Influencing policy (training slides from Fast Track Impact)
New Processes Drive OpenBIM Collaboration
1. New Processes and Interoperability
Andrew Bellerby, Managing Director, Tekla UK
OpenBIM Learning Xchange/ 15th May 2012 / Andrew Bellerby
2. Tekla BIM software
Accurate and data-rich 3D environment
Highly detailed as-built building information
models providing constructible data.
Specialized solutions and configurations for:
– Main contractors
– Structural engineers
– Steel detailers and fabricators
– Precast and cast in-situ concrete
detailers and manufacturers
New FREE application for model-based
project collaboration and communication
between all project disciplines
7. Comprehensive BIM solution
SALES MODELS, TENDER CONSTRUCTION DETAILING &
VISUALIZATIONS QUANTITIES SIMULATION DRAWINGS
REPORTS & BENDING
SCHEDULES
INSTALLATION - DELIVERY
COORDINATION
PRODUCTION
INTEGRATION
SUBCONTRACTOR SITE AND DELIVERY CHANGE
A&D MODELS
COORDINATION SCHEDULING MANAGEMENT
8.
9. Trimble Corporate Overview
Founded in 1978
Market Focus
– Construction & Surveying
– Agriculture, Mapping & GIS
– Mobile Workers
Leader in positioning, alignment and control
technologies
– GPS positioning technology
– Robotic optical total stations
– Task focused field software
– 3D machine control
Annual Revenue >$1.5B
Number of Employees ~5300 in 26 countries
Track record of consistent financial performance
Publicly traded on Nasdaq (TRMB)
12. Design BIM vs Construction BIM
OpenBIM Learning Xchange / 15th May 2012 / Andrew Bellerby
13. Integrating design with construction
Building the Model Building with Models
OWNER Planning
ARCHITECT Architectural Design
ENG. CONSULTANT Engineering
GENERAL Construction
CONTRACTOR
Bidding Construction Construction
Planning Execution
SUBCONTRACTOR
Detailing Sub-
DETAILER contracting
END-USER Operation
Design Construction
16. New Processes & Interoperability
OpenBIM Learning Xchange / 15th May 2012 / Andrew Bellerby
17. From drawing based process COST ESTIMATION
PROJECT MGMT
The building = PROCUREMENT
drawings
DESIGN & DETAILING
QUANTITY MGMT
Inconsistent,
ambigous, only
human readable
SUBCONTRACTOR
information
COORDINATION
RESOURCE PLANNNING
CHANGE MGMT
SITE EXECUTION
12.04.2011
17
18. to BIM process COST ESTIMATION
PROJECT MGMT
PROCUREMENT
DESIGN & DETAILING
QUANTITY MGMT
SUBCONTRACTOR
COORDINATION
RESOURCE PLANNNING
CHANGE MGMT
SITE EXECUTION
12.04.2011
18
20. OpenBIM Concept
Native data
(Master)
Native data IFC BIM software
(Master) Read only
IFC
BIM software Read only
The ”Cloud”
IFC Basic assumptions:
Read only • Master data in applications (native proprietary
format)
• Applications publish a part of their data as IFC
• Only the application that has created and owns data
Native data can change it (No roundtrip)
(Master) DRUM - Distributed information • IFC model is a collection (combination) of discipline
specific models that coexist throughout the project
BIM software management
BuildingSMART International Conference 2011
Integrated Construction for Sustainable Build
21. OpenBIM Concept
Native data
(Master)
BIM Viewer Native data
(Master)
Native data
(Master)
Planning and scheduling
Estimation
The ”Cloud”
Native data Native data
(Master) (Master)
Document Management BIM Modeller(s)
Native data
(Master)
Progress Control
22. ”Cloud” functionality
• Transaction based communication
– Subscribing to published IFC datasets with incremental updates
• Any client can subscribe to any data published by another application,
current situation transferred initially and then changes only, as they are
published
– Workflow type of action transactions with (semi)automatic routing
• Eg MEP engineer needs penetrations through structures and requests
these from architect and/or structural engineer.
• Managing and publishing metadata of and from participating
models
• Creating, Managing and publishing relationships between objects
in the participating models
DRUM - Distributed information management
BuildingSMART International Conference 2011
Integrated Construction for Sustainable Build
23. BIM process Example – Penetration Request
Mechanical designer and
structural designer can
see their local and all
foreign models
– MEP local + Structural IFC
– Structural local + MEP IFC
Penetration request
– MEP designer creates
request = reservation object
+ status information
– Structural designer approves
request and creates
penetration with reservation
object
– MEP designer adds a
pipeline
– Modifies the penetration
request
– Structural designer
recognizes the changed
request, adjusts the
penetration to suit and
approves the request
24. Contractor Owner
Fabricator
Architect
Structural Engineer Detailer
MEP detailer
MEP designer
Best in
class
12.04.2011
Open BIM Partnering
24
32. DPR Construction - Formwork
$25K Savings from Panel
Arrangement Analysis
Vertical Horizontal
5/18/2012
32
33. DPR Construction - Formwork
Formwork Layout Drawings and
Bills of Material
5/18/2012
33
34. Crusellin Bridge – BIM Partners
City of Helsinki – Owner
Skanska Infra – Contractor
WSP - Structural engineer
Ruukki - Subcontractor,
Steel structures
Celsa - Subcontractor,
Rebars
5/18/2012
34
35. WSP - Crusellin Bridge, Helsinki, Finland
Reinforcements
and coastal
structures
modelled
Design drawings
produced from
Tekla Model
5/18/2012
Amy Farrell, Technical Consultant
35