Reliability and Maintenance Engineering
                Lecture 8
   Introduction
   Job Planning
   Steps of Job Planning
   Job Manual
   Steps in preparing Job Manual
   Uses of Job Manual
   Short Term Planning
   Long Term Planning
   References
Effective planning and scheduling
  contribute significantly to the following:
 Reduced maintenance cost.
 Improved utilization of maintenance workforce

  by reducing delays and interruptions.
 Improved quality of maintenance work by

  adopting best methods and procedures and
  assigning the most qualified worker for the jobs.
   Planning of maintenance jobs basically deals with
    answering two questions, “what ” and “How” of the job;
    i.e., “what jobs/activities are to be done” and “how those
    jobs and activities are to be done.

   The job planning forms the basic foundation, over which
    the efficiency and cost of further actions (e.g.
    scheduling, execution and control etc) will be decided.

   Person responsible for job planning should have
    adequate qualities/capabilities, such as knowledge about
    jobs and available techniques facilities and resources.
   Knowledge Base: It includes knowledge about
    equipment, job, available techniques, material and
    facilities etc.

   Job Investigation at Site: It gives a clear perception of
    the total job and also helps in ascertaining the physical
    access and space limitation.
         Lifting & handling facilities
         Disposal of oil/gases/hazardous material facility
         Safety enclosures for m/c under repair


   Identify and document the work: knowing earlier two
    steps and knowing the needs of preventive, predictive and
    other maintenance jobs, a complete job/work list is made.
4. Development of Repair Plan: Preparation of step-step
  procedures which would accomplish the work with the
  most economical use of time, manpower and material.
  (see fig(a)).

5. Preparation of Tools, Tackles & Facilities Lists:
     Job Plan sheet


6.Estimation of Time Required to do the Job: For
  smaller jobs, it is easier, but for bigger jobs it may need
  knowledge       of    “Work       simplification”,   “Work
  measurement” and Critical Path analysis.
Planning sheet for Changing V belt of Blower-X

Equipment Name: Blower                W.O Number            Planner         Date      Seq
X                                     ----                  Mr, ---         -----     -----
Equipment Code----

Job Title- Change V belt (Cracked & worm)
Job scope                                      Material, Tools & Equipments

Job Steps                       Cre
                                w
                                       Est.
                                       hours
                                               Description                   Qty     Stock as
                                                                                     on
                                                                                                Co
                                                                                                st



1.  Look out, disconnect &             0.25
    Tag Motor starter,
2. Remove belt guard, loosen
    & jack motor, remove               0.75    Sheave guage(tool kit)
    bolts
3. Check both sheaves for                      Mag. base dial Indicator      1set    4, SH-1
    side wall wear & radial            1.0     •Big sheave (Part No.)        1 set   4 ,SH-1
    run-out (should not be                     •Bushing (Part No.)           1 set   3, SH-1
    more the +1mm for big &                    •Small Sheave(Part No.)       1 set   3, SH-1
    +0.25 for small end),                      •Bushing (Part No.)
    Replace Worn-out sheaves
    if needed
Drawing No:-                 Total time:-                    Total cost:-
Open repair file

          ok                                        Check
                       planning                     spares
    waiting time                                    &matl


                    Postpon
                    e repair
     no
Discuss with
    Plant
  Engineer
maintenance
                               no
   I/c and
 others for                 Finalization of
 alternative                  repair plan

                   Print Repair plans/work-orders
   Job manuals includes methodologies, tools
    tackles and facilities for all maintenance jobs
    which may have to be done in future.

   This also involves saving the different plans and
    modifying and expanding those plans for other
    similar machines.
1.   Make a list of all major and medium jobs of the plant
     and codify for proper identification,

3.   For each coded job, a separate job manual is to be
     made in the form of job plan, indicating job steps,
     tools, tackles, spares, consumables and facilities
     needed and also indicating safety and statutory
     clearance.

5.   Each job manual, thus prepared, should and cross
     checked and cleared by maintenance in-charge.
4. Different job manuals should be bunched and sent
  to respective potential users.

5. Necessary updating of job manuals, as needed, in
  consultation with respective users.
   For actual planning and scheduling of any job, the
    job manuals provide ready information for use as it
    is or for further micro-planning.

