This is an eagle scout service project created and built by Brett for Sister Mary Roy of Calhoun County's Center Of Concern. To date, this project is still in full bloom and a very used project by all!
21. In Search of … Crossties 9/10/2011 21 Just one of the many piles of crossties that I had to salvage through. Goes without saying that these things are heavy no matter whether new or used!
22. In Search of … Crossties After sifting through countless ties, I finally managed to find enough to complete both beds. I will have to saw the excess off the ends but that’s not a big deal! 9/10/2011 22
23. In Search of … Crossties Volunteers Penny and Mom (the driver) with me. 9/10/2011 23
24. In Search of … Crossties 9/10/2011 24 Beds completed
26. Up Goes The Fence Liberty Fence of Oxford, AL donated their time to install the fence for this project! 9/10/2011 26
27. Up Goes The Fence Brian and Justin hard at work laying out the posts 9/10/2011 27
28. Up Goes The Fence Brian sets the gate post. Here I am with Brian and Justin discussing the procedures for setting of the posts. 9/10/2011 28
29. Up Goes The Fence I’m learning about proper water to cement ratio. Brian and Justin install the gate. 9/10/2011 29
30. Up Goes The Fence All the posts and the gate are now installed and cement is curing. 9/10/2011 30
31. Up Goes The Fence Uh oh! The soil was dumped on the fence line and the fence guys are due in a few minutes to put up the linkage. 9/10/2011 31
32. Up Goes The Fence Volunteers Ben Douglas and Tommy Carroll make quick work of moving the misplaced soil. 32 9/10/2011
33. The Fence Goes Up Justin and Michael installing the linkage. 9/10/2011 33
34. The Fence Goes Up The sides are done as is the gate side. The end left open to provide easier access in putting the soil in the beds. 9/10/2011 34
35. The Soil is Moved Awaiting the arrival of the volunteers from Troop 4010. 9/10/2011 35
36. The Soil is Moved Bobby and I are distributing the soil in the beds. 9/10/2011 36
37. The Soil is Moved Volunteers Brent, Bobby and Penny are hard at work filling up the wheelbarrows to move the soil. 9/10/2011 37
38. The Soil is Moved I got the job of emptying the wheelbarrow! Volunteers still shoveling! 9/10/2011 38
39. The Soil is Moved Another load of soil I’m smoothing out the soil between loads. 9/10/2011 39
40. The Soil is Moved Volunteers Garrison, Bobby, Penny and Alex still moving soil! Eagle Scout & Volunteer Brent distributing the soil in bed number two. 9/10/2011 40
41. The Soil is Moved I’m still busy smoothing out the soil in bed number one. 9/10/2011 41
42. The Soil is Moved Brent & I are smoothing out the soil in bed number two. Bobby & Alex working on the pile of soil. 9/10/2011 42
43. The Soil is Moved Finished! Both beds now filled and the crosstie ends have been put into place. Now comes the rebar reinforcements. The pile of soil is smaller now. Plenty of good soil remains – perfect to add some flowers around the outside. 43
58. A BIG Thank You Goes To….. Webb Concrete Beautification Board of Calhoun County The Fence Place Liberty Fence Coldwater Landscaping Supplies J. Smith CJ’s Chuckwagon Ginrose & Friends Downing General Store Nor-Folk Southern Railways FabArc, Inc. Williams Scrap Yard 9/10/2011 50 Without these people and their donations, this project could not happen