Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Case Studies PPT.pptx
1. 1. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given
below. Assume a Lossless system and equal line parameters and lengths.
G1 G2
G3
Cost = $8/MWh
12 $/MWh
120 MW
Pmax = 150 MW Pmax = 150 MW
Pmax = 150 MW
Line Capacity = 150 MW
150 MW
PLoad = 200 MW
A B
C
Cost = $10/MWh
Cost = $12/MWh
2. 2. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given
below. Assume a Lossless system and equal line parameters and lengths.
G1 G2
G3
Cost = $8/MWh
12 $/MWh
120 MW
Pmax = 200 MW Pmax = 200 MW
Pmax = 200 MW
Line Capacity = 150 MW
150 MW
PLoad = 200 MW
A B
C
Cost = $10/MWh
Cost = $12/MWh
3. G1 G2
G3
Cost = $8/MWh
12 $/MWh
120 MW
Pmax = 150 MW Pmax = 150 MW
Pmax = 150 MW
Line Capacity = 150 MW
150 MW
PLoad = 200 MW
A B
C
Cost = $10/MWh
Cost = $12/MWh
3. Find the LMP (and its individual component) at all buses and calculate generation/dispatch of each generator in the illustration given
below. Assume 5% Loss on each Transmission line and assume equal line parameters and lengths. Comment on the LMP change due to
loss inclusion
4. 4. Put together a brief presentation (4-5 slides) for following topics.
• “Technical Challenges posed by Wind and Solar Integration in System Operation and Planning”. What are major steps ERCOT is
considering for growing RE penetration?
• What is role of a capacity market? How does it help with the RE integration?