   The executing agencies refer to the job manual
    before starting the job, to avoid frequent visits to
    stores and thus save time.

   Material department may also use job manual for
    better material procurement strategy.
   Short term plans are generally short term schedule and
    its duration may be hours, day weeks or months and it
    is tactical(particular goal) planning.

   It covers 10% to 15% of the schedule of total job.

   These jobs are normally derived from master schedule
    of total job and carried out on day-to-day basis or at
    shorter notice.
1.   Lubrication plans and schedules,
2.   Small defect rectification
3.   Vibrating monitoring of few critical equipments,
4.   Lubricant monitoring, thermography and other
     monitoring as per need,
5.   Small predictive maintenance and preventive
     maintenance jobs etc.,
6.   Occasionally, small shutdowns, for some urgent
     repairs, may also be included in short term planning.
   Long term plans are generally for future purpose
    and the duration may be months or years.

   It includes the jobs/actions which are helpful in
    maintaining original level of performance in
    terms of output, efficiency and reliability.

   These jobs call for more resources, coordination
    with many agencies and planning much in
    advance.
   Major Repairs: It includes jobs required to restore
    a seriously deteriorated or broken-down equipment
    . The frequency of such repair is normally once or
    twice a year.

   Capital Repairs: It includes major dismantling
    and nearly rebuilding of the equipment /plant,
    needing lot of resources. Frequency of such
    repairs is once in two years or even later.
   Annual overhauls :- These apparently appears like
    major repairs/overhauls and may include job of
    similar nature but it is generally taken on yearly basis
    and mainly taken for following reasons –

1. Annual maintenance cleaning, painting and corrosion
  prevention of equipments, machines, tanks,
  reservoirs, filters and heat exchangers etc.,
2. Annual operational cleaning and painting jobs, like
  removal of mill-scales, dust & debris, cobbles and
  crop- pieces and reconditioning of deflectors,
  diverters etc.,
   Renovation & Revamping: After the equipment has
    deteriorated to such an extent that the amount of major/
    capital repairs, PM,PdM and other maintenance repairs
    do not yield desired result and maintenance becomes
    uneconomical.

   These includes almost total rebuilding of the
    equipment, using either similar type of technology with
    some redesign or improved technology and equipment.

   Up-gradation of equipment availability and reliability
    are definitely the aim for such plans.
   Modernization: It is planned when the
    operation and profitability of the plant or
    section uneconomical and no
    improvement can be made.
   Five year Rolling Plan(3 to 10)
   Turn around Planning(for total
    maintenance jobs)
   Corporate Maintenance Plans(like 5-yr
    or 10-yr rolling plan)
   Sushil Kumar Srivastava, Industrial maintenance
    management, s.chand & co.
   www.maintenanceworld.com/articles/rushton/effective
   www.bin95.com
A presentation on job planning job manuals,

Más contenido relacionado

La actualidad más candente

Motion and time study
Motion and time studyMotion and time study
Motion and time studyNiket Kawale
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And SchedulingRicky Smith CMRP, CMRT
 
Safety officer performance appraisal
Safety officer performance appraisalSafety officer performance appraisal
Safety officer performance appraisalmartinezrosie780
 
Health and safety powerpoint complete (1)
Health and safety powerpoint complete (1)Health and safety powerpoint complete (1)
Health and safety powerpoint complete (1)brownjamesa
 
Health & safety officer performance appraisal
Health & safety officer performance appraisalHealth & safety officer performance appraisal
Health & safety officer performance appraisalsandersjamie999
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowancePratibha Khemchandani
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessmentSimba Zhao
 
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...PECB
 

La actualidad más candente (20)

Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
OHS Accidents
OHS AccidentsOHS Accidents
OHS Accidents
 
8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling8 Steps To Success In Maintenance Planning And Scheduling
8 Steps To Success In Maintenance Planning And Scheduling
 
Kaizen
KaizenKaizen
Kaizen
 
Safety officer performance appraisal
Safety officer performance appraisalSafety officer performance appraisal
Safety officer performance appraisal
 
HIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdfHIRARC FORM (skylift).pdf
HIRARC FORM (skylift).pdf
 
Safety in manufacturing
Safety in manufacturingSafety in manufacturing
Safety in manufacturing
 
