SlideShare una empresa de Scribd logo
1 de 29
Welcome to The Presentation

Technical and Financial Proposal :
Consultancy Services for the Preparation of Bakerganj Upazilla Master Plan
Presented by: Group-06
Afia Sultana Shanta (0615002)
Nabila Nur Kuhu (0615009)
Tazrina Habib Ananya (0615019)

Shahadat Hossain Shakil (0615020)
Khalid Bin Abdul Quader (0615030)
(1)
Objectives
 To identify the development issues and potential of the upazilla and
make a long term development vision for the upazilla and to prepare a
Master Plan in accordance with the vision for the development.
 To ensure and promote growth of the upazilla in line with the guiding
principles of the Master Plan and control any unplanned growth by any
private and public organization.

(2)
Comments on ToR
Points which should be considered :
 Lack of Detail and Specific Description

 Stakeholder Analysis
 Sample Size
 Sample Population
 Population Projection

(3)
Consultants General Understanding Brief Socio-Economic Profile
Bakerganj Upazilla
 District : Barisal
 Area : 417.21 sq. km.

 Union : 14
 Mouzas: 156
 Population : 3,36,706
 Main Occupation : Agriculture
Fig. : Map of Bakerganj Upazilla (Banglapedia, 2006)
(4)
Consultants General Understanding –
Constraints and Potentials of the Area
 Constraints
 Salinity of water
 Shortage of essential services
 Unplanned and haphazard development

 Potentials
 Extensive river network
 Fertile land

 Production of Coconut & Battle Nut

(5)
Technical Proposal – Planning Approach
Relationship among the plans as specified in the ToR
Sl.No.

Type of Plan

Coverage

Time Frame

Purpose

1.

Structure Plan

Whole study area

20 years

2.

Master Plan/ Urban Area Whole study area
Plan

20 years

(i)

Land Use Plan

20 years

(ii)

To determine overall strategy of urban
development in the area
To
provide
development guidance for area
where most of the urban development activities
will take place. Development control, land
reservation for infrastructure and essential
purposes.
To provide guidance about the future land use of
the area and suggest best possible zoning system
considering all the factors.
To provide suggestion and enforcement measures
for transportation management.
Guidelines and controls to protect unplanned
physical development in urban environment.

Transportation and Traffic Whole study area
20 years
Management Plan
Drainage
and Whole study area
20 years
Environmental
Management Plan
Local Action Plan
Individual area of the Short
Term Guidance
for
development where action is
upazilla where priority (possibly
5 expected in the short term.
action is needed.
Years)

(iii)

3.

Whole study area

(6)
Technical Proposal – Planning Approach
Relationship among the plans as specified in the ToR
Structure Plan
- Overall Strategies
- Policy Framework

Master Plan/Urban Area Plan
- Details of Structure Plan’s Goals
and Objects

Land Use Plan
- Output of Master Plan/Urban
Area Plan’s Goals and
Objectives

Transportation and Traffic
Management Plan
- Output of Master Plan/Urban
Area Plan’s Goals and Objectives

Drainage and Environmental
Management Plan
- Output of Master Plan/Urban
Area Plan’s Goals and Objectives

Local Action Plan
- Specific Programs, Schemes in
the Light of Master Plan /Urban
Area Plan’s Goals and Objectives

(7)
Technical Proposal – Planning Approach
Steps in Plan Preparation
Assessment of Planning Parameter

Identification of Goals and Objectives

Review of Current Development
Initiatives

Identification of Problem/Constraints,
Opportunities/Potentials

Resource and Need Assessment

People’s Consultation

Plan Formulation

Project/Schemes Identification,
Feasibility and Prioritization

Development of Alternative Options

Plan Finalization
Source: SCPL-DPM, 2008 (Modified Version Adopted)

(8)
Technical Proposal – Planning Approach
Steps in Plan Preparation
Assessment of Planning Parameter
- Basic data on population, employment, land use, infrastructure, environmental conditions
etc. for plan preparation

- Information from existing studies, plans and programs, government publications, public
authorities, statistical previous year book, the records of upazilla and other development
agencies working in the concerned upazilla area
Population Projection
- 2030 (plans lifetime) following the Age Cohort wise projection system
- Age cohort structure and growth rate of BBS will be used
- Base population year : 1991, 2001 and 2011
(9)
Technical Proposal – Planning Approach
Steps in Plan Preparation
Identification of Goals and Objectives
- Broad scale strategy of the Plan
- Specific issue to cover

Identification of Problem/Constraints & Opportunities/Potentials
- Rapid scanning survey of problems affecting different groups and having different
impacts through discussions with different interest groups

- Exact nature and quantification of the problems: data from secondary sources
- Potentials of the issue in the plan area
- Opportunities during plan preparation process

(10)
Technical Proposal – Planning Approach
Steps in Plan Preparation
Review of Current Development Initiatives
-Sectoral projects in the study area by different organizations will be identified
- As required in the ToR, projects will be mapped using thematic overlays

- Review of current urban and sectoral policies and programs, design standards etc.

Resource and Need Assessment
- Availability of technical and physical resources

- Availability of funds in the short term
- Physical and Economic need of the plan area
- Long term and short term need

(11)
Technical Proposal – Planning Approach
Steps in Plan Preparation
Consultation
- People's Participatory Planning Approach will be applied
- Parties to be consulted with
(i) The Government/Public Agencies
(ii) Local Communities/Beneficiaries
(iii) Private Sectors
(iv) Non-Government Organizations (NGOs)

- Stages of Consultation
(i)

First Consultation - Draft Structure Plan

(ii)

Second Consultation – Draft Master Plan

(12)
Technical Proposal – Planning Approach
Steps in Plan Preparation
Plan Preparation
- Finalizing preparation of the plans is the last stage of the planning process
- Plans will be supported by
i.

review of the database and information

ii.

assessment of the existing functional structure

iii. problems in developing process
iv. formulation of conceptual plan
v.

formulation of planning principles

vi. analysis of alternative plans
vii. integration of optimum plans
viii. priority phasing
ix. development control, zoning

x.

financial-economic, social, environmental impact assessment, legal support, etc.
(13)
Technical Proposal – Planning Approach
Formulation of Bankable Projects
 Prioritization of Project


Compatibility with other projects



Acceptability to all parties concerned



Equity consideration



Sustainability



Whether self financing or not



Environmental impacts

Issues Considered


Low Cost Housing



Telephone



New Construction



Gas



Upgrading of Old ones



Private Electricity Generation



Employment Generation Projects



Services



Utility Services Projects



Market and Shops



Water Supply and Sanitation



Education



Flood Control Embankment



Religious



Drainage Infrastructure



Recreation
(14)
Technical Proposal – Technical Approach and Methodology
Mobilization of Resources, Reconnaissance Survey, Project Design
- Inception Report (After 30 working Days)
Collection and Review of Database, Information, Maps, Reports

Preparation and Compilation of Base Map, Demarcation of Project Area
- Study Area Report with Map (After 90 working Days)
Physical and Environmental Feature Survey; Topographic Survey
Methodology of Base Map Preparation
Land Use Survey
Methodology of Physical  Collection of RS and CS Mouza Maps
Feature Survey

Methodology of Environmental

 Physical Feature and Physical
Socio-Economic Survey Infrastructure – Maps Methodology of
Scanning of Mouza
Feature Survey
Methodology of Socio-Economic Survey
Mauza/Base Map

