CONTOURING
By
Sachin M. Gunjal
Assistant Professor
Department of Civil Engineering
Sanjivani College of Engineering, Kopargaon
• Contours are those lines you can
see on OS maps.
• A contour line is an imaginary
line that joins points of equal
height above sea level.
• They can be used to learn about
the shape of the land (the relief).
• A map with only a few contour
lines will be flat (and often low
lying)
• If a map has lots of contours it is
a mountainous or hilly area.
• The actual pattern of the lines
will tell you more detail about
the area too.
Steep slopes
Area that is
flatter with only
a gentle slope
2
CONTOURS
• Contour An imaginary line on the ground surface joining the points
of equal elevation is known as contour.
• In other words, contour is a line in which the ground surface is
intersected by a level surface obtained by joining points of equal
elevation. This line on the map represents a contour and is called
contour line.
• Contour Map :-A map showing contour lines is known as Contour
map.
• A contour map gives an idea of the altitudes of the surface features
as well as their relative positions in plan serves the purpose of both,
a plan and a section.
3
Contouring
• The process of tracing contour lines on the surface of the earth is called
Contouring.
• PURPOSE OF CONTOURING
• Contour survey is carried out at the starting of any engineering
project such as a road, a railway, a canal, a dam, a building etc.
i) For preparing contour maps in order to select the most economical
or suitable site.
ii) To locate the alignment of a canal so that it should follow a ridge
line.
iii) To mark the alignment of roads and railways so that the quantity of
earthwork both in cutting and filling should be minimum.
4
iv) For getting information about the ground whether it is flat,
undulating or mountainous.
v) To find the capacity of a reservoir and volume of earthwork
especially in a mountainous region.
vi) To trace out the given grade of a particular route.
vii)To locate the physical features of the ground such as a pond
depression, hill, steep or small slopes.
5
METHODS OF CONTOURING
• There are mainly two methods of
locating contours:-
(1)Direct Method and
(2) Indirect Method.
6
1] Direct Method:
• In this method, the contours to be
located are directly traced out in the
field by locating and marking a
number of points on each contour.
• These points are then surveyed and
plotted on plan and the contours
drawn through them.
• This method is most accurate but
very slow and tedious as a lot of time
is wasted in searching points of the
same elevation for a contour.
• This is suitable for small area and
where great accuracy is required
DIRECT METHOD OF
CONTOURING
50
48
B.M.
46
7
Procedure:
• To start with, a temporary B.M is established near the area to be
surveyed with reference to a permanent B.M by fly levelling.
• The level is then set up in such a position so that the maximum
number of points can be commanded from the instrument station.
• The height of instrument is determined by taking a back sight on the
B.M. and adding it to the R.L. of bench mark.
• The staff reading required to fix points on the various contours is
determined by subtracting the R.L. of each of the contours from the
height of instrument.
8
• Example:
• If the height of instrument is 82.48m., then the staff readings
required to locate 82, 81 and 80m contours are 0.48, 1.48 and
2.48m respectively. The staff is held on an approximate position of
point and then moved up and down the slope until the desired
reading is obtained. The point is marked with a peg.
• Similarly various other points are marked on each contour. The line
joining all these points give the required contour. It may be noted
that one contour is located at a time. Having fixed the contours
within the range of the instrument, the level is shifted and set up in
a new position.
9
Procedure (Contd…..)
• The new height of instrument and the required staff readings are
then calculated in a similar manner and the process repeated till all
the contours are located.
• The positions of the contour points are located suitably either
simultaneous with levelling or afterwards.
• A theodolite , a compass or a plane table traversing is usually
adopted for locating these points.
• The points are then plotted on the plan and the contours drawn by
joining the corresponding points by dotted curved lines.
10
Direct Method By Radial Lines
• This method is suitable for
small areas, where a single
point in the centre can
command the whole area.
Radial lines are laid out from
the common centre by
theodolite or compass and
their positions are fixed up by
horizontal angles and bearings.
RADIAL LINES METHOD
OF CONTOURING
70
65
60
55
11
Direct Method By Radial Lines (contd.):
• Temporary bench marks are first established at the centre and near
the ends of the radial lines .
• The contour points are then located and marked on these lines and
their positions are determined by measuring their distances along
the radial lines.
• They are then plotted on the plan and the contours drawn by
joining all the corresponding points with the help of a plane table
instrument.
12
2. INDIRECT METHOD
• In this method the points located and surveyed are not necessarily
on the contour lines but the spot levels are taken along the series of
lines laid out over the area .
• The spot levels of the several representative points representing
hills, depressions, ridge and valley lines and the changes in the
slope all over the area to be contoured are also observed.
• Their positions are then plotted on the plan and the contours drawn
by interpolation.
• This method of contouring is also known as contouring by spot
levels.
13
• This method is commonly employed in all kinds of surveys as this is
cheaper, quicker and less tedious as compared to direct method.
There are mainly three method of contouring in indirect method:
• (I) BY SQUARES [SQUARE METHOD]:-
• In this method, the whole area is divided into number of squares,
the side of which may vary from 5m to 30m depending upon the
nature of the ground and the contour interval. The square need not
be of the same size throughout.
• The corners of the squares are pegged out and the reduced levels
of these points are determined with a level.
14
SQUARE METHOD
15
(II) By Cross- Sections:
• This method is most suitable for the survey of long narrow strips
such as a road, railway or canal etc.
16
• (III) By Tacheometric method:
• A techeometer is a transit theodolite having a diaphragm fitted with
two stadia wires, one above and other below the central wire.
• The horizontal distance between the instrument and staff station
may be determined by multiplying the difference of the staff
readings of the upper and lower stadia wires with the stadia
constant of the instrument, which is usually 100.
• Thus the techeometer is used for both the vertical as well as
horizontal measurements.
Stadia Wires at Diaphragm
17
iii) By Tacheometric method (contd…):
• This method is most suitable in hilly areas as the number of stations
which can be commanded by a techeometer is far more than those
by a level and thus the number of instrument settings are
considerably reduced. A number of radial lines are laid out at a
known angular interval and representative points are marked by
pegs along these radial lines. Their elevations and distances are
then calculated and plotted on the plan and the contour lines are
then interpolated.
18
19

