“Smart Glass”) Facade (Commercial...Structural Glazing  System- Electrochromic (“Smart Glass”) Facade (Commercial...
Structural Glazing System- Electrochromic (“Smart Glass”) Facade (Commercial...
 
Concrete Canvas – Surface & Slope Protection Works
Concrete Canvas – Surface & Slope Protection WorksConcrete Canvas – Surface & Slope Protection Works
Concrete Canvas – Surface & Slope Protection Works
 
Smart Concrete Sensors - Temperature and Strength Monitoring-Early Project C...
Smart Concrete Sensors  - Temperature and Strength Monitoring-Early Project C...Smart Concrete Sensors  - Temperature and Strength Monitoring-Early Project C...
Smart Concrete Sensors - Temperature and Strength Monitoring-Early Project C...
 
Ground Penetrating Radar Survey
Ground Penetrating Radar Survey Ground Penetrating Radar Survey
Ground Penetrating Radar Survey
 
Construction Contracts – Hybrid Annuity Model
Construction Contracts – Hybrid Annuity ModelConstruction Contracts – Hybrid Annuity Model
Construction Contracts – Hybrid Annuity Model
 

Último

Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 

Último (20)

Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 

Project Management Tool – Kanban Board

  • 1. Project Management Tool – Kanban Board S.Sudha Velan B.E (Civil)
  • 2.
  • 3. • Kanban (Japanese: 看板, meaning signboard or billboard) • Kanban is a visual system used to manage and keep track of work as it moves through a process. The word kanban is Japanese and roughly translated means “card you can see.”
  • 4. Kanban board • A kanban board is an agile project management tool designed to help visualize work, limit work-in-progress, and maximize efficiency (or flow).
  • 5. Kanban Visual System • Kanban is a visual system for managing work as it moves through a process. The goal of Kanban is to identify potential bottlenecks in your process and fix them so work can flow through it cost-effectively at an optimal speed or throughput. •
  • 6. The following are the six most common types of Kanban cards : 1. Withdrawal or Conveyance Kanban Cards. ... 2. Supplier Kanban Cards. ... 3. Emergency Kanban Cards. ... 4. Express Kanban Cards. ... 5. Production Kanban Cards. ... 6. Through Kanban Cards
  • 7.
  • 8. The Six General Practices of Kanban • 1. Visualize the process. • This is where Kanban cards come into play. Once you can actually see work, the number of requests, the amount of time it takes to deliver on a request, who is making the requests, and risks, you can take steps to manage them better individually and as a team. Cards are placed on a Kanban board so all team members can follow the current workflow. • 2. Control work in progress (WIP). • This is a cornerstone of Kanban. One should limit the WIP. Thus, it forces the team to focus on a limited number of tasks and work to completion. Also, it spotlights where work is being obstructed in the delivery pipeline before a situation becomes critical. • 3. Manage flow • Based on the data gathered on cycle time and other agreed upon metrics, and using information about the current state of work on the board, Kanban helps visually track and manage tasks to deliver maximum value
  • 9. • 4. Communicate policies explicitly • Kanban teams work together to create basic rules about workflows for different items, when to move an item into the next lane or row, and how to note and manage blocked work tasks. These items are near the board, and the team works toward improvement. • 5. Implement feedback • Most Kanban teams do daily standup meetings in front of their Kanban board. They discuss ways to improve task delivery and overall process. Also, they check for elimination of waste . • 6. Collaborate for improvement, evolve experimentally. • A Kanban system shines a light on the areas that call for improvement. Once highlighted, workgroups develop a way to solve the problem, hypothesize, and test solutions.
  • 10.
  • 11.
  • 12. Advantages • Versatility • Kanban is versatile, and as such spans industries and job roles, meaning that it can be used right across your company. • Continuous improvement • The visual aspect of Kanban means that progress is simple to monitor and review. This means that changes can be made easily if waste is identified. • Responsiveness • The “just-in-time” delivery origin means that inventory can be matched with demand, enabling more agile responses to business needs. • Higher output • As WIP is limited, the team is encouraged to work collaboratively to complete tasks, increasing focus and reducing the risk of distractions, such as multi- tasking. • Team empowerment • Ownership and responsibility of the process is shared amongst the whole team, allowing innovative and efficient decisions. • Product perfection • The focus on continuous improvement and quality control throughout the process reduces the number of errors and means less rework. The product will therefore be more accurate.
  • 13. Disadvantages • Kanban board misuse • You must ensure that the tasks on the Kanban board are kept up-to-date to ensure that the process continues to flow smoothly with no backlog of tasks. • The Kanban board can be as complicated as you make it, so keep it simple and avoid overcomplication. • Unspecific timelines • The continuous shift of tasks on the Kanban board mean that predicting timelines of completion becomes difficult. This is due to the pull production system. • Unsuitable for dynamic projects • Kanban assumes that the project is somewhat stable and consistent, meaning that it is ineffective in industries where projects aren’t static. • Potential bottlenecks • If one card becomes blocked, due to a lack of action on another card then the process may become stuck. The emphasis on cards in this process makes scheduling difficult and presents a greater risk than other methodologies