Kingston Seymour to Sand Bay
This Theme area contains the Policy Unit KIN 1, KIN 2, KIN 3 and KIN 4.
It includes the shoreline on the east bank of the River Severn from Old Church Road,
Clevedon to Birnbeck Island, including Congresbury Yeo.
The Key Policy Drivers in this area are:
• International nature conservation sites – Severn Estuary SAC, SPA and Ramsar;
• Critical infrastructure – M5, Kingston Seymour sewage treatment works, electricity
substations;
• Residential areas – Clevedon, Yatton / Congresbury.
Policy Unit: KIN 1 - Old Church Road, Clevedon to St Thomas’ Head
(east bank of the River Severn)
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
MR
The Short Term policy for this unit is Managed Realignment.
The current defences along the coastal shoreline (reinforced earth
embankments) are expected to remain in place for this epoch with little
maintenance.
MR in this epoch should focus on the area around Congresbury Yeo, where
a MR scheme is currently being developed. This approach manages the risk
of impacts from flooding to this and linked Policy Units (KIN 3, KIN 4).
MR does not guarantee funding to build or maintain new realigned defences.
20 to 50
years
(2055)
MR
The medium term policy for this unit is a Managed Realignment policy.
The existing defences along the coastal shoreline will come to the end of
their serviceable life in this epoch. MR in this epoch should focus on the
creation of new, realigned defences along the shoreline to the north
(Commissioner’s Bank) and south of Congresbury Yeo to enable new
intertidal habitat to be created. MR manages the risk of impacts from
flooding to this and linked Policy Units (KIN 3, KIN 4). The position, size and
materials of new defences should be considered in detail and determined by
the SEFRMS.
Land, nature conservation and historic environment features in front of the
new line of defences or in areas of NAI will be at increased risk of flooding
and erosion. Adaptation actions should be considered and implemented
where appropriate. The habitat created in this Policy Unit will help
compensate for areas lost elsewhere in the estuary and help
maintain/improve the condition of the European protected sites.
MR does not guarantee funding to build or maintain new realigned defences.
50 to 100
years
(2105)
MR
The long term policy for this unit is Managed Realignment.
New realigned defences should be maintained and further MR along the
shoreline to the north (Commissioner’s Bank) and south of Congresbury Yeo
should be considered as and when defences created in the previous epoch
need to be replaced. MR manages the risk of impacts from flooding to this
and linked Policy Units (KIN 3, KIN 4). The position, size and materials of
new defences should be considered in detail by the SEFRMS.
Land, nature conservation and historic environment features in front of the
new line of defences or in areas of NAI will be at increased risk of flooding
and erosion. Adaptation actions should be considered and implemented
where appropriate. The habitat created in this Policy Unit will help
compensate for areas lost elsewhere in the estuary and help
maintain/improve the condition of the European protected sites.
MR does not guarantee funding to build or maintain new realigned defences.
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
KIN 1 HTL MR MR MR
£3,172m
(KIN1, 3, 4 total)
£15m
(KIN1, 3, 4 total)
The preferred policy is economically viable for the linked Policy Units of KIN 1, KIN 3 and KIN 4. The costs
and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
Predicted Implication of the Preferred Plan for the KIN 1 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
The existing defences will
remain in place along the
coastal shoreline. A MR
scheme in Congresbury
Yeo is underway and will
need to be maintained
when completed.
Present defences will
remain in place along the
coastal shoreline,
managing the risk of
impacts from flooding to
properties and land. MR
in Congresbury Yeo will
manage the risk of
impacts to properties and
land behind the defences.
There will be limited
impact in this epoch as
the existing defence line
remains in place. The
MR scheme in
Congresbury Yeo has
been agreed and will
create some additional
intertidal habitat. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Limited erosion and
flood risk will not impact
on existing landscape
and visual amenity. The
MR scheme in
Congresbury Yeo has
been agreed and will a
slight impact on
landscape and visual
amenity
Defences will manage the
risk to the historic
environment. The MR
scheme in Congresbury
Yeo has been agreed and
may have a slight impact
on historic environment.
Defences will manage the
risk to amenity and
recreational assets. The
MR scheme in
Congresbury Yeo has
been agreed and may
have a slight impact on
amenity.
20 – 50
years
Existing defences along
the coastal shoreline are
expected to come to the
end of their serviceable
life during this epoch.
Prior to complete failure
of the existing earth
embankment, new set
back defences, should be
established to allow
habitat creation and to
reduce the impact from
fluvial flooding by
increasing floodwater
conveyance.
Realigned defences will
manage the risk of
impacts to properties and
land behind new
defences. Assets in front
of realigned defences will
be at risk from inundation.
Impacts on property and
land, and mitigation
actions will need to be
considered in determining
realignment of defences.
A MR policy may benefit
flood risk management in
adjacent, linked Policy
Units (KIN 3, KIN 4).
A MR policy will allow the
creation additional
intertidal habitat. There
will be loss of terrestrial
habitats as intertidal
habitats roll back. Works
should take account of
possible environmental
impacts and the need for
an EIA.
The creation of intertidal
habitat will replace
existing agricultural
land, altering the
landscape.
Realigned defences will
manage the risk of impacts
to historic environment
assets behind new
defences. Assets in front of
realigned defences will be
at risk from inundation.
Managed re-alignment is
likely to adversely impact
on a limited number of
listed buildings. Impacts on
historic environment
assets, and mitigation
actions, will need to be
considered in determining
realignment of defences
Realigned defences will
manage the risk on the
amenity value or
recreational use of the
land behind new
defences. Impacts on
recreational assets, and
mitigation actions, will
need to be considered in
determining realignment
of defences
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