Introduction to maintenance
Introduction to maintenanceIntroduction to maintenance
Introduction to maintenance
 
Machine Safety
Machine Safety Machine Safety
Machine Safety
 
Tpm
TpmTpm
Tpm
 
Safety management
Safety managementSafety management
Safety management
 
Time study
Time studyTime study
Time study
 
behavior based safety
behavior based safetybehavior based safety
behavior based safety
 
The SMED Method by CLT Services
The SMED Method by CLT ServicesThe SMED Method by CLT Services
The SMED Method by CLT Services
 
Health and safety powerpoint complete (1)
Health and safety powerpoint complete (1)Health and safety powerpoint complete (1)
Health and safety powerpoint complete (1)
 
Health & safety officer performance appraisal
Health & safety officer performance appraisalHealth & safety officer performance appraisal
Health & safety officer performance appraisal
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
Overhead crane risk assessment
Overhead crane risk assessmentOverhead crane risk assessment
Overhead crane risk assessment
 
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
PECB Webinar: Occupational Hazard Identification Risk Assessment and Risk Con...
 
Tpm (group 8)
Tpm (group 8)Tpm (group 8)
Tpm (group 8)
 

Destacado

Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocationJatin Mandhyan
 
Jobs in-English-
Jobs in-English-Jobs in-English-
Jobs in-English-awat850
 
Veterinarian powerpoint
Veterinarian powerpointVeterinarian powerpoint
Veterinarian powerpointpiperhopple
 
Veterinary slideshow (presentation of career)
Veterinary slideshow (presentation of career)Veterinary slideshow (presentation of career)
Veterinary slideshow (presentation of career)RachelSchott12
 
Human resource planning ppt.
Human resource planning ppt.Human resource planning ppt.
Human resource planning ppt.Bibin Ssb
 

Destacado (8)

Planning, scheduling and resource allocation
Planning, scheduling and resource allocationPlanning, scheduling and resource allocation
Planning, scheduling and resource allocation
 
Jobs in-English-
Jobs in-English-Jobs in-English-
Jobs in-English-
 
job scheduling
job schedulingjob scheduling
job scheduling
 
Veterinarian powerpoint
Veterinarian powerpointVeterinarian powerpoint
Veterinarian powerpoint
 
Veterinary slideshow (presentation of career)
Veterinary slideshow (presentation of career)Veterinary slideshow (presentation of career)
Veterinary slideshow (presentation of career)
 
Life@SlideShare
Life@SlideShareLife@SlideShare
Life@SlideShare
 
Resource allocation
Resource allocationResource allocation
Resource allocation
 
Human resource planning ppt.
Human resource planning ppt.Human resource planning ppt.
Human resource planning ppt.
 

Similar a A presentation on job planning job manuals,

Module_2_Industrial_Maintenance_Manageme.pptx
Module_2_Industrial_Maintenance_Manageme.pptxModule_2_Industrial_Maintenance_Manageme.pptx
Module_2_Industrial_Maintenance_Manageme.pptxAnaAna856803
 
OR&A - Bridging the gap
OR&A - Bridging the gapOR&A - Bridging the gap
OR&A - Bridging the gapuak10
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxARIV4
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineeringSyed Jafri
 
IRJET- Production Plan and Control
IRJET- Production Plan and ControlIRJET- Production Plan and Control
IRJET- Production Plan and ControlIRJET Journal
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingeSAT Publishing House
 
PRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMP
PRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMPPRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMP
PRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMPmeijjournal
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
Chap 8 Organization of Maintenance Resources.ppt
Chap 8 Organization of Maintenance Resources.pptChap 8 Organization of Maintenance Resources.ppt
Chap 8 Organization of Maintenance Resources.pptAbeyuAssefa
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materialspikuoec
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...IRJET Journal
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityJoanRachelCalansingi
 

Similar a A presentation on job planning job manuals, (20)

Industrial Machines Maintenance
Industrial Machines MaintenanceIndustrial Machines Maintenance
Industrial Machines Maintenance
 
Module_2_Industrial_Maintenance_Manageme.pptx
Module_2_Industrial_Maintenance_Manageme.pptxModule_2_Industrial_Maintenance_Manageme.pptx
Module_2_Industrial_Maintenance_Manageme.pptx
 