Methodology of
Selection of Ground of Land Pointsurvey
Topographic Survey
Methodology Control Use Questionnaire Survey Transportation Survey
Existing Infrastructure – physical
 (GCP)
 Location and dimension of physicalSurvey
 An inventory offeature survey
the
GCP
 Based on Mouza Map  Land Level/SpotSize - 384 at circulation system (roads and
 Sample
95% confidence level and 5%
- Survey Report (After 150 working Days)
infrastructures-Total Station (TS)
waterways)
Digitization of Mouza Level at confidence interval Environmental Hazard –
Maps 50m interval according to ToR
Total Station/DGPS
Draft Structure features- Data Logger ProXR of Maps Stationseries of Volume andDays)
 Location of point Plan Preparation - Interim Report (After 210 working O-D survey
A
Checking/Editing
Total  20% additional sample for piloting and error
questionnaire survey and secondary
DGPS Master Plan and Local Action

Joining and Printing of Mouza Maps- Draft Count
Draft(Differential Global Positioning System)Plan PreparationPedestrian Report (After 300 working Days)
source
minimizing
 Later on Data will be transferred to GIS

Transportation Survey

Final Structure Plan and Master Plan Preparation - Final Report (After 360 working Days)
Database

(15)
Technical Proposal - Work Schedule

(16)
Technical Proposal – Network Diagram of Principal Activities

(17)
Technical Proposal – Staffing Schedule

(18)
Technical Proposal – Organogram
Team Leader

Deputy Team Leader

Urban Planner-1

Transport
Planning Expert

Civil Engineer

Urban Planner-2

Demographer
/Statistician

Environmental
Analyst

GIS Specialist

Architect

Urban
Developmet
Economist
Office Manager

Municipal
Engineer

Hydrologist

Peon

(19)
Mobilization, Reconnaissance Survey, Project Design, Submission of
Inception Report

P

P

P

S

S

P

P

P

P

P

S

S

S

P

P

P

S

S

P

P

P

S

S

Socio-Economic Survey

S

S

S

P

Transportation Survey

S

S

P

P

All Survey Report Compilation and Submission of Survey Report

S

S

P

P

Draft Structure Plan Preparation and Interim Report

P

P

P

P

Draft Master Plan and Local Action Plan Preparation; Draft Report

P

P

P

Final Structure Plan and Master Plan preparation; Final Report

P

P

P

Peon

P

Land Use Survey

Office Manager

P

Physical and Environmental Feature Survey; Topographic Survey

Urban Development
Economist

P

Preparation and Compilation of Base Map, Demarcation of Project
Area, Study Area Report with Map

Municipal Engineer

P

Collection and Review of Database, Information, Maps, Reports

Hydrologist

Demographer
/Statistician
Environmental
Analyst

Civil Engineer

Transport Planning
Expert

GIS Specialist

Architect

Urban Planner-2

Urban Planner-1

Activity

Deputy Team
Leader

Team Leader

Technical Proposal – Responsibility Linkage

P

P

P

S

S

S

S

S

S

S

S

S

S

S

S

S

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

S

Office and Account Management

P

Office Maintenance

P

N. B. - “P” for Primary Activity and “S” for Secondary Activity

(20)
Financial Proposal - Staff Remuneration
Sl. No.

Position

Monthly Salary (BDT)

Working
Month

Total (BDT)

Staff
A. Professional Staff
1.
Team Leader
2.
Deputy Team Leader
3.
Urban Planner-1
4.
Urban Planner-2
5.
Architect
6.
GIS Specialist
7.
Transport Planning Expert
8.
Civil Engineer
9.
Demographer/Statistician
10.
Environmental Analyst
11.
Hydrologist
12.
Municipal Engineer
13.
Urban Development Economist

70,000
60,000
50,000
45,000
45,000
45,000
40,000
35,000
30,000
30,000
30,000
30,000
30,000

17
17
17
17
10
17
15
15
14
15
9
9
14
Sub Total A

11,90,000
10,20,000
8,50,000
7,65,000
4,50,000
7,65,000
6,00,000
5,25,000
4,20,000
4,50,000
2,70,000
2,70,000
4,20,000
79,95,000

B. Supporting Staff
14.
Office Manger
15.
Peon

30,000
12,000

17
17
Sub Total B

5,10,000
2,04,000
7,14,000
87,09,000

Grand Total of Project Staff Remuneration

(21)
Financial Proposal – Reimbursable Cost
Sl.
No.

Description

Unit

Unit
Quantity
Cost
in BDT
30,000
17

Total in
BDT

1.

Rental Cost of Office (Including Utility Bill)

Month

5,10,000

2.

Rental Cost of Office Setup

Month

50,000

17

8,50,000

3.

Cost of Office Stationary

Month

5,000

17

85,000

4.

Communication Costs Between "Base Office"
and "Field Office"

Month

5,000

17

85,000

5.

Rental Vehicle Cost for Transport (1 no.)

Month

30,000

17

5,10,000

6.

Cost of Procurement of Mauza Maps

Number

300

780

2,34,000

7.

Secondary Data Collection Cost

Number of
Organization

1,000

50

50,000

8.

Cost of Construction and Installation of
Benchmark/Ground Control Point

Number

3,000

156

18,72,000

9.

Cost of GIS Database Preparation on the Basis of
Subcontract - Scanning, Digitizing of Maps and
Reproduction

Number

500

780

3,90,000

(22)
Financial Proposal – Reimbursable Cost
Description

Sl.
No.
10.

11.

Cost of Survey
i) Physical and Environmental Feature Survey;
Topographic Survey
ii) Land Use Survey
iii) Socio-Economic Survey
iv) Transportation Survey
Cost of Map Printing
i. Base/Mouza Map
ii. Survey Maps
iii. Structure Plan

12.

Unit

Acre

Unit
Cost
in BDT

Quantity

Total in
BDT

350

103097

3,60,83,950

Acre
Per HH
Package

150
150
100,000

103097
460
1

1,54,64,550
69,000
1,00,000

Number

500

30

15,000

Number
Number

500
500

180
30

90,000
15,000

Cost of Reports for the Service (Including Printing, Binding and Photocopy Cost)
i. Inception Report

Number

500

25

12,500

ii. Study Area Report

Number

750

25

18,750

ii. Survey Report

Number

2,000

25

50,000

iii. Interim Report
iv) Draft Final Report

Number
Number

2,000
3,000

25
25

50,000
75,000

v) Final Report

Number

3,500

25

87,500

Grand Total of Projects Reimbursable Cost

5,67,77,250
(23)
Financial Proposal – Per Month Cost Schedule
Cost Schedule Per Month
SI. No.

Item
Jan

A.
1
2
3
4
5
6

Reimbursable Cost
Office Rent
Setup Rent
Office Stationary
Communication Cost
Vehicle Cost
Mouza Map Procurement Cost

7
8
9
10

Secondary Data Cost
Cost of BM, GCP
GIS Database Cost
Cost of Surveys
i) Physical& Environmental Feature;
Topographic Survey
ii) Land Use Survey
iii) Socio-Economic Survey
iv) Transportation Survey
11
Cost of Map Printing
i. Base/Mouza Map
ii. Survey Maps
iii. Structure Plan
iv) Master Plan
12
Cost of Reports
i. Inception Report
ii. Study Area Report
ii. Survey Report
iii. Interim Report
iv) Draft Report
v) Final Report
B.
Staff Remuneration
1.
Team Leader
2.
Deputy Team Leader
3.
Urban Planner-1
4.
Urban Planner-2
5.
Architect
6.
GIS Specialist
7.
Transport Planning Expert
8.
Civil Engineer
9.
Demographer/Statistician
10.
Environmental Analyst
11.
Hydrologist
12.
Municipal Engineer
13.
Urban Development Economist
14.
Office Manager
15.
Peon
C.
Miscellaneous Cost
Monthly Total Cost (without VAT)
Monthly Total Cost (with VAT)
Grand Total (Project Life Time Cost)