50 – 100
years
The new defence line
should be maintained. A
further MR of defences
should be considered as
and when defences
created in the previous
epoch need to be
replaced.
Realigned defences will
manage the risk of
impacts to properties and
land behind new
defences. Assets in front
of realigned defences will
be at risk from inundation.
Impacts on property and
land, and mitigation
actions will need to be
considered in determining
realignment of defences.
A MR policy may benefit
flood risk management in
adjacent, linked Policy
Units (KIN 3, KIN 4).
A MR policy will allow the
creation additional
intertidal habitat. There
will be loss of terrestrial
habitats as intertidal
habitats roll back. Works
should take account of
possible environmental
impacts and the need for
an EIA.
In the long term sea
level rise will result in
more frequent flooding
of the seaward side of
the defence line and
creation of intertidal
habitat, altering the
landscape.
Realigned defences will
manage the risk of impacts
to historic environment
assets behind new
defences. Assets in front of
realigned defences will be
at risk from inundation.
Managed re-alignment is
likely to adversely impact
on a limited number of
listed buildings. Impacts on
historic environment
assets, and mitigation
actions, will need to be
considered in determining
realignment of defences
Realigned defences will
manage the risk on the
amenity value or
recreational use of the
land behind new
defences.
Policy Unit: KIN 2 - St Thomas’ Head to Middle Hope car park at Sand
Point (east bank of the River Severn)
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
NAI
The short term policy for this unit is No Active Intervention.
High ground and hard geology naturally limit the risk of coastal flooding and
erosion in this Policy Unit. NAI will allow natural processes to continue with
little or no impact. This Policy Unit is not linked to any others.
20 to 50
years
(2055)
NAI
The medium term policy for this unit is No Active Intervention.
High ground and hard geology naturally limit the risk of coastal flooding and
erosion in this Policy Unit. NAI will allow natural processes to continue with
little or no impact. This Policy Unit is not linked to any others.
50 to 100
years
(2105)
NAI
The long term policy for this unit is No Active Intervention.
High ground and hard geology naturally limit the risk of coastal flooding and
erosion in this Policy Unit. NAI will allow natural processes to continue with
little or no impact. This Policy Unit is not linked to any others.
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
KIN 2
Do
nothing
NAI NAI NAI Minimal Minimal
The preferred policy has no economic impact in this Policy Unit. This Policy Unit is not linked to any
others.
Predicted Implication of the Preferred Plan for the KIN 2 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
The shoreline will remain
stable in this period, and
as a result management
activities will be limited.
Limited erosion and flood
risk will not impact on
existing property, land
use or human health.
A NAI policy will allow
natural processes to
dominate. There will be
continued exposure of
Middle Hope SSSI.
Limited erosion and flood
risk will not impact on
existing landscape and
visual amenity
Limited erosion and flood
risk will not impact on the
historic environment
Limited erosion and flood
risk will not impact on the
amenity value of the land
or recreational use.
20 – 50
years
The shoreline will
undergo limited erosion
within this period, and as
a result management
activities will be limited.
Limited erosion and flood
risk will not impact on
existing properties, land
use or human health.
A NAI policy will allow
habitats to roll back so
intertidal habitats and
features will be
maintained. Roll back will
be limited due to
restriction by hard
geology and high ground.
There will be continued
exposure of Middle Hope
SSSI.
Limited erosion and flood
risk will not impact on
existing landscape and
visual amenity
Limited erosion and flood
risk will not impact on the
historic environment
Limited erosion and flood
risk will not impact on the
amenity value of the land
or recreational use.
50 – 100
years
The shoreline will
undergo limited erosion
within this period, and as
a result management
activities will be limited.
Limited erosion and flood
risk will not impact on
existing properties, land
use or human health.
A NAI policy will allow
habitats to roll back so
intertidal habitats and
features will be
maintained. Roll back will
be limited due to
restriction by hard
geology and high ground.
There will be continued
exposure of Middle Hope
SSSI.
Limited erosion and flood
risk will not impact on
existing landscape and
visual amenity
Limited erosion and flood
risk will not impact on the
historic environment
Limited erosion and flood
risk will not impact on the
amenity value of the land
or recreational use.
Policy Unit: KIN 3 - Middle Hope car park at Sand Point to the southern
end of Beach Road, Kewstoke (east bank of the River Severn)
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The Short Term policy for this unit is Hold The Line.
HTL requires the active management of the sand dunes, which are the main
line of defence. The sand dunes will remain in place in during this epoch,
managing the impacts of coastal flooding. Historic accretion at the north end
of this Policy Unit is expected to continue. HTL is expected to require only
minimal management of the sand dunes.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line.
HTL requires the active management of the sand dunes, which are the main
line of defence. This will manage the risk of impacts from flooding and
erosion. Historic accretion at the north end of this Policy Unit is expected to
stop and possibly reverse (start to erode), as sea level rises. Actions should
take account of impacts on linked Policy Units (KIN 1, KIN 4).
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line.
HTL requires the active management of the sand dunes, which are the main
line of defence. This will manage the risk of impacts from flooding and
erosion. Historic accretion at the north end of this Policy Unit is expected to
reverse (start to erode), as sea level rises. Actions should take account of
impacts on linked Policy Units (KIN 1, KIN 4).
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
KIN 3 HTL HTL HTL HTL
£3,172m
(KIN1, 3, 4 total)
£15m
(KIN1, 3, 4 total)
The preferred policy is economically viable for the linked Policy Units of KIN 1, KIN 3 and KIN 4. The costs
