Challenges / Restrictions: Issues / Problems:
- Construction Codes
- Roof & Exterior Wall
Space
- Space Requirements for
MEP Equipment
- Reuse of Existing MEP
Systems
- Capacity of Existing
Utilities
- Construction Budgets
- Temperature & Humidity
Out of Control
- Grease Duct
Construction & Routing
- Exhaust Termination
- Grease Interceptor
- Domestic Hot Water
- Cross Connection BFP
- Gas Pressure
- Electrical Capacity
Building Codes / Jurisdictions
- International Building Code
- International Mechanical Code
- International Plumbing Code
- International Fuel Gas Code
- International Energy Conservation Code
- International Fire Code
- National Electrical Code
- Washington Suburban Sanitary Commission (WSSC )
- DC Codes Supplement of 2013
- Local Health Department
- Metropolitan Washington Airport Authority (MWAA)
Temperature & Humidity is Out of Control!
1. Fresh Air: Avoid Oversizing
2. Apply Smart Fresh Air Solutions
3. Design Proper Space Air Balance
Fresh Air Solutions
Different Methods for Different Scenarios
i) Blue Jacket Brewery (BJB):
100% outside air system,
see next slide
ii) Sugar Shack:
High and Low Fresh Air `
Intake Settings
Architect: ALine Architecture
Alexandria, VA
iii) Dream Café:
Energy Recovery System
combined with Exhaust Or
Relief Air Fan
Architect: The Lieumann Firm
Fairfax Station, VA
Space Air Balance Design
Design Case: BJB
Architect:
Form Design
Fairfax, VA
Grease Duct Construction & Routing
- Separation Of Grease Duct Systems
a separate system for solid fuel cooking
- Construction, 16 gage steel or 18 gage SS.
- Enclosure: One Per Grease Duct
- Clearances: 18” to combustibles, 3” to non-combustibles
where not enclosed, 6” to non-combustibles in an enclosure,
Exception: use listed fire wrap.
- Slope: 2% for < 75 Ft, 8.3% for > 75 Ft
50’  12” fall, 75’  6.25’ fall.
- Cleaning Access
Grease Duct Construction & Routing
Ben’s Chili Bowl, H Street
Architect:
Form Design
Fairfax, VA
Grease Duct Termination
IMC
(VA, MD)
DC (w/o
Scrubber)
DC (w/
Scrubber)
Property Line 10’ 10’ 10’
Exterior Walls & Roofs 3’ 3’ 3’
Openings in the Building / Horizontal 10’ 20’ (1) 10’
Or Vertical 3’ 5’ 3’
Adjoining Grade 10’ 15’ 15’
(1) On narrow lots where 20’ distance is not doable the code
official is authorized to approve a smaller distance.
CaptiveAire
Pollution
Control Unit
(PCU)
Grease Duct Termination
Use of Scrubber (Grease and Odor Removal)
Architect:
GrizForm Design
District of Columbia
Grease Interceptor
Sizing: WSSC or Not-WSSC
IPC WSSC All The Rest
Section 1003.3.4 and Table
1003.3.4.1
Hydromechanical Grease
Interceptor shall be sized in
accordance with: ASME
112.14.4 or PDI G101
Flow Based GI vs Volume
Based GI
Flow Based GI: sizing
based Tables 1003.a &
1003.b
Volume Based GI: sizing
based on Table 1003.c
Sizing is based on
PDI G101
Grease Interceptor
Sizing: WSSC Methods
Flow Based GI:
• Sizing is based on flow rate
• Indoor Installation
• Serves particular group of fixtures
Volume Based GI:
• Sizing is based on retention time
• Outdoor Installation
• Serves Building Wide
If DFUs are not known, the GI shall be
sized on the maximum DFUs allowed for
the pipe size connected (2”=21 DFU,
3”=36 DFU, 4”=180 DFU)
Grease Interceptor
Sizing: PDI G101 Method
Grease Interceptor
Piping: Under The Sink Flow Based GI
Important Note: Where food waste grinder connects to a grease
interceptor, a solid interceptor shall be installed between the
grinder and the grease interceptor
Domestic Water Heater
- Two Temperature System
(140F and 110F)
- Recovery Requirements
80 degrees temp. rise for manual dishwashing
and 100 degrees when using dishwashing
machine
- Gas vs Electric
36 KW electrical water heater
requires 100 amps
- Tank vs Tankless
Tankless electrical is not feasible
Two gas tankless would be required
- Installation, Equipment Weight,
8.33 lbs./gal, 100-gals HWH is 1500 lbs. or more
Cross Connection & Backflow
Prevention Guide
Equipment AVB PVB DCV DCV with
Intermed. AV
Pre-Rinse Hose with Spray Nozzle X
Hose Bib, Threaded Faucet X
Mechanical Dishwashing Machine X X
Soap or Detergent Dispenser X X
Coffee Urn, Ice Maker X
Carbonated Beverage Dispenser X (1)
Garbage Can Washer X X
(1) Stainless steel or composite, copper is not allowed
AVB: Atmospheric Vacuum Breaker
PVB: Pressure Vacuum Breaker
DCV: Double Check Valve
DCV+AV: Double Check with Intermediate Atmospheric Vent
Electrical & Lighting
- Fifty (50) foot-candles (FC) in food prep, bar, beverage service islands,
and areas where knifes, slicers, saws or grinders are used.
- Twenty (20) foot-candles in buffet / salad bar, dishwashing, inside
reach-in and under-counter refrigerator equipment, utensil storage,
handwashing, toilet rooms, and at handsinks.
- Ten (10) FC in walk-in, dry food storage, dining and all other areas.
- Covered light fixtures with a lens, or shatter-resistant lamps / bulbs
are required in food storage, preparation, service, and display areas,
and where utensils and equipment are cleaned and stored, including
bars and waitstaff service areas.
- IECC, Allowable LPD is 1.4 w/ft2
- Electrical Service Sizing
Questions?

