Improved Recovery  (IOR) in Statoil Improved recovery through drilling and well technologies Terje Schmidt, Alastair Buchanan, Morten Eidem
Annual Process Idea Phase 1 Oct 1 Mar 1 May 1 Jun 1 Nov 1 Jan Preparation  Idea  Maturation  Project  Product  to Capture IOR Ideas & Projects across Statoil
IOR techniques identified in 2010
Water injection improvements ,[object Object]
Water injection assisted by EOR chemicals ,[object Object],[object Object],[object Object],EOR = Enhanced Oil Recovery with a potential of 6%
Low Pressure & Pre-compression ,[object Object],[object Object],0 20 40 60 80 100 120 140 160 PDO (2001) Reserve upgrade (2006) Precomp stage 1 (cut-off 2045) Precomp stage 2 (cut-off 2045) Precomp stage 1 & 2 (after 2045)  Reserves, MSm3 o.e. Production potential from pre-compression Compressor module 117bar 37bar 15bar
Extensive IOR recovery “toolbox” used by Statoil  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Through Tubing Drilling and Completion
Why through tubing drilling & completion  - Classification: Internal  2010-08-25 Example: Watered out well ” New” TTDC well Remaining oil
Taking the technology subsea < 300  kSm3 < 100  kSm3 < 50 kSm3 Additional reserves Enabled by new technology and methods = IOR
The Statoil Category B initiative (Cat B) Lightweight HP riser system (through tubing) Full DP or mooring assisted station keeping options Topside system sized for through tubing operations (2⅞” & 3 ½” drillpipe) Integrated high capacity coiled tubing package  (2 ⅞” / 3 ½”)   Full handling of live well returns Semi-submersible rig hull type
Downhole technology developments
Work in progress – delivering results A world record 1744 m  through tubing sidetrack TVDMSL T1 T2 T3 T4 T5
Steerable Drilling Liner
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],This is Steerable Drilling Liner
More cost effective drilling ,[object Object],[object Object],[object Object],[object Object]
Steerable Drilling Liner development ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
Future “One-trip” Steerable Drilling Liner ,[object Object],[object Object],[object Object],Most efficient measure to keep up the production level and increase  the recovery Yearly value creation for a “one trip” system fully implemented on the  Norwegian Continental Shelf is estimated to NOK 2 billion / year
Visit  www.statoil.com/ONS  and stay up to  date with the hottest news, latest  presentations, vacant positions and more.

Más contenido relacionado

La actualidad más candente

The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...Mohawk Innovative Technology
 
Emag News 21 English
Emag News 21 EnglishEmag News 21 English
Emag News 21 EnglishUli Kaiser
 
Loksa Shipyard presentation
Loksa Shipyard presentationLoksa Shipyard presentation
Loksa Shipyard presentationLoksaShipyard
 
Sleipner-DB120-4pp brochure
Sleipner-DB120-4pp brochureSleipner-DB120-4pp brochure
Sleipner-DB120-4pp brochureNick Bolton
 
Turcon glyd ring c
Turcon glyd ring cTurcon glyd ring c
Turcon glyd ring cBanana Yuan
 
Short Paper on Braze Repair of Gas Turbine Blades
Short Paper on Braze Repair of Gas Turbine BladesShort Paper on Braze Repair of Gas Turbine Blades
Short Paper on Braze Repair of Gas Turbine BladesAdeniran Oluokun
 
Lokesh Training report from BHEL
Lokesh Training report from BHELLokesh Training report from BHEL
Lokesh Training report from BHELLokesh Khatri
 
WELL HEAD pcp overview1234
WELL HEAD  pcp overview1234WELL HEAD  pcp overview1234
WELL HEAD pcp overview1234Afsal Ameen c
 
Complexity of pilgering in nuclear applications
Complexity of pilgering in nuclear applicationsComplexity of pilgering in nuclear applications
Complexity of pilgering in nuclear applicationsIJERA Editor
 
Development and depillaring with continuous miner
Development and depillaring with continuous minerDevelopment and depillaring with continuous miner
Development and depillaring with continuous minerSafdar Ali
 
World Pipelines article - new pipe laying equipment
World Pipelines article - new pipe laying equipmentWorld Pipelines article - new pipe laying equipment
World Pipelines article - new pipe laying equipmentMaats
 
Evolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysEvolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysOMPRAKASHCHAUBE
 

La actualidad más candente (19)

Taifun_E
Taifun_ETaifun_E
Taifun_E
 
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
The End of Oil Lubricated Bearings? Extreme Hi-Temp Foil Bearings by James Wa...
 