and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
Predicted Implication of the Preferred Plan for the KIN 3 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
The shoreline will remain
stable (accretion to the
north) and constrained
flooding in this period will
result in minimal
management activities.
Limited erosion and flood
risk will not impact on
existing property, land
use or human health.
A HTL policy will not
impact the nature
conservation sites during
this time period. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Limited erosion and flood
risk will not impact on
existing landscape and
visual amenity
Limited erosion and flood
risk will not impact on the
historic environment
Management of sand
dunes will manage the
risk to the amenity value
of the land or recreational
use.
20 – 50
years
The sand dunes that form
the defence are expected
to come to the end of
their serviceable life
during this epoch. A
management programme
to maintain the dunes
should be implemented to
maintain the shoreline.
Management of sand
dunes will manage the
risk to property, land use
or human health.
Coastal squeeze will
occur which will result in
loss of intertidal habitats.
Management of sand
dunes is likely to impact
upon to integrity of the
SSSI. Works should take
account of possible
environmental impacts
and the need for an EIA.
Management of sand
dunes will help maintain
the visual character of the
area.
Management of sand
dunes will manage the
risk to the historic
environment
Management of sand
dunes will manage the
risk to the amenity value
of the land or recreational
use.
50 – 100
years
The sand dunes should
continue to be
maintained. Monitoring of
shoreline erosion should
also be undertaken.
Management of sand
dunes will manage the
risk to property, land use
or human health.
Coastal squeeze will
occur which will result in
loss of intertidal habitats.
Management of sand
dunes is likely to impact
upon to integrity of the
SSSI. Works should take
account of possible
environmental impacts
and the need for an EIA.
Management of sand
dunes will help maintain
the visual character of the
area.
Management of sand
dunes will manage the
risk to the historic
environment
Management of sand
dunes will manage the
risk to the amenity value
of the land or recreational
use.
Policy Unit: KIN 4 - the southern end of Beach Road, Kewstoke to
Birnbeck Island (east bank of the River
Severn)
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
NAI
The short term policy for this unit is No Active Intervention.
High ground and hard geology naturally limit the risk of coastal flooding and
erosion in this Policy Unit. NAI will allow natural processes to continue with
little or no impact.
20 to 50
years
(2055)
NAI
The medium term policy for this unit is No Active Intervention.
High ground and hard geology naturally limit the risk of coastal flooding and
erosion in this Policy Unit. NAI will allow natural processes to continue.
The rate of erosion in the medium (and long) term is unclear and should be
monitored. If the rate of erosion increases, or properties are at risk, action
should be considered. Funding is not guaranteed.
50 to 100
years
(2105)
NAI
The long term policy for this unit is No Active Intervention.
High ground and hard geology naturally limit the risk of coastal flooding and
erosion in this Policy Unit. NAI will allow natural processes to continue.
The rate of erosion in the medium (and long) term is unclear and should be
monitored. If the rate of erosion increases, or properties are at risk, action
should be considered. Funding is not guaranteed.
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
KIN 4
Do
Nothing
(Locally
HTL)
NAI NAI NAI
£3,172m
(KIN1, 3, 4 total)
£15m
(KIN1, 3, 4 total)
The preferred policy has no economic impact in this Policy Unit. The preferred policy is economically
viable for the linked Policy Units of KIN 1, KIN 3 and KIN 4. The costs and damages of the preferred policy
in the table above relate to actions taken in linked policy units, not in KIN 4.
Predicted Implication of the Preferred Plan for the KIN 4 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation –
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 – 20
years
The shoreline will remain
stable in this period, and
as a result management
activities will be very
limited.
Limited erosion and flood
risk will not impact on
existing property, land
use or human health.
Flood risk to property and
land use from linked
Policy Units (KIN 1, KIN
3, adjacent SMP2 area) –
cannot be affected by
shoreline management
actions within KIN 4.
A NAI policy will allow
natural processes to
dominate.
Limited erosion and flood
risk will not impact on
existing landscape and
visual amenity
Limited erosion and flood
risk will not impact on the
historic environment
Limited erosion and flood
risk will not impact on the
amenity value of the land
or recreational use.
20 – 50
years
The shoreline will
undergo limited erosion
within this period, and as
a result management
activities will be limited.
Limited erosion and flood
risk will not impact on
existing properties, land
use or human health.
Flood risk to property and
land use from linked
Policy Units (KIN 1, KIN
3, adjacent SMP2 area) –
cannot be affected by
shoreline management
actions within KIN 4.
A NAI policy will allow
habitats to roll back so
intertidal habitats and
features will be
maintained. Roll back will
be limited due to
restriction by hard
geology and high ground.
Limited erosion and flood
risk will not impact on
existing landscape and
visual amenity
Limited erosion and flood
risk will not impact on the
historic environment
Limited erosion and flood
risk will not impact on the
amenity value of the land
or recreational use.
50 – 100
years
The shoreline will
undergo limited erosion
within this period, and as
a result management
activities will be limited.
Limited erosion and flood
risk will not impact on
existing properties, land
use or human health.
Flood risk to property and
land use from linked
Policy Units (KIN 1, KIN
3, adjacent SMP2 area) –
cannot be affected by
shoreline management
actions within KIN 4.
A NAI policy will allow
habitats to roll back so
intertidal habitats and
features will be
maintained. Roll back will
be limited due to
restriction by hard
geology and high ground.
Limited erosion and flood
risk will not impact on
existing landscape and
visual amenity
Limited erosion and flood
risk will not impact on the
historic environment
Limited erosion and flood
risk will not impact on the
amenity value of the land
or recreational use.