Más contenido relacionado

La actualidad más candente

Air Conditioning case study
Air Conditioning case studyAir Conditioning case study
Air Conditioning case studySona Rawat
 
228279816 philippine-electrical-code-summary
228279816 philippine-electrical-code-summary228279816 philippine-electrical-code-summary
228279816 philippine-electrical-code-summaryJoaquin Oronan
 
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between SystemsVictor Ashkenazy
 
Introduction to VRF
Introduction to VRF Introduction to VRF
Introduction to VRF John Chavez
 
Design considerations of electrical installations
Design considerations of electrical installationsDesign considerations of electrical installations
Design considerations of electrical installationsvishalgohel12195
 
Building Service Chapter 1
Building Service Chapter 1Building Service Chapter 1
Building Service Chapter 1Izam Lukman
 
Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...Mahesh Chandra Manav
 
Air conditioning for large multistory buildings
Air conditioning for large multistory buildingsAir conditioning for large multistory buildings
Air conditioning for large multistory buildingspnazila
 
Underground car parking ventilation system
Underground car parking ventilation systemUnderground car parking ventilation system
Underground car parking ventilation systemMohamed Hashish
 
Design, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF SystemDesign, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF SystemSocheat Veng
 
NBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMSNBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMSasif anwar
 
5. Corridors & Passageways
5. Corridors & Passageways5. Corridors & Passageways
5. Corridors & PassagewaysSadiq Alam
 
Hvac systems presentation_slides
Hvac systems presentation_slidesHvac systems presentation_slides
Hvac systems presentation_slidesguy ygal
 
Hvac presentation for beginers
Hvac presentation for beginersHvac presentation for beginers
Hvac presentation for beginersguestf11b52
 
PRINCIPLES OF AIR CONDITIONING.pptx
PRINCIPLES OF AIR CONDITIONING.pptxPRINCIPLES OF AIR CONDITIONING.pptx
PRINCIPLES OF AIR CONDITIONING.pptxCharltonInao1
 
Air Condtioning Systems HVAC
Air Condtioning Systems HVACAir Condtioning Systems HVAC
Air Condtioning Systems HVACPrashanth Dommeti
 

La actualidad más candente (20)

Eat105 chapter 2
Eat105 chapter 2Eat105 chapter 2
Eat105 chapter 2
 
Air Conditioning case study
Air Conditioning case studyAir Conditioning case study
Air Conditioning case study
 
228279816 philippine-electrical-code-summary
228279816 philippine-electrical-code-summary228279816 philippine-electrical-code-summary
228279816 philippine-electrical-code-summary
 
Comparison between Systems
Comparison between SystemsComparison between Systems
Comparison between Systems
 
Introduction to VRF
Introduction to VRF Introduction to VRF
Introduction to VRF
 
Design considerations of electrical installations
Design considerations of electrical installationsDesign considerations of electrical installations
Design considerations of electrical installations
 
VRF II VRV
VRF II VRVVRF II VRV
VRF II VRV
 
BMS Automation wiring
BMS Automation wiringBMS Automation wiring
BMS Automation wiring
 
Building Service Chapter 1
Building Service Chapter 1Building Service Chapter 1
Building Service Chapter 1
 
Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...
 
