Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastructure
1. Aasta Hansteen Development: Opening a
New Gas Region. Extending Gas
Infrastructure.
Torolf Lund Christensen
Vice President Aasta Hansteen Development project, Statoil ASA, Norway
Moscow, Russia | 15-19 June, 2014
Block: 1
Forum: 03
3. Moscow, Russia | 15-19 June, 2014
Use at least a 24-point font.
Please duplicate this slide and use as the template for the whole
presentation. Blank space may be used at your convenience.
You may use up to 20 of these slides.
Aasta Hansteen: Opening a New Gas Region.
Extending Gas Infrastructure
21st
World Petroleum Congress, Moscow, 15-19 June 2014
PL218 partnership:
Statoil (Operator) 75 %
OMV 15 %
ConocoPhillips 10%
Aasta Hansteen
4. Moscow, Russia | 15-19 June, 2014
• Opening up a new, promising area
• Establishing new gas infrastructure
• Extend options for further developments
in the area
• Gives Statoil a key position in the region
• Supports Statoil’s production ambition
from 2017
Main Drivers and Key Area Objectives
Aasta Hansteen
Heidrun
Skarv
Norne
Åsgard
5. Moscow, Russia | 15-19 June, 2014
Aasta Hansteen
•Medium size; 47 GSm3
gas
•High GOR
•Low CO2/H2S content
Prospective area
•Asterix discovered in 2009
•Exploration wells 2014 - 2016
2 km
Greater Aasta Hansteen area – growth potential
Asterix
Aasta
Hansteen
7. Moscow, Russia | 15-19 June, 2014
•Installations across three seasons
•Limit installation weight to 250 t to
maintain 400 t crane vessel segment
•Critical operations - pull-in of steel
catenary risers after spar installation
•And diligent planning…
…and reduced operability
8. Moscow, Russia | 15-19 June, 2014
• Spar FPSO
23 MSm3
/d
On-board power generation
Condensate storage
Steel catenary risers (SCR)
• Subsea system
2 x 4-slots templates + 1 satellite
• Gas export through Polarled pipeline
• Margins included to serve as
future hub
Selected development concept
9. Moscow, Russia | 15-19 June, 2014
• Tie-in of Aasta Hansteen and future
fields
• 480 km pipeline, 36” diameter
• Modifications at Nyhamna
−build extra gas processing
−export capacity up 84 MSm3
/d
• Statoil development operator -
Gassco from start operation
Polarled Pipeline
10. Moscow, Russia | 15-19 June, 2014
Topside
•Dry weight 23.000 tonnes
•Conventional gas processing plant
•Produced water treatment and disposal to sea
•LQ 100 beds
Substructure
•Total length 198 m
•Hard tank diameter 50 m
•Displacement 146.000 tonnes
•SCR - 12 riser and 4 umbilical slots
•17 point polyester taut line mooring system
Spar FPSO
11. Moscow, Russia | 15-19 June, 2014
•New deep-water 4-slot template
• Monopile template foundation
•No trawl protection
•Guide-wire less X- mas tree installation
•Work Over System technology
qualifications
Subsea concept
12. Moscow, Russia | 15-19 June, 2014
Project status
• Project sanction (DG3) December 2012
• Start construction April 2014
• Start drilling Q1 2016
• Start production Q3 2017
13. Moscow, Russia | 15-19 June, 2014
Main contracts
Topside EPCH
Hyundai Heavy
Industries
Substructure EPC
Technip/Hyundai
Tow to field/mooring installation.
Pipelines and marine operations
Subsea7
Template Installation
Emas
Subsea system
Aker Solutions
Umbilicals EPC
Aker Solutions
Fibreoptic cable
DeepOcean
14. Moscow, Russia | 15-19 June, 2014
• An enabler for realization of the area
• First harsh environment deep-water development
• Creates local spin-off effects
• Supports regional industrial development
Aasta Hansteen in summary
16. Moscow, Russia | 15-19 June, 2014
Torolf Lund Christensen
Vice President Aasta Hansteen Development project,
Statoil ASA, Norway
Author Biography
Master degree in Petroleum Technology from 1978, University of
Trondheim.
Worked 10 years for Mobil Exploration Norway with drilling, completion and
production technology, onshore and offshore on the Statfjord field.
From 1988 to present employed in Statoil. Seven years in subsurface R&D,
of which 4 years heading the Statoil R&D subsurface portfolio.
Thirteen years in Operations heading Petroleum Technology units for the
Heidrun, Kristin and Åsgard fields. Six 6 years in field development,
heading Petroleum Technology in the Kristin HPHT field and presently for 3
years heading the Aasta Hansteen field development project in the deep
water Norwegian Sea.