SlideShare una empresa de Scribd logo
1 de 1
Descargar para leer sin conexión
REFERENCE DRAWINGS
ARCHITECTURAL STRUCTURAL
DRAWING No.
MEP
REV. DRAWING No. REV. DRAWING No. REV.
DESCRIPTION
JABAL OMAR DEVELOPMENT PROJECT
IN MAKKAH
Jabal Omar Development Co.
OWNER:
MAIN CONSULTANT:
Engineers
PROJECT MANAGER:
ATELIERS LION
ASSOCIES
URBAN DESIGNERS: Design development coordinator
MAIN CONTRACTORS:
SUPERVISION CONSULTANT:
APPROVED BY:CHECKED BY:DRAWN BY:
DATE:
SCALE:
DRAWING NUMBER :
Title
DesciplineProject Code Zone/Area
Phase
Number Tower Name Work Package Company Name Drawing Type Floor Type
Drawing
Group Serial Number Revision
ENGr.SHERIF ENGr.SHERIF
AL-FUTTAIM ENGINEERING & TECHNOLOGIES LTD.
REVISIONS
REV. DATE
INGEROP
P.O. BOX 67716, POSTAL CODE 11424, KING FAHAD ROAD, RIYADH, K.S.A.
TEL: +966 (1) 282 4444; FAX:+966 (1) 282 4333; Email: ksa-info@naffco.ae
NAFFCO
SKH
S03Z
1:100
0 SUBMITTED FOR APPROVAL
U T C 3 0 2 0 0 0S 0 9 S 0 3 Z C N 1 2 R C C S H8 8 3 4 M F 0 5
LEGEND :
FIRE PUMP DETAILS
FOR TOWER SR03@UT01 and UT02
01/05/2016
01/05/2016
SHEET (1-3)
0
0
0 0
0
883-4-S09-S03Z-DC04-RMC-FC-TYP-A0-03-171.0 883-4-S09-S03Z-DC04-RMC-FC-TYP-MF-03-113.0
883-4-S09-S09Z-DC04-RMC-FC-S00-MF-05-101.0
883-4-S09-S03Z-DC04-RMC-FC-UTC-S0-04-089.0
883-4-S09-S03Z-DC04-RMC-FC-UTC-S0-04-091.0

Más contenido relacionado

La actualidad más candente

La actualidad más candente (15)

hikal CV June 2016
hikal CV June 2016hikal CV June 2016
hikal CV June 2016
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1
 
C.V.UP DATE
C.V.UP DATEC.V.UP DATE
C.V.UP DATE
 
WAB Profile 20160425
WAB Profile 20160425WAB Profile 20160425
WAB Profile 20160425
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
EZZAT SHAHEEN CV.compressed
EZZAT SHAHEEN  CV.compressedEZZAT SHAHEEN  CV.compressed
EZZAT SHAHEEN CV.compressed
 
Ayman Hussien cv - Copy
Ayman Hussien cv - CopyAyman Hussien cv - Copy
Ayman Hussien cv - Copy
 
CV Muhammad Kashif Khan
CV Muhammad Kashif KhanCV Muhammad Kashif Khan
CV Muhammad Kashif Khan
 
C.V. for haitham sobhy
C.V. for haitham sobhyC.V. for haitham sobhy
C.V. for haitham sobhy
 
Monthly Cost Report May 15
Monthly Cost Report May 15Monthly Cost Report May 15
Monthly Cost Report May 15
 
kenan Alnamous CV
kenan Alnamous CVkenan Alnamous CV
kenan Alnamous CV
 
ANISUR RAHMAN DRAUGHTSMAN
ANISUR RAHMAN DRAUGHTSMANANISUR RAHMAN DRAUGHTSMAN
ANISUR RAHMAN DRAUGHTSMAN
 
my resume
my resumemy resume
my resume
 
CV2
CV2CV2
CV2
 
Sandeep.mep
Sandeep.mepSandeep.mep
Sandeep.mep
 

Similar a 883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK

Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignmentashleyyeap
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNshaat Hafez
 
PORTFOLIO.compressed
PORTFOLIO.compressedPORTFOLIO.compressed
PORTFOLIO.compressedJoseph Ahmadi
 
Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1KhangWei Chin
 
CALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCaleb Bercero
 
CALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCaleb Bercero
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترibrahim shukri el-eter
 
Project 1 ICI & ITD Presentation
Project 1 ICI & ITD PresentationProject 1 ICI & ITD Presentation
Project 1 ICI & ITD PresentationAfiqah Zariful
 
MEP Design Draughtsman Ducoment
MEP Design Draughtsman DucomentMEP Design Draughtsman Ducoment
MEP Design Draughtsman DucomentHussain Sajid
 