Más contenido relacionado

La actualidad más candente

Nelsonquarrylanteigne 121011161032-phpapp01
Nelsonquarrylanteigne 121011161032-phpapp01Nelsonquarrylanteigne 121011161032-phpapp01
Nelsonquarrylanteigne 121011161032-phpapp01Louisette Lanteigne
 
Disaster mitigation - land slide
Disaster mitigation - land slideDisaster mitigation - land slide
Disaster mitigation - land slideParth Sadaria
 
The role of land use planning in the disaster risk reduction
The role of land use planning in the disaster risk reductionThe role of land use planning in the disaster risk reduction
The role of land use planning in the disaster risk reductionGlobal Risk Forum GRFDavos
 
Presentation on the CRZ 2011: Business as usual? by-Marianne Manuel
Presentation on the CRZ 2011: Business as usual? by-Marianne ManuelPresentation on the CRZ 2011: Business as usual? by-Marianne Manuel
Presentation on the CRZ 2011: Business as usual? by-Marianne ManuelEcotist
 
AAG Poster April 2015
AAG Poster April 2015AAG Poster April 2015
AAG Poster April 2015Karen Zelzer
 
Smp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_finalSmp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_finalSevern Estuary
 
Coastal Fieldwork Assessment Task
Coastal Fieldwork Assessment TaskCoastal Fieldwork Assessment Task
Coastal Fieldwork Assessment TaskRebecca Nicholas
 
Marsh Elevation Response to Hurricanes Katrina and Rita and the Effect of Alt...
Marsh Elevation Response to Hurricanes Katrina and Rita and the Effect of Alt...Marsh Elevation Response to Hurricanes Katrina and Rita and the Effect of Alt...
Marsh Elevation Response to Hurricanes Katrina and Rita and the Effect of Alt...acomma1
 
Impact of climate change, land use change and residential mitigation measures...
Impact of climate change, land use change and residential mitigation measures...Impact of climate change, land use change and residential mitigation measures...
Impact of climate change, land use change and residential mitigation measures...Global Risk Forum GRFDavos
 
Coastal & River Zone Management, Regulations & Development. -Prof. Shyam R. A...
Coastal & River Zone Management, Regulations & Development. -Prof. Shyam R. A...Coastal & River Zone Management, Regulations & Development. -Prof. Shyam R. A...
Coastal & River Zone Management, Regulations & Development. -Prof. Shyam R. A...Ecotist
 

La actualidad más candente (20)

Nelsonquarrylanteigne 121011161032-phpapp01
Nelsonquarrylanteigne 121011161032-phpapp01Nelsonquarrylanteigne 121011161032-phpapp01
Nelsonquarrylanteigne 121011161032-phpapp01
 
Disaster mitigation - land slide
Disaster mitigation - land slideDisaster mitigation - land slide
Disaster mitigation - land slide
 
Landslide aw
Landslide aw Landslide aw
Landslide aw
 
The role of land use planning in the disaster risk reduction
The role of land use planning in the disaster risk reductionThe role of land use planning in the disaster risk reduction
The role of land use planning in the disaster risk reduction
 
Presentation on the CRZ 2011: Business as usual? by-Marianne Manuel
Presentation on the CRZ 2011: Business as usual? by-Marianne ManuelPresentation on the CRZ 2011: Business as usual? by-Marianne Manuel
Presentation on the CRZ 2011: Business as usual? by-Marianne Manuel
 
Rehabilitation of Open Pit Mines
Rehabilitation of Open Pit MinesRehabilitation of Open Pit Mines
Rehabilitation of Open Pit Mines
 
AAG Poster April 2015
AAG Poster April 2015AAG Poster April 2015
AAG Poster April 2015
 
GLOBAL LANDSLIDE DISASTER RESILIENCE. AN INTEGRATED FRAMEWORK DEMONSTRATION O...
GLOBAL LANDSLIDE DISASTER RESILIENCE. AN INTEGRATED FRAMEWORK DEMONSTRATION O...GLOBAL LANDSLIDE DISASTER RESILIENCE. AN INTEGRATED FRAMEWORK DEMONSTRATION O...
GLOBAL LANDSLIDE DISASTER RESILIENCE. AN INTEGRATED FRAMEWORK DEMONSTRATION O...
 
Bagacay_Abandoned_Mine_ Samar
Bagacay_Abandoned_Mine_ SamarBagacay_Abandoned_Mine_ Samar
Bagacay_Abandoned_Mine_ Samar
 
Pennsylvania
PennsylvaniaPennsylvania
Pennsylvania
 
Smp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_finalSmp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_final
 
Coastal Fieldwork Assessment Task
Coastal Fieldwork Assessment TaskCoastal Fieldwork Assessment Task
Coastal Fieldwork Assessment Task
 
Marsh Elevation Response to Hurricanes Katrina and Rita and the Effect of Alt...
Marsh Elevation Response to Hurricanes Katrina and Rita and the Effect of Alt...Marsh Elevation Response to Hurricanes Katrina and Rita and the Effect of Alt...
Marsh Elevation Response to Hurricanes Katrina and Rita and the Effect of Alt...
 
Crz
CrzCrz
Crz
 
Blair Dunderdale 2015
Blair Dunderdale 2015Blair Dunderdale 2015
Blair Dunderdale 2015
 
Types of disasters
Types of disastersTypes of disasters
Types of disasters
 
Landslide disaster management
Landslide disaster managementLandslide disaster management
Landslide disaster management
 
Impact of climate change, land use change and residential mitigation measures...
Impact of climate change, land use change and residential mitigation measures...Impact of climate change, land use change and residential mitigation measures...
Impact of climate change, land use change and residential mitigation measures...
 
Coastal regulation zone
Coastal regulation zoneCoastal regulation zone
Coastal regulation zone
 
Coastal & River Zone Management, Regulations & Development. -Prof. Shyam R. A...
Coastal & River Zone Management, Regulations & Development. -Prof. Shyam R. A...Coastal & River Zone Management, Regulations & Development. -Prof. Shyam R. A...
Coastal & River Zone Management, Regulations & Development. -Prof. Shyam R. A...
 

Destacado

Smp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_finalSmp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_finalSevern Estuary
 
Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Severn Estuary
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15John Grover
 
Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Severn Estuary
 
Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07John Grover
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-finalJohn Grover
 
Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Severn Estuary
 
Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Severn Estuary
 
PII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferencePII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferenceJohn Grover
 
Appendix d theme review final_dec2010a
Appendix d theme review final_dec2010aAppendix d theme review final_dec2010a
Appendix d theme review final_dec2010aSevern Estuary
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...John Grover
 
Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Severn Estuary
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalJohn Grover
 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan finalSevern Estuary
 
Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Severn Estuary
 
Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Severn Estuary
 
Smp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_finalSmp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_finalSevern Estuary
 
Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Severn Estuary
 

Destacado (20)

Smp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_finalSmp2 part b policy statements cardiff only_final
Smp2 part b policy statements cardiff only_final
 
Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 
Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010
 
Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07Offshore Ind Gases J Grover 11 Dec 07
Offshore Ind Gases J Grover 11 Dec 07
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
 
Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010
 
Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010
 
PII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferencePII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline Conference
 
Appendix d theme review final_dec2010a
Appendix d theme review final_dec2010aAppendix d theme review final_dec2010a
Appendix d theme review final_dec2010a
 
Tasnia
TasniaTasnia
Tasnia
 
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
Offshore - Coiled Tubing Offers Pre-Commissioning Tool for Deepwater Pipeline...
 
Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010
 
OSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact finalOSEA 2006 - Precom Impact final
OSEA 2006 - Precom Impact final
 
PII_IQPC_May_04
PII_IQPC_May_04PII_IQPC_May_04
PII_IQPC_May_04
 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan final
 
Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010
 
Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010
 
Smp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_finalSmp2 part b policy statements bristol only_final
Smp2 part b policy statements bristol only_final
 
Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010
 

Similar a Smp2 part b policy statements kingston seymour only_final

Smp2 part b policy statements caldicot only_final
Smp2 part b policy statements caldicot only_finalSmp2 part b policy statements caldicot only_final
Smp2 part b policy statements caldicot only_finalSevern Estuary
 
Smp2 part b policy statements newport-usk only_final
Smp2 part b policy statements newport-usk only_finalSmp2 part b policy statements newport-usk only_final
Smp2 part b policy statements newport-usk only_finalSevern Estuary
 
Small Islands: Staying afloat and alive@1.5
Small Islands: Staying afloat and alive@1.5Small Islands: Staying afloat and alive@1.5
Small Islands: Staying afloat and alive@1.5ipcc-media
 
Smp2 part a main report final
Smp2 part a main report finalSmp2 part a main report final
Smp2 part a main report finalSevern Estuary
 
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency 2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency SevernEstuary
 
Armoring the Massachusetts Coast: Increased Protection or Added Risk?
Armoring the Massachusetts Coast: Increased Protection or Added Risk?Armoring the Massachusetts Coast: Increased Protection or Added Risk?
Armoring the Massachusetts Coast: Increased Protection or Added Risk?Lisa Granquist
 
Interdisciplinary approach
Interdisciplinary approachInterdisciplinary approach
Interdisciplinary approachOmkar Parishwad
 
Climate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And ErosionClimate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And ErosionRoger_Moore
 
DEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim CanyonDEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim CanyonBrian Robey
 
Igcse geography coastal environments fieldwork
Igcse geography coastal environments fieldworkIgcse geography coastal environments fieldwork
Igcse geography coastal environments fieldworkWill Williams
 
Igcse geography coastal environments fieldwork
Igcse geography coastal environments fieldworkIgcse geography coastal environments fieldwork
Igcse geography coastal environments fieldworkWill Williams
 
11. soft engineering
11. soft engineering11. soft engineering
11. soft engineeringMr Blackwell
 
Coastal law lecture 2013 part 2
Coastal law lecture 2013 part 2Coastal law lecture 2013 part 2
Coastal law lecture 2013 part 2Raewyn Peart
 
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Events
 
Climate change adaptation in Fiji
Climate change adaptation in FijiClimate change adaptation in Fiji
Climate change adaptation in FijiNAP Events
 

Similar a Smp2 part b policy statements kingston seymour only_final (20)

Smp2 part b policy statements caldicot only_final
Smp2 part b policy statements caldicot only_finalSmp2 part b policy statements caldicot only_final
Smp2 part b policy statements caldicot only_final
 
Smp2 part b policy statements newport-usk only_final
Smp2 part b policy statements newport-usk only_finalSmp2 part b policy statements newport-usk only_final
Smp2 part b policy statements newport-usk only_final
 
Small Islands: Staying afloat and alive@1.5
Small Islands: Staying afloat and alive@1.5Small Islands: Staying afloat and alive@1.5
Small Islands: Staying afloat and alive@1.5
 
Smp2 part a main report final
Smp2 part a main report finalSmp2 part a main report final
Smp2 part a main report final
 
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency 2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
 
Armoring the Massachusetts Coast: Increased Protection or Added Risk?
Armoring the Massachusetts Coast: Increased Protection or Added Risk?Armoring the Massachusetts Coast: Increased Protection or Added Risk?
Armoring the Massachusetts Coast: Increased Protection or Added Risk?
 
Interdisciplinary approach
Interdisciplinary approachInterdisciplinary approach
Interdisciplinary approach
 
Qingdao coastal risks - Rebecca Nadin
Qingdao coastal risks  - Rebecca NadinQingdao coastal risks  - Rebecca Nadin
Qingdao coastal risks - Rebecca Nadin
 
Climate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And ErosionClimate Change Impact On Cliff Instability And Erosion
Climate Change Impact On Cliff Instability And Erosion
 
DEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim CanyonDEIR Resiliency Plan San Tim Canyon
DEIR Resiliency Plan San Tim Canyon
 
Igcse geography coastal environments fieldwork
Igcse geography coastal environments fieldworkIgcse geography coastal environments fieldwork
Igcse geography coastal environments fieldwork
 
Igcse geography coastal environments fieldwork
Igcse geography coastal environments fieldworkIgcse geography coastal environments fieldwork
Igcse geography coastal environments fieldwork
 
11. soft engineering
11. soft engineering11. soft engineering
11. soft engineering
 
Summary lecture 2
Summary lecture 2Summary lecture 2
Summary lecture 2
 
Adaptation in Action; A Cork Example - Dr Valerie Cummins CMRC
Adaptation in Action; A Cork Example - Dr Valerie Cummins CMRCAdaptation in Action; A Cork Example - Dr Valerie Cummins CMRC
Adaptation in Action; A Cork Example - Dr Valerie Cummins CMRC
 
