Preventive Maintenance Strategies for
Electrical Distribution System
Presented by:
Charles Alvis
Schneider Electric
The cost of ignoring maintenance and testing
Recommended steps to an effective electrical preventive maintenance
program:
- Assess the current state of the electrical system
- Maintenance and testing protocol
- Planning for outages
Considerations for outsourcing
- Is in-house staff qualified, as defined by NFPA 70E?
- Do they have the capability to make corrective recommendations
for issues that may arise?
Fixed Cost Service Agreements
Multi-year service plans help make maintenance easy for facilities
Predictive Maintenance Technology and Trends
Preventive Maintenance Strategies
The Cost of Ignoring Maintenance
“A well-administered Electrical Preventive Maintenance
program:
Reduces accidents
Saves lives
Minimizes costly breakdowns and unplanned outages
Impending troubles can be identified, and solutions
applied, before they become major problems requiring
more expensive, time-consuming solutions.”
NFPA 70B-2013 Ed., Section 4.2.1
The Cost of Ignoring Maintenance
Section 4.2.7 goes on to state:
“An Electrical Preventive Maintenance (EPM) program
satisfies an important part of management’s
responsibility for keeping costs down and production
up.”
Having a preventive maintenance program in
place can reduce the risk of unplanned
downtime by as much as 66%. Source: IEEE
Recommended Steps:
Assess the Current State of the Electrical
System
• An up-to-date one-line
diagram of the electrical
system provides clear and
precise information concerning
the exact interconnections of
all electrical equipment.
• Due to modifications made to
the electrical infrastructure,
many facilities do not have a
current drawing.
Recommended Steps:
Assess the Current State of the Electrical System
• A licensed professional electrical engineer should be contracted
and commissioned to create and maintain current electrical
one-line diagrams and equipment name plate data.
• Prior to initiating a preventive
maintenance program, have a
short circuit analyses, a time-
current coordination study, and
an arc flash analysis of all of the
power distribution systems to
ensure equipment is properly
rated, set and labeled.
Recommended Steps:
Maintenance and Testing Protocol
• A comprehensive preventive maintenance and testing program
should incorporate detailed policies, procedures, and
maintenance activities for the entire electrical power
distribution system, regardless of the manufacturer.
• NETA-MTS, NFPA 70B and OEM operations and maintenance
manuals can provide recommended guidelines for developing
the work scopes as frequency for performing maintenance and
testing.
If OEM manuals are not readily available,
contact the manufacturer or check online.
Recommended Steps:
Maintenance and Testing Protocol
The recommended maintenance and testing interval may need to
be altered if any of these factors exist:
• Potential to safety of equipment failure
• Operating environment and equipment condition
• Operating load and ratings
• High repair cost equipment
• Cost of down-time to production
• Performance history of equipment
Recommended Steps:
Maintenance and Testing Protocol
Any specific maintenance of separate pieces
of electrical equipment does not guarantee a
completely coordinated and reliable power
distribution system as intended and
necessary.
Recommended Steps:
Maintenance and Testing Protocol
The facility’s management needs to clearly communicate to the
service provider:
Which equipment is included in the maintenance program
The specific order the
electrical equipment
should be removed from
service for maintenance
The detailed scope of
work for each piece of
equipment or component
Recommended Steps:
Maintenance and Testing Protocol
Recommended items or equipment to Incorporate into a
Preventive Maintenance Program:
• Monitoring equipment
• Metering equipment
• Protective relays
• Service-entrance
switchgear
• Circuit breakers
• Switchboards
• Panelboards
• Motor control centers
• Transformers
• Automatic transfer switches
• UPS Systems
• Busway
• Optional Stand-by
Generators
and…
• Bonding & Grounding
Systems (often overlooked)
Recommended Steps: Planning for Outages
With FEW exceptions, electrical
equipment should NOT be cleaned,
inspected, maintained, serviced,
or tested while it is energized.
When planning for an outage, ‘critical’
equipment should be identified and
scheduled, as noted earlier.
Arrangements for temporary electrical
power should be made, if needed.
Above all, it is management’s