Feb

Mar

Apr

May

Year-2012
Jun

30,000
50,000
5,000
5,000
30,000

30,000
50,000
5,000
5,000
30,000

30,000
50,000
5,000
5,000
30,000

10,000

10,000
18,72,000
1,30,000

10,000

10,000

1,30,000
72,16,790

72,16,790

72,16,790

72,16,790

30,92,910
17,250
20,000

30,92,910
17,250
20,000

30,92,910
20,,000

30,000
50,000
5,000
5,000
30,000

5,000

30,000
50,000
5,000
5,000
30,000

30,000
50,000
5,000
5,000
30,000

30,000
50,000
5,000
5,000
30,000

Year-2013
Mar

5,000

30,000
50,000
5,000
5,000
30,000

Feb

30,000

30,000
50,000
5,000
5,000
30,000

Apr
30,000
50,000
5,000
5,000
30,000

May

30,92,910

20,,000

30,000
50,000
5,000
5,000
30,000

Jan

72,16,790

30,92,910

30,000
50,000
5,000
5,000
30,000

Nov

1,30,000

17,250

30,000
50,000
5,000
5,000
30,000

Oct

10,000

17,250

30,000
50,000
5,000
5,000
30,000

Aug

Dec

30,000

30,000
50,000
5,000
5,000
30,000

Sep

5,000

30,000
50,000
5,000
5,000
30,000
2,34,000

Jul

30,000
50,000
5,000
5,000
30,000

20,000
15,000
90,000

12,500
18,750
50,000
50,000
75,000
87,500
(Including 10% Income Tax)
73,535
73,535
63,030
63,030
52,525
52,525
47,273
47,273
47,273

47,273

31,515

31,515

31,515
31,515
12,606
2,90,675
10,62,712

31,515
31,515
12,606
2,90,675
28,43,212

73,535
63,030
52,525
47,273

73,535
63,030
52,525
47,273

73,535
63,030
52,525
47,273

73,535
63,030
52,525
47,273

73,535
63,030
52,525
47,273

47,273
42,020
36,768
31,515
31,515

47,273
42,020
36,768
31,515
31,515

47,273
42,020
36,768

47,273
42,020
36,768

47,273
42,020
36,768

31,515

31,515

31,515

73,535
63,030
52,525
47,273
47,273
47,273
42,020
36,768
31,515
31,515

31,515
31,515
12,606
2,90,675
1,14,78,715

31,515
31,515
12,606
2,90,675
1,14,97,465

31,515
12,606
2,90,675
1,12,68,435

31,515
12,606
2,90,675
1,12,58,435

31,515
12,606
2,90,675
1,14,13,435

1,19,11,657

1,19,11,657

1,19,11,657

11,10,534
29,71,157 1,19,11,657 1,19,11,657
(Including VAT, Income Tax, Msc. Cost)

31,515
31,515
12,606
2,90,675
9,64,038

73,535
63,030
52,525
47,273
47,273
47,273
42,020
36,768
31,515
31,515
31,515
31,515
31,515
31,515
12,606
2,90,675
10,27,068

73,535
63,030
52,525
47,273
47,273
47,273
42,020
36,768
31,515
31,515
31,515
31,515
31,515
31,515
12,606
2,90,675
10,77,068

73,535
63,030
52,525
47,273
47,273
47,273
42,020
36,768
31,515
31,515
31,515
31,515
31,515
31,515
12,606
2,90,675
10,22,068

73,535
63,030
52,525
47,273
47,273
47,273
42,020
36,768
31,515
31,515
31,515
31,515
31,515
31,515
12,606
2,90,675
10,22,068

73,535
63,030
52,525
47,273
47,273
47,273
42,020
36,768
31,515
31,515
31,515
31,515
31,515
31,515
12,606
2,90,675
10,52,068

73,535
63,030
52,525
47,273
47,273
47,273
42,020
36,768
31,515
31,515
31,515
31,515
31,515
31,515
12,606
2,90,675
11,27,068

73,535
63,030
52,525
47,273
47,273
47,273
42,020
36,768
31,515
31,515
31,515
31,515
31,515
31,515
12,606
2,90,675
10,22,068

73,535
63,030
52,525
47,273
47,273
47,273
42,020
36,768
31,515
31,515
31,515
31,515
31,515
31,515
12,606
2,90,675
10,22,068

73,535
63,030
52,525
47,273
47,273
47,273
42,020
36,768
31,515
31,515
31,515
31,515
31,515
31,515
12,606
2,90,675
11,09,568

10,07,420

10,73,286

11,25,536

10,68,061

10,68,061

10,99,411

11,77,786

10,68,061

10,68,061 11,59,499
7,40,56,599

(24)
Financial Proposal – Per Month Cost Schedule
Monthly Total Cost
14000000

12000000

Total cost in tk

10000000

8000000

6000000

4000000

2000000

0
Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13

Months

(25)
Financial Proposal – Summary of Costs
Cost Component
Reimbursable Expenses
Staff Remuneration

Cost in BDT
5,67,77,250
87,09,000

Sub-Total
Miscellaneous Cost (7.5%)
Total Cost
Local Taxes

6,54,86,250
49,11,469
7,03,97,719
39,99,607

Grand-Total

7,43,97,326

(26)
Financial Proposal – Breakdown of Taxes
Sl.
No.

Description

Unit

1.

Value Added Tax
(VAT)

Percent

2.

Advance Income Tax
(AIT)

Percent

Total Taxes Cost in Taka

Unit Cost

Quantity
in Taka

4.50 7,03,97,719

10.00

83,17,095

Total in
Taka

Remarks

31,67,897

(Reimbursable
Cost + Staff
Remuneration +
Msc. Cost) *
4.5 %
8,31,710 (Taxable Staff
Remuneration)
* 10.00%

39,99,607

(Local Tax)

(27)
Thanks for your patience….

Q/A

(28)
References
Banglapedia. (2006). Bakerganj Upazilla. Retrieved December 5, 2011, from
Banglapedia: http://www.banglapedia.org/httpdocs/HT/B_0064.HTM

BBS. (2007). Zilla Profile; Zilla: Barishal, Upazilla: Bakerganj. Retrieved 11 15,
2011, from Bangladesh Bureau of Statistics:
http://www.bbs.gov.bd/RptZillaProfile.aspx
DPM, S. (2008). Technical Proposal: Consultancy Services for The Preparation of
Master Plan for the Pourashavas. Dhaka: Sheltech Consultacy Private Limited
& Design Planning Management Consultants.
Kashem, M. S., Shabnam, F., Jahan, I., & Zaman, S. (2005). Consultancy Services for
The Preparation of DAP for DMDP Area. Dhaka: BURP, BUET.