Coastal law lecture 2013 part 2
Coastal law lecture 2013 part 2Coastal law lecture 2013 part 2
Coastal law lecture 2013 part 2
 
ICZM.pptx
ICZM.pptxICZM.pptx
ICZM.pptx
 
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
 
EdgeW
EdgeWEdgeW
EdgeW
 
Climate change adaptation in Fiji
Climate change adaptation in FijiClimate change adaptation in Fiji
Climate change adaptation in Fiji
 

Más de Severn Estuary

Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Severn Estuary
 
Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Severn Estuary
 
Appendix h economics final dec2010
Appendix h economics final dec2010Appendix h economics final dec2010
Appendix h economics final dec2010Severn Estuary
 
Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010Severn Estuary
 
Smp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSmp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSevern Estuary
 
Smp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_finalSmp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_finalSevern Estuary
 

Más de Severn Estuary (6)

Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010
 
Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010
 
Appendix h economics final dec2010
Appendix h economics final dec2010Appendix h economics final dec2010
Appendix h economics final dec2010
 
Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010
 
Smp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSmp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_final
 
Smp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_finalSmp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_final
 

Último

(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Servicesexy call girls service in goa
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesDr. Salem Baidas
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Tina Ji
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...ranjana rawat
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BHbill846304
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 

Último (20)

(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
(ANIKA) Call Girls Wagholi ( 7001035870 ) HI-Fi Pune Escorts Service
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
Contact Number Call Girls Service In Goa  9316020077 Goa  Call Girls ServiceContact Number Call Girls Service In Goa  9316020077 Goa  Call Girls Service
Contact Number Call Girls Service In Goa 9316020077 Goa Call Girls Service
 
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
Sustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and ChallengesSustainable Clothing Strategies and Challenges
Sustainable Clothing Strategies and Challenges
 
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
Call Girls In Faridabad(Ballabgarh) Book ☎ 8168257667, @4999
 
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Sinhagad Road ( 7001035870 ) HI-Fi Pune Escorts Service
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(NANDITA) Hadapsar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
(PARI) Viman Nagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune ...
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
Freegle User Survey as visual display - BH
Freegle User Survey as visual display - BHFreegle User Survey as visual display - BH
Freegle User Survey as visual display - BH
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
(ZARA) Call Girls Talegaon Dabhade ( 7001035870 ) HI-Fi Pune Escorts Service
 