Emag News 21 English
Emag News 21 EnglishEmag News 21 English
Emag News 21 English
 
Ere ction manual bhel
Ere ction manual bhelEre ction manual bhel
Ere ction manual bhel
 
Loksa Shipyard presentation
Loksa Shipyard presentationLoksa Shipyard presentation
Loksa Shipyard presentation
 
Sleipner-DB120-4pp brochure
Sleipner-DB120-4pp brochureSleipner-DB120-4pp brochure
Sleipner-DB120-4pp brochure
 
Turcon glyd ring c
Turcon glyd ring cTurcon glyd ring c
Turcon glyd ring c
 
Short Paper on Braze Repair of Gas Turbine Blades
Short Paper on Braze Repair of Gas Turbine BladesShort Paper on Braze Repair of Gas Turbine Blades
Short Paper on Braze Repair of Gas Turbine Blades
 
Gas Turbines at PACT - talk by Karen Finney, University of Leeds, at the open...
Gas Turbines at PACT - talk by Karen Finney, University of Leeds, at the open...Gas Turbines at PACT - talk by Karen Finney, University of Leeds, at the open...
Gas Turbines at PACT - talk by Karen Finney, University of Leeds, at the open...
 
Road Header and Bolter Miner
Road Header and Bolter MinerRoad Header and Bolter Miner
Road Header and Bolter Miner
 
XLP
XLPXLP
XLP
 
Lokesh Training report from BHEL
Lokesh Training report from BHELLokesh Training report from BHEL
Lokesh Training report from BHEL
 
WELL HEAD pcp overview1234
WELL HEAD  pcp overview1234WELL HEAD  pcp overview1234
WELL HEAD pcp overview1234
 
Demonstratio3.pptx
Demonstratio3.pptxDemonstratio3.pptx
Demonstratio3.pptx
 
Complexity of pilgering in nuclear applications
Complexity of pilgering in nuclear applicationsComplexity of pilgering in nuclear applications
Complexity of pilgering in nuclear applications
 
Development and depillaring with continuous miner
Development and depillaring with continuous minerDevelopment and depillaring with continuous miner
Development and depillaring with continuous miner
 
World Pipelines article - new pipe laying equipment
World Pipelines article - new pipe laying equipmentWorld Pipelines article - new pipe laying equipment
World Pipelines article - new pipe laying equipment
 
Evolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian RailwaysEvolution of Freight Stock in Indian Railways
Evolution of Freight Stock in Indian Railways
 
Hydrogen Gas Turbine
Hydrogen Gas TurbineHydrogen Gas Turbine
Hydrogen Gas Turbine
 

Destacado

Metodologia para mantenimiento y análisis de la producción base en campos mad...
Metodologia para mantenimiento y análisis de la producción base en campos mad...Metodologia para mantenimiento y análisis de la producción base en campos mad...
Metodologia para mantenimiento y análisis de la producción base en campos mad...Academia de Ingeniería de México
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020Pomcert
 
[1] ptk 2014 2015 pendahuluan
[1] ptk 2014 2015 pendahuluan[1] ptk 2014 2015 pendahuluan
[1] ptk 2014 2015 pendahuluanSyaifullah Hamim
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Charlie Reith
 
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan
 
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...oilandgas
 
ISES 2013 - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...
ISES 2013  - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...ISES 2013  - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...
ISES 2013 - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...Student Energy
 
[4] ptk 2014 2015 offshore constructions
[4] ptk 2014 2015 offshore constructions[4] ptk 2014 2015 offshore constructions
[4] ptk 2014 2015 offshore constructionsSyaifullah Hamim
 
[2] ptk 2014 2015 engineering related to marine engineering
[2] ptk 2014 2015 engineering related to marine engineering[2] ptk 2014 2015 engineering related to marine engineering
[2] ptk 2014 2015 engineering related to marine engineeringSyaifullah Hamim
 
