12. Before and After Working on the Floor Working at the right height
13. Before Make shift build Table to place bar after its been punched, then TM screws in the hardware from boxes as shown. Fresh air stop punch
14. After TM can now punch Stucco and regular frame bar, then slide over into new slot. Once bar is in slot, TM can screw in hardware easily. Punch has New shelf to hold three bins for screws and hardware, and holder for the air drill.