Chapter 13




                          Progress and
                          Performance
                         Measurement
                         and Evaluation


McGraw-Hill/Irwin        © 2008 The McGraw-Hill Companies, All Rights Reserved
Project Monitoring System for Control
 Information   System Structure
   What   data are collected?
     o Current status of project (schedule and cost)
     o Remaining cost to compete project
     o Date that project will be complete
     o Potential problems to be addressed now
     o Out-of-control activities requiring intervention
     o Cost and/or schedule overruns and the reasons for
       them
     o Forecast of overruns at time of project completion

                                                            13-2
Project Progress Report Format
 Progress Since Last Report
 Current Status of Project
   Schedule
   Cost
   Scope

 CumulativeTrends
 Problems and Issues Since Last Report
   Actionsand resolution of earlier problems
   New variances and problems identified

 Corrective   Action Planned
                                                13-3
The Project Control Process
Control
      The process of comparing actual performance
       against plan to identify deviations, evaluate
       courses of action, and take appropriate corrective
       action
Project    Control Steps
  1.   Setting a baseline plan
  2.   Measuring progress and performance
  3.   Comparing plan against actual
  4.   Taking actions

                                                            13-4
Monitoring Time Performance
 ToolsUsed to Catch Negative Variances
 from Plan and Communicate Project
 Schedule Status:
   Tracking   and baseline Gantt charts
    o Show expected, actual, and trend data for event
      duration performance
   Control   charts
    o Plot the difference in scheduled time on the critical
      path with the actual point on the critical path


                                                              13-5
Baseline and Tracking Gantt Charts




                                     FIGURE 13.1


                                          13-6
Project Schedule Control Chart




                             FIGURE 13.2


                                     13-7
Disparity Among Monitoring Systems
 Time-Phase   Baseline Plan
   Corrects
           the failure of most monitoring systems to
   connect a project’s actual performance to its
   schedule and forecast budget
 Earned   Value Cost/Schedule System
   Anintegrated project management system based
   on the earned value concept that uses a time-
   phased budget baseline to compare actual and
   planned schedule and costs




                                                       13-8
Glossary of Terms
   EV
       The percent complete times its original budget. The older
        acronym for this value was BCWP—budgeted cost of the
        work performed.
   PV (Planned Value)
       The time-phased baseline of the value of the work
        scheduled. (BCWS—budgeted cost of the work
        scheduled).
   AC
       The actual cost of the work completed. (ACWP—actual
        cost of the work performed).




                                                                    13-9
Glossary of Terms
   CV
       Cost variance is the difference between the earned value and
        the actual costs for the work completed to date where CV=EV-
        AC.
   SV
       Schedule variance (SV) is the difference between the earned
        value and the baseline line to date where SV=EV-PV.
   BAC
       Budgeted cost at completion. The total budgeted cost of the
        baseline or project cost accounts.
   EACre
       Estimated costs at completion. Includes costs to-date plus
        revised estimated costs for the work remaining.
                                                                      13-10
Glossary of Terms
 ETC
     Estimate to complete.
 VAC
     Cost variance at completion (BAC-EACre), where
      EACre is derived by estimators in the field.
   Or, alternatively, cost variance at completion (BAC-
    EACf), where EACf is derived from a formula using
    actual and earned value costs.
   VAC indicates expected actual over-or underrun cost
    at completion.


                                                           13-11
Developing an Integrated
                   Cost/Schedule System
1.   Define the work using a                 3.   Develop a time-phased
     WBS.                                         budget using work packages
     a.   Scope                                   included in an activity.
     b.   Work packages
                                                  Accumulate budgets (PV).
     c.   Deliverables                       4.   At the work package level,
     d.   Organization units                      collect the actual costs for
     e.   Resources
                                                  the work performed (AC).
     f.   Budgets                            5.   Multiply percent complete
                                                  times original budget (EV).
2.   Develop work and resource
     schedules.                              6.   Compute the schedule
     a.   Schedule resources to activities        variance (EV-PV) and the
                                                  cost variance (EV-AC).
     b.   Time-phase work packages into
          a network


                                                                                 13-12
Baseline Data Relationships




                              13-13
Methods of Variance Analysis
 Cost   Variance (CV)
   Indicates
            if the work accomplished using labor
   and materials costs more or less than was
   planned at any point in the project
 Schedule     Variance (SV)
   Presents an overall assessment in dollar
   terms of the progress of all work packages in
   the project scheduled to date



                                                   13-14
Cost/Schedule Graph




                      FIGURE 13.4


                             13-15
Earned Value Review Exercise




                           FIGURE 13.5


                                  13-16
Digital Camera Prototype Project
      Baseline Gantt Chart




                                   FIGURE 13.7


                                          13-17
Digital Camera Prototype Project
           Baseline




                                   FIGURE 13.8


                                          13-18
Digital Camera Prototype Status
      Reports: Periods 1–3




                           TABLE 13.1
                                        13-19
Digital Camera Prototype Status
      Reports: Periods 4–6