Air conditioning for large multistory buildings
Air conditioning for large multistory buildingsAir conditioning for large multistory buildings
Air conditioning for large multistory buildings
 
Underground car parking ventilation system
Underground car parking ventilation systemUnderground car parking ventilation system
Underground car parking ventilation system
 
Design, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF SystemDesign, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF System
 
NBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMSNBC NORMS FOR HVAC SYSTEMS
NBC NORMS FOR HVAC SYSTEMS
 
5. Corridors & Passageways
5. Corridors & Passageways5. Corridors & Passageways
5. Corridors & Passageways
 
Hvac systems presentation_slides
Hvac systems presentation_slidesHvac systems presentation_slides
Hvac systems presentation_slides
 
Hvac presentation for beginers
Hvac presentation for beginersHvac presentation for beginers
Hvac presentation for beginers
 
ELEVATORS
ELEVATORSELEVATORS
ELEVATORS
 
PRINCIPLES OF AIR CONDITIONING.pptx
PRINCIPLES OF AIR CONDITIONING.pptxPRINCIPLES OF AIR CONDITIONING.pptx
PRINCIPLES OF AIR CONDITIONING.pptx
 
Air Condtioning Systems HVAC
Air Condtioning Systems HVACAir Condtioning Systems HVAC
Air Condtioning Systems HVAC
 

Destacado

Tripleseat Software Presentation
Tripleseat Software PresentationTripleseat Software Presentation
Tripleseat Software PresentationJonathan Morse
 
The really final powerpoint
The really final powerpointThe really final powerpoint
The really final powerpointMurillo Ataíde
 
Table setting and meal service
Table setting and meal serviceTable setting and meal service
Table setting and meal servicekannan kans
 
Food & beverage service equipment
Food & beverage service equipmentFood & beverage service equipment
Food & beverage service equipmentUjjwal Kalia
 
Types of food and beverage services
Types of food and beverage servicesTypes of food and beverage services
Types of food and beverage servicesAmaresh Kumar
 

Destacado (7)

Tripleseat Software Presentation
Tripleseat Software PresentationTripleseat Software Presentation
Tripleseat Software Presentation
 
The really final powerpoint
The really final powerpointThe really final powerpoint
The really final powerpoint
 
Table setting
Table settingTable setting
Table setting
 
Table setting and meal service
Table setting and meal serviceTable setting and meal service
Table setting and meal service
 
Types of table service
Types of table serviceTypes of table service
Types of table service
 
Food & beverage service equipment
Food & beverage service equipmentFood & beverage service equipment
Food & beverage service equipment
 
Types of food and beverage services
Types of food and beverage servicesTypes of food and beverage services
Types of food and beverage services
 

Similar a Mep restaurant and dining

52240 plumbingfixtures
52240 plumbingfixtures52240 plumbingfixtures
52240 plumbingfixturestagalamut143
 
Cenelca Ii Drm Presentation
Cenelca Ii Drm PresentationCenelca Ii Drm Presentation
Cenelca Ii Drm PresentationWilson Contreras
 
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...BharathwajanTS
 
dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014GWT
 
Advancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAdvancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAudubon Engineering Company
 
13 the acceptance of newer measurement technologies by global regulators (cam...
13 the acceptance of newer measurement technologies by global regulators (cam...13 the acceptance of newer measurement technologies by global regulators (cam...
13 the acceptance of newer measurement technologies by global regulators (cam...Pilar Cortes
 
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Audubon Engineering Company
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Jeffrey Pickett
 
What Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobWhat Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobjoseph william
 
Active Chilled Beam Technology
Active Chilled Beam TechnologyActive Chilled Beam Technology
Active Chilled Beam TechnologyIllinois ASHRAE
 
Energy recovery presentation
Energy recovery presentationEnergy recovery presentation
Energy recovery presentationplugtrab
 
TDLR Well Driller/Pump Installer Program, W.L. Stribling, Project Manager, Te...
TDLR Well Driller/Pump Installer Program, W.L. Stribling, Project Manager, Te...TDLR Well Driller/Pump Installer Program, W.L. Stribling, Project Manager, Te...
TDLR Well Driller/Pump Installer Program, W.L. Stribling, Project Manager, Te...Texas Alliance of Groundwater Districts
 
CaseStudy WellVizor Production Automation & Optimization
CaseStudy WellVizor Production Automation & OptimizationCaseStudy WellVizor Production Automation & Optimization
CaseStudy WellVizor Production Automation & OptimizationAEGEOS OILFIELD TECHNOLOGY
 
Water Tank Rehabilitation For A Small Community
Water Tank Rehabilitation For A Small CommunityWater Tank Rehabilitation For A Small Community
Water Tank Rehabilitation For A Small CommunityAjay Kashi, P.E.
 

