1. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given
below. Assume a Lossless system and equal line parameters and lengths.
G1 G2
G3
Cost = $8/MWh
12 $/MWh
120 MW
Pmax = 150 MW Pmax = 150 MW
Pmax = 150 MW
Line Capacity = 150 MW
150 MW
PLoad = 200 MW
A B
C
Cost = $10/MWh
Cost = $12/MWh
2. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given
below. Assume a Lossless system and equal line parameters and lengths.
G1 G2
G3
Cost = $8/MWh
12 $/MWh
120 MW
Pmax = 200 MW Pmax = 200 MW
Pmax = 200 MW
Line Capacity = 150 MW
150 MW
PLoad = 200 MW
A B
C
Cost = $10/MWh
Cost = $12/MWh
G1 G2
G3
Cost = $8/MWh
12 $/MWh
120 MW
Pmax = 150 MW Pmax = 150 MW
Pmax = 150 MW
Line Capacity = 150 MW
150 MW
PLoad = 200 MW
A B
C
Cost = $10/MWh
Cost = $12/MWh
3. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given
below. Assume 5% Loss on each Transmission line and assume equal line parameters and lengths. Comment on the LMP change due to
loss inclusion
4. Put together a brief presentation (4-5 slides) for following topics.
• “Technical Challenges posed by Wind and Solar Integration in System Operation and Planning”. What are major steps ERCOT is
considering for growing RE penetration?
• What is role of a capacity market? How does it help with the RE integration?

Más contenido relacionado

Similar a Case Studies PPT.pptx

Sutherland.Malad Audit Results Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results Electrical.V1.24 Jan 08
pavang
 
Cable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - ExampleCable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - Example
Leonardo ENERGY
 
Alternating Current Machines-Synchronous Machines
Alternating Current Machines-Synchronous MachinesAlternating Current Machines-Synchronous Machines
Alternating Current Machines-Synchronous Machines
Talia Carbis
 
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hiyoy18481
 
Economical stepper motor
Economical stepper motorEconomical stepper motor
Economical stepper motor
Hari Prasath
 

Similar a Case Studies PPT.pptx (20)

Different type s of power converters fed relutance
Different type s of power converters fed relutanceDifferent type s of power converters fed relutance
Different type s of power converters fed relutance
 
Sutherland.Malad Audit Results Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08Sutherland.Malad Audit Results    Electrical.V1.24 Jan 08
Sutherland.Malad Audit Results Electrical.V1.24 Jan 08
 
J DJ
J DJJ DJ
J DJ
 
Cable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - ExampleCable sizing to withstand short-circuit current - Example
Cable sizing to withstand short-circuit current - Example
 
Product: UPS: UniStar VP
Product: UPS: UniStar VPProduct: UPS: UniStar VP
Product: UPS: UniStar VP
 
Alternating Current Machines-Synchronous Machines
Alternating Current Machines-Synchronous MachinesAlternating Current Machines-Synchronous Machines
Alternating Current Machines-Synchronous Machines
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etap
 
ETAP - Transformer sizing using etap
ETAP - Transformer sizing using etapETAP - Transformer sizing using etap
ETAP - Transformer sizing using etap
 
Ece 523 project – fully differential two stage telescopic op amp
Ece 523 project – fully differential two stage telescopic op ampEce 523 project – fully differential two stage telescopic op amp
Ece 523 project – fully differential two stage telescopic op amp
 
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptxhgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
hgghjghghggh gvgh bhbh hbhbh hh hhhhh hh dd gg vv Lighting.pptx
 
Symmetrical Fault Analysis
Symmetrical Fault AnalysisSymmetrical Fault Analysis
Symmetrical Fault Analysis
 
Northern western raiways ppt
Northern western raiways pptNorthern western raiways ppt
Northern western raiways ppt
 
A Modified C-Dump Converter for BLDC Machine Used in a Flywheel Energy Storag...
A Modified C-Dump Converter for BLDC Machine Used in a Flywheel Energy Storag...A Modified C-Dump Converter for BLDC Machine Used in a Flywheel Energy Storag...
A Modified C-Dump Converter for BLDC Machine Used in a Flywheel Energy Storag...
 
SMC LET Primary Injection Test Sets
SMC LET Primary Injection Test SetsSMC LET Primary Injection Test Sets
SMC LET Primary Injection Test Sets
 
Lab manual
Lab manualLab manual
Lab manual
 
Economical stepper motor
Economical stepper motorEconomical stepper motor
Economical stepper motor
 
Kd3418211827
Kd3418211827Kd3418211827
Kd3418211827
 
BEEM UII.pptx
BEEM UII.pptxBEEM UII.pptx
BEEM UII.pptx
 
Simple Model of Transformer using LTspice
Simple Model of Transformer using LTspiceSimple Model of Transformer using LTspice
Simple Model of Transformer using LTspice
 
Power-System-Slide-1.pptx
Power-System-Slide-1.pptxPower-System-Slide-1.pptx
Power-System-Slide-1.pptx
 

Último

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Último (20)

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 

Case Studies PPT.pptx

  • 1. 1. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given below. Assume a Lossless system and equal line parameters and lengths. G1 G2 G3 Cost = $8/MWh 12 $/MWh 120 MW Pmax = 150 MW Pmax = 150 MW Pmax = 150 MW Line Capacity = 150 MW 150 MW PLoad = 200 MW A B C Cost = $10/MWh Cost = $12/MWh
  • 2. 2. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given below. Assume a Lossless system and equal line parameters and lengths. G1 G2 G3 Cost = $8/MWh 12 $/MWh 120 MW Pmax = 200 MW Pmax = 200 MW Pmax = 200 MW Line Capacity = 150 MW 150 MW PLoad = 200 MW A B C Cost = $10/MWh Cost = $12/MWh
  • 3. G1 G2 G3 Cost = $8/MWh 12 $/MWh 120 MW Pmax = 150 MW Pmax = 150 MW Pmax = 150 MW Line Capacity = 150 MW 150 MW PLoad = 200 MW A B C Cost = $10/MWh Cost = $12/MWh 3. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given below. Assume 5% Loss on each Transmission line and assume equal line parameters and lengths. Comment on the LMP change due to loss inclusion
  • 4. 4. Put together a brief presentation (4-5 slides) for following topics. • “Technical Challenges posed by Wind and Solar Integration in System Operation and Planning”. What are major steps ERCOT is considering for growing RE penetration? • What is role of a capacity market? How does it help with the RE integration?