                          TABLE 13.1 (CONT)
                                              13-20
Digital Camera Prototype Status
        Reports: Period 7




                          TABLE 13.1 (CONT)
                                              13-21
Digital Camera Prototype Summary
           Graph (000)




                               FIGURE 13.9


                                      13-22
Digital Camera Project Tracking Gantt Chart

   Showing Status—Through Period 7




                                      FIGURE 13.10


                                              13-23
Digital Camera
 Project Rollup at
End Period 7 (000)




                     FIGURE 13.11
                                    13-24
Indexes to Monitor Progress
 Performance    Indexes
   Cost   Performance Index (CPI)
    o Measures the cost efficiency of work accomplished to date
    o CPI = EV/AC
   Scheduling   Performance Index (SPI)
    o Measures scheduling efficiency
    o SPI = EV/PV
   Percent   Complete Indexes
    o Indicates how much of the work accomplished represents of
      the total budgeted (BAC) and actual (AC) dollars to date
    o PCIB = EV/BAC
    o PCIC = AC/EAC

                                                              13-25
Interpretation of Indexes




                            TABLE 13.3


                                         13-26
Indexes
Periods 1–7




       FIGURE 13.12


                      13-27
Additional Earned Value Rules
 RulesApplied to Short-Duration Activities
 and/or Small-Cost Activities
   0/100   percent rule
    o Assumes 100 % of budget credit is earned at once
      and only when the work is completed
   50/50   rule
    o Allows for 50% of the value of the work package
      budget to be earned when it is started and 50% to
      be earned when the package is completed


                                                          13-28
Forecasting Final Project Cost
 Methods Used to Revise Estimates of
 Future Project Costs:
   EAC
         re
    o Allows experts in the field to change original
      baseline durations and costs because new
      information tells them the original estimates are
      not accurate

   EAC
         f
    o Uses actual costs-to-date plus an efficiency index
      to project final costs in large projects where the
      original budget is unreliable
                                                           13-29
Forecasting Model: EACf
The equation for this forecasting model:




                                           13-30
To Complete Performance Index
           (TCPI)

             BAC - EV
   TCPI=     BAC – AC

   TCPI = the amount of value each
remaining     dollar in the budget must
earn to stay within       budget

                                          13-31

Más contenido relacionado

La actualidad más candente

functional and matrix organization
functional and matrix organizationfunctional and matrix organization
functional and matrix organization
Bhavana Rohidekar
 

La actualidad más candente (20)

Operations management notes
Operations management notesOperations management notes
Operations management notes
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Production planning hierarchy
Production planning hierarchyProduction planning hierarchy
Production planning hierarchy
 
Program Management
Program ManagementProgram Management
Program Management
 
Chap008
Chap008Chap008
Chap008
 
functional and matrix organization
functional and matrix organizationfunctional and matrix organization
functional and matrix organization
 
Organizational Strategy
Organizational StrategyOrganizational Strategy
Organizational Strategy
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS PROJECT CONTROL PROCESS
PROJECT CONTROL PROCESS
 
Oc 6440 competitive and collaborative strategies
Oc 6440 competitive and collaborative strategiesOc 6440 competitive and collaborative strategies
Oc 6440 competitive and collaborative strategies
 
System of compensating
System of compensatingSystem of compensating
System of compensating
 
Effective project management skills
Effective project management skillsEffective project management skills
Effective project management skills
 
Project integration management
Project integration managementProject integration management
Project integration management
 
Project portfolio management
Project portfolio managementProject portfolio management
Project portfolio management
 
Master production schedule
Master production scheduleMaster production schedule
Master production schedule
 
Project management
Project managementProject management
Project management
 
Organising
OrganisingOrganising
Organising
 
Project Management Steps And Process PowerPoint Presentation Slides
Project Management Steps And Process PowerPoint Presentation Slides Project Management Steps And Process PowerPoint Presentation Slides
Project Management Steps And Process PowerPoint Presentation Slides
 
Facility Layout
Facility LayoutFacility Layout
Facility Layout
 
UNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULINGUNIT 4 - PRODUCTION SCHEDULING
UNIT 4 - PRODUCTION SCHEDULING
 

Similar a Chap013 4er1

160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-control
eidalin95
 
GL3eChap13-new.pptqpotieuwbsjsjsushshshdhd
GL3eChap13-new.pptqpotieuwbsjsjsushshshdhdGL3eChap13-new.pptqpotieuwbsjsjsushshshdhd
GL3eChap13-new.pptqpotieuwbsjsjsushshshdhd
nithinnick66
 