OR&A - Bridging the gap
OR&A - Bridging the gapOR&A - Bridging the gap
OR&A - Bridging the gap
 
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docxMFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
MFG 240 - Manufacturing DesignFinal ProjectScope of Project.docx
 
Guidelines industrial engineering
Guidelines industrial engineeringGuidelines industrial engineering
Guidelines industrial engineering
 
IRJET- Production Plan and Control
IRJET- Production Plan and ControlIRJET- Production Plan and Control
IRJET- Production Plan and Control
 
Reducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casingReducing manufacturing lead time of steam turbine casing
Reducing manufacturing lead time of steam turbine casing
 
PRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMP
PRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMPPRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMP
PRODUCTION PROCESS ANALYSIS ON MANUFACTURING OF HYDRAULIC GEAR PUMP
 
PEPD MODULE 1.pdf
PEPD MODULE 1.pdfPEPD MODULE 1.pdf
PEPD MODULE 1.pdf
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Chap 8 Organization of Maintenance Resources.ppt
Chap 8 Organization of Maintenance Resources.pptChap 8 Organization of Maintenance Resources.ppt
Chap 8 Organization of Maintenance Resources.ppt
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
Production And Operation Materials
Production And Operation MaterialsProduction And Operation Materials
Production And Operation Materials
 
LEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOLLEAN STANDARDIZED WORK TOOL
LEAN STANDARDIZED WORK TOOL
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
 
Maintenance Work Order
Maintenance Work OrderMaintenance Work Order
Maintenance Work Order
 
Capacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of CapacityCapacity-Planning-Report - Measurement of Capacity
Capacity-Planning-Report - Measurement of Capacity
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
Viziya
Viziya Viziya
Viziya
 

Último

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...RKavithamani
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 

Último (20)

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
Privatization and Disinvestment - Meaning, Objectives, Advantages and Disadva...
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 