(29)

Más contenido relacionado

La actualidad más candente

Structural plan for bangalore
Structural plan for bangaloreStructural plan for bangalore
Structural plan for bangalorevidhya monisha
 
Land use planning system in bangladesh
Land use planning system in bangladeshLand use planning system in bangladesh
Land use planning system in bangladeshSJ Ohi
 
Urban Regeneration
Urban RegenerationUrban Regeneration
Urban RegenerationNubi Kay'
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburDr. Md. Taibur Rahman
 
Transferable Development Rights
Transferable Development RightsTransferable Development Rights
Transferable Development RightsAman Kudesia
 
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016Tulika Kumar
 
Untold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master PlanUntold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master PlanJIT KUMAR GUPTA
 
TOWN PLANNING AND MODERN PLANNING
TOWN PLANNING AND MODERN PLANNING TOWN PLANNING AND MODERN PLANNING
TOWN PLANNING AND MODERN PLANNING Mahreen Zamir Abro
 
ITPI, Conditions of Engagement and Scale of Professional Fees
ITPI, Conditions of Engagement and Scale of Professional FeesITPI, Conditions of Engagement and Scale of Professional Fees
ITPI, Conditions of Engagement and Scale of Professional FeesShubhranshu Upadhyay
 
PREPARETION AND IMPLEMENTATION OF STRUCTURAL PLAN
PREPARETION AND IMPLEMENTATION OF STRUCTURAL PLANPREPARETION AND IMPLEMENTATION OF STRUCTURAL PLAN
PREPARETION AND IMPLEMENTATION OF STRUCTURAL PLANARCHIABYSSINIYA ART+THOUGHT
 
Ajmer singh CV- Urban Planner & GIS expert
Ajmer singh CV- Urban Planner & GIS expertAjmer singh CV- Urban Planner & GIS expert
Ajmer singh CV- Urban Planner & GIS expertAjmer Singh
 
local area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabadlocal area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, AhmedabadPratham Pincha
 
Evolution of planning legislation in india
Evolution of planning legislation in india Evolution of planning legislation in india
Evolution of planning legislation in india Parth Sadaria
 

La actualidad más candente (20)

Structural plan for bangalore
Structural plan for bangaloreStructural plan for bangalore
Structural plan for bangalore
 
Urban & Regional Planning - Issues & Challenges
Urban & Regional Planning - Issues & ChallengesUrban & Regional Planning - Issues & Challenges
Urban & Regional Planning - Issues & Challenges
 
Land use planning system in bangladesh
Land use planning system in bangladeshLand use planning system in bangladesh
Land use planning system in bangladesh
 
Urban Regeneration
Urban RegenerationUrban Regeneration
Urban Regeneration
 
Planning techniques
Planning techniquesPlanning techniques
Planning techniques
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
 
Transferable Development Rights
Transferable Development RightsTransferable Development Rights
Transferable Development Rights
 
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016KERALA TOWN AND COUNTRY PLANNING ACT, 2016
KERALA TOWN AND COUNTRY PLANNING ACT, 2016
 
Untold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master PlanUntold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master Plan
 
Planning Theory
Planning TheoryPlanning Theory
Planning Theory
 
TOWN PLANNING AND MODERN PLANNING
TOWN PLANNING AND MODERN PLANNING TOWN PLANNING AND MODERN PLANNING
TOWN PLANNING AND MODERN PLANNING
 
Planning profession
Planning professionPlanning profession
Planning profession
 
Urban Policy
Urban PolicyUrban Policy
Urban Policy
 
ITPI, Conditions of Engagement and Scale of Professional Fees
ITPI, Conditions of Engagement and Scale of Professional FeesITPI, Conditions of Engagement and Scale of Professional Fees
ITPI, Conditions of Engagement and Scale of Professional Fees
 
Unit 1 ppt
Unit 1 pptUnit 1 ppt
Unit 1 ppt
 
PREPARETION AND IMPLEMENTATION OF STRUCTURAL PLAN
PREPARETION AND IMPLEMENTATION OF STRUCTURAL PLANPREPARETION AND IMPLEMENTATION OF STRUCTURAL PLAN
PREPARETION AND IMPLEMENTATION OF STRUCTURAL PLAN
 
Regional plan
Regional plan Regional plan
Regional plan
 
Ajmer singh CV- Urban Planner & GIS expert
Ajmer singh CV- Urban Planner & GIS expertAjmer singh CV- Urban Planner & GIS expert
Ajmer singh CV- Urban Planner & GIS expert
 
local area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabadlocal area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabad
 
Evolution of planning legislation in india
Evolution of planning legislation in india Evolution of planning legislation in india
Evolution of planning legislation in india
 

Similar a Technical and Financial Proposal-Consultancy Services for the Preparation of Bakerganj Upazilla Master Plan

Urban Planning Studio Project Orientation.pptx
Urban Planning Studio Project Orientation.pptxUrban Planning Studio Project Orientation.pptx
Urban Planning Studio Project Orientation.pptxtemesgen442110
 
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД Bayar Tsend
 
Introduction to Planning Techniques.pptx
Introduction to Planning Techniques.pptxIntroduction to Planning Techniques.pptx
Introduction to Planning Techniques.pptxManishAgarwal844671
 
Meaning and Need of Urban Planning
Meaning and Need of Urban Planning Meaning and Need of Urban Planning
Meaning and Need of Urban Planning Ravi Varma reddy
 
GUIDELINE OF RURAL DEVELOPMENT STANDARD ONLY
GUIDELINE OF RURAL DEVELOPMENT STANDARD ONLYGUIDELINE OF RURAL DEVELOPMENT STANDARD ONLY
GUIDELINE OF RURAL DEVELOPMENT STANDARD ONLYjitu9918
 
TA-7779 Introduction to High level
TA-7779 Introduction to High levelTA-7779 Introduction to High level
TA-7779 Introduction to High levelSon Ha-Dang
 
Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...
Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...
Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...Medi Ambient. Generalitat de Catalunya
 
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...Fosu Anthony
 
Rohit Gupta Resume
Rohit Gupta ResumeRohit Gupta Resume
Rohit Gupta ResumeROHIT GUPTA
 
Lecture 4: Urban & Regional Planning (Risk Mitigation Concept)
Lecture 4: Urban & Regional Planning (Risk Mitigation Concept)Lecture 4: Urban & Regional Planning (Risk Mitigation Concept)
Lecture 4: Urban & Regional Planning (Risk Mitigation Concept)Bayes Ahmed
 
Risk sensitive spatial planning in global south
Risk sensitive spatial planning in global south Risk sensitive spatial planning in global south
Risk sensitive spatial planning in global south Mwenje Emmanuel
 
Urban transportation planning
Urban transportation planningUrban transportation planning
Urban transportation planningPiter Biswas
 
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...journal ijrtem
 

Similar a Technical and Financial Proposal-Consultancy Services for the Preparation of Bakerganj Upazilla Master Plan (20)

Urban Planning Studio Project Orientation.pptx
Urban Planning Studio Project Orientation.pptxUrban Planning Studio Project Orientation.pptx
Urban Planning Studio Project Orientation.pptx
 
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
 
Municipal periodic plan in nepalese context [compatibility mode]
Municipal periodic plan in nepalese context [compatibility mode]Municipal periodic plan in nepalese context [compatibility mode]
Municipal periodic plan in nepalese context [compatibility mode]
 
Introduction to Planning Techniques.pptx
Introduction to Planning Techniques.pptxIntroduction to Planning Techniques.pptx
Introduction to Planning Techniques.pptx
 
Meaning and Need of Urban Planning
Meaning and Need of Urban Planning Meaning and Need of Urban Planning
Meaning and Need of Urban Planning
 
GUIDELINE OF RURAL DEVELOPMENT STANDARD ONLY
GUIDELINE OF RURAL DEVELOPMENT STANDARD ONLYGUIDELINE OF RURAL DEVELOPMENT STANDARD ONLY
GUIDELINE OF RURAL DEVELOPMENT STANDARD ONLY
 
The Tomorrow Plan
The Tomorrow PlanThe Tomorrow Plan
The Tomorrow Plan
 
TA-7779 Introduction to High level
TA-7779 Introduction to High levelTA-7779 Introduction to High level
TA-7779 Introduction to High level
 
2030 and 2035 Transportation Plans Review
2030 and 2035 Transportation Plans Review2030 and 2035 Transportation Plans Review
2030 and 2035 Transportation Plans Review
 
3.5.1 master plan
3.5.1 master plan3.5.1 master plan
3.5.1 master plan
 
Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...
Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...
Efforts in the field of adaptation in the Alpine space . outcomes of the C3-A...
 
