  1. 1. 1. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given below. Assume a Lossless system and equal line parameters and lengths. G1 G2 G3 Cost = $8/MWh 12 $/MWh 120 MW Pmax = 150 MW Pmax = 150 MW Pmax = 150 MW Line Capacity = 150 MW 150 MW PLoad = 200 MW A B C Cost = $10/MWh Cost = $12/MWh
  2. 2. 2. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given below. Assume a Lossless system and equal line parameters and lengths. G1 G2 G3 Cost = $8/MWh 12 $/MWh 120 MW Pmax = 200 MW Pmax = 200 MW Pmax = 200 MW Line Capacity = 150 MW 150 MW PLoad = 200 MW A B C Cost = $10/MWh Cost = $12/MWh
  3. 3. G1 G2 G3 Cost = $8/MWh 12 $/MWh 120 MW Pmax = 150 MW Pmax = 150 MW Pmax = 150 MW Line Capacity = 150 MW 150 MW PLoad = 200 MW A B C Cost = $10/MWh Cost = $12/MWh 3. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given below. Assume 5% Loss on each Transmission line and assume equal line parameters and lengths. Comment on the LMP change due to loss inclusion
  4. 4. 4. Put together a brief presentation (4-5 slides) for following topics. • “Technical Challenges posed by Wind and Solar Integration in System Operation and Planning”. What are major steps ERCOT is considering for growing RE penetration? • What is role of a capacity market? How does it help with the RE integration?

×