002 My Cv in English (Briefing updated 03.04.2016-All)
002 My Cv in English (Briefing updated 03.04.2016-All)002 My Cv in English (Briefing updated 03.04.2016-All)
002 My Cv in English (Briefing updated 03.04.2016-All)Ahmed Abdeen
 

Similar a 883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK (20)

Measurement Assignment
Measurement AssignmentMeasurement Assignment
Measurement Assignment
 
NASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORSNASHAT_CV updated FOR NOORS
NASHAT_CV updated FOR NOORS
 
YOONAS_CV
YOONAS_CVYOONAS_CV
YOONAS_CV
 
Amr Moneim CV March 2016
Amr Moneim CV March 2016Amr Moneim CV March 2016
Amr Moneim CV March 2016
 
Resume[q]
Resume[q]Resume[q]
Resume[q]
 
SAQ-Profile
SAQ-ProfileSAQ-Profile
SAQ-Profile
 
PORTFOLIO.compressed
PORTFOLIO.compressedPORTFOLIO.compressed
PORTFOLIO.compressed
 
Mahendran CV
Mahendran CVMahendran CV
Mahendran CV
 
Ici and itd project 1
Ici and itd project 1Ici and itd project 1
Ici and itd project 1
 
CALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CV
 
CALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CV
 
السيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العترالسيرة الذاتية إبراهيم العتر
السيرة الذاتية إبراهيم العتر
 
omar-cv-1 QC
omar-cv-1 QComar-cv-1 QC
omar-cv-1 QC
 
SIEMENS HQ
SIEMENS HQSIEMENS HQ
SIEMENS HQ
 
Project 1 ICI & ITD Presentation
Project 1 ICI & ITD PresentationProject 1 ICI & ITD Presentation
Project 1 ICI & ITD Presentation
 
MEP Design Draughtsman Ducoment
MEP Design Draughtsman DucomentMEP Design Draughtsman Ducoment
MEP Design Draughtsman Ducoment
 
IS252_PAA
IS252_PAAIS252_PAA
IS252_PAA
 
002 My Cv in English (Briefing updated 03.04.2016-All)
002 My Cv in English (Briefing updated 03.04.2016-All)002 My Cv in English (Briefing updated 03.04.2016-All)
002 My Cv in English (Briefing updated 03.04.2016-All)
 
cv2
cv2cv2
cv2
 
CV Shylandran-2016
CV Shylandran-2016CV Shylandran-2016
CV Shylandran-2016
 

883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK

  • 1. REFERENCE DRAWINGS ARCHITECTURAL STRUCTURAL DRAWING No. MEP REV. DRAWING No. REV. DRAWING No. REV. DESCRIPTION JABAL OMAR DEVELOPMENT PROJECT IN MAKKAH Jabal Omar Development Co. OWNER: MAIN CONSULTANT: Engineers PROJECT MANAGER: ATELIERS LION ASSOCIES URBAN DESIGNERS: Design development coordinator MAIN CONTRACTORS: SUPERVISION CONSULTANT: APPROVED BY:CHECKED BY:DRAWN BY: DATE: SCALE: DRAWING NUMBER : Title DesciplineProject Code Zone/Area Phase Number Tower Name Work Package Company Name Drawing Type Floor Type Drawing Group Serial Number Revision ENGr.SHERIF ENGr.SHERIF AL-FUTTAIM ENGINEERING & TECHNOLOGIES LTD. REVISIONS REV. DATE INGEROP P.O. BOX 67716, POSTAL CODE 11424, KING FAHAD ROAD, RIYADH, K.S.A. TEL: +966 (1) 282 4444; FAX:+966 (1) 282 4333; Email: ksa-info@naffco.ae NAFFCO SKH S03Z 1:100 0 SUBMITTED FOR APPROVAL U T C 3 0 2 0 0 0S 0 9 S 0 3 Z C N 1 2 R C C S H8 8 3 4 M F 0 5 LEGEND : FIRE PUMP DETAILS FOR TOWER SR03@UT01 and UT02 01/05/2016 01/05/2016 SHEET (1-3) 0 0 0 0 0 883-4-S09-S03Z-DC04-RMC-FC-TYP-A0-03-171.0 883-4-S09-S03Z-DC04-RMC-FC-TYP-MF-03-113.0 883-4-S09-S09Z-DC04-RMC-FC-S00-MF-05-101.0 883-4-S09-S03Z-DC04-RMC-FC-UTC-S0-04-089.0 883-4-S09-S03Z-DC04-RMC-FC-UTC-S0-04-091.0