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
 
Rohit Gupta Resume
Rohit Gupta ResumeRohit Gupta Resume
Rohit Gupta Resume
 
14 04-09 complete streets overview
14 04-09 complete streets overview14 04-09 complete streets overview
14 04-09 complete streets overview
 
Lecture 4: Urban & Regional Planning (Risk Mitigation Concept)
Lecture 4: Urban & Regional Planning (Risk Mitigation Concept)Lecture 4: Urban & Regional Planning (Risk Mitigation Concept)
Lecture 4: Urban & Regional Planning (Risk Mitigation Concept)
 
Ahmed's CV- May, 2015
Ahmed's CV- May, 2015Ahmed's CV- May, 2015
Ahmed's CV- May, 2015
 
Risk sensitive spatial planning in global south
Risk sensitive spatial planning in global south Risk sensitive spatial planning in global south
Risk sensitive spatial planning in global south
 
Faculty of Planning
Faculty of Planning Faculty of Planning
Faculty of Planning
 
Urban transportation planning
Urban transportation planningUrban transportation planning
Urban transportation planning
 
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...
Evaluate deficiencies and shortages for the Libyan Residential Urban Planning...
 

Más de Shahadat Hossain Shakil

Urban and Rural Planning Discipline in Bangladesh: Scope, Job Search Techniq...
Urban and Rural Planning Discipline in Bangladesh:  Scope, Job Search Techniq...Urban and Rural Planning Discipline in Bangladesh:  Scope, Job Search Techniq...
Urban and Rural Planning Discipline in Bangladesh: Scope, Job Search Techniq...Shahadat Hossain Shakil
 
Potential Career Path of a Planner in Bangladesh
Potential Career Path of a Planner in BangladeshPotential Career Path of a Planner in Bangladesh
Potential Career Path of a Planner in BangladeshShahadat Hossain Shakil
 
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...Shahadat Hossain Shakil
 
Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...
Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...
Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...Shahadat Hossain Shakil
 
Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...
Stakeholder Debate in Policy Implementation:An Evaluation of Bangladesh Leat...Stakeholder Debate in Policy Implementation:An Evaluation of Bangladesh Leat...
Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...Shahadat Hossain Shakil
 
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...Shahadat Hossain Shakil
 
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...Shahadat Hossain Shakil
 
Multi-Actor Partnership for Environmental Governance - An Investigation from ...
Multi-Actor Partnership for Environmental Governance - An Investigation from ...Multi-Actor Partnership for Environmental Governance - An Investigation from ...
Multi-Actor Partnership for Environmental Governance - An Investigation from ...Shahadat Hossain Shakil
 
Strategic Environmental Assessment (SEA) Processes and International System D...
Strategic Environmental Assessment (SEA) Processes and International System D...Strategic Environmental Assessment (SEA) Processes and International System D...
Strategic Environmental Assessment (SEA) Processes and International System D...Shahadat Hossain Shakil
 
Strategic Environmental Assessment and International System Development
Strategic Environmental Assessment and International System Development  Strategic Environmental Assessment and International System Development
Strategic Environmental Assessment and International System Development Shahadat Hossain Shakil
 
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, India
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, IndiaAssessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, India
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, IndiaShahadat Hossain Shakil
 
Climate Change Adaptation through Multi-level Governance: Perspectives from C...
Climate Change Adaptation through Multi-level Governance: Perspectives from C...Climate Change Adaptation through Multi-level Governance: Perspectives from C...
Climate Change Adaptation through Multi-level Governance: Perspectives from C...Shahadat Hossain Shakil
 
Public Participation and Lay Knowledge in Environmental Governance: A Case St...
Public Participation and Lay Knowledge in Environmental Governance: A Case St...Public Participation and Lay Knowledge in Environmental Governance: A Case St...
Public Participation and Lay Knowledge in Environmental Governance: A Case St...Shahadat Hossain Shakil
 
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA):  Bangladesh PerspectiveEffectiveness of Environmental Impact Assessment (EIA):  Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh PerspectiveShahadat Hossain Shakil
 
Does Distribution of Schools Matter in Human Development? - A Case Study of B...
Does Distribution of Schools Matter in Human Development? - A Case Study of B...Does Distribution of Schools Matter in Human Development? - A Case Study of B...
Does Distribution of Schools Matter in Human Development? - A Case Study of B...Shahadat Hossain Shakil
 
Topographic Analysis Linkages among Climate, Erosion and Tectonics
Topographic Analysis Linkages among Climate, Erosion and TectonicsTopographic Analysis Linkages among Climate, Erosion and Tectonics
Topographic Analysis Linkages among Climate, Erosion and TectonicsShahadat Hossain Shakil
 
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...Shahadat Hossain Shakil
 
Solving a “Transportation Planning” Problem through the Programming Language “C”
Solving a “Transportation Planning” Problem through the Programming Language “C”Solving a “Transportation Planning” Problem through the Programming Language “C”
Solving a “Transportation Planning” Problem through the Programming Language “C”Shahadat Hossain Shakil
 

Más de Shahadat Hossain Shakil (20)

Shakil_CV_ADB_June 28, 2021
Shakil_CV_ADB_June 28, 2021Shakil_CV_ADB_June 28, 2021
Shakil_CV_ADB_June 28, 2021
 
CV_Shakil_vApr-2020
CV_Shakil_vApr-2020CV_Shakil_vApr-2020
CV_Shakil_vApr-2020
 
Urban and Rural Planning Discipline in Bangladesh: Scope, Job Search Techniq...
Urban and Rural Planning Discipline in Bangladesh:  Scope, Job Search Techniq...Urban and Rural Planning Discipline in Bangladesh:  Scope, Job Search Techniq...
Urban and Rural Planning Discipline in Bangladesh: Scope, Job Search Techniq...
 
Potential Career Path of a Planner in Bangladesh
Potential Career Path of a Planner in BangladeshPotential Career Path of a Planner in Bangladesh
Potential Career Path of a Planner in Bangladesh
 
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...
Assessment of the Extent to which Strategic Environmental Assessment (SEA) ca...
 
Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...
Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...
Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...
 
Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...
Stakeholder Debate in Policy Implementation:An Evaluation of Bangladesh Leat...Stakeholder Debate in Policy Implementation:An Evaluation of Bangladesh Leat...
Stakeholder Debate in Policy Implementation: An Evaluation of Bangladesh Leat...
 
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...
Transport Sustainability of Dhaka: A Measure of Ecological Footprint and Mean...
 
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...
Carbon Emission from Domestic Level Consumption: Ecological Footprint Account...
 
Multi-Actor Partnership for Environmental Governance - An Investigation from ...
Multi-Actor Partnership for Environmental Governance - An Investigation from ...Multi-Actor Partnership for Environmental Governance - An Investigation from ...
Multi-Actor Partnership for Environmental Governance - An Investigation from ...
 
Strategic Environmental Assessment (SEA) Processes and International System D...
Strategic Environmental Assessment (SEA) Processes and International System D...Strategic Environmental Assessment (SEA) Processes and International System D...
Strategic Environmental Assessment (SEA) Processes and International System D...
 
Strategic Environmental Assessment and International System Development
Strategic Environmental Assessment and International System Development  Strategic Environmental Assessment and International System Development
Strategic Environmental Assessment and International System Development
 
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, India
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, IndiaAssessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, India
Assessing Climate Change Impact and Adptaion Measures in Surat, Gujarat, India
 
Climate Change Adaptation through Multi-level Governance: Perspectives from C...
Climate Change Adaptation through Multi-level Governance: Perspectives from C...Climate Change Adaptation through Multi-level Governance: Perspectives from C...
Climate Change Adaptation through Multi-level Governance: Perspectives from C...
 