responsibility for onsite safety, whether
for in-house or third-party electrical
workers.
Considerations for Outsourcing
• Facility management needs to insure that
electrical workers are experienced in the
specific equipment or system that is to be
maintained.
• Very few companies have in-house staff who
have the experience to service all of the
electrical equipment within the facility’s
electrical power system.
• Proposed third-party electrical
providers should be thoroughly
qualified by management.
An in-depth interview is
suggested and applicable
references obtained.
Considerations for Outsourcing
Personnel performing the maintenance activities need to
be qualified as defined by OSHA and NFPA 70E.
Fundamental requirements include:
• Complete understanding of equipment,
the required work scope and electrical
hazards present.
• Proper use of protective equipment,
tools, shielding and test equipment
as well as precautionary techniques.
• Discipline and decision making
skills to determine risk and ability
to maintain a safe work environment.
Photo Courtesy of Oberon
Code and Regulatory Compliance Requirements
Regularly scheduled electrical preventive
maintenance helps companies meet the
requirements of OSHA, NFPA 70E and other
authorities having jurisdiction.
Code and Regulatory Compliance Requirements
Conditions that may warrant preventive maintenance be
performed more frequently than the OEM’s
recommendations include:
●Environmental conditions,
including humidity, corrosive
atmosphere, dirt or dust
●Equipment runs constantly
or with heavy loads
Requirements of local
authorities having jurisdiction
Maintaining quality records of maintenance (and repair)
activities support regulatory compliance as well as provide
trending data.
●Helps identify potential problems to avoid equipment
breakdown.
●Enables management to track costs of maintenance
activities over time.
Code and Regulatory Compliance
Requirements
In addition to maintenance records, having the
following documentation available* will prove helpful
in the event of an electrical incident.
● Tools, materials and equipment needed
● Average time to perform tasks
● Reference manuals
● Past test reports
● Past incident reports
● Record of repair work
Code and Regulatory Compliance
Requirements
For each piece of
equipment being
tested.
Fixed-costs service agreements are a growing trend to
manage increasingly complex electrical power distribution
systems or systems with multiple brands of equipment.
●In addition to meeting regulatory requirements, these plans
offer the flexibility to customize a scope of work and term.
●A fixed-cost service plan avoids fluctuations to the maintenance
budget
●Billing can usually
be structured to
provide a fixed >
payment schedule.
Fixed Cost Service Plans
Fixed Cost Service Plans
Typically Three Levels Of Outsourced Field Support
Maintenance
Service
Emergency on
Site Response
Replacement
Parts
(All Inclusive)
A New Approach
for Maintenance
Predictive maintenance techniques safely provide condition
status to help anticipate and plan maintenance activities.
Predictive maintenance solutions detect early
warning signs and help prevent downtime.
Predictive Maintenance Solutions
Infrared Viewing Windows
Enhances safety by allowing infrared inspections without the need to remove equipment covers.
Infrared Viewing Window
Allows monitoring of critical connection points.
Exceptionally valuable for areas not seen by infrared cameras.
Temperature Monitoring
SensorSensor
Detects impending insulation breakdown in MV equipment, which can lead to costly equipment
damage and downtime.
Coupling
Capacitors
RF CTs
Bushing Sensor
Partial Discharge Monitoring
Active Asset Condition
Based Monitoring
Emerging – Comprehensive Asset Monitoring
References
• National Fire Protection Association (NFPA) 70B, Recommended Practice for
Electrical Equipment Maintenance.
• National Fire Protection Association (NFPA) 70, National Electrical Code.
• National Electrical Manufacturer’s Association (NEMA) Standard AB4, Procedures for Verifying
Field Inspections and Performance Verification of Molded-Case Circuit Breakers.
• National Electrical Testing Association (NETA), Maintenance Testing Specifications for Electrical
Power Distribution Equipment and Systems.
• IEEE Standard 902-1998, IEEE Guide for Maintenance, Operation, and Safety of Industrial and
Commercial Power Systems.
• IEEE Standard 142-2007, IEEE Recommended Practice for Grounding of Industrial and
Commercial Power Systems.
• National Electrical Manufacturer’s Association (NEMA) Standard MG1.