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Contouring
ContouringContouring
Contouring
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
 
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTSSURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
SURVEYING-LEVELING-MODERN SURVEYING INSTRUMENTS
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
 
Traversing
TraversingTraversing
Traversing
 
Module 1 tacheometry
Module 1 tacheometryModule 1 tacheometry
Module 1 tacheometry
 
Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveying
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
 
Theodolite traversing
Theodolite traversingTheodolite traversing
Theodolite traversing
 
Levelling
LevellingLevelling
Levelling
 
Balancing of traverse
Balancing of traverseBalancing of traverse
Balancing of traverse
 
Introduction to survey
Introduction to surveyIntroduction to survey
Introduction to survey
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Contouring
ContouringContouring
Contouring
 
UNit no 1 Contouring.pptx
UNit no 1 Contouring.pptxUNit no 1 Contouring.pptx
UNit no 1 Contouring.pptx
 
Levelling
LevellingLevelling
Levelling
 
Curves
CurvesCurves
Curves
 

Similar a Contouring

CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfKumkumaIp
 
Contour maps: preparation and understanding.
Contour maps: preparation and understanding.Contour maps: preparation and understanding.
Contour maps: preparation and understanding.VIVEK CHAUHAN
 
contouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptxcontouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptxramjan14
 
contouring.pptx
contouring.pptxcontouring.pptx
contouring.pptxSaiSrija7
 
Information About Contour And its charecteristics
Information About Contour And its charecteristicsInformation About Contour And its charecteristics
Information About Contour And its charecteristicsAshraf Sayyed
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouringANAND JIBHKATE
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURINGANAND JIBHKATE
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring SurveyingBahzad5
 
Ce6304 surveying 1 contour (iv unit) lecture ppt notes
Ce6304 surveying 1   contour (iv unit) lecture ppt notesCe6304 surveying 1   contour (iv unit) lecture ppt notes
Ce6304 surveying 1 contour (iv unit) lecture ppt notesnandishsajjan
 
surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868RahulSinghParihar18
 
Contour lines by sk
Contour lines by skContour lines by sk
Contour lines by skSalman Khan
 
contourlines-161212065738.pdf
contourlines-161212065738.pdfcontourlines-161212065738.pdf
contourlines-161212065738.pdfshucaybcabdi
 
Week1 introductiontobasicsurveying
Week1 introductiontobasicsurveyingWeek1 introductiontobasicsurveying
Week1 introductiontobasicsurveyingJackie Arul
 