[5] ptk 2014 2015 ship main particulars
[5] ptk 2014 2015 ship main particulars[5] ptk 2014 2015 ship main particulars
[5] ptk 2014 2015 ship main particularsSyaifullah Hamim
 
Longer, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiersLonger, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiersStatoil
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibilityguest651e92c
 
Technology development in Statoil
Technology development in Statoil Technology development in Statoil
Technology development in Statoil Statoil
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overviewminh nguyễn
 
Life extension of aging petroleum production facilities offshore
Life extension of aging petroleum production facilities offshoreLife extension of aging petroleum production facilities offshore
Life extension of aging petroleum production facilities offshoreE.ON Exploration & Production
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray FirstsMyLast1
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production SystemsSahyog Shishodia
 

Destacado (20)

Metodologia para mantenimiento y análisis de la producción base en campos mad...
Metodologia para mantenimiento y análisis de la producción base en campos mad...Metodologia para mantenimiento y análisis de la producción base en campos mad...
Metodologia para mantenimiento y análisis de la producción base en campos mad...
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020
 
Trawler report
Trawler reportTrawler report
Trawler report
 
[1] ptk 2014 2015 pendahuluan
[1] ptk 2014 2015 pendahuluan[1] ptk 2014 2015 pendahuluan
[1] ptk 2014 2015 pendahuluan
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
 
Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16Baijan Savalan _ Avans High School lecture 27.10.16
Baijan Savalan _ Avans High School lecture 27.10.16
 
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
 
ISES 2013 - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...
ISES 2013  - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...ISES 2013  - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...
ISES 2013 - Day 2 - Tor-Eivind Moen (Technology Director, ABB) - Energy on N...
 
[4] ptk 2014 2015 offshore constructions
[4] ptk 2014 2015 offshore constructions[4] ptk 2014 2015 offshore constructions
[4] ptk 2014 2015 offshore constructions
 
[2] ptk 2014 2015 engineering related to marine engineering
[2] ptk 2014 2015 engineering related to marine engineering[2] ptk 2014 2015 engineering related to marine engineering
[2] ptk 2014 2015 engineering related to marine engineering
 
[5] ptk 2014 2015 ship main particulars
[5] ptk 2014 2015 ship main particulars[5] ptk 2014 2015 ship main particulars
[5] ptk 2014 2015 ship main particulars
 
Longer, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiersLonger, deeper, colder - Technology to cross energy frontiers
Longer, deeper, colder - Technology to cross energy frontiers
 
Marginal offshore production platform feasibility
Marginal offshore production platform feasibilityMarginal offshore production platform feasibility
Marginal offshore production platform feasibility
 
Technology development in Statoil
Technology development in Statoil Technology development in Statoil
Technology development in Statoil
 
Offshore oil and gas overview
Offshore oil and gas overviewOffshore oil and gas overview
Offshore oil and gas overview
 
Life extension of aging petroleum production facilities offshore
Life extension of aging petroleum production facilities offshoreLife extension of aging petroleum production facilities offshore
Life extension of aging petroleum production facilities offshore
 
J Ray Firsts
J Ray FirstsJ Ray Firsts
J Ray Firsts
 
Subsea Separation presentation
Subsea Separation presentationSubsea Separation presentation
Subsea Separation presentation
 
Semi submersible
Semi submersibleSemi submersible
Semi submersible
 
Offshore Petroleum Production Systems
Offshore Petroleum Production SystemsOffshore Petroleum Production Systems
Offshore Petroleum Production Systems
 

Similar a IOR drilling technologies

Subsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the futureSubsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the futureStatoil
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24Jean-Francois Saint-Marcoux
 
Sector Summary - Subsea
Sector Summary - SubseaSector Summary - Subsea
Sector Summary - SubseaThomas Burke
 
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...jdowns
 
Revista en ingles miguel lugo
Revista en ingles miguel lugoRevista en ingles miguel lugo
Revista en ingles miguel lugoMiguelLugo42
 
Technical Prospects of Floating LNG
Technical Prospects of Floating LNGTechnical Prospects of Floating LNG
Technical Prospects of Floating LNGRonak Sani
 
Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Mattia Agnoletto
 
Dr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technologyDr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technologyGlobal CCS Institute
 
novas-slidedeck-GPS-Print
novas-slidedeck-GPS-Printnovas-slidedeck-GPS-Print
novas-slidedeck-GPS-PrintLee Primeau
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020Pomcert
 
Intelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field DevelopmentIntelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field Developmentfhmutairi
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012ggurudev
 
Statoil at OTC 2014 - The Power of Possible
Statoil at OTC 2014 - The Power of PossibleStatoil at OTC 2014 - The Power of Possible
Statoil at OTC 2014 - The Power of PossibleStatoil
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaMichaelUberti
 

Similar a IOR drilling technologies (20)

Subsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the futureSubsea well intervention: Learning from the past - planning for the future
Subsea well intervention: Learning from the past - planning for the future
 
PQ_SEC _2014
PQ_SEC _2014PQ_SEC _2014
PQ_SEC _2014
 
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
ISOPE-2014-TPC-0405 Recent Trends and Future 14-02-24
 
Sector Summary - Subsea
Sector Summary - SubseaSector Summary - Subsea
Sector Summary - Subsea
 
fishbone-.pptx
fishbone-.pptxfishbone-.pptx
fishbone-.pptx
 
eni_EST_esecutivo
eni_EST_esecutivoeni_EST_esecutivo
eni_EST_esecutivo
 
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...SPE 165151  The Long-Term Production Performance of Deep HPHT Gas Condensate ...
SPE 165151 The Long-Term Production Performance of Deep HPHT Gas Condensate ...
 
Revista en ingles miguel lugo
Revista en ingles miguel lugoRevista en ingles miguel lugo
Revista en ingles miguel lugo
 
Technical Prospects of Floating LNG
Technical Prospects of Floating LNGTechnical Prospects of Floating LNG
Technical Prospects of Floating LNG
 
Thesis new
Thesis newThesis new
Thesis new
 
Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08Inoxtech Presentation Marbella 11 Nov 08
Inoxtech Presentation Marbella 11 Nov 08
 
Dr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technologyDr Wang Rui - Status of Sinopec CCUS technology
Dr Wang Rui - Status of Sinopec CCUS technology
 
novas-slidedeck-GPS-Print
novas-slidedeck-GPS-Printnovas-slidedeck-GPS-Print
novas-slidedeck-GPS-Print
 
ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin ACARP wall -flow DFP project - Coplin
ACARP wall -flow DFP project - Coplin
 
Marginal oil fields
Marginal oil fieldsMarginal oil fields
Marginal oil fields
 
Horizon 2020
Horizon 2020Horizon 2020
Horizon 2020
 
Intelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field DevelopmentIntelligent Fields: A New Era for Oil and Gas Field Development
Intelligent Fields: A New Era for Oil and Gas Field Development
 
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
Offshore Engineering Kavin Engneering Fpso Corporate Profile 2012
 
Statoil at OTC 2014 - The Power of Possible
Statoil at OTC 2014 - The Power of PossibleStatoil at OTC 2014 - The Power of Possible
Statoil at OTC 2014 - The Power of Possible
 
RV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey AustraliaRV Thuwal - Refit project overview by Maritime Survey Australia
RV Thuwal - Refit project overview by Maritime Survey Australia
 

Más de Statoil

Technologies to solve new energy challenges
Technologies to solve new energy challengesTechnologies to solve new energy challenges
Technologies to solve new energy challengesStatoil
 
Bakken Development: Pathway to Success, Roadmap to a New Tomorrow
Bakken Development: Pathway to Success, Roadmap to a New TomorrowBakken Development: Pathway to Success, Roadmap to a New Tomorrow
Bakken Development: Pathway to Success, Roadmap to a New TomorrowStatoil
 
Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...
Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...
Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...Statoil
 
A collaborative approach to the Arctic
A collaborative approach to the ArcticA collaborative approach to the Arctic
A collaborative approach to the ArcticStatoil
 
Statoil in north america nacc otc lunch 050614
Statoil in north america   nacc otc lunch 050614Statoil in north america   nacc otc lunch 050614
Statoil in north america nacc otc lunch 050614Statoil
 
Challenge - Going north
Challenge - Going northChallenge - Going north
Challenge - Going northStatoil
 
Ons 2012 peregrino ior (rev2)
Ons 2012   peregrino ior (rev2)Ons 2012   peregrino ior (rev2)
Ons 2012 peregrino ior (rev2)Statoil
 