Public Participation and Lay Knowledge in Environmental Governance: A Case St...
Public Participation and Lay Knowledge in Environmental Governance: A Case St...Public Participation and Lay Knowledge in Environmental Governance: A Case St...
Public Participation and Lay Knowledge in Environmental Governance: A Case St...
 
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA):  Bangladesh PerspectiveEffectiveness of Environmental Impact Assessment (EIA):  Bangladesh Perspective
Effectiveness of Environmental Impact Assessment (EIA): Bangladesh Perspective
 
Does Distribution of Schools Matter in Human Development? - A Case Study of B...
Does Distribution of Schools Matter in Human Development? - A Case Study of B...Does Distribution of Schools Matter in Human Development? - A Case Study of B...
Does Distribution of Schools Matter in Human Development? - A Case Study of B...
 
Topographic Analysis Linkages among Climate, Erosion and Tectonics
Topographic Analysis Linkages among Climate, Erosion and TectonicsTopographic Analysis Linkages among Climate, Erosion and Tectonics
Topographic Analysis Linkages among Climate, Erosion and Tectonics
 
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...
Shift Share Analysis Based on Main Activity Sector of Selected Districts of B...
 
Solving a “Transportation Planning” Problem through the Programming Language “C”
Solving a “Transportation Planning” Problem through the Programming Language “C”Solving a “Transportation Planning” Problem through the Programming Language “C”
Solving a “Transportation Planning” Problem through the Programming Language “C”
 

Último

Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...lizamodels9
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Sheetaleventcompany
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...amitlee9823
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876dlhescort
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 

Último (20)

Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
Call Girls Zirakpur👧 Book Now📱7837612180 📞👉Call Girl Service In Zirakpur No A...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 

Technical and Financial Proposal-Consultancy Services for the Preparation of Bakerganj Upazilla Master Plan