Smp2 part b policy statements kingston seymour only_final

  • 1. Kingston Seymour to Sand Bay This Theme area contains the Policy Unit KIN 1, KIN 2, KIN 3 and KIN 4. It includes the shoreline on the east bank of the River Severn from Old Church Road, Clevedon to Birnbeck Island, including Congresbury Yeo. The Key Policy Drivers in this area are: • International nature conservation sites – Severn Estuary SAC, SPA and Ramsar; • Critical infrastructure – M5, Kingston Seymour sewage treatment works, electricity substations; • Residential areas – Clevedon, Yatton / Congresbury.
  • 2.
  • 3. Policy Unit: KIN 1 - Old Church Road, Clevedon to St Thomas’ Head (east bank of the River Severn)
  • 4. Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) MR The Short Term policy for this unit is Managed Realignment. The current defences along the coastal shoreline (reinforced earth embankments) are expected to remain in place for this epoch with little maintenance. MR in this epoch should focus on the area around Congresbury Yeo, where a MR scheme is currently being developed. This approach manages the risk of impacts from flooding to this and linked Policy Units (KIN 3, KIN 4). MR does not guarantee funding to build or maintain new realigned defences. 20 to 50 years (2055) MR The medium term policy for this unit is a Managed Realignment policy. The existing defences along the coastal shoreline will come to the end of their serviceable life in this epoch. MR in this epoch should focus on the creation of new, realigned defences along the shoreline to the north (Commissioner’s Bank) and south of Congresbury Yeo to enable new intertidal habitat to be created. MR manages the risk of impacts from flooding to this and linked Policy Units (KIN 3, KIN 4). The position, size and materials of new defences should be considered in detail and determined by the SEFRMS. Land, nature conservation and historic environment features in front of the new line of defences or in areas of NAI will be at increased risk of flooding and erosion. Adaptation actions should be considered and implemented where appropriate. The habitat created in this Policy Unit will help compensate for areas lost elsewhere in the estuary and help maintain/improve the condition of the European protected sites. MR does not guarantee funding to build or maintain new realigned defences. 50 to 100 years (2105) MR The long term policy for this unit is Managed Realignment. New realigned defences should be maintained and further MR along the shoreline to the north (Commissioner’s Bank) and south of Congresbury Yeo should be considered as and when defences created in the previous epoch need to be replaced. MR manages the risk of impacts from flooding to this and linked Policy Units (KIN 3, KIN 4). The position, size and materials of new defences should be considered in detail by the SEFRMS. Land, nature conservation and historic environment features in front of the new line of defences or in areas of NAI will be at increased risk of flooding and erosion. Adaptation actions should be considered and implemented where appropriate. The habitat created in this Policy Unit will help compensate for areas lost elsewhere in the estuary and help maintain/improve the condition of the European protected sites. MR does not guarantee funding to build or maintain new realigned defences.
  • 5. Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs KIN 1 HTL MR MR MR £3,172m (KIN1, 3, 4 total) £15m (KIN1, 3, 4 total) The preferred policy is economically viable for the linked Policy Units of KIN 1, KIN 3 and KIN 4. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 6. Predicted Implication of the Preferred Plan for the KIN 1 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The existing defences will remain in place along the coastal shoreline. A MR scheme in Congresbury Yeo is underway and will need to be maintained when completed. Present defences will remain in place along the coastal shoreline, managing the risk of impacts from flooding to properties and land. MR in Congresbury Yeo will manage the risk of impacts to properties and land behind the defences. There will be limited impact in this epoch as the existing defence line remains in place. The MR scheme in Congresbury Yeo has been agreed and will create some additional intertidal habitat. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk will not impact on existing landscape and visual amenity. The MR scheme in Congresbury Yeo has been agreed and will a slight impact on landscape and visual amenity Defences will manage the risk to the historic environment. The MR scheme in Congresbury Yeo has been agreed and may have a slight impact on historic environment. Defences will manage the risk to amenity and recreational assets. The MR scheme in Congresbury Yeo has been agreed and may have a slight impact on amenity. 20 – 50 years Existing defences along the coastal shoreline are expected to come to the end of their serviceable life during this epoch. Prior to complete failure of the existing earth embankment, new set back defences, should be established to allow habitat creation and to reduce the impact from fluvial flooding by increasing floodwater conveyance. Realigned defences will manage the risk of impacts to properties and land behind new defences. Assets in front of realigned defences will be at risk from inundation. Impacts on property and land, and mitigation actions will need to be considered in determining realignment of defences. A MR policy may benefit flood risk management in adjacent, linked Policy Units (KIN 3, KIN 4). A MR policy will allow the creation additional intertidal habitat. There will be loss of terrestrial habitats as intertidal habitats roll back. Works should take account of possible environmental impacts and the need for an EIA. The creation of intertidal habitat will replace existing agricultural land, altering the landscape. Realigned defences will manage the risk of impacts to historic environment assets behind new defences. Assets in front of realigned defences will be at risk from inundation. Managed re-alignment is likely to adversely impact on a limited number of listed buildings. Impacts on historic environment assets, and mitigation actions, will need to be considered in determining realignment of defences Realigned defences will manage the risk on the amenity value or recreational use of the land behind new defences. Impacts on recreational assets, and mitigation actions, will need to be considered in determining realignment of defences
  • 7. Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 50 – 100 years The new defence line should be maintained. A further MR of defences should be considered as and when defences created in the previous epoch need to be replaced. Realigned defences will manage the risk of impacts to properties and land behind new defences. Assets in front of realigned defences will be at risk from inundation. Impacts on property and land, and mitigation actions will need to be considered in determining realignment of defences. A MR policy may benefit flood risk management in adjacent, linked Policy Units (KIN 3, KIN 4). A MR policy will allow the creation additional intertidal habitat. There will be loss of terrestrial habitats as intertidal habitats roll back. Works should take account of possible environmental impacts and the need for an EIA. In the long term sea level rise will result in more frequent flooding of the seaward side of the defence line and creation of intertidal habitat, altering the landscape. Realigned defences will manage the risk of impacts to historic environment assets behind new defences. Assets in front of realigned defences will be at risk from inundation. Managed re-alignment is likely to adversely impact on a limited number of listed buildings. Impacts on historic environment assets, and mitigation actions, will need to be considered in determining realignment of defences Realigned defences will manage the risk on the amenity value or recreational use of the land behind new defences.
  • 8. Policy Unit: KIN 2 - St Thomas’ Head to Middle Hope car park at Sand Point (east bank of the River Severn)
  • 9. Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) NAI The short term policy for this unit is No Active Intervention. High ground and hard geology naturally limit the risk of coastal flooding and erosion in this Policy Unit. NAI will allow natural processes to continue with little or no impact. This Policy Unit is not linked to any others. 20 to 50 years (2055) NAI The medium term policy for this unit is No Active Intervention. High ground and hard geology naturally limit the risk of coastal flooding and erosion in this Policy Unit. NAI will allow natural processes to continue with little or no impact. This Policy Unit is not linked to any others. 50 to 100 years (2105) NAI The long term policy for this unit is No Active Intervention. High ground and hard geology naturally limit the risk of coastal flooding and erosion in this Policy Unit. NAI will allow natural processes to continue with little or no impact. This Policy Unit is not linked to any others. Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs KIN 2 Do nothing NAI NAI NAI Minimal Minimal The preferred policy has no economic impact in this Policy Unit. This Policy Unit is not linked to any others.