Contouring Survey.ppt
Contouring Survey.pptContouring Survey.ppt
Contouring Survey.pptJaveria Ishaq
 

Similar a Contouring (20)

CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdf
 
Contour maps: preparation and understanding.
Contour maps: preparation and understanding.Contour maps: preparation and understanding.
Contour maps: preparation and understanding.
 
contouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptxcontouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptx
 
Contouring
ContouringContouring
Contouring
 
Contouring
ContouringContouring
Contouring
 
contouring.pptx
contouring.pptxcontouring.pptx
contouring.pptx
 
Information About Contour And its charecteristics
Information About Contour And its charecteristicsInformation About Contour And its charecteristics
Information About Contour And its charecteristics
 
levelling and contouring
levelling and contouringlevelling and contouring
levelling and contouring
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
 
Contour & Contouring Surveying
Contour & Contouring SurveyingContour & Contouring Surveying
Contour & Contouring Surveying
 
Unit 2
Unit 2Unit 2
Unit 2
 
Ce6304 surveying 1 contour (iv unit) lecture ppt notes
Ce6304 surveying 1   contour (iv unit) lecture ppt notesCe6304 surveying 1   contour (iv unit) lecture ppt notes
Ce6304 surveying 1 contour (iv unit) lecture ppt notes
 
Levelling
LevellingLevelling
Levelling
 
surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868
 
1. Intro to Surveying.pdf
1. Intro to Surveying.pdf1. Intro to Surveying.pdf
1. Intro to Surveying.pdf
 
Surveying
Surveying Surveying
Surveying
 
Contour lines by sk
Contour lines by skContour lines by sk
Contour lines by sk
 
contourlines-161212065738.pdf
contourlines-161212065738.pdfcontourlines-161212065738.pdf
contourlines-161212065738.pdf
 
Week1 introductiontobasicsurveying
Week1 introductiontobasicsurveyingWeek1 introductiontobasicsurveying
Week1 introductiontobasicsurveying
 
Contouring Survey.ppt
Contouring Survey.pptContouring Survey.ppt
Contouring Survey.ppt
 

Último

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfsmsksolar
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...HenryBriggs2
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksMagic Marks
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxnuruddin69
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 

Último (20)

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Rums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdfRums floating Omkareshwar FSPV IM_16112021.pdf
Rums floating Omkareshwar FSPV IM_16112021.pdf
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Learn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic MarksLearn the concepts of Thermodynamics on Magic Marks
Learn the concepts of Thermodynamics on Magic Marks
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Bridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptxBridge Jacking Design Sample Calculation.pptx
Bridge Jacking Design Sample Calculation.pptx
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 