  • 1. Welcome to The Presentation Technical and Financial Proposal : Consultancy Services for the Preparation of Bakerganj Upazilla Master Plan Presented by: Group-06 Afia Sultana Shanta (0615002) Nabila Nur Kuhu (0615009) Tazrina Habib Ananya (0615019) Shahadat Hossain Shakil (0615020) Khalid Bin Abdul Quader (0615030) (1)
  • 2. Objectives  To identify the development issues and potential of the upazilla and make a long term development vision for the upazilla and to prepare a Master Plan in accordance with the vision for the development.  To ensure and promote growth of the upazilla in line with the guiding principles of the Master Plan and control any unplanned growth by any private and public organization. (2)
  • 3. Comments on ToR Points which should be considered :  Lack of Detail and Specific Description  Stakeholder Analysis  Sample Size  Sample Population  Population Projection (3)
  • 4. Consultants General Understanding Brief Socio-Economic Profile Bakerganj Upazilla  District : Barisal  Area : 417.21 sq. km.  Union : 14  Mouzas: 156  Population : 3,36,706  Main Occupation : Agriculture Fig. : Map of Bakerganj Upazilla (Banglapedia, 2006) (4)
  • 5. Consultants General Understanding – Constraints and Potentials of the Area  Constraints  Salinity of water  Shortage of essential services  Unplanned and haphazard development  Potentials  Extensive river network  Fertile land  Production of Coconut & Battle Nut (5)
  • 6. Technical Proposal – Planning Approach Relationship among the plans as specified in the ToR Sl.No. Type of Plan Coverage Time Frame Purpose 1. Structure Plan Whole study area 20 years 2. Master Plan/ Urban Area Whole study area Plan 20 years (i) Land Use Plan 20 years (ii) To determine overall strategy of urban development in the area To provide development guidance for area where most of the urban development activities will take place. Development control, land reservation for infrastructure and essential purposes. To provide guidance about the future land use of the area and suggest best possible zoning system considering all the factors. To provide suggestion and enforcement measures for transportation management. Guidelines and controls to protect unplanned physical development in urban environment. Transportation and Traffic Whole study area 20 years Management Plan Drainage and Whole study area 20 years Environmental Management Plan Local Action Plan Individual area of the Short Term Guidance for development where action is upazilla where priority (possibly 5 expected in the short term. action is needed. Years) (iii) 3. Whole study area (6)
  • 7. Technical Proposal – Planning Approach Relationship among the plans as specified in the ToR Structure Plan - Overall Strategies - Policy Framework Master Plan/Urban Area Plan - Details of Structure Plan’s Goals and Objects Land Use Plan - Output of Master Plan/Urban Area Plan’s Goals and Objectives Transportation and Traffic Management Plan - Output of Master Plan/Urban Area Plan’s Goals and Objectives Drainage and Environmental Management Plan - Output of Master Plan/Urban Area Plan’s Goals and Objectives Local Action Plan - Specific Programs, Schemes in the Light of Master Plan /Urban Area Plan’s Goals and Objectives (7)
  • 8. Technical Proposal – Planning Approach Steps in Plan Preparation Assessment of Planning Parameter Identification of Goals and Objectives Review of Current Development Initiatives Identification of Problem/Constraints, Opportunities/Potentials Resource and Need Assessment People’s Consultation Plan Formulation Project/Schemes Identification, Feasibility and Prioritization Development of Alternative Options Plan Finalization Source: SCPL-DPM, 2008 (Modified Version Adopted) (8)
  • 9. Technical Proposal – Planning Approach Steps in Plan Preparation Assessment of Planning Parameter - Basic data on population, employment, land use, infrastructure, environmental conditions etc. for plan preparation - Information from existing studies, plans and programs, government publications, public authorities, statistical previous year book, the records of upazilla and other development agencies working in the concerned upazilla area Population Projection - 2030 (plans lifetime) following the Age Cohort wise projection system - Age cohort structure and growth rate of BBS will be used - Base population year : 1991, 2001 and 2011 (9)
  • 10. Technical Proposal – Planning Approach Steps in Plan Preparation Identification of Goals and Objectives - Broad scale strategy of the Plan - Specific issue to cover Identification of Problem/Constraints & Opportunities/Potentials - Rapid scanning survey of problems affecting different groups and having different impacts through discussions with different interest groups - Exact nature and quantification of the problems: data from secondary sources - Potentials of the issue in the plan area - Opportunities during plan preparation process (10)
  • 11. Technical Proposal – Planning Approach Steps in Plan Preparation Review of Current Development Initiatives -Sectoral projects in the study area by different organizations will be identified - As required in the ToR, projects will be mapped using thematic overlays - Review of current urban and sectoral policies and programs, design standards etc. Resource and Need Assessment - Availability of technical and physical resources - Availability of funds in the short term - Physical and Economic need of the plan area - Long term and short term need (11)
  • 12. Technical Proposal – Planning Approach Steps in Plan Preparation Consultation - People's Participatory Planning Approach will be applied - Parties to be consulted with (i) The Government/Public Agencies (ii) Local Communities/Beneficiaries (iii) Private Sectors (iv) Non-Government Organizations (NGOs) - Stages of Consultation (i) First Consultation - Draft Structure Plan (ii) Second Consultation – Draft Master Plan (12)
  • 13. Technical Proposal – Planning Approach Steps in Plan Preparation Plan Preparation - Finalizing preparation of the plans is the last stage of the planning process - Plans will be supported by i. review of the database and information ii. assessment of the existing functional structure iii. problems in developing process iv. formulation of conceptual plan v. formulation of planning principles vi. analysis of alternative plans vii. integration of optimum plans viii. priority phasing ix. development control, zoning x. financial-economic, social, environmental impact assessment, legal support, etc. (13)
  • 14. Technical Proposal – Planning Approach Formulation of Bankable Projects  Prioritization of Project  Compatibility with other projects  Acceptability to all parties concerned  Equity consideration  Sustainability  Whether self financing or not  Environmental impacts Issues Considered  Low Cost Housing  Telephone  New Construction  Gas  Upgrading of Old ones  Private Electricity Generation  Employment Generation Projects  Services  Utility Services Projects  Market and Shops  Water Supply and Sanitation  Education  Flood Control Embankment  Religious  Drainage Infrastructure  Recreation (14)
  • 15. Technical Proposal – Technical Approach and Methodology Mobilization of Resources, Reconnaissance Survey, Project Design - Inception Report (After 30 working Days) Collection and Review of Database, Information, Maps, Reports Preparation and Compilation of Base Map, Demarcation of Project Area - Study Area Report with Map (After 90 working Days) Physical and Environmental Feature Survey; Topographic Survey Methodology of Base Map Preparation Land Use Survey Methodology of Physical  Collection of RS and CS Mouza Maps Feature Survey Methodology of Environmental  Physical Feature and Physical Socio-Economic Survey Infrastructure – Maps Methodology of Scanning of Mouza Feature Survey Methodology of Socio-Economic Survey Mauza/Base Map Methodology of Selection of Ground of Land Pointsurvey Topographic Survey Methodology Control Use Questionnaire Survey Transportation Survey Existing Infrastructure – physical  (GCP)  Location and dimension of physicalSurvey  An inventory offeature survey the GCP  Based on Mouza Map  Land Level/SpotSize - 384 at circulation system (roads and  Sample 95% confidence level and 5% - Survey Report (After 150 working Days) infrastructures-Total Station (TS) waterways) Digitization of Mouza Level at confidence interval Environmental Hazard – Maps 50m interval according to ToR Total Station/DGPS Draft Structure features- Data Logger ProXR of Maps Stationseries of Volume andDays)  Location of point Plan Preparation - Interim Report (After 210 working O-D survey A Checking/Editing Total  20% additional sample for piloting and error questionnaire survey and secondary DGPS Master Plan and Local Action  Joining and Printing of Mouza Maps- Draft Count Draft(Differential Global Positioning System)Plan PreparationPedestrian Report (After 300 working Days) source minimizing  Later on Data will be transferred to GIS Transportation Survey Final Structure Plan and Master Plan Preparation - Final Report (After 360 working Days) Database (15)
  • 16. Technical Proposal - Work Schedule (16)
  • 17. Technical Proposal – Network Diagram of Principal Activities (17)
  • 18. Technical Proposal – Staffing Schedule (18)
  • 19. Technical Proposal – Organogram Team Leader Deputy Team Leader Urban Planner-1 Transport Planning Expert Civil Engineer Urban Planner-2 Demographer /Statistician Environmental Analyst GIS Specialist Architect Urban Developmet Economist Office Manager Municipal Engineer Hydrologist Peon (19)