Similar a Mep restaurant and dining (20)

52240 plumbingfixtures
52240 plumbingfixtures52240 plumbingfixtures
52240 plumbingfixtures
 
Plumbing training
Plumbing training Plumbing training
Plumbing training
 
Cenelca Ii Drm Presentation
Cenelca Ii Drm PresentationCenelca Ii Drm Presentation
Cenelca Ii Drm Presentation
 
High rise plumbing design by aspe
High rise plumbing design by aspeHigh rise plumbing design by aspe
High rise plumbing design by aspe
 
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
Vibrations analysis Infrared Ultrasonic Integrations marine industry-rev - Co...
 
dancookgcc2014
dancookgcc2014dancookgcc2014
dancookgcc2014
 
Advancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanksAdvancements cathodic protection for on grade storage tanks
Advancements cathodic protection for on grade storage tanks
 
13 the acceptance of newer measurement technologies by global regulators (cam...
13 the acceptance of newer measurement technologies by global regulators (cam...13 the acceptance of newer measurement technologies by global regulators (cam...
13 the acceptance of newer measurement technologies by global regulators (cam...
 
Boiler Operation and Maintenance Experiences
Boiler Operation and Maintenance ExperiencesBoiler Operation and Maintenance Experiences
Boiler Operation and Maintenance Experiences
 
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs) Cathodic Protection for Above Ground Storage Tanks (AGSTs)
Cathodic Protection for Above Ground Storage Tanks (AGSTs)
 
Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
What Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning jobWhat Constittutes a Cuality Commissioning job
What Constittutes a Cuality Commissioning job
 
Active Chilled Beam Technology
Active Chilled Beam TechnologyActive Chilled Beam Technology
Active Chilled Beam Technology
 
Energy recovery presentation
Energy recovery presentationEnergy recovery presentation
Energy recovery presentation
 
TDLR Well Driller/Pump Installer Program, W.L. Stribling, Project Manager, Te...
TDLR Well Driller/Pump Installer Program, W.L. Stribling, Project Manager, Te...TDLR Well Driller/Pump Installer Program, W.L. Stribling, Project Manager, Te...
TDLR Well Driller/Pump Installer Program, W.L. Stribling, Project Manager, Te...
 
Job1.doc
Job1.docJob1.doc
Job1.doc
 
CaseStudy WellVizor Production Automation & Optimization
CaseStudy WellVizor Production Automation & OptimizationCaseStudy WellVizor Production Automation & Optimization
CaseStudy WellVizor Production Automation & Optimization
 
Donnie Belloit_Reume
Donnie Belloit_ReumeDonnie Belloit_Reume
Donnie Belloit_Reume
 
Water Tank Rehabilitation For A Small Community
Water Tank Rehabilitation For A Small CommunityWater Tank Rehabilitation For A Small Community
Water Tank Rehabilitation For A Small Community
 