Contouring

  • 1. 1 CONTOURING By Sachin M. Gunjal Assistant Professor Department of Civil Engineering Sanjivani College of Engineering, Kopargaon
  • 2. • Contours are those lines you can see on OS maps. • A contour line is an imaginary line that joins points of equal height above sea level. • They can be used to learn about the shape of the land (the relief). • A map with only a few contour lines will be flat (and often low lying) • If a map has lots of contours it is a mountainous or hilly area. • The actual pattern of the lines will tell you more detail about the area too. Steep slopes Area that is flatter with only a gentle slope 2
  • 3. CONTOURS • Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour. • In other words, contour is a line in which the ground surface is intersected by a level surface obtained by joining points of equal elevation. This line on the map represents a contour and is called contour line. • Contour Map :-A map showing contour lines is known as Contour map. • A contour map gives an idea of the altitudes of the surface features as well as their relative positions in plan serves the purpose of both, a plan and a section. 3
  • 4. Contouring • The process of tracing contour lines on the surface of the earth is called Contouring. • PURPOSE OF CONTOURING • Contour survey is carried out at the starting of any engineering project such as a road, a railway, a canal, a dam, a building etc. i) For preparing contour maps in order to select the most economical or suitable site. ii) To locate the alignment of a canal so that it should follow a ridge line. iii) To mark the alignment of roads and railways so that the quantity of earthwork both in cutting and filling should be minimum. 4
  • 5. iv) For getting information about the ground whether it is flat, undulating or mountainous. v) To find the capacity of a reservoir and volume of earthwork especially in a mountainous region. vi) To trace out the given grade of a particular route. vii)To locate the physical features of the ground such as a pond depression, hill, steep or small slopes. 5
  • 6. METHODS OF CONTOURING • There are mainly two methods of locating contours:- (1)Direct Method and (2) Indirect Method. 6
  • 7. 1] Direct Method: • In this method, the contours to be located are directly traced out in the field by locating and marking a number of points on each contour. • These points are then surveyed and plotted on plan and the contours drawn through them. • This method is most accurate but very slow and tedious as a lot of time is wasted in searching points of the same elevation for a contour. • This is suitable for small area and where great accuracy is required DIRECT METHOD OF CONTOURING 50 48 B.M. 46 7
  • 8. Procedure: • To start with, a temporary B.M is established near the area to be surveyed with reference to a permanent B.M by fly levelling. • The level is then set up in such a position so that the maximum number of points can be commanded from the instrument station. • The height of instrument is determined by taking a back sight on the B.M. and adding it to the R.L. of bench mark. • The staff reading required to fix points on the various contours is determined by subtracting the R.L. of each of the contours from the height of instrument. 8
  • 9. • Example: • If the height of instrument is 82.48m., then the staff readings required to locate 82, 81 and 80m contours are 0.48, 1.48 and 2.48m respectively. The staff is held on an approximate position of point and then moved up and down the slope until the desired reading is obtained. The point is marked with a peg. • Similarly various other points are marked on each contour. The line joining all these points give the required contour. It may be noted that one contour is located at a time. Having fixed the contours within the range of the instrument, the level is shifted and set up in a new position. 9
  • 10. Procedure (Contd…..) • The new height of instrument and the required staff readings are then calculated in a similar manner and the process repeated till all the contours are located. • The positions of the contour points are located suitably either simultaneous with levelling or afterwards. • A theodolite , a compass or a plane table traversing is usually adopted for locating these points. • The points are then plotted on the plan and the contours drawn by joining the corresponding points by dotted curved lines. 10
  • 11. Direct Method By Radial Lines • This method is suitable for small areas, where a single point in the centre can command the whole area. Radial lines are laid out from the common centre by theodolite or compass and their positions are fixed up by horizontal angles and bearings. RADIAL LINES METHOD OF CONTOURING 70 65 60 55 11
  • 12. Direct Method By Radial Lines (contd.): • Temporary bench marks are first established at the centre and near the ends of the radial lines . • The contour points are then located and marked on these lines and their positions are determined by measuring their distances along the radial lines. • They are then plotted on the plan and the contours drawn by joining all the corresponding points with the help of a plane table instrument. 12
  • 13. 2. INDIRECT METHOD • In this method the points located and surveyed are not necessarily on the contour lines but the spot levels are taken along the series of lines laid out over the area . • The spot levels of the several representative points representing hills, depressions, ridge and valley lines and the changes in the slope all over the area to be contoured are also observed. • Their positions are then plotted on the plan and the contours drawn by interpolation. • This method of contouring is also known as contouring by spot levels. 13
  • 14. • This method is commonly employed in all kinds of surveys as this is cheaper, quicker and less tedious as compared to direct method. There are mainly three method of contouring in indirect method: • (I) BY SQUARES [SQUARE METHOD]:- • In this method, the whole area is divided into number of squares, the side of which may vary from 5m to 30m depending upon the nature of the ground and the contour interval. The square need not be of the same size throughout. • The corners of the squares are pegged out and the reduced levels of these points are determined with a level. 14
  • 16. (II) By Cross- Sections: • This method is most suitable for the survey of long narrow strips such as a road, railway or canal etc. 16
  • 17. • (III) By Tacheometric method: • A techeometer is a transit theodolite having a diaphragm fitted with two stadia wires, one above and other below the central wire. • The horizontal distance between the instrument and staff station may be determined by multiplying the difference of the staff readings of the upper and lower stadia wires with the stadia constant of the instrument, which is usually 100. • Thus the techeometer is used for both the vertical as well as horizontal measurements. Stadia Wires at Diaphragm 17
  • 18. iii) By Tacheometric method (contd…): • This method is most suitable in hilly areas as the number of stations which can be commanded by a techeometer is far more than those by a level and thus the number of instrument settings are considerably reduced. A number of radial lines are laid out at a known angular interval and representative points are marked by pegs along these radial lines. Their elevations and distances are then calculated and plotted on the plan and the contour lines are then interpolated. 18
  • 19. 19