Ons 2012 us onshore torstein hole 4 3
Ons 2012 us onshore torstein hole 4 3Ons 2012 us onshore torstein hole 4 3
Ons 2012 us onshore torstein hole 4 3Statoil
 
Ons 2012 us onshore torstein hole
Ons 2012 us onshore torstein holeOns 2012 us onshore torstein hole
Ons 2012 us onshore torstein holeStatoil
 
Challenge - Going north
Challenge - Going northChallenge - Going north
Challenge - Going northStatoil
 
Ons 2012 sek@ior conference presentation fragrafisk-final_2
Ons 2012   sek@ior conference presentation fragrafisk-final_2Ons 2012   sek@ior conference presentation fragrafisk-final_2
Ons 2012 sek@ior conference presentation fragrafisk-final_2Statoil
 
Johan sverdrup ons 2012 speakers corner
Johan sverdrup ons 2012 speakers cornerJohan sverdrup ons 2012 speakers corner
Johan sverdrup ons 2012 speakers cornerStatoil
 
Ons 2012 bkv@åsgard speakers corner
Ons 2012   bkv@åsgard speakers cornerOns 2012   bkv@åsgard speakers corner
Ons 2012 bkv@åsgard speakers cornerStatoil
 
Aasta hansteen ons speakers corner
Aasta hansteen ons speakers cornerAasta hansteen ons speakers corner
Aasta hansteen ons speakers cornerStatoil
 
Aasta hansteen ons speakers corner
Aasta hansteen ons speakers cornerAasta hansteen ons speakers corner
Aasta hansteen ons speakers cornerStatoil
 
Skrugard for ons speakers corner
Skrugard for ons  speakers cornerSkrugard for ons  speakers corner
Skrugard for ons speakers cornerStatoil
 
Arctic the final frontier
Arctic the final frontierArctic the final frontier
Arctic the final frontierStatoil
 
Technology will unlock the far north
Technology will unlock the far northTechnology will unlock the far north
Technology will unlock the far northStatoil
 
Challenge - Going North
Challenge - Going NorthChallenge - Going North
Challenge - Going NorthStatoil
 
Ons 2012 unlocking the resources of the north - runi
Ons 2012   unlocking the resources of the north - runiOns 2012   unlocking the resources of the north - runi
Ons 2012 unlocking the resources of the north - runiStatoil
 

Más de Statoil (20)

Technologies to solve new energy challenges
Technologies to solve new energy challengesTechnologies to solve new energy challenges
Technologies to solve new energy challenges
 
Bakken Development: Pathway to Success, Roadmap to a New Tomorrow
Bakken Development: Pathway to Success, Roadmap to a New TomorrowBakken Development: Pathway to Success, Roadmap to a New Tomorrow
Bakken Development: Pathway to Success, Roadmap to a New Tomorrow
 
Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...
Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...
Aasta Hansteen Development: Opening a New Gas Region. Extending Gas Infrastru...
 
A collaborative approach to the Arctic
A collaborative approach to the ArcticA collaborative approach to the Arctic
A collaborative approach to the Arctic
 
Statoil in north america nacc otc lunch 050614
Statoil in north america   nacc otc lunch 050614Statoil in north america   nacc otc lunch 050614
Statoil in north america nacc otc lunch 050614
 
Challenge - Going north
Challenge - Going northChallenge - Going north
Challenge - Going north
 
Ons 2012 peregrino ior (rev2)
Ons 2012   peregrino ior (rev2)Ons 2012   peregrino ior (rev2)
Ons 2012 peregrino ior (rev2)
 
Ons 2012 us onshore torstein hole 4 3
Ons 2012 us onshore torstein hole 4 3Ons 2012 us onshore torstein hole 4 3
Ons 2012 us onshore torstein hole 4 3
 
Ons 2012 us onshore torstein hole
Ons 2012 us onshore torstein holeOns 2012 us onshore torstein hole
Ons 2012 us onshore torstein hole
 
Challenge - Going north
Challenge - Going northChallenge - Going north
Challenge - Going north
 
Ons 2012 sek@ior conference presentation fragrafisk-final_2
Ons 2012   sek@ior conference presentation fragrafisk-final_2Ons 2012   sek@ior conference presentation fragrafisk-final_2
Ons 2012 sek@ior conference presentation fragrafisk-final_2
 