Más contenido relacionado

La actualidad más candente

Troubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
Troubleshooting, Maintenance and Protection of AC Electrical Motors and DrivesTroubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
Troubleshooting, Maintenance and Protection of AC Electrical Motors and DrivesLiving Online
 
IEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage componentsIEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage componentsCotmac Electronics Pvt. Ltd.
 
Electrical Design calculations
Electrical Design calculationsElectrical Design calculations
Electrical Design calculationsPankaj Chavan
 
Grounding,Earthing,Bonding
Grounding,Earthing,BondingGrounding,Earthing,Bonding
Grounding,Earthing,BondingKo Winnwe
 
Overload capacity of power transformers
Overload capacity of power transformersOverload capacity of power transformers
Overload capacity of power transformersLeonardo ENERGY
 
Troubleshooting Electrical Faults
Troubleshooting Electrical FaultsTroubleshooting Electrical Faults
Troubleshooting Electrical FaultsSimutech Multimedia
 
LV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxLV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxshivendra68
 
Power cable - Installation methods
Power cable - Installation methodsPower cable - Installation methods
Power cable - Installation methodsLeonardo ENERGY
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systemsBiswajit Pratihari
 
Principles of Cable Selection
Principles of Cable SelectionPrinciples of Cable Selection
Principles of Cable SelectionLeonardo ENERGY
 
Fire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution AspectsFire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution AspectsJames S Nasby
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ramGRBabu Naidu
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1Siswoyo Edo
 
Electrical wiring system - and estimation
Electrical wiring system -  and estimation Electrical wiring system -  and estimation
Electrical wiring system - and estimation Mahfuz Sikder
 

La actualidad más candente (20)

Electrical Wiring Practices and Diagrams
Electrical Wiring Practices and DiagramsElectrical Wiring Practices and Diagrams
Electrical Wiring Practices and Diagrams
 
Cable Sizing Calculations
Cable Sizing CalculationsCable Sizing Calculations
Cable Sizing Calculations
 
Troubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
Troubleshooting, Maintenance and Protection of AC Electrical Motors and DrivesTroubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
Troubleshooting, Maintenance and Protection of AC Electrical Motors and Drives
 
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad IbrahimElectrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
Electrical Installation Design Project_DUBAI STANDARD_ by Mohnad Ibrahim
 
IEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage componentsIEC 61439 - the new standard for low voltage components
IEC 61439 - the new standard for low voltage components
 
Electrical Design calculations
Electrical Design calculationsElectrical Design calculations
Electrical Design calculations
 
Panel designing
Panel designingPanel designing
Panel designing
 
Grounding,Earthing,Bonding
Grounding,Earthing,BondingGrounding,Earthing,Bonding
Grounding,Earthing,Bonding
 
Relay testing procedure
Relay testing procedure Relay testing procedure
Relay testing procedure
 
Overload capacity of power transformers
Overload capacity of power transformersOverload capacity of power transformers
Overload capacity of power transformers
 
Troubleshooting Electrical Faults
Troubleshooting Electrical FaultsTroubleshooting Electrical Faults
Troubleshooting Electrical Faults
 
LV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptxLV SWITCHGEAR -Final PPT.pptx
LV SWITCHGEAR -Final PPT.pptx
 
Power cable - Installation methods
Power cable - Installation methodsPower cable - Installation methods
Power cable - Installation methods
 
Electrical grounding and earthing systems
Electrical grounding and earthing systemsElectrical grounding and earthing systems
Electrical grounding and earthing systems
 
Principles of Cable Selection
Principles of Cable SelectionPrinciples of Cable Selection
Principles of Cable Selection
 
Fire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution AspectsFire Pumps, Controllers & Associated Electrical Distribution Aspects
Fire Pumps, Controllers & Associated Electrical Distribution Aspects
 
Electrical maintenance
Electrical maintenanceElectrical maintenance
Electrical maintenance
 
Substation presentation by ram
Substation presentation by ramSubstation presentation by ram
Substation presentation by ram
 
Power system protection topic 1
Power system protection topic 1Power system protection topic 1
Power system protection topic 1
 
Electrical wiring system - and estimation
Electrical wiring system -  and estimation Electrical wiring system -  and estimation
Electrical wiring system - and estimation
 

Destacado

Electrical maintenance fundamentals
Electrical maintenance fundamentalsElectrical maintenance fundamentals
Electrical maintenance fundamentalsJames Shearer
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenancePramod A
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1Vijay Raskar
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e bookjericfreimuth
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)nfra erp
 
Preventive Maintenance Presentation
Preventive Maintenance PresentationPreventive Maintenance Presentation
Preventive Maintenance Presentationimhoffm
 