  • 20. Mobilization, Reconnaissance Survey, Project Design, Submission of Inception Report P P P S S P P P P P S S S P P P S S P P P S S Socio-Economic Survey S S S P Transportation Survey S S P P All Survey Report Compilation and Submission of Survey Report S S P P Draft Structure Plan Preparation and Interim Report P P P P Draft Master Plan and Local Action Plan Preparation; Draft Report P P P Final Structure Plan and Master Plan preparation; Final Report P P P Peon P Land Use Survey Office Manager P Physical and Environmental Feature Survey; Topographic Survey Urban Development Economist P Preparation and Compilation of Base Map, Demarcation of Project Area, Study Area Report with Map Municipal Engineer P Collection and Review of Database, Information, Maps, Reports Hydrologist Demographer /Statistician Environmental Analyst Civil Engineer Transport Planning Expert GIS Specialist Architect Urban Planner-2 Urban Planner-1 Activity Deputy Team Leader Team Leader Technical Proposal – Responsibility Linkage P P P S S S S S S S S S S S S S P P P P P P P P P P P P P P P P P P P P S Office and Account Management P Office Maintenance P N. B. - “P” for Primary Activity and “S” for Secondary Activity (20)
  • 21. Financial Proposal - Staff Remuneration Sl. No. Position Monthly Salary (BDT) Working Month Total (BDT) Staff A. Professional Staff 1. Team Leader 2. Deputy Team Leader 3. Urban Planner-1 4. Urban Planner-2 5. Architect 6. GIS Specialist 7. Transport Planning Expert 8. Civil Engineer 9. Demographer/Statistician 10. Environmental Analyst 11. Hydrologist 12. Municipal Engineer 13. Urban Development Economist 70,000 60,000 50,000 45,000 45,000 45,000 40,000 35,000 30,000 30,000 30,000 30,000 30,000 17 17 17 17 10 17 15 15 14 15 9 9 14 Sub Total A 11,90,000 10,20,000 8,50,000 7,65,000 4,50,000 7,65,000 6,00,000 5,25,000 4,20,000 4,50,000 2,70,000 2,70,000 4,20,000 79,95,000 B. Supporting Staff 14. Office Manger 15. Peon 30,000 12,000 17 17 Sub Total B 5,10,000 2,04,000 7,14,000 87,09,000 Grand Total of Project Staff Remuneration (21)
  • 22. Financial Proposal – Reimbursable Cost Sl. No. Description Unit Unit Quantity Cost in BDT 30,000 17 Total in BDT 1. Rental Cost of Office (Including Utility Bill) Month 5,10,000 2. Rental Cost of Office Setup Month 50,000 17 8,50,000 3. Cost of Office Stationary Month 5,000 17 85,000 4. Communication Costs Between "Base Office" and "Field Office" Month 5,000 17 85,000 5. Rental Vehicle Cost for Transport (1 no.) Month 30,000 17 5,10,000 6. Cost of Procurement of Mauza Maps Number 300 780 2,34,000 7. Secondary Data Collection Cost Number of Organization 1,000 50 50,000 8. Cost of Construction and Installation of Benchmark/Ground Control Point Number 3,000 156 18,72,000 9. Cost of GIS Database Preparation on the Basis of Subcontract - Scanning, Digitizing of Maps and Reproduction Number 500 780 3,90,000 (22)
  • 23. Financial Proposal – Reimbursable Cost Description Sl. No. 10. 11. Cost of Survey i) Physical and Environmental Feature Survey; Topographic Survey ii) Land Use Survey iii) Socio-Economic Survey iv) Transportation Survey Cost of Map Printing i. Base/Mouza Map ii. Survey Maps iii. Structure Plan 12. Unit Acre Unit Cost in BDT Quantity Total in BDT 350 103097 3,60,83,950 Acre Per HH Package 150 150 100,000 103097 460 1 1,54,64,550 69,000 1,00,000 Number 500 30 15,000 Number Number 500 500 180 30 90,000 15,000 Cost of Reports for the Service (Including Printing, Binding and Photocopy Cost) i. Inception Report Number 500 25 12,500 ii. Study Area Report Number 750 25 18,750 ii. Survey Report Number 2,000 25 50,000 iii. Interim Report iv) Draft Final Report Number Number 2,000 3,000 25 25 50,000 75,000 v) Final Report Number 3,500 25 87,500 Grand Total of Projects Reimbursable Cost 5,67,77,250 (23)
  • 24. Financial Proposal – Per Month Cost Schedule Cost Schedule Per Month SI. No. Item Jan A. 1 2 3 4 5 6 Reimbursable Cost Office Rent Setup Rent Office Stationary Communication Cost Vehicle Cost Mouza Map Procurement Cost 7 8 9 10 Secondary Data Cost Cost of BM, GCP GIS Database Cost Cost of Surveys i) Physical& Environmental Feature; Topographic Survey ii) Land Use Survey iii) Socio-Economic Survey iv) Transportation Survey 11 Cost of Map Printing i. Base/Mouza Map ii. Survey Maps iii. Structure Plan iv) Master Plan 12 Cost of Reports i. Inception Report ii. Study Area Report ii. Survey Report iii. Interim Report iv) Draft Report v) Final Report B. Staff Remuneration 1. Team Leader 2. Deputy Team Leader 3. Urban Planner-1 4. Urban Planner-2 5. Architect 6. GIS Specialist 7. Transport Planning Expert 8. Civil Engineer 9. Demographer/Statistician 10. Environmental Analyst 11. Hydrologist 12. Municipal Engineer 13. Urban Development Economist 14. Office Manager 15. Peon C. Miscellaneous Cost Monthly Total Cost (without VAT) Monthly Total Cost (with VAT) Grand Total (Project Life Time Cost) Feb Mar Apr May Year-2012 Jun 30,000 50,000 5,000 5,000 30,000 30,000 50,000 5,000 5,000 30,000 30,000 50,000 5,000 5,000 30,000 10,000 10,000 18,72,000 1,30,000 10,000 10,000 1,30,000 72,16,790 72,16,790 72,16,790 72,16,790 30,92,910 17,250 20,000 30,92,910 17,250 20,000 30,92,910 20,,000 30,000 50,000 5,000 5,000 30,000 5,000 30,000 50,000 5,000 5,000 30,000 30,000 50,000 5,000 5,000 30,000 30,000 50,000 5,000 5,000 30,000 Year-2013 Mar 5,000 30,000 50,000 5,000 5,000 30,000 Feb 30,000 30,000 50,000 5,000 5,000 30,000 Apr 30,000 50,000 5,000 5,000 30,000 May 30,92,910 20,,000 30,000 50,000 5,000 5,000 30,000 Jan 72,16,790 30,92,910 30,000 50,000 5,000 5,000 30,000 Nov 1,30,000 17,250 30,000 50,000 5,000 5,000 30,000 Oct 10,000 17,250 30,000 50,000 5,000 5,000 30,000 Aug Dec 30,000 30,000 50,000 5,000 5,000 30,000 Sep 5,000 30,000 50,000 5,000 5,000 30,000 2,34,000 Jul 30,000 50,000 5,000 5,000 30,000 20,000 15,000 90,000 12,500 18,750 50,000 50,000 75,000 87,500 (Including 10% Income Tax) 73,535 73,535 63,030 63,030 52,525 52,525 47,273 47,273 47,273 47,273 31,515 31,515 31,515 31,515 12,606 2,90,675 10,62,712 31,515 31,515 12,606 2,90,675 28,43,212 73,535 63,030 52,525 47,273 73,535 63,030 52,525 47,273 73,535 63,030 52,525 47,273 73,535 63,030 52,525 47,273 73,535 63,030 52,525 47,273 47,273 42,020 36,768 31,515 31,515 47,273 42,020 36,768 31,515 31,515 47,273 42,020 36,768 47,273 42,020 36,768 47,273 42,020 36,768 31,515 31,515 31,515 73,535 63,030 52,525 47,273 47,273 47,273 42,020 36,768 31,515 31,515 31,515 31,515 12,606 2,90,675 1,14,78,715 31,515 31,515 12,606 2,90,675 1,14,97,465 31,515 12,606 2,90,675 1,12,68,435 31,515 12,606 2,90,675 1,12,58,435 31,515 12,606 2,90,675 1,14,13,435 1,19,11,657 1,19,11,657 1,19,11,657 11,10,534 29,71,157 1,19,11,657 1,19,11,657 (Including VAT, Income Tax, Msc. Cost) 31,515 31,515 12,606 2,90,675 9,64,038 73,535 63,030 52,525 47,273 47,273 47,273 42,020 36,768 31,515 31,515 31,515 31,515 31,515 31,515 12,606 2,90,675 10,27,068 73,535 63,030 52,525 47,273 47,273 47,273 42,020 36,768 31,515 31,515 31,515 31,515 31,515 31,515 12,606 2,90,675 10,77,068 73,535 63,030 52,525 47,273 47,273 47,273 42,020 36,768 31,515 31,515 31,515 31,515 31,515 31,515 12,606 2,90,675 10,22,068 73,535 63,030 52,525 47,273 47,273 47,273 42,020 36,768 31,515 31,515 31,515 31,515 31,515 31,515 12,606 2,90,675 10,22,068 73,535 63,030 52,525 47,273 47,273 47,273 42,020 36,768 31,515 31,515 31,515 31,515 31,515 31,515 12,606 2,90,675 10,52,068 73,535 63,030 52,525 47,273 47,273 47,273 42,020 36,768 31,515 31,515 31,515 31,515 31,515 31,515 12,606 2,90,675 11,27,068 73,535 63,030 52,525 47,273 47,273 47,273 42,020 36,768 31,515 31,515 31,515 31,515 31,515 31,515 12,606 2,90,675 10,22,068 73,535 63,030 52,525 47,273 47,273 47,273 42,020 36,768 31,515 31,515 31,515 31,515 31,515 31,515 12,606 2,90,675 10,22,068 73,535 63,030 52,525 47,273 47,273 47,273 42,020 36,768 31,515 31,515 31,515 31,515 31,515 31,515 12,606 2,90,675 11,09,568 10,07,420 10,73,286 11,25,536 10,68,061 10,68,061 10,99,411 11,77,786 10,68,061 10,68,061 11,59,499 7,40,56,599 (24)
  • 25. Financial Proposal – Per Month Cost Schedule Monthly Total Cost 14000000 12000000 Total cost in tk 10000000 8000000 6000000 4000000 2000000 0 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Months (25)
  • 26. Financial Proposal – Summary of Costs Cost Component Reimbursable Expenses Staff Remuneration Cost in BDT 5,67,77,250 87,09,000 Sub-Total Miscellaneous Cost (7.5%) Total Cost Local Taxes 6,54,86,250 49,11,469 7,03,97,719 39,99,607 Grand-Total 7,43,97,326 (26)
  • 27. Financial Proposal – Breakdown of Taxes Sl. No. Description Unit 1. Value Added Tax (VAT) Percent 2. Advance Income Tax (AIT) Percent Total Taxes Cost in Taka Unit Cost Quantity in Taka 4.50 7,03,97,719 10.00 83,17,095 Total in Taka Remarks 31,67,897 (Reimbursable Cost + Staff Remuneration + Msc. Cost) * 4.5 % 8,31,710 (Taxable Staff Remuneration) * 10.00% 39,99,607 (Local Tax) (27)
  • 28. Thanks for your patience…. Q/A (28)
  • 29. References Banglapedia. (2006). Bakerganj Upazilla. Retrieved December 5, 2011, from Banglapedia: http://www.banglapedia.org/httpdocs/HT/B_0064.HTM BBS. (2007). Zilla Profile; Zilla: Barishal, Upazilla: Bakerganj. Retrieved 11 15, 2011, from Bangladesh Bureau of Statistics: http://www.bbs.gov.bd/RptZillaProfile.aspx DPM, S. (2008). Technical Proposal: Consultancy Services for The Preparation of Master Plan for the Pourashavas. Dhaka: Sheltech Consultacy Private Limited & Design Planning Management Consultants. Kashem, M. S., Shabnam, F., Jahan, I., & Zaman, S. (2005). Consultancy Services for The Preparation of DAP for DMDP Area. Dhaka: BURP, BUET. (29)