Johan sverdrup ons 2012 speakers corner
Johan sverdrup ons 2012 speakers cornerJohan sverdrup ons 2012 speakers corner
Johan sverdrup ons 2012 speakers corner
 
Ons 2012 bkv@åsgard speakers corner
Ons 2012   bkv@åsgard speakers cornerOns 2012   bkv@åsgard speakers corner
Ons 2012 bkv@åsgard speakers corner
 
Aasta hansteen ons speakers corner
Aasta hansteen ons speakers cornerAasta hansteen ons speakers corner
Aasta hansteen ons speakers corner
 
Aasta hansteen ons speakers corner
Aasta hansteen ons speakers cornerAasta hansteen ons speakers corner
Aasta hansteen ons speakers corner
 
Skrugard for ons speakers corner
Skrugard for ons  speakers cornerSkrugard for ons  speakers corner
Skrugard for ons speakers corner
 
Arctic the final frontier
Arctic the final frontierArctic the final frontier
Arctic the final frontier
 
Technology will unlock the far north
Technology will unlock the far northTechnology will unlock the far north
Technology will unlock the far north
 
Challenge - Going North
Challenge - Going NorthChallenge - Going North
Challenge - Going North
 
Ons 2012 unlocking the resources of the north - runi
Ons 2012   unlocking the resources of the north - runiOns 2012   unlocking the resources of the north - runi
Ons 2012 unlocking the resources of the north - runi
 

IOR drilling technologies

  • 1. Improved Recovery (IOR) in Statoil Improved recovery through drilling and well technologies Terje Schmidt, Alastair Buchanan, Morten Eidem
  • 2. Annual Process Idea Phase 1 Oct 1 Mar 1 May 1 Jun 1 Nov 1 Jan Preparation Idea Maturation Project Product to Capture IOR Ideas & Projects across Statoil
  • 4.
  • 5.
  • 6.
  • 7.
  • 8. Through Tubing Drilling and Completion
  • 9. Why through tubing drilling & completion - Classification: Internal 2010-08-25 Example: Watered out well ” New” TTDC well Remaining oil
  • 10. Taking the technology subsea < 300 kSm3 < 100 kSm3 < 50 kSm3 Additional reserves Enabled by new technology and methods = IOR
  • 11. The Statoil Category B initiative (Cat B) Lightweight HP riser system (through tubing) Full DP or mooring assisted station keeping options Topside system sized for through tubing operations (2⅞” & 3 ½” drillpipe) Integrated high capacity coiled tubing package (2 ⅞” / 3 ½”) Full handling of live well returns Semi-submersible rig hull type
  • 13. Work in progress – delivering results A world record 1744 m through tubing sidetrack TVDMSL T1 T2 T3 T4 T5
  • 15.
  • 16.
  • 17.
  • 18.  
  • 19.
  • 20. Visit www.statoil.com/ONS and stay up to date with the hottest news, latest presentations, vacant positions and more.