A presentation on job planning job manuals,

  • 1. Reliability and Maintenance Engineering Lecture 8
  • 2. Introduction  Job Planning  Steps of Job Planning  Job Manual  Steps in preparing Job Manual  Uses of Job Manual  Short Term Planning  Long Term Planning  References
  • 3. Effective planning and scheduling contribute significantly to the following:  Reduced maintenance cost.  Improved utilization of maintenance workforce by reducing delays and interruptions.  Improved quality of maintenance work by adopting best methods and procedures and assigning the most qualified worker for the jobs.
  • 4. Planning of maintenance jobs basically deals with answering two questions, “what ” and “How” of the job; i.e., “what jobs/activities are to be done” and “how those jobs and activities are to be done.  The job planning forms the basic foundation, over which the efficiency and cost of further actions (e.g. scheduling, execution and control etc) will be decided.  Person responsible for job planning should have adequate qualities/capabilities, such as knowledge about jobs and available techniques facilities and resources.
  • 5.
  • 6. Knowledge Base: It includes knowledge about equipment, job, available techniques, material and facilities etc.  Job Investigation at Site: It gives a clear perception of the total job and also helps in ascertaining the physical access and space limitation.  Lifting & handling facilities  Disposal of oil/gases/hazardous material facility  Safety enclosures for m/c under repair  Identify and document the work: knowing earlier two steps and knowing the needs of preventive, predictive and other maintenance jobs, a complete job/work list is made.
  • 7. 4. Development of Repair Plan: Preparation of step-step procedures which would accomplish the work with the most economical use of time, manpower and material. (see fig(a)). 5. Preparation of Tools, Tackles & Facilities Lists: Job Plan sheet 6.Estimation of Time Required to do the Job: For smaller jobs, it is easier, but for bigger jobs it may need knowledge of “Work simplification”, “Work measurement” and Critical Path analysis.
  • 8. Planning sheet for Changing V belt of Blower-X Equipment Name: Blower W.O Number Planner Date Seq X ---- Mr, --- ----- ----- Equipment Code---- Job Title- Change V belt (Cracked & worm) Job scope Material, Tools & Equipments Job Steps Cre w Est. hours Description Qty Stock as on Co st 1. Look out, disconnect & 0.25 Tag Motor starter, 2. Remove belt guard, loosen & jack motor, remove 0.75 Sheave guage(tool kit) bolts 3. Check both sheaves for Mag. base dial Indicator 1set 4, SH-1 side wall wear & radial 1.0 •Big sheave (Part No.) 1 set 4 ,SH-1 run-out (should not be •Bushing (Part No.) 1 set 3, SH-1 more the +1mm for big & •Small Sheave(Part No.) 1 set 3, SH-1 +0.25 for small end), •Bushing (Part No.) Replace Worn-out sheaves if needed Drawing No:- Total time:- Total cost:-
  • 9. Open repair file ok Check planning spares waiting time &matl Postpon e repair no Discuss with Plant Engineer maintenance no I/c and others for Finalization of alternative repair plan Print Repair plans/work-orders
  • 10. Job manuals includes methodologies, tools tackles and facilities for all maintenance jobs which may have to be done in future.  This also involves saving the different plans and modifying and expanding those plans for other similar machines.
  • 11. 1. Make a list of all major and medium jobs of the plant and codify for proper identification, 3. For each coded job, a separate job manual is to be made in the form of job plan, indicating job steps, tools, tackles, spares, consumables and facilities needed and also indicating safety and statutory clearance. 5. Each job manual, thus prepared, should and cross checked and cleared by maintenance in-charge.
  • 12. 4. Different job manuals should be bunched and sent to respective potential users. 5. Necessary updating of job manuals, as needed, in consultation with respective users.
  • 13. For actual planning and scheduling of any job, the job manuals provide ready information for use as it is or for further micro-planning.  The executing agencies refer to the job manual before starting the job, to avoid frequent visits to stores and thus save time.  Material department may also use job manual for better material procurement strategy.
  • 14.
  • 15. Short term plans are generally short term schedule and its duration may be hours, day weeks or months and it is tactical(particular goal) planning.  It covers 10% to 15% of the schedule of total job.  These jobs are normally derived from master schedule of total job and carried out on day-to-day basis or at shorter notice.
  • 16. 1. Lubrication plans and schedules, 2. Small defect rectification 3. Vibrating monitoring of few critical equipments, 4. Lubricant monitoring, thermography and other monitoring as per need, 5. Small predictive maintenance and preventive maintenance jobs etc., 6. Occasionally, small shutdowns, for some urgent repairs, may also be included in short term planning.
  • 17. Long term plans are generally for future purpose and the duration may be months or years.  It includes the jobs/actions which are helpful in maintaining original level of performance in terms of output, efficiency and reliability.  These jobs call for more resources, coordination with many agencies and planning much in advance.
  • 18. Major Repairs: It includes jobs required to restore a seriously deteriorated or broken-down equipment . The frequency of such repair is normally once or twice a year.  Capital Repairs: It includes major dismantling and nearly rebuilding of the equipment /plant, needing lot of resources. Frequency of such repairs is once in two years or even later.
  • 19. Annual overhauls :- These apparently appears like major repairs/overhauls and may include job of similar nature but it is generally taken on yearly basis and mainly taken for following reasons – 1. Annual maintenance cleaning, painting and corrosion prevention of equipments, machines, tanks, reservoirs, filters and heat exchangers etc., 2. Annual operational cleaning and painting jobs, like removal of mill-scales, dust & debris, cobbles and crop- pieces and reconditioning of deflectors, diverters etc.,
  • 20. Renovation & Revamping: After the equipment has deteriorated to such an extent that the amount of major/ capital repairs, PM,PdM and other maintenance repairs do not yield desired result and maintenance becomes uneconomical.  These includes almost total rebuilding of the equipment, using either similar type of technology with some redesign or improved technology and equipment.  Up-gradation of equipment availability and reliability are definitely the aim for such plans.
  • 21. Modernization: It is planned when the operation and profitability of the plant or section uneconomical and no improvement can be made.  Five year Rolling Plan(3 to 10)  Turn around Planning(for total maintenance jobs)  Corporate Maintenance Plans(like 5-yr or 10-yr rolling plan)
  • 22. Sushil Kumar Srivastava, Industrial maintenance management, s.chand & co.  www.maintenanceworld.com/articles/rushton/effective  www.bin95.com