883-4-S09-S03Z-CN12-RCC-SH-UTC-MF-05-3020-(1-3)-SR7A FIRE TANK
1. REFERENCE DRAWINGS
ARCHITECTURAL STRUCTURAL
DRAWING No.
MEP
REV. DRAWING No. REV. DRAWING No. REV.
DESCRIPTION
JABAL OMAR DEVELOPMENT PROJECT
IN MAKKAH
Jabal Omar Development Co.
OWNER:
MAIN CONSULTANT:
Engineers
PROJECT MANAGER:
ATELIERS LION
ASSOCIES
URBAN DESIGNERS: Design development coordinator
MAIN CONTRACTORS:
SUPERVISION CONSULTANT:
APPROVED BY:CHECKED BY:DRAWN BY:
DATE:
SCALE:
DRAWING NUMBER :
Title
DesciplineProject Code Zone/Area
Phase
Number Tower Name Work Package Company Name Drawing Type Floor Type
Drawing
Group Serial Number Revision
ENGr.SHERIF ENGr.SHERIF
AL-FUTTAIM ENGINEERING & TECHNOLOGIES LTD.
REVISIONS
REV. DATE
INGEROP
P.O. BOX 67716, POSTAL CODE 11424, KING FAHAD ROAD, RIYADH, K.S.A.
TEL: +966 (1) 282 4444; FAX:+966 (1) 282 4333; Email: ksa-info@naffco.ae
NAFFCO
SKH
S03Z
1:100
0 SUBMITTED FOR APPROVAL
U T C 3 0 2 0 0 0S 0 9 S 0 3 Z C N 1 2 R C C S H8 8 3 4 M F 0 5
LEGEND :
FIRE PUMP DETAILS
FOR TOWER SR03@UT01 and UT02
01/05/2016
01/05/2016
SHEET (1-3)
0
0
0 0
0
883-4-S09-S03Z-DC04-RMC-FC-TYP-A0-03-171.0 883-4-S09-S03Z-DC04-RMC-FC-TYP-MF-03-113.0
883-4-S09-S09Z-DC04-RMC-FC-S00-MF-05-101.0
883-4-S09-S03Z-DC04-RMC-FC-UTC-S0-04-089.0
883-4-S09-S03Z-DC04-RMC-FC-UTC-S0-04-091.0