Notas del editor

  1. En systematisk prosess med stor involvering. Tidsangivelsene sier når noe senest må være ferdig, men om en lisens ønsker å starte Maturation fasen tidligere enn 1. januar så kan de gjøre det. Statoil har også benyttet Sintef Kunne til å hjelpe oss i den Kreative fasen. Ende produkt kan være en liste av boremål som meldes inn til Brønnkonstruksjonsprosessen og Teknologi behov som meldes inn til F&amp;U innmeldingen.
  2. Quality – scale problematikk , injektivitet ( dette var vel aldri noe stort problem for injekstjon ppå statfjord)
  3. Quality – scale problematikk , injektivitet ( dette var vel aldri noe stort problem for injekstjon ppå statfjord)
  4. Figure on top shows the location of the compressor module (hanging beneath the flare deck). Figure on left shows the reserve growth on Kvitebjørn. After a re-modelling done in 2006, the reserve increased by almost 50% compared to the PDO volume. Pre-compression is the single most important IOR method to increase the reserves on Kvitebjørn. Figure at the bottom shows the latest prognosis of the base (natural depletion) and pre-compression profiles.
  5. Copied from Terje Schmidts presentation Multilaterals : roughly 20 , 5 level 5 installed DIACS : Subsea 20 – Platform 18 TTRD : 14 PLATFORM – 2 SUBSEA (Norne 2005 - 1500 m sidetrack, GF Sør 2006) Light well intervention : 12 operations – 2006 campaign ongoing Sub sea separation : Tordis Sub sea pumping : Tordis Sub sea compression : Åsgard , being developed
  6. Can be a large number of reasons for drilling sidetracks On the left: Example of existing well with water encroachment around existing wellbore Additional reserves identified in vicinity (isolated by faulting) Conventional options: 1. new well or 2. conventional sidetrack (remove existing completion, re-use only upper part of well) Both alternatives very expensive and can easily be cost prohibitive depending on volume of remaining oil. On the right: Through tubing option. Leave existing completion in place. Re-use majority of existing well. Save time and money. Environmental benefits as well: materials and chemicals usage a fraction of conventional scenarios TTD not new in the industry or Statoil. Over 30 wells drilled by Statoil – primarily in platform wells. What we are discussing today is the Statoil strategy and actions to develop the technique and extend the application – particularly to subsea wells
  7. Now looking at a subsea scenario. The cost implications of conventional technques are even more dramatic and benefits and potential for TTDC even greater in contrast. Large proportion of Statoil production coming from subsea wells this is a key forcus area for the company. Scearios from left to right indicate a progression in time and technical solutions Conventional sidetrack – conventional drilling unit Through tubing sidetrack – still using conventional non-optimised rig Introducing fit-for-purpose ’lighter’ solutions – Category B rig and riser that will be discussed in next slide The effect of introducing fit-for-purpose technical solutions is that the cost per operation can be signficantly reduced making it economical to pursue smaller and smaller targets As dedicated organisational capacity and equipment is implemented – learning curve advantages are realised – efficiency increases even more and even smaller targets can be harvested
  8. Now look at technology required to establish a safe and efficient work platform and access to subsea wells for through tubing work 1st look at what we in Statoil call the Category B or ”Cat B” rig (and yes that is somewhere between a light Cat A system and a heavy Cat C or C drilling unit). In contrast to a conventional drilling unit the Cat B is relatively small and configured specifically for through tubing operations – in fact all types of production and injection well management in addition to TTDC. Able to handle live well operations. In addition to mooring dynamic positioning is available as an option for better efficiency on shorter duration operations. Cat B is work in progress with technical feed studies nearing completion and a commercial tender to be completed (and contract awarded) before the end of yr. Take a look at the riser system connecting the rig to the well. This provides both well access and key well control functions. Statoil have been intimately involved in developing a unique riser system for Cat B operations over several years – unique in that it can be used for both TTDC and live well intervention operations with a minimum of re-configuration. As you can see from pictures this equipment already exists and has been used for two TTDC wells that were drilled during the winter of 2009/2010. Those operations were conducted from the Stena Don drilling unit.
  9. As well as an efficient working platform and well access Statoil have also identified development areas for downhole tools and technology required to improve and expand TTDC applications. Illustrated here are 3 examples at different stages of implementation: Protection of the existing completion equipment during the TTDC operation is essential. A customized system compatible with Statoil wells has been developed and is now implemented on all TTD operations Drilling systems suitable for the size and directional path of holes being drilled and at the same time compatible with subsea well configurations have been developed and already successfully tested on several wells (including the example give on the next slide). Multi-lateral junctions providing mechanical and hydraulic integrity have been developed. These will allow combined production and access from/to the existing and new wellbore providing increased flexibility when planning these operations. This technology is now available and awaiting the first field trial.
  10. As mentioned there were 2 subsea TTDC wells drilled during last winter – 1on Åsgard field and one on Norned field. This was the first field trial of the new riser system – as well as being challenging operations in their own right. Despite the challenges – good planning and operational focus led to both wells being completed successfully. The graphic here indicates the well path that was drilled on the Åsgard well. 2 producing zones Upper one easy Lower zone with several targets – cleared 4 out of 5 World record length Most important – well production came in over expectations delivering a commercial success. Increased oil recovery.
  11. SDL can handle issues such as tight hole, hole collapse, difficulties to get liner to TD etc.. SDL potential in 2009: Reduce Non-Productive Time with 320 MNOK on the Norwegian Continental Shelf for 12 ¼” sections alone