Public Distribution System
Public Distribution SystemPublic Distribution System
Public Distribution SystemSneha J Chouhan
 
39 alfred a. mello - 5910878 - method and apparatus for protecting electric...
39   alfred a. mello - 5910878 - method and apparatus for protecting electric...39   alfred a. mello - 5910878 - method and apparatus for protecting electric...
39 alfred a. mello - 5910878 - method and apparatus for protecting electric...Mello_Patent_Registry
 
9.3 transformers
9.3 transformers9.3 transformers
9.3 transformerspixelcowboy
 
Electrical Power Distribution Systems Design
Electrical Power Distribution Systems DesignElectrical Power Distribution Systems Design
Electrical Power Distribution Systems DesignCurrent Solutions PC
 
Electrical Control Panels | Variable Frequency Drives | Hazardous Location Pa...
Electrical Control Panels | Variable Frequency Drives | Hazardous Location Pa...Electrical Control Panels | Variable Frequency Drives | Hazardous Location Pa...
Electrical Control Panels | Variable Frequency Drives | Hazardous Location Pa...Jazz Matharu
 
Electrical devices
Electrical  devicesElectrical  devices
Electrical devicesshubifareek
 
electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221saikrishna kandhikatla
 
ELECTRICAL DISTRIBUTION TECHNOLOGY
ELECTRICAL DISTRIBUTION TECHNOLOGYELECTRICAL DISTRIBUTION TECHNOLOGY
ELECTRICAL DISTRIBUTION TECHNOLOGYAmeen San
 
Power Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage CablesPower Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage CablesThorne & Derrick International
 
Distribution systems
Distribution systemsDistribution systems
Distribution systemsSURAJ PRASAD
 
Power System Protection (Primary & Backup)
Power System Protection (Primary & Backup)Power System Protection (Primary & Backup)
Power System Protection (Primary & Backup)Kamran Gillani
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system Ankush Bharti
 

Destacado (20)

Electrical maintenance fundamentals
Electrical maintenance fundamentalsElectrical maintenance fundamentals
Electrical maintenance fundamentals
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)Preventive Maintenance System (Plant Maintaintenance)
Preventive Maintenance System (Plant Maintaintenance)
 
Preventive Maintenance Presentation
Preventive Maintenance PresentationPreventive Maintenance Presentation
Preventive Maintenance Presentation
 
Public Distribution System
Public Distribution SystemPublic Distribution System
Public Distribution System
 
39 alfred a. mello - 5910878 - method and apparatus for protecting electric...
39   alfred a. mello - 5910878 - method and apparatus for protecting electric...39   alfred a. mello - 5910878 - method and apparatus for protecting electric...
39 alfred a. mello - 5910878 - method and apparatus for protecting electric...
 
9.3 transformers
9.3 transformers9.3 transformers
9.3 transformers
 
Electrical Power Distribution Systems Design
Electrical Power Distribution Systems DesignElectrical Power Distribution Systems Design
Electrical Power Distribution Systems Design
 
Electrical Control Panels | Variable Frequency Drives | Hazardous Location Pa...
Electrical Control Panels | Variable Frequency Drives | Hazardous Location Pa...Electrical Control Panels | Variable Frequency Drives | Hazardous Location Pa...
Electrical Control Panels | Variable Frequency Drives | Hazardous Location Pa...
 
Electrical devices
Electrical  devicesElectrical  devices
Electrical devices
 
electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221electrical distribution system ppt/13b61a0221
electrical distribution system ppt/13b61a0221
 
ELECTRICAL DISTRIBUTION TECHNOLOGY
ELECTRICAL DISTRIBUTION TECHNOLOGYELECTRICAL DISTRIBUTION TECHNOLOGY
ELECTRICAL DISTRIBUTION TECHNOLOGY
 
Control Panel
Control PanelControl Panel
Control Panel
 
Earthing
EarthingEarthing
Earthing
 
Power Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage CablesPower Cable Fault Location - Medium & High Voltage Cables
Power Cable Fault Location - Medium & High Voltage Cables
 
Distribution systems
Distribution systemsDistribution systems
Distribution systems
 
Power System Protection (Primary & Backup)
Power System Protection (Primary & Backup)Power System Protection (Primary & Backup)
Power System Protection (Primary & Backup)
 
Electrical distribution system
Electrical distribution system Electrical distribution system
Electrical distribution system
 

Similar a Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis

Planned Preventive Ambulance Medical Equipment Maintenance
Planned Preventive Ambulance Medical Equipment MaintenancePlanned Preventive Ambulance Medical Equipment Maintenance
Planned Preventive Ambulance Medical Equipment MaintenanceAshendu Pandey
 
Nidec asi service capabilities overview
Nidec asi service capabilities overviewNidec asi service capabilities overview
Nidec asi service capabilities overviewNidec Corporation
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering Michel Mafumba
 
Pre-Amble for Monitoring Applications
Pre-Amble for Monitoring ApplicationsPre-Amble for Monitoring Applications
Pre-Amble for Monitoring ApplicationsRob Schroeder
 
maintenance-management-UNIT-I-and-II-1.ppt
maintenance-management-UNIT-I-and-II-1.pptmaintenance-management-UNIT-I-and-II-1.ppt
maintenance-management-UNIT-I-and-II-1.pptYunusEmreKarabacak2
 
MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2Benjamin Canaday
 
The prevailing approaches to electrical compliance management are broken!
The prevailing approaches to electrical compliance management are broken!The prevailing approaches to electrical compliance management are broken!
The prevailing approaches to electrical compliance management are broken!michaeljoubert
 
Smarter eit smarter electrical inspection and testing - slideshare 31 may2016
Smarter eit  smarter electrical inspection and testing - slideshare 31 may2016Smarter eit  smarter electrical inspection and testing - slideshare 31 may2016
Smarter eit smarter electrical inspection and testing - slideshare 31 may2016michaeljoubert
 
AS_TD_en_SAFE-Audit-Tools_1304
AS_TD_en_SAFE-Audit-Tools_1304AS_TD_en_SAFE-Audit-Tools_1304
AS_TD_en_SAFE-Audit-Tools_1304Niels Inderbiethen
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
 
INTRODUCTION OF MAINTENANCE.pptx
INTRODUCTION OF MAINTENANCE.pptxINTRODUCTION OF MAINTENANCE.pptx
INTRODUCTION OF MAINTENANCE.pptxEkhwan Rahim
 
A-ConMonIntro.ppt
A-ConMonIntro.pptA-ConMonIntro.ppt
A-ConMonIntro.pptveeruyadav9
 

Similar a Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis (20)

Electrical Distribution Maintenance Services Guide
Electrical Distribution Maintenance Services GuideElectrical Distribution Maintenance Services Guide
Electrical Distribution Maintenance Services Guide
 
Planned Preventive Ambulance Medical Equipment Maintenance
Planned Preventive Ambulance Medical Equipment MaintenancePlanned Preventive Ambulance Medical Equipment Maintenance
Planned Preventive Ambulance Medical Equipment Maintenance
 
Nidec asi service capabilities overview
Nidec asi service capabilities overviewNidec asi service capabilities overview
Nidec asi service capabilities overview
 
Importance of O&M
Importance of O&MImportance of O&M
Importance of O&M
 
Smart Maintenance engineering
Smart Maintenance engineering Smart Maintenance engineering
Smart Maintenance engineering
 
Preventive maintenance
Preventive maintenancePreventive maintenance
Preventive maintenance
 
MAINTENANCE.ppt
MAINTENANCE.pptMAINTENANCE.ppt
MAINTENANCE.ppt
 
MAINTENANCE.ppt
MAINTENANCE.pptMAINTENANCE.ppt
MAINTENANCE.ppt
 
MAINTENANCE.pptx
MAINTENANCE.pptxMAINTENANCE.pptx
MAINTENANCE.pptx
 
Pre-Amble for Monitoring Applications
Pre-Amble for Monitoring ApplicationsPre-Amble for Monitoring Applications
Pre-Amble for Monitoring Applications
 
maintenance-management-UNIT-I-and-II-1.ppt
maintenance-management-UNIT-I-and-II-1.pptmaintenance-management-UNIT-I-and-II-1.ppt
maintenance-management-UNIT-I-and-II-1.ppt
 
MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2
 
The prevailing approaches to electrical compliance management are broken!
The prevailing approaches to electrical compliance management are broken!The prevailing approaches to electrical compliance management are broken!
The prevailing approaches to electrical compliance management are broken!
 
Smarter eit smarter electrical inspection and testing - slideshare 31 may2016
Smarter eit  smarter electrical inspection and testing - slideshare 31 may2016Smarter eit  smarter electrical inspection and testing - slideshare 31 may2016
Smarter eit smarter electrical inspection and testing - slideshare 31 may2016
 
Maintenance
MaintenanceMaintenance
Maintenance
 
maintenance_lec-3-4.pptx
maintenance_lec-3-4.pptxmaintenance_lec-3-4.pptx
maintenance_lec-3-4.pptx
 
AS_TD_en_SAFE-Audit-Tools_1304
AS_TD_en_SAFE-Audit-Tools_1304AS_TD_en_SAFE-Audit-Tools_1304
AS_TD_en_SAFE-Audit-Tools_1304
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
INTRODUCTION OF MAINTENANCE.pptx
INTRODUCTION OF MAINTENANCE.pptxINTRODUCTION OF MAINTENANCE.pptx
INTRODUCTION OF MAINTENANCE.pptx
 
A-ConMonIntro.ppt
A-ConMonIntro.pptA-ConMonIntro.ppt
A-ConMonIntro.ppt
 

Más de Schneider Electric

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design ConsiderationsSchneider Electric
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsSchneider Electric
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing Schneider Electric
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsSchneider Electric
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service ProvidersSchneider Electric
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingSchneider Electric
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSchneider Electric
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingSchneider Electric
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingSchneider Electric
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Schneider Electric
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesSchneider Electric
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Schneider Electric
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.Schneider Electric
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580Schneider Electric
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...Schneider Electric
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTSchneider Electric
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingSchneider Electric
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingSchneider Electric
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingSchneider Electric
 

Más de Schneider Electric (20)

Secure Power Design Considerations
Secure Power Design ConsiderationsSecure Power Design Considerations
Secure Power Design Considerations
 
Digital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting InvestorsDigital International Colo Club: Attracting Investors
Digital International Colo Club: Attracting Investors
 
32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing 32 phaseo power supplies and transformers briefing
32 phaseo power supplies and transformers briefing
 
Key Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation TrendsKey Industry Trends, M&A Valuation Trends
Key Industry Trends, M&A Valuation Trends
 
EcoStruxure™ for Cloud & Service Providers
 EcoStruxure™ for Cloud & Service Providers EcoStruxure™ for Cloud & Service Providers
EcoStruxure™ for Cloud & Service Providers
 
Magelis Basic HMI Briefing
Magelis Basic HMI Briefing Magelis Basic HMI Briefing
Magelis Basic HMI Briefing
 
Zelio Time Electronic Relay Briefing
Zelio Time Electronic Relay BriefingZelio Time Electronic Relay Briefing
Zelio Time Electronic Relay Briefing
 
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures BriefingSpacial, Thalassa, ClimaSys Universal enclosures Briefing
Spacial, Thalassa, ClimaSys Universal enclosures Briefing
 
Relay Control Zelio SSR Briefing
Relay Control Zelio SSR BriefingRelay Control Zelio SSR Briefing
Relay Control Zelio SSR Briefing
 
Magelis HMI, iPC and software Briefing
Magelis HMI, iPC and software BriefingMagelis HMI, iPC and software Briefing
Magelis HMI, iPC and software Briefing
 
Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?Where will the next 80% improvement in data center performance come from?
Where will the next 80% improvement in data center performance come from?
 
EcoStruxure for Intuitive Industries
EcoStruxure for Intuitive IndustriesEcoStruxure for Intuitive Industries
EcoStruxure for Intuitive Industries
 
Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017Systems Integrator Alliance Program 2017
Systems Integrator Alliance Program 2017
 
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
EcoStruxure, IIoT-enabled architecture, delivering value in key segments.
 
It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580It's time to modernize your industrial controls with Modicon M580
It's time to modernize your industrial controls with Modicon M580
 
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
A Practical Guide to Ensuring Business Continuity and High Performance in Hea...
 