  • 10. Predicted Implication of the Preferred Plan for the KIN 2 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The shoreline will remain stable in this period, and as a result management activities will be limited. Limited erosion and flood risk will not impact on existing property, land use or human health. A NAI policy will allow natural processes to dominate. There will be continued exposure of Middle Hope SSSI. Limited erosion and flood risk will not impact on existing landscape and visual amenity Limited erosion and flood risk will not impact on the historic environment Limited erosion and flood risk will not impact on the amenity value of the land or recreational use. 20 – 50 years The shoreline will undergo limited erosion within this period, and as a result management activities will be limited. Limited erosion and flood risk will not impact on existing properties, land use or human health. A NAI policy will allow habitats to roll back so intertidal habitats and features will be maintained. Roll back will be limited due to restriction by hard geology and high ground. There will be continued exposure of Middle Hope SSSI. Limited erosion and flood risk will not impact on existing landscape and visual amenity Limited erosion and flood risk will not impact on the historic environment Limited erosion and flood risk will not impact on the amenity value of the land or recreational use. 50 – 100 years The shoreline will undergo limited erosion within this period, and as a result management activities will be limited. Limited erosion and flood risk will not impact on existing properties, land use or human health. A NAI policy will allow habitats to roll back so intertidal habitats and features will be maintained. Roll back will be limited due to restriction by hard geology and high ground. There will be continued exposure of Middle Hope SSSI. Limited erosion and flood risk will not impact on existing landscape and visual amenity Limited erosion and flood risk will not impact on the historic environment Limited erosion and flood risk will not impact on the amenity value of the land or recreational use.
  • 11. Policy Unit: KIN 3 - Middle Hope car park at Sand Point to the southern end of Beach Road, Kewstoke (east bank of the River Severn)
  • 12. Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The Short Term policy for this unit is Hold The Line. HTL requires the active management of the sand dunes, which are the main line of defence. The sand dunes will remain in place in during this epoch, managing the impacts of coastal flooding. Historic accretion at the north end of this Policy Unit is expected to continue. HTL is expected to require only minimal management of the sand dunes. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line. HTL requires the active management of the sand dunes, which are the main line of defence. This will manage the risk of impacts from flooding and erosion. Historic accretion at the north end of this Policy Unit is expected to stop and possibly reverse (start to erode), as sea level rises. Actions should take account of impacts on linked Policy Units (KIN 1, KIN 4). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line. HTL requires the active management of the sand dunes, which are the main line of defence. This will manage the risk of impacts from flooding and erosion. Historic accretion at the north end of this Policy Unit is expected to reverse (start to erode), as sea level rises. Actions should take account of impacts on linked Policy Units (KIN 1, KIN 4). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs KIN 3 HTL HTL HTL HTL £3,172m (KIN1, 3, 4 total) £15m (KIN1, 3, 4 total) The preferred policy is economically viable for the linked Policy Units of KIN 1, KIN 3 and KIN 4. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 13. Predicted Implication of the Preferred Plan for the KIN 3 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The shoreline will remain stable (accretion to the north) and constrained flooding in this period will result in minimal management activities. Limited erosion and flood risk will not impact on existing property, land use or human health. A HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk will not impact on existing landscape and visual amenity Limited erosion and flood risk will not impact on the historic environment Management of sand dunes will manage the risk to the amenity value of the land or recreational use. 20 – 50 years The sand dunes that form the defence are expected to come to the end of their serviceable life during this epoch. A management programme to maintain the dunes should be implemented to maintain the shoreline. Management of sand dunes will manage the risk to property, land use or human health. Coastal squeeze will occur which will result in loss of intertidal habitats. Management of sand dunes is likely to impact upon to integrity of the SSSI. Works should take account of possible environmental impacts and the need for an EIA. Management of sand dunes will help maintain the visual character of the area. Management of sand dunes will manage the risk to the historic environment Management of sand dunes will manage the risk to the amenity value of the land or recreational use. 50 – 100 years The sand dunes should continue to be maintained. Monitoring of shoreline erosion should also be undertaken. Management of sand dunes will manage the risk to property, land use or human health. Coastal squeeze will occur which will result in loss of intertidal habitats. Management of sand dunes is likely to impact upon to integrity of the SSSI. Works should take account of possible environmental impacts and the need for an EIA. Management of sand dunes will help maintain the visual character of the area. Management of sand dunes will manage the risk to the historic environment Management of sand dunes will manage the risk to the amenity value of the land or recreational use.
  • 14. Policy Unit: KIN 4 - the southern end of Beach Road, Kewstoke to Birnbeck Island (east bank of the River Severn)
  • 15. Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) NAI The short term policy for this unit is No Active Intervention. High ground and hard geology naturally limit the risk of coastal flooding and erosion in this Policy Unit. NAI will allow natural processes to continue with little or no impact. 20 to 50 years (2055) NAI The medium term policy for this unit is No Active Intervention. High ground and hard geology naturally limit the risk of coastal flooding and erosion in this Policy Unit. NAI will allow natural processes to continue. The rate of erosion in the medium (and long) term is unclear and should be monitored. If the rate of erosion increases, or properties are at risk, action should be considered. Funding is not guaranteed. 50 to 100 years (2105) NAI The long term policy for this unit is No Active Intervention. High ground and hard geology naturally limit the risk of coastal flooding and erosion in this Policy Unit. NAI will allow natural processes to continue. The rate of erosion in the medium (and long) term is unclear and should be monitored. If the rate of erosion increases, or properties are at risk, action should be considered. Funding is not guaranteed. Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs KIN 4 Do Nothing (Locally HTL) NAI NAI NAI £3,172m (KIN1, 3, 4 total) £15m (KIN1, 3, 4 total) The preferred policy has no economic impact in this Policy Unit. The preferred policy is economically viable for the linked Policy Units of KIN 1, KIN 3 and KIN 4. The costs and damages of the preferred policy in the table above relate to actions taken in linked policy units, not in KIN 4.
  • 16. Predicted Implication of the Preferred Plan for the KIN 4 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation – including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 – 20 years The shoreline will remain stable in this period, and as a result management activities will be very limited. Limited erosion and flood risk will not impact on existing property, land use or human health. Flood risk to property and land use from linked Policy Units (KIN 1, KIN 3, adjacent SMP2 area) – cannot be affected by shoreline management actions within KIN 4. A NAI policy will allow natural processes to dominate. Limited erosion and flood risk will not impact on existing landscape and visual amenity Limited erosion and flood risk will not impact on the historic environment Limited erosion and flood risk will not impact on the amenity value of the land or recreational use. 20 – 50 years The shoreline will undergo limited erosion within this period, and as a result management activities will be limited. Limited erosion and flood risk will not impact on existing properties, land use or human health. Flood risk to property and land use from linked Policy Units (KIN 1, KIN 3, adjacent SMP2 area) – cannot be affected by shoreline management actions within KIN 4. A NAI policy will allow habitats to roll back so intertidal habitats and features will be maintained. Roll back will be limited due to restriction by hard geology and high ground. Limited erosion and flood risk will not impact on existing landscape and visual amenity Limited erosion and flood risk will not impact on the historic environment Limited erosion and flood risk will not impact on the amenity value of the land or recreational use. 50 – 100 years The shoreline will undergo limited erosion within this period, and as a result management activities will be limited. Limited erosion and flood risk will not impact on existing properties, land use or human health. Flood risk to property and land use from linked Policy Units (KIN 1, KIN 3, adjacent SMP2 area) – cannot be affected by shoreline management actions within KIN 4. A NAI policy will allow habitats to roll back so intertidal habitats and features will be maintained. Roll back will be limited due to restriction by hard geology and high ground. Limited erosion and flood risk will not impact on existing landscape and visual amenity Limited erosion and flood risk will not impact on the historic environment Limited erosion and flood risk will not impact on the amenity value of the land or recreational use.