Sorge.les
Sorge.lesSorge.les
Sorge.les
NASAPMC
 
Chapter ThirteenProgress and Performance Measurement and Evalu
Chapter ThirteenProgress and Performance Measurement and EvaluChapter ThirteenProgress and Performance Measurement and Evalu
Chapter ThirteenProgress and Performance Measurement and Evalu
JinElias52
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeff
NASAPMC
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
Serdar Temiz
 
2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1
reddvise
 

Similar a Chap013 4er1 (20)

Group 12 - Progress and Performance Measurement and Evaluation.pdf
Group 12 - Progress and Performance Measurement and Evaluation.pdfGroup 12 - Progress and Performance Measurement and Evaluation.pdf
Group 12 - Progress and Performance Measurement and Evaluation.pdf
 
Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015
 
Performing against the wall - SPI after completion
Performing against the wall - SPI after completionPerforming against the wall - SPI after completion
Performing against the wall - SPI after completion
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-control
 
GL3eChap13-new.pptqpotieuwbsjsjsushshshdhd
GL3eChap13-new.pptqpotieuwbsjsjsushshshdhdGL3eChap13-new.pptqpotieuwbsjsjsushshshdhd
GL3eChap13-new.pptqpotieuwbsjsjsushshshdhd
 
The Project Management Process - Week 9 Performance Management
The Project Management Process - Week 9   Performance ManagementThe Project Management Process - Week 9   Performance Management
The Project Management Process - Week 9 Performance Management
 
Sorge.les
Sorge.lesSorge.les
Sorge.les
 
Earned Value Analysis in Project Management — an Easy Cheat Sheet 🡆 http://b...
Earned Value Analysis in Project Management — an Easy Cheat Sheet  🡆 http://b...Earned Value Analysis in Project Management — an Easy Cheat Sheet  🡆 http://b...
Earned Value Analysis in Project Management — an Easy Cheat Sheet 🡆 http://b...
 
Program Management 2.0: Work Breakdown Structure
Program Management 2.0: Work Breakdown StructureProgram Management 2.0: Work Breakdown Structure
Program Management 2.0: Work Breakdown Structure
 
Chapter ThirteenProgress and Performance Measurement and Evalu
Chapter ThirteenProgress and Performance Measurement and EvaluChapter ThirteenProgress and Performance Measurement and Evalu
Chapter ThirteenProgress and Performance Measurement and Evalu
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
Vanessa.jeff
Vanessa.jeffVanessa.jeff
Vanessa.jeff
 
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation
Earned Value Probabilistic Forecasting Using Monte Carlo SimulationEarned Value Probabilistic Forecasting Using Monte Carlo Simulation
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Earned Value Management
Earned Value ManagementEarned Value Management
Earned Value Management
 
Ch 9 project monitoring & control updated
Ch 9 project monitoring & control updatedCh 9 project monitoring & control updated
Ch 9 project monitoring & control updated
 
2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1
 
Software Project Management Spm1176
Software Project Management Spm1176Software Project Management Spm1176
Software Project Management Spm1176
 
Schulte
SchulteSchulte
Schulte
 
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
Polynomial Function and Fuzzy Inference for Evaluating the Project Performanc...
 

Último

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 

Último (20)

Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 

Chap013 4er1

  • 1. Chapter 13 Progress and Performance Measurement and Evaluation McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, All Rights Reserved
  • 2. Project Monitoring System for Control  Information System Structure  What data are collected? o Current status of project (schedule and cost) o Remaining cost to compete project o Date that project will be complete o Potential problems to be addressed now o Out-of-control activities requiring intervention o Cost and/or schedule overruns and the reasons for them o Forecast of overruns at time of project completion 13-2
  • 3. Project Progress Report Format  Progress Since Last Report  Current Status of Project  Schedule  Cost  Scope  CumulativeTrends  Problems and Issues Since Last Report  Actionsand resolution of earlier problems  New variances and problems identified  Corrective Action Planned 13-3
  • 4. The Project Control Process Control  The process of comparing actual performance against plan to identify deviations, evaluate courses of action, and take appropriate corrective action Project Control Steps 1. Setting a baseline plan 2. Measuring progress and performance 3. Comparing plan against actual 4. Taking actions 13-4
  • 5. Monitoring Time Performance  ToolsUsed to Catch Negative Variances from Plan and Communicate Project Schedule Status:  Tracking and baseline Gantt charts o Show expected, actual, and trend data for event duration performance  Control charts o Plot the difference in scheduled time on the critical path with the actual point on the critical path 13-5
  • 6. Baseline and Tracking Gantt Charts FIGURE 13.1 13-6
  • 7. Project Schedule Control Chart FIGURE 13.2 13-7
  • 8. Disparity Among Monitoring Systems  Time-Phase Baseline Plan  Corrects the failure of most monitoring systems to connect a project’s actual performance to its schedule and forecast budget  Earned Value Cost/Schedule System  Anintegrated project management system based on the earned value concept that uses a time- phased budget baseline to compare actual and planned schedule and costs 13-8
  • 9. Glossary of Terms  EV  The percent complete times its original budget. The older acronym for this value was BCWP—budgeted cost of the work performed.  PV (Planned Value)  The time-phased baseline of the value of the work scheduled. (BCWS—budgeted cost of the work scheduled).  AC  The actual cost of the work completed. (ACWP—actual cost of the work performed). 13-9
  • 10. Glossary of Terms  CV  Cost variance is the difference between the earned value and the actual costs for the work completed to date where CV=EV- AC.  SV  Schedule variance (SV) is the difference between the earned value and the baseline line to date where SV=EV-PV.  BAC  Budgeted cost at completion. The total budgeted cost of the baseline or project cost accounts.  EACre  Estimated costs at completion. Includes costs to-date plus revised estimated costs for the work remaining. 13-10
  • 11. Glossary of Terms  ETC  Estimate to complete.  VAC  Cost variance at completion (BAC-EACre), where EACre is derived by estimators in the field.  Or, alternatively, cost variance at completion (BAC- EACf), where EACf is derived from a formula using actual and earned value costs.  VAC indicates expected actual over-or underrun cost at completion. 13-11
  • 12. Developing an Integrated Cost/Schedule System 1. Define the work using a 3. Develop a time-phased WBS. budget using work packages a. Scope included in an activity. b. Work packages Accumulate budgets (PV). c. Deliverables 4. At the work package level, d. Organization units collect the actual costs for e. Resources the work performed (AC). f. Budgets 5. Multiply percent complete times original budget (EV). 2. Develop work and resource schedules. 6. Compute the schedule a. Schedule resources to activities variance (EV-PV) and the cost variance (EV-AC). b. Time-phase work packages into a network 13-12
  • 14. Methods of Variance Analysis  Cost Variance (CV)  Indicates if the work accomplished using labor and materials costs more or less than was planned at any point in the project  Schedule Variance (SV)  Presents an overall assessment in dollar terms of the progress of all work packages in the project scheduled to date 13-14
  • 15. Cost/Schedule Graph FIGURE 13.4 13-15
  • 16. Earned Value Review Exercise FIGURE 13.5 13-16
  • 17. Digital Camera Prototype Project Baseline Gantt Chart FIGURE 13.7 13-17
  • 18. Digital Camera Prototype Project Baseline FIGURE 13.8 13-18
  • 19. Digital Camera Prototype Status Reports: Periods 1–3 TABLE 13.1 13-19
  • 20. Digital Camera Prototype Status Reports: Periods 4–6 TABLE 13.1 (CONT) 13-20
  • 21. Digital Camera Prototype Status Reports: Period 7 TABLE 13.1 (CONT) 13-21
  • 22. Digital Camera Prototype Summary Graph (000) FIGURE 13.9 13-22
  • 23. Digital Camera Project Tracking Gantt Chart Showing Status—Through Period 7 FIGURE 13.10 13-23
  • 24. Digital Camera Project Rollup at End Period 7 (000) FIGURE 13.11 13-24
  • 25. Indexes to Monitor Progress  Performance Indexes  Cost Performance Index (CPI) o Measures the cost efficiency of work accomplished to date o CPI = EV/AC  Scheduling Performance Index (SPI) o Measures scheduling efficiency o SPI = EV/PV  Percent Complete Indexes o Indicates how much of the work accomplished represents of the total budgeted (BAC) and actual (AC) dollars to date o PCIB = EV/BAC o PCIC = AC/EAC 13-25
  • 26. Interpretation of Indexes TABLE 13.3 13-26
  • 27. Indexes Periods 1–7 FIGURE 13.12 13-27
  • 28. Additional Earned Value Rules  RulesApplied to Short-Duration Activities and/or Small-Cost Activities  0/100 percent rule o Assumes 100 % of budget credit is earned at once and only when the work is completed  50/50 rule o Allows for 50% of the value of the work package budget to be earned when it is started and 50% to be earned when the package is completed 13-28
  • 29. Forecasting Final Project Cost  Methods Used to Revise Estimates of Future Project Costs:  EAC re o Allows experts in the field to change original baseline durations and costs because new information tells them the original estimates are not accurate  EAC f o Uses actual costs-to-date plus an efficiency index to project final costs in large projects where the original budget is unreliable 13-29
  • 30. Forecasting Model: EACf The equation for this forecasting model: 13-30
  • 31. To Complete Performance Index (TCPI) BAC - EV TCPI= BAC – AC TCPI = the amount of value each remaining dollar in the budget must earn to stay within budget 13-31