Connected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoTConnected Services Study – Facility Managers Respond to IoT
Connected Services Study – Facility Managers Respond to IoT
 
Telemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories BriefingTelemecanqiue Cabling and Accessories Briefing
Telemecanqiue Cabling and Accessories Briefing
 
Telemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors BriefingTelemecanique Photoelectric Sensors Briefing
Telemecanique Photoelectric Sensors Briefing
 
Telemecanique Limit Switches Briefing
Telemecanique Limit Switches BriefingTelemecanique Limit Switches Briefing
Telemecanique Limit Switches Briefing
 

Último

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsNanddeep Nachan
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...apidays
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKJago de Vreede
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobeapidays
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...Zilliz
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024The Digital Insurer
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...apidays
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businesspanagenda
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 

Último (20)

Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 

Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis

  • 1. Preventive Maintenance Strategies for Electrical Distribution System Presented by: Charles Alvis Schneider Electric
  • 2. The cost of ignoring maintenance and testing Recommended steps to an effective electrical preventive maintenance program: - Assess the current state of the electrical system - Maintenance and testing protocol - Planning for outages Considerations for outsourcing - Is in-house staff qualified, as defined by NFPA 70E? - Do they have the capability to make corrective recommendations for issues that may arise? Fixed Cost Service Agreements Multi-year service plans help make maintenance easy for facilities Predictive Maintenance Technology and Trends Preventive Maintenance Strategies
  • 3. The Cost of Ignoring Maintenance “A well-administered Electrical Preventive Maintenance program: Reduces accidents Saves lives Minimizes costly breakdowns and unplanned outages Impending troubles can be identified, and solutions applied, before they become major problems requiring more expensive, time-consuming solutions.” NFPA 70B-2013 Ed., Section 4.2.1
  • 4. The Cost of Ignoring Maintenance Section 4.2.7 goes on to state: “An Electrical Preventive Maintenance (EPM) program satisfies an important part of management’s responsibility for keeping costs down and production up.” Having a preventive maintenance program in place can reduce the risk of unplanned downtime by as much as 66%. Source: IEEE
  • 5. Recommended Steps: Assess the Current State of the Electrical System • An up-to-date one-line diagram of the electrical system provides clear and precise information concerning the exact interconnections of all electrical equipment. • Due to modifications made to the electrical infrastructure, many facilities do not have a current drawing.
  • 6. Recommended Steps: Assess the Current State of the Electrical System • A licensed professional electrical engineer should be contracted and commissioned to create and maintain current electrical one-line diagrams and equipment name plate data. • Prior to initiating a preventive maintenance program, have a short circuit analyses, a time- current coordination study, and an arc flash analysis of all of the power distribution systems to ensure equipment is properly rated, set and labeled.
  • 7. Recommended Steps: Maintenance and Testing Protocol • A comprehensive preventive maintenance and testing program should incorporate detailed policies, procedures, and maintenance activities for the entire electrical power distribution system, regardless of the manufacturer. • NETA-MTS, NFPA 70B and OEM operations and maintenance manuals can provide recommended guidelines for developing the work scopes as frequency for performing maintenance and testing. If OEM manuals are not readily available, contact the manufacturer or check online.
  • 8. Recommended Steps: Maintenance and Testing Protocol The recommended maintenance and testing interval may need to be altered if any of these factors exist: • Potential to safety of equipment failure • Operating environment and equipment condition • Operating load and ratings • High repair cost equipment • Cost of down-time to production • Performance history of equipment
  • 9. Recommended Steps: Maintenance and Testing Protocol Any specific maintenance of separate pieces of electrical equipment does not guarantee a completely coordinated and reliable power distribution system as intended and necessary.
  • 10. Recommended Steps: Maintenance and Testing Protocol The facility’s management needs to clearly communicate to the service provider: Which equipment is included in the maintenance program The specific order the electrical equipment should be removed from service for maintenance The detailed scope of work for each piece of equipment or component
  • 11. Recommended Steps: Maintenance and Testing Protocol Recommended items or equipment to Incorporate into a Preventive Maintenance Program: • Monitoring equipment • Metering equipment • Protective relays • Service-entrance switchgear • Circuit breakers • Switchboards • Panelboards • Motor control centers • Transformers • Automatic transfer switches • UPS Systems • Busway • Optional Stand-by Generators and… • Bonding & Grounding Systems (often overlooked)
  • 12. Recommended Steps: Planning for Outages With FEW exceptions, electrical equipment should NOT be cleaned, inspected, maintained, serviced, or tested while it is energized. When planning for an outage, ‘critical’ equipment should be identified and scheduled, as noted earlier. Arrangements for temporary electrical power should be made, if needed. Above all, it is management’s responsibility for onsite safety, whether for in-house or third-party electrical workers.
  • 13. Considerations for Outsourcing • Facility management needs to insure that electrical workers are experienced in the specific equipment or system that is to be maintained. • Very few companies have in-house staff who have the experience to service all of the electrical equipment within the facility’s electrical power system. • Proposed third-party electrical providers should be thoroughly qualified by management. An in-depth interview is suggested and applicable references obtained.
  • 14. Considerations for Outsourcing Personnel performing the maintenance activities need to be qualified as defined by OSHA and NFPA 70E. Fundamental requirements include: • Complete understanding of equipment, the required work scope and electrical hazards present. • Proper use of protective equipment, tools, shielding and test equipment as well as precautionary techniques. • Discipline and decision making skills to determine risk and ability to maintain a safe work environment. Photo Courtesy of Oberon
  • 15. Code and Regulatory Compliance Requirements Regularly scheduled electrical preventive maintenance helps companies meet the requirements of OSHA, NFPA 70E and other authorities having jurisdiction.
  • 16. Code and Regulatory Compliance Requirements Conditions that may warrant preventive maintenance be performed more frequently than the OEM’s recommendations include: ●Environmental conditions, including humidity, corrosive atmosphere, dirt or dust ●Equipment runs constantly or with heavy loads Requirements of local authorities having jurisdiction
  • 17. Maintaining quality records of maintenance (and repair) activities support regulatory compliance as well as provide trending data. ●Helps identify potential problems to avoid equipment breakdown. ●Enables management to track costs of maintenance activities over time. Code and Regulatory Compliance Requirements
  • 18. In addition to maintenance records, having the following documentation available* will prove helpful in the event of an electrical incident. ● Tools, materials and equipment needed ● Average time to perform tasks ● Reference manuals ● Past test reports ● Past incident reports ● Record of repair work Code and Regulatory Compliance Requirements For each piece of equipment being tested.
  • 19. Fixed-costs service agreements are a growing trend to manage increasingly complex electrical power distribution systems or systems with multiple brands of equipment. ●In addition to meeting regulatory requirements, these plans offer the flexibility to customize a scope of work and term. ●A fixed-cost service plan avoids fluctuations to the maintenance budget ●Billing can usually be structured to provide a fixed > payment schedule. Fixed Cost Service Plans
  • 20. Fixed Cost Service Plans Typically Three Levels Of Outsourced Field Support Maintenance Service Emergency on Site Response Replacement Parts (All Inclusive) A New Approach for Maintenance
  • 21. Predictive maintenance techniques safely provide condition status to help anticipate and plan maintenance activities. Predictive maintenance solutions detect early warning signs and help prevent downtime. Predictive Maintenance Solutions
  • 22. Infrared Viewing Windows Enhances safety by allowing infrared inspections without the need to remove equipment covers. Infrared Viewing Window
  • 23. Allows monitoring of critical connection points. Exceptionally valuable for areas not seen by infrared cameras. Temperature Monitoring SensorSensor
  • 24. Detects impending insulation breakdown in MV equipment, which can lead to costly equipment damage and downtime. Coupling Capacitors RF CTs Bushing Sensor Partial Discharge Monitoring
  • 25. Active Asset Condition Based Monitoring Emerging – Comprehensive Asset Monitoring
  • 26. References • National Fire Protection Association (NFPA) 70B, Recommended Practice for Electrical Equipment Maintenance. • National Fire Protection Association (NFPA) 70, National Electrical Code. • National Electrical Manufacturer’s Association (NEMA) Standard AB4, Procedures for Verifying Field Inspections and Performance Verification of Molded-Case Circuit Breakers. • National Electrical Testing Association (NETA), Maintenance Testing Specifications for Electrical Power Distribution Equipment and Systems. • IEEE Standard 902-1998, IEEE Guide for Maintenance, Operation, and Safety of Industrial and Commercial Power Systems. • IEEE Standard 142-2007, IEEE Recommended Practice for Grounding of Industrial and Commercial Power Systems. • National Electrical Manufacturer’s Association (NEMA) Standard MG1.