INTRODUCTION Estimating is defined as a method by which we can get  an approximation of the material, investment involved, and the time to be taken for the completion of Electrification project Normally it can be enlisted under following four headings. - Estimating the quantity of the material and the cost involved. - Analysis of cost or selling price. - Maintaining proper accounts. - Provision of selling aids .
ESSENTIAL ELEMENTS OF ESTIMATING Specification of material. Latest market cost of material. Calculation of material and labour cost.   Knowledge of purchase system.
SUBSTATION Substations are serves as a source of energy supply for the local area of distribution.  Their main functions are to receive energy transmitted at high voltage from the generating stations, reduce the voltage to a value appropriate for distribution and provide facilities for switching.
CLASSIFICATION OF SUBSTATION 1) Indoor type.  In such substation the apparatus is installed within the substation building.  The equipment on primary side may be T.P.M.O. circuit breakers, H.T fuse The equipment on secondary side may be distribution switch board .
pole mounted substations. 2) Outdoor type. Plinth mounted substation.
ADVANTAGES OF OUTDOOR SUBSTATION The constructional works is needed is much smaller than the indoor substations.  Less quantity of building material is needed. The extension of the scheme is easier, whenever needed. Whole of the equipment can viewed, which makes fault location easier.
 
ESTIMATING OF 11KV/440V POLE MOUNTED OUTDOOR SUBSTATION
 
40x6 mm,M.S flat with nut & bolt. 2nos 2nos H.T grade, , porcelain body, glazed
 
 
 
CONCLUSION Estimating of substation plays an important role in distribution of electrical energy, because substation is the heart of distribution system of electrical energy. So we have to consider both all points before estimating of a substation. Generally we should estimate in such a way that the cost involved should be low and further addition of new parts can be easily done for the fulfillment of rise in power demand.

Más contenido relacionado

La actualidad más candente

Measurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_versionMeasurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_version
Aman Ansari
 

La actualidad más candente (20)

132kV GSS ppt
132kV GSS ppt132kV GSS ppt
132kV GSS ppt
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
Concept of energy transmission & distribution
Concept of energy transmission & distribution Concept of energy transmission & distribution
Concept of energy transmission & distribution
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Power Transformer Differential protection
Power Transformer Differential protectionPower Transformer Differential protection
Power Transformer Differential protection
 
Switchgear Equipment in a Substation
Switchgear Equipment in a SubstationSwitchgear Equipment in a Substation
Switchgear Equipment in a Substation
 
Distribution transformer
Distribution transformerDistribution transformer
Distribution transformer
 
33kv substation
33kv substation33kv substation
33kv substation
 
Single line diagram
Single line diagramSingle line diagram
Single line diagram
 
132kv substation inplant training seminar
132kv substation inplant training seminar132kv substation inplant training seminar
132kv substation inplant training seminar
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
Measurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_versionMeasurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_version
 
Design of substation
Design of substationDesign of substation
Design of substation
 
Power system protection devices
Power system protection devicesPower system protection devices
Power system protection devices
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
 
TDU Unit 03 Distribution Systems
TDU Unit  03 Distribution SystemsTDU Unit  03 Distribution Systems
TDU Unit 03 Distribution Systems
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
Electrical bus bar and its types
Electrical bus bar and its typesElectrical bus bar and its types
Electrical bus bar and its types
 
Electrical Power substation
Electrical Power substationElectrical Power substation
Electrical Power substation
 
Earthing system
Earthing system   Earthing system
Earthing system
 

Destacado

Pole mounted substaion in kerala
Pole mounted substaion in keralaPole mounted substaion in kerala
Pole mounted substaion in kerala
sebinkb
 
Uttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training reportUttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training report
19saurabh89
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
Prateek Agarwal
 
substation 101
substation 101substation 101
substation 101
danica11
 
System and method for generating electric power
System and method for generating electric powerSystem and method for generating electric power
System and method for generating electric power
shalsub
 
Power cables
Power cablesPower cables
Power cables
college
 
Power generation through railway track
Power generation through railway trackPower generation through railway track
Power generation through railway track
Muhammad Aleem
 
Wireless+power+transmission+via+solar+power+satellite
Wireless+power+transmission+via+solar+power+satelliteWireless+power+transmission+via+solar+power+satellite
Wireless+power+transmission+via+solar+power+satellite
niteshmishra05
 

Destacado (20)

ppt
pptppt
ppt
 
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurTraining from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
 
Pole mounted substaion in kerala
Pole mounted substaion in keralaPole mounted substaion in kerala
Pole mounted substaion in kerala
 
Uttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training reportUttar pradesh power corparation ltd. training report
Uttar pradesh power corparation ltd. training report
 
33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)33/11 kV substation (u.p.p.c.l.)
33/11 kV substation (u.p.p.c.l.)
 
Analsis of very fast transient over voltages in gas insulated substations
Analsis of very fast transient over voltages in gas insulated substationsAnalsis of very fast transient over voltages in gas insulated substations
Analsis of very fast transient over voltages in gas insulated substations
 
2003 09-08 joeck icefa fuse protection in transformer pole substation
2003 09-08 joeck icefa fuse protection in transformer pole substation2003 09-08 joeck icefa fuse protection in transformer pole substation
2003 09-08 joeck icefa fuse protection in transformer pole substation
 
substation 101
substation 101substation 101
substation 101
 
Speed
SpeedSpeed
Speed
 
Alok ppt new 13 aprl
Alok ppt new 13 aprlAlok ppt new 13 aprl
Alok ppt new 13 aprl
 
Gas insulated sub station 2
Gas insulated sub station 2Gas insulated sub station 2
Gas insulated sub station 2
 
System and method for generating electric power
System and method for generating electric powerSystem and method for generating electric power
System and method for generating electric power
 
electrical engineering
electrical engineeringelectrical engineering
electrical engineering
 
Power generation from railway track
Power generation from railway trackPower generation from railway track
Power generation from railway track
 
Power cables
Power cablesPower cables
Power cables
 
Power generation through railway track
Power generation through railway trackPower generation through railway track
Power generