Kanban literally means “visual card,” “signboard,” or “billboard.”
Kanban cards act as a form of “currency” representing how WIP is allowed in a system
Challenges of Iterative Approach
 Short time-boxes give more frequent opportunity to measure progress and inspect software but force development items to
be smaller.
 Smaller development items are often too small to be valuable and difficult to identify
 Quality of requirements suffers as analysts rush to prepare for upcoming cycles
 Quality of current development suffers when busy analysts are unable to inspect software or answer questions during
development
 Quality often suffers as testers race to complete work late in the development time-box
Development work often continues throughout a cycle while testing starts late and never seems to get enough time.
Kanban for Software Teams
 Agile software development teams today are able to leverage the concept of agile by matching the amount of work in progress (WIP) to the team's capacity. This
gives teams more flexible planning options, faster output, clearer focus, and transparency throughout the development cycle.
 While the core principles of the framework are timeless and applicable to almost any industry, software development teams have found particular success with the
agile practice.
 In part, this is because software teams can begin practicing with little to no overhead once they understand the basic principles. Unlike implementing Kanban on a
factory floor, which would involve changes to physical processes and the addition of substantial materials, the only physical things a software teams need are a
board and cards, and even those can be virtual.
Kanban boards
 The work of all Kanban teams revolves around a Kanban board, a tool used to visualize work and optimize the flow of the
work among the team. While physical boards are popular among some teams, virtual boards are a crucial feature in any
agile software development tool for their traceability, easier collaboration, and accessibility from multiple locations.
 Regardless of whether a team's board is physical or digital, their function is to ensure the team's work is visualized, their
workflow is standardized, and all blockers and dependencies are immediately identified and resolved. A basic Kanban board
has a three-step workflow: To Do, In Progress, and Done. However, depending on a team's size, structure, and objectives,
the workflow can be mapped to meet the unique process of any particular team.
 The Kanban methodology relies upon full transparency of work and real-time communication of capacity, therefore the
Kanban board should be seen as the single source of truth for the team's work.
Kanban benefits
Planning flexibility
A Kanban team is only focused on the work that's actively in progress. Once the team completes a work item, they pluck the next work item off the top of the backlog. The product owner is free
to reprioritize work in the backlog without disrupting the team, because any changes outside the current work items don't impact the team. As long as the product owner keeps the most
important work items on top of the backlog, the development team is assured they are delivering maximum value back to the business. So there's no need for the fixed-length iterations you
find in scrum.
Tip: Savvy product owners always engage the development team when considering changes to the backlog. For example, if user stories 1-6 are in the backlog, user story 6's estimate may be based on the completion of
user stories 1-5. It's always a good practice to confirm changes with the engineering team to ensure there are no surprises.
Shortened cycle times
Cycle time is a key metric for Kanban teams. Cycle time is the amount of time it takes for a unit of work to travel through the team’s workflow–from the moment work starts to the moment it
ships. By optimizing cycle time, the team can confidently forecast the delivery of future work.
Overlapping skill sets lead to smaller cycle times. When only one person holds a skill set, that person becomes a bottleneck in the workflow. So teams employ basic best practices like code
review and mentoring help to spread knowledge. Shared skills mean that team members can take on heterogeneous work, which further optimizes cycle time. It also means that if there is a
backup of work, the entire team can swarm on it to get the process flowing smoothly again. For instance, testing isn't only done by QA engineers. Developers pitch in, too.
In a Kanban framework, it's the entire team's responsibility to ensure work is moving smoothly through the process.
Fewer bottlenecks
Multitasking kills efficiency. The more work items in flight at any given time, the more context switching, which hinders their path to completion. That's why a key tenant of Kanban is to limit
the amount of work in progress (WIP). Work-in-progress limits highlight bottlenecks and backups in the team's process due to lack of focus, people, or skill sets.
Continuous delivery
We know that continuous integration–the practice of automatically building and testing code incrementally throughout the day–is essential for maintaining quality. Now it's time to meet
continuous delivery (CD). CD is the practice of releasing work to customers frequently–even daily or hourly. Kanban and CD beautifully complement each other because both techniques focus
on the just-in-time (and one-at-a-time) delivery of value. The faster a team can deliver innovation to market, the more competitive their product will be in the marketplace. And Kanban teams
focus on exactly that: optimizing the flow of work out to customers.
Kanban Metrics
One of the core values is a strong focus on continually improving team efficiency and effectiveness with every iteration of work. Charts provide a visual
mechanism for teams to ensure they're continuing to improve. When the team can see data, it's easier to spot bottlenecks in the process (and remove
them). Two common reports Kanban teams use are control charts and cumulative flow diagrams.
Tip: The team's goal is to reduce the amount of time an issue takes to move through the entire process. Seeing the average cycle time drop in the control chart is an indicator of success.
A control chart shows the cycle time for each issue as well
as a rolling average for the team.
A cumulative flow diagram shows the number of issues in each state.
The team can easily spot blockages by seeing the number of issues
increase in any given state. Issues in intermediate states such as "In
Progress" or "In Review" are not yet shipped to customers, and a
blockage in these states can increase the likelihood of massive
integration conflicts when the work does get merged upstream.
Scrum Vs. Kanban
Some teams blend the ideals of Kanban and scrum into "scrumban." They take fixed length sprints and roles from scrum and the focus on
work in progress limits and cycle time from Kanban.
For teams just starting out with agile, however, we strongly recommend choosing one methodology or the other and running with it for a
while.
Kanban Board – Configuration Options
Options Description
General General info. of the project such as name, administrators.
Columns Define constraints on the number of issues (Kanban is usually 9 issues)
Swim lanes Horizontal Splits based on Stories, Assignees or Epics
Quick Filters Filter Options (Need to have understanding of JQL)
Card Colors Define Flag Colors based on Assignees, DOR etc.
Card layout Extra Fields (Maximum of 3) to be shown on the Stories
Working days Time Zone, Working Days Definition for the team
Issue Detail view Fields to be shown on Issue Detail Screen
Kanban Board – Configuration Options
Board View
Releases – Defined in the Project Administration and set to each
story.
Report View
Issues – Issue Types (Stories/Epics) as defined in the Project
Administration
Components – Defined in the Project Administration and set to each
story
Feedback
Project Administration – Visible to Administrators
Add Ons
Expand the window
Appendix
Elaborate Kanban Board
1. Define a work process flow.
2. Lay out a visual Kanban board.
3. Decide on limits for items in queue and work in progress.
4. Place prioritized goals on the left column of the board.
5. Start the board by placing stories or features in queue.
6. Move features through the process flow as work is complete.
7. Use the dates on the cards to calculate cycle time.
Place an expedite track above the main left to right queue
This board uses painters tape to indicate available “slots” for
work in progress
Product Owners manage the waiting queue.
Place “done and waiting” queues between each work
queue.
Cycle time = finish date –
start date
The average cycle time
from the date the item
enters the board is the
wait time from this point in
the queue

Más contenido relacionado

La actualidad más candente

Scrum Training (One Day)
Scrum Training (One Day)Scrum Training (One Day)
Scrum Training (One Day)beLithe
 
Kanban in the Kitchen
Kanban in the KitchenKanban in the Kitchen
Kanban in the KitchenSteve Purkis
 
Kanban Basics for Beginners
Kanban Basics for BeginnersKanban Basics for Beginners
Kanban Basics for BeginnersZsolt Fabok
 
Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)Scrum & Kanban
 
Scrum to Scrumban Migration
Scrum to Scrumban MigrationScrum to Scrumban Migration
Scrum to Scrumban MigrationSkills Matter
 
Introduction To Scrum
Introduction To ScrumIntroduction To Scrum
Introduction To ScrumDave Neuman
 
Agile Lean Kanban Training 1 hour
Agile Lean Kanban Training 1 hourAgile Lean Kanban Training 1 hour
Agile Lean Kanban Training 1 hourRyan Polk
 
Kanban in 4 easy steps
Kanban in 4 easy steps Kanban in 4 easy steps
Kanban in 4 easy steps Shore Labs
 
Agile project management using scrum
Agile project management using scrumAgile project management using scrum
Agile project management using scrumPrudentialSolutions
 
Introducing Agile Scrum XP and Kanban
Introducing Agile Scrum XP and KanbanIntroducing Agile Scrum XP and Kanban
Introducing Agile Scrum XP and KanbanDimitri Ponomareff
 
Scrum 101: Introduction to Scrum
Scrum 101: Introduction to ScrumScrum 101: Introduction to Scrum
Scrum 101: Introduction to ScrumArrielle Mali
 
Scrum - Agile Methodology
Scrum - Agile MethodologyScrum - Agile Methodology
Scrum - Agile MethodologyNiel Deckx
 
Understanding the Agile Release and Sprint Planning Process
Understanding the Agile Release and Sprint Planning Process Understanding the Agile Release and Sprint Planning Process
Understanding the Agile Release and Sprint Planning Process John Derrico
 
Intro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 KeynoteIntro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 KeynoteChileAgil
 

La actualidad más candente (20)

Scrum Training (One Day)
Scrum Training (One Day)Scrum Training (One Day)
Scrum Training (One Day)
 
Kanban in the Kitchen
Kanban in the KitchenKanban in the Kitchen
Kanban in the Kitchen
 
Agile 101
Agile 101Agile 101
Agile 101
 
Kanban Basics for Beginners
Kanban Basics for BeginnersKanban Basics for Beginners
Kanban Basics for Beginners
 
Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)Introduction to Kanban (June 2015)
Introduction to Kanban (June 2015)
 
Scrum to Scrumban Migration
Scrum to Scrumban MigrationScrum to Scrumban Migration
Scrum to Scrumban Migration
 
Introduction To Scrum
Introduction To ScrumIntroduction To Scrum
Introduction To Scrum
 
Agile Lean Kanban Training 1 hour
Agile Lean Kanban Training 1 hourAgile Lean Kanban Training 1 hour
Agile Lean Kanban Training 1 hour
 
Kanban in 4 easy steps
Kanban in 4 easy steps Kanban in 4 easy steps
Kanban in 4 easy steps
 
Scrum in an hour
Scrum in an hourScrum in an hour
Scrum in an hour
 
Agile project management using scrum
Agile project management using scrumAgile project management using scrum
Agile project management using scrum
 
Introducing Agile Scrum XP and Kanban
Introducing Agile Scrum XP and KanbanIntroducing Agile Scrum XP and Kanban
Introducing Agile Scrum XP and Kanban
 
Scrum 101: Introduction to Scrum
Scrum 101: Introduction to ScrumScrum 101: Introduction to Scrum
Scrum 101: Introduction to Scrum
 
Scrum - Agile Methodology
Scrum - Agile MethodologyScrum - Agile Methodology
Scrum - Agile Methodology
 
An Introduction to kanban
An Introduction to kanbanAn Introduction to kanban
An Introduction to kanban
 
Understanding the Agile Release and Sprint Planning Process
Understanding the Agile Release and Sprint Planning Process Understanding the Agile Release and Sprint Planning Process
Understanding the Agile Release and Sprint Planning Process
 
Agile scrum training
Agile scrum trainingAgile scrum training
Agile scrum training
 
Intro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 KeynoteIntro to Kanban - AgileDayChile2011 Keynote
Intro to Kanban - AgileDayChile2011 Keynote
 
Kanban Workshop
Kanban WorkshopKanban Workshop
Kanban Workshop
 
Kanban VS Scrum
Kanban VS ScrumKanban VS Scrum
Kanban VS Scrum
 

Similar a Kanban Methodology

Advanced kanban overview for waterfall & scrum practitioners (16x9 deck)
Advanced kanban overview for waterfall & scrum practitioners  (16x9 deck)Advanced kanban overview for waterfall & scrum practitioners  (16x9 deck)
Advanced kanban overview for waterfall & scrum practitioners (16x9 deck)Ravi Tadwalkar
 
Agile Methodologies in SAP
Agile Methodologies in SAPAgile Methodologies in SAP
Agile Methodologies in SAPGaurav Ahluwalia
 
Kin2020- flow based product development- an experience report
Kin2020-  flow based product development- an experience reportKin2020-  flow based product development- an experience report
Kin2020- flow based product development- an experience reportRavi Tadwalkar
 
Kanban board 9th may 2017
Kanban board   9th may 2017Kanban board   9th may 2017
Kanban board 9th may 2017gagann78
 
Kanban - a quick intro.
Kanban - a quick intro.Kanban - a quick intro.
Kanban - a quick intro.IlPeach
 
Kanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum pptKanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum pptSabaKhalid48
 
LKIN17: Managing an Enterprise Shared Services with Kanban in SAFe - Saikat Das
LKIN17: Managing an Enterprise Shared Services with Kanban in SAFe - Saikat DasLKIN17: Managing an Enterprise Shared Services with Kanban in SAFe - Saikat Das
LKIN17: Managing an Enterprise Shared Services with Kanban in SAFe - Saikat DasInnovation Roots
 
Kanban India 2022 | Ravi Tadwalkar | From Scrum to ScrumBan/Kanban: Process ...
Kanban India 2022 | Ravi Tadwalkar |  From Scrum to ScrumBan/Kanban: Process ...Kanban India 2022 | Ravi Tadwalkar |  From Scrum to ScrumBan/Kanban: Process ...
Kanban India 2022 | Ravi Tadwalkar | From Scrum to ScrumBan/Kanban: Process ...LeanKanbanIndia
 
From Scrum to ScrumBan or Kanban- Process Evaluator Workshop using Excel.pptx
From Scrum to ScrumBan or Kanban- Process Evaluator Workshop using Excel.pptxFrom Scrum to ScrumBan or Kanban- Process Evaluator Workshop using Excel.pptx
From Scrum to ScrumBan or Kanban- Process Evaluator Workshop using Excel.pptxRavi Tadwalkar
 
What is Kanban in Agile?
What is Kanban in Agile?What is Kanban in Agile?
What is Kanban in Agile?Advance Agility
 
Kanban
KanbanKanban
Kanbanbramoe
 
Kanplexity - a jumping-off point for Cynefin using Kanban
Kanplexity - a jumping-off point for Cynefin using KanbanKanplexity - a jumping-off point for Cynefin using Kanban
Kanplexity - a jumping-off point for Cynefin using KanbanOrderly Disruption
 
Scrumban – lean software development
Scrumban – lean software developmentScrumban – lean software development
Scrumban – lean software developmentNaveen Kumar Singh
 

Similar a Kanban Methodology (20)

Advanced kanban overview for waterfall & scrum practitioners (16x9 deck)
Advanced kanban overview for waterfall & scrum practitioners  (16x9 deck)Advanced kanban overview for waterfall & scrum practitioners  (16x9 deck)
Advanced kanban overview for waterfall & scrum practitioners (16x9 deck)
 
Kanban English
Kanban   EnglishKanban   English
Kanban English
 
WP # 1 - Kanban-fitment
WP # 1 - Kanban-fitmentWP # 1 - Kanban-fitment
WP # 1 - Kanban-fitment
 
Agile Methodologies in SAP
Agile Methodologies in SAPAgile Methodologies in SAP
Agile Methodologies in SAP
 
WP # 2 - Optimizing WIP
WP # 2 - Optimizing WIPWP # 2 - Optimizing WIP
WP # 2 - Optimizing WIP
 
Kin2020- flow based product development- an experience report
Kin2020-  flow based product development- an experience reportKin2020-  flow based product development- an experience report
Kin2020- flow based product development- an experience report
 
Kanban
Kanban Kanban
Kanban
 
Scrumban
ScrumbanScrumban
Scrumban
 
Kanban board 9th may 2017
Kanban board   9th may 2017Kanban board   9th may 2017
Kanban board 9th may 2017
 
Kanban - a quick intro.
Kanban - a quick intro.Kanban - a quick intro.
Kanban - a quick intro.
 
Kanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum pptKanban.pptx software engineering scrum ppt
Kanban.pptx software engineering scrum ppt
 
LKIN17: Managing an Enterprise Shared Services with Kanban in SAFe - Saikat Das
LKIN17: Managing an Enterprise Shared Services with Kanban in SAFe - Saikat DasLKIN17: Managing an Enterprise Shared Services with Kanban in SAFe - Saikat Das
LKIN17: Managing an Enterprise Shared Services with Kanban in SAFe - Saikat Das
 
Kanban India 2022 | Ravi Tadwalkar | From Scrum to ScrumBan/Kanban: Process ...
Kanban India 2022 | Ravi Tadwalkar |  From Scrum to ScrumBan/Kanban: Process ...Kanban India 2022 | Ravi Tadwalkar |  From Scrum to ScrumBan/Kanban: Process ...
Kanban India 2022 | Ravi Tadwalkar | From Scrum to ScrumBan/Kanban: Process ...
 
From Scrum to ScrumBan or Kanban- Process Evaluator Workshop using Excel.pptx
From Scrum to ScrumBan or Kanban- Process Evaluator Workshop using Excel.pptxFrom Scrum to ScrumBan or Kanban- Process Evaluator Workshop using Excel.pptx
From Scrum to ScrumBan or Kanban- Process Evaluator Workshop using Excel.pptx
 
What is Kanban in Agile?
What is Kanban in Agile?What is Kanban in Agile?
What is Kanban in Agile?
 
Kanban
KanbanKanban
Kanban
 
Kanban v1.1
Kanban v1.1Kanban v1.1
Kanban v1.1
 
Kanplexity - a jumping-off point for Cynefin using Kanban
Kanplexity - a jumping-off point for Cynefin using KanbanKanplexity - a jumping-off point for Cynefin using Kanban
Kanplexity - a jumping-off point for Cynefin using Kanban
 
Introduction to Scrum
Introduction to ScrumIntroduction to Scrum
Introduction to Scrum
 
Scrumban – lean software development
Scrumban – lean software developmentScrumban – lean software development
Scrumban – lean software development
 

Último

Xen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdfXen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdfStefano Stabellini
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based projectAnoyGreter
 
SpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at RuntimeSpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at Runtimeandrehoraa
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEOrtus Solutions, Corp
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesPhilip Schwarz
 
Unveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesUnveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesŁukasz Chruściel
 
Taming Distributed Systems: Key Insights from Wix's Large-Scale Experience - ...
Taming Distributed Systems: Key Insights from Wix's Large-Scale Experience - ...Taming Distributed Systems: Key Insights from Wix's Large-Scale Experience - ...
Taming Distributed Systems: Key Insights from Wix's Large-Scale Experience - ...Natan Silnitsky
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEEVICTOR MAESTRE RAMIREZ
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaHanief Utama
 
How to submit a standout Adobe Champion Application
How to submit a standout Adobe Champion ApplicationHow to submit a standout Adobe Champion Application
How to submit a standout Adobe Champion ApplicationBradBedford3
 
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...Angel Borroy López
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxTier1 app
 
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...confluent
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样umasea
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityNeo4j
 
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in NoidaBuds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in Noidabntitsolutionsrishis
 
Cyber security and its impact on E commerce
Cyber security and its impact on E commerceCyber security and its impact on E commerce
Cyber security and its impact on E commercemanigoyal112
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024StefanoLambiase
 
Unveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsUnveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsAhmed Mohamed
 
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)jennyeacort
 

Último (20)

Xen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdfXen Safety Embedded OSS Summit April 2024 v4.pdf
Xen Safety Embedded OSS Summit April 2024 v4.pdf
 
MYjobs Presentation Django-based project
MYjobs Presentation Django-based projectMYjobs Presentation Django-based project
MYjobs Presentation Django-based project
 
SpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at RuntimeSpotFlow: Tracking Method Calls and States at Runtime
SpotFlow: Tracking Method Calls and States at Runtime
 
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASEBATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
BATTLEFIELD ORM: TIPS, TACTICS AND STRATEGIES FOR CONQUERING YOUR DATABASE
 
Folding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a seriesFolding Cheat Sheet #4 - fourth in a series
Folding Cheat Sheet #4 - fourth in a series
 
Unveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New FeaturesUnveiling the Future: Sylius 2.0 New Features
Unveiling the Future: Sylius 2.0 New Features
 
Taming Distributed Systems: Key Insights from Wix's Large-Scale Experience - ...
Taming Distributed Systems: Key Insights from Wix's Large-Scale Experience - ...Taming Distributed Systems: Key Insights from Wix's Large-Scale Experience - ...
Taming Distributed Systems: Key Insights from Wix's Large-Scale Experience - ...
 
Cloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEECloud Data Center Network Construction - IEEE
Cloud Data Center Network Construction - IEEE
 
React Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief UtamaReact Server Component in Next.js by Hanief Utama
React Server Component in Next.js by Hanief Utama
 
How to submit a standout Adobe Champion Application
How to submit a standout Adobe Champion ApplicationHow to submit a standout Adobe Champion Application
How to submit a standout Adobe Champion Application
 
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...
Alfresco TTL#157 - Troubleshooting Made Easy: Deciphering Alfresco mTLS Confi...
 
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptxKnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
KnowAPIs-UnknownPerf-jaxMainz-2024 (1).pptx
 
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...
Catch the Wave: SAP Event-Driven and Data Streaming for the Intelligence Ente...
 
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
办理学位证(UQ文凭证书)昆士兰大学毕业证成绩单原版一模一样
 
EY_Graph Database Powered Sustainability
EY_Graph Database Powered SustainabilityEY_Graph Database Powered Sustainability
EY_Graph Database Powered Sustainability
 
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in NoidaBuds n Tech IT Solutions: Top-Notch Web Services in Noida
Buds n Tech IT Solutions: Top-Notch Web Services in Noida
 
Cyber security and its impact on E commerce
Cyber security and its impact on E commerceCyber security and its impact on E commerce
Cyber security and its impact on E commerce
 
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
Dealing with Cultural Dispersion — Stefano Lambiase — ICSE-SEIS 2024
 
Unveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML DiagramsUnveiling Design Patterns: A Visual Guide with UML Diagrams
Unveiling Design Patterns: A Visual Guide with UML Diagrams
 
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)
Call Us🔝>༒+91-9711147426⇛Call In girls karol bagh (Delhi)
 

Kanban Methodology

  • 2. 看板 – Kanban Kanban literally means “visual card,” “signboard,” or “billboard.” Kanban cards act as a form of “currency” representing how WIP is allowed in a system
  • 3. Challenges of Iterative Approach  Short time-boxes give more frequent opportunity to measure progress and inspect software but force development items to be smaller.  Smaller development items are often too small to be valuable and difficult to identify  Quality of requirements suffers as analysts rush to prepare for upcoming cycles  Quality of current development suffers when busy analysts are unable to inspect software or answer questions during development  Quality often suffers as testers race to complete work late in the development time-box Development work often continues throughout a cycle while testing starts late and never seems to get enough time.
  • 4. Kanban for Software Teams  Agile software development teams today are able to leverage the concept of agile by matching the amount of work in progress (WIP) to the team's capacity. This gives teams more flexible planning options, faster output, clearer focus, and transparency throughout the development cycle.  While the core principles of the framework are timeless and applicable to almost any industry, software development teams have found particular success with the agile practice.  In part, this is because software teams can begin practicing with little to no overhead once they understand the basic principles. Unlike implementing Kanban on a factory floor, which would involve changes to physical processes and the addition of substantial materials, the only physical things a software teams need are a board and cards, and even those can be virtual.
  • 5. Kanban boards  The work of all Kanban teams revolves around a Kanban board, a tool used to visualize work and optimize the flow of the work among the team. While physical boards are popular among some teams, virtual boards are a crucial feature in any agile software development tool for their traceability, easier collaboration, and accessibility from multiple locations.  Regardless of whether a team's board is physical or digital, their function is to ensure the team's work is visualized, their workflow is standardized, and all blockers and dependencies are immediately identified and resolved. A basic Kanban board has a three-step workflow: To Do, In Progress, and Done. However, depending on a team's size, structure, and objectives, the workflow can be mapped to meet the unique process of any particular team.  The Kanban methodology relies upon full transparency of work and real-time communication of capacity, therefore the Kanban board should be seen as the single source of truth for the team's work.
  • 6. Kanban benefits Planning flexibility A Kanban team is only focused on the work that's actively in progress. Once the team completes a work item, they pluck the next work item off the top of the backlog. The product owner is free to reprioritize work in the backlog without disrupting the team, because any changes outside the current work items don't impact the team. As long as the product owner keeps the most important work items on top of the backlog, the development team is assured they are delivering maximum value back to the business. So there's no need for the fixed-length iterations you find in scrum. Tip: Savvy product owners always engage the development team when considering changes to the backlog. For example, if user stories 1-6 are in the backlog, user story 6's estimate may be based on the completion of user stories 1-5. It's always a good practice to confirm changes with the engineering team to ensure there are no surprises. Shortened cycle times Cycle time is a key metric for Kanban teams. Cycle time is the amount of time it takes for a unit of work to travel through the team’s workflow–from the moment work starts to the moment it ships. By optimizing cycle time, the team can confidently forecast the delivery of future work. Overlapping skill sets lead to smaller cycle times. When only one person holds a skill set, that person becomes a bottleneck in the workflow. So teams employ basic best practices like code review and mentoring help to spread knowledge. Shared skills mean that team members can take on heterogeneous work, which further optimizes cycle time. It also means that if there is a backup of work, the entire team can swarm on it to get the process flowing smoothly again. For instance, testing isn't only done by QA engineers. Developers pitch in, too. In a Kanban framework, it's the entire team's responsibility to ensure work is moving smoothly through the process. Fewer bottlenecks Multitasking kills efficiency. The more work items in flight at any given time, the more context switching, which hinders their path to completion. That's why a key tenant of Kanban is to limit the amount of work in progress (WIP). Work-in-progress limits highlight bottlenecks and backups in the team's process due to lack of focus, people, or skill sets. Continuous delivery We know that continuous integration–the practice of automatically building and testing code incrementally throughout the day–is essential for maintaining quality. Now it's time to meet continuous delivery (CD). CD is the practice of releasing work to customers frequently–even daily or hourly. Kanban and CD beautifully complement each other because both techniques focus on the just-in-time (and one-at-a-time) delivery of value. The faster a team can deliver innovation to market, the more competitive their product will be in the marketplace. And Kanban teams focus on exactly that: optimizing the flow of work out to customers.
  • 7. Kanban Metrics One of the core values is a strong focus on continually improving team efficiency and effectiveness with every iteration of work. Charts provide a visual mechanism for teams to ensure they're continuing to improve. When the team can see data, it's easier to spot bottlenecks in the process (and remove them). Two common reports Kanban teams use are control charts and cumulative flow diagrams. Tip: The team's goal is to reduce the amount of time an issue takes to move through the entire process. Seeing the average cycle time drop in the control chart is an indicator of success. A control chart shows the cycle time for each issue as well as a rolling average for the team. A cumulative flow diagram shows the number of issues in each state. The team can easily spot blockages by seeing the number of issues increase in any given state. Issues in intermediate states such as "In Progress" or "In Review" are not yet shipped to customers, and a blockage in these states can increase the likelihood of massive integration conflicts when the work does get merged upstream.
  • 8. Scrum Vs. Kanban Some teams blend the ideals of Kanban and scrum into "scrumban." They take fixed length sprints and roles from scrum and the focus on work in progress limits and cycle time from Kanban. For teams just starting out with agile, however, we strongly recommend choosing one methodology or the other and running with it for a while.
  • 9. Kanban Board – Configuration Options Options Description General General info. of the project such as name, administrators. Columns Define constraints on the number of issues (Kanban is usually 9 issues) Swim lanes Horizontal Splits based on Stories, Assignees or Epics Quick Filters Filter Options (Need to have understanding of JQL) Card Colors Define Flag Colors based on Assignees, DOR etc. Card layout Extra Fields (Maximum of 3) to be shown on the Stories Working days Time Zone, Working Days Definition for the team Issue Detail view Fields to be shown on Issue Detail Screen
  • 10. Kanban Board – Configuration Options Board View Releases – Defined in the Project Administration and set to each story. Report View Issues – Issue Types (Stories/Epics) as defined in the Project Administration Components – Defined in the Project Administration and set to each story Feedback Project Administration – Visible to Administrators Add Ons Expand the window
  • 12. Elaborate Kanban Board 1. Define a work process flow. 2. Lay out a visual Kanban board. 3. Decide on limits for items in queue and work in progress. 4. Place prioritized goals on the left column of the board. 5. Start the board by placing stories or features in queue. 6. Move features through the process flow as work is complete. 7. Use the dates on the cards to calculate cycle time. Place an expedite track above the main left to right queue This board uses painters tape to indicate available “slots” for work in progress Product Owners manage the waiting queue. Place “done and waiting” queues between each work queue. Cycle time = finish date – start date The average cycle time from the date the item enters the board is the wait time from this point in the queue