2015 weec broadusa
2015 weec broadusa2015 weec broadusa
2015 weec broadusa
 

Mep restaurant and dining

  • 1. Restaurant & Kitchen MEP The Architect Guide to Pre-Empting MEP Engineering Nightmares
  • 2. Challenges / Restrictions: Issues / Problems: - Construction Codes - Roof & Exterior Wall Space - Space Requirements for MEP Equipment - Reuse of Existing MEP Systems - Capacity of Existing Utilities - Construction Budgets - Temperature & Humidity Out of Control - Grease Duct Construction & Routing - Exhaust Termination - Grease Interceptor - Domestic Hot Water - Cross Connection BFP - Gas Pressure - Electrical Capacity
  • 3. Building Codes / Jurisdictions - International Building Code - International Mechanical Code - International Plumbing Code - International Fuel Gas Code - International Energy Conservation Code - International Fire Code - National Electrical Code - Washington Suburban Sanitary Commission (WSSC ) - DC Codes Supplement of 2013 - Local Health Department - Metropolitan Washington Airport Authority (MWAA)
  • 4. Temperature & Humidity is Out of Control! 1. Fresh Air: Avoid Oversizing 2. Apply Smart Fresh Air Solutions 3. Design Proper Space Air Balance
  • 5. Fresh Air Solutions Different Methods for Different Scenarios i) Blue Jacket Brewery (BJB): 100% outside air system, see next slide ii) Sugar Shack: High and Low Fresh Air ` Intake Settings Architect: ALine Architecture Alexandria, VA iii) Dream Café: Energy Recovery System combined with Exhaust Or Relief Air Fan Architect: The Lieumann Firm Fairfax Station, VA
  • 6. Space Air Balance Design Design Case: BJB Architect: Form Design Fairfax, VA
  • 7. Grease Duct Construction & Routing - Separation Of Grease Duct Systems a separate system for solid fuel cooking - Construction, 16 gage steel or 18 gage SS. - Enclosure: One Per Grease Duct - Clearances: 18” to combustibles, 3” to non-combustibles where not enclosed, 6” to non-combustibles in an enclosure, Exception: use listed fire wrap. - Slope: 2% for < 75 Ft, 8.3% for > 75 Ft 50’  12” fall, 75’  6.25’ fall. - Cleaning Access
  • 8. Grease Duct Construction & Routing Ben’s Chili Bowl, H Street Architect: Form Design Fairfax, VA
  • 9. Grease Duct Termination IMC (VA, MD) DC (w/o Scrubber) DC (w/ Scrubber) Property Line 10’ 10’ 10’ Exterior Walls & Roofs 3’ 3’ 3’ Openings in the Building / Horizontal 10’ 20’ (1) 10’ Or Vertical 3’ 5’ 3’ Adjoining Grade 10’ 15’ 15’ (1) On narrow lots where 20’ distance is not doable the code official is authorized to approve a smaller distance. CaptiveAire Pollution Control Unit (PCU)
  • 10. Grease Duct Termination Use of Scrubber (Grease and Odor Removal) Architect: GrizForm Design District of Columbia
  • 11. Grease Interceptor Sizing: WSSC or Not-WSSC IPC WSSC All The Rest Section 1003.3.4 and Table 1003.3.4.1 Hydromechanical Grease Interceptor shall be sized in accordance with: ASME 112.14.4 or PDI G101 Flow Based GI vs Volume Based GI Flow Based GI: sizing based Tables 1003.a & 1003.b Volume Based GI: sizing based on Table 1003.c Sizing is based on PDI G101
  • 12. Grease Interceptor Sizing: WSSC Methods Flow Based GI: • Sizing is based on flow rate • Indoor Installation • Serves particular group of fixtures Volume Based GI: • Sizing is based on retention time • Outdoor Installation • Serves Building Wide If DFUs are not known, the GI shall be sized on the maximum DFUs allowed for the pipe size connected (2”=21 DFU, 3”=36 DFU, 4”=180 DFU)
  • 14. Grease Interceptor Piping: Under The Sink Flow Based GI Important Note: Where food waste grinder connects to a grease interceptor, a solid interceptor shall be installed between the grinder and the grease interceptor
  • 15. Domestic Water Heater - Two Temperature System (140F and 110F) - Recovery Requirements 80 degrees temp. rise for manual dishwashing and 100 degrees when using dishwashing machine - Gas vs Electric 36 KW electrical water heater requires 100 amps - Tank vs Tankless Tankless electrical is not feasible Two gas tankless would be required - Installation, Equipment Weight, 8.33 lbs./gal, 100-gals HWH is 1500 lbs. or more
  • 16. Cross Connection & Backflow Prevention Guide Equipment AVB PVB DCV DCV with Intermed. AV Pre-Rinse Hose with Spray Nozzle X Hose Bib, Threaded Faucet X Mechanical Dishwashing Machine X X Soap or Detergent Dispenser X X Coffee Urn, Ice Maker X Carbonated Beverage Dispenser X (1) Garbage Can Washer X X (1) Stainless steel or composite, copper is not allowed AVB: Atmospheric Vacuum Breaker PVB: Pressure Vacuum Breaker DCV: Double Check Valve DCV+AV: Double Check with Intermediate Atmospheric Vent
  • 17. Electrical & Lighting - Fifty (50) foot-candles (FC) in food prep, bar, beverage service islands, and areas where knifes, slicers, saws or grinders are used. - Twenty (20) foot-candles in buffet / salad bar, dishwashing, inside reach-in and under-counter refrigerator equipment, utensil storage, handwashing, toilet rooms, and at handsinks. - Ten (10) FC in walk-in, dry food storage, dining and all other areas. - Covered light fixtures with a lens, or shatter-resistant lamps / bulbs are required in food storage, preparation, service, and display areas, and where utensils and equipment are cleaned and stored, including bars and waitstaff service areas. - IECC, Allowable LPD is 1.4 w/ft2 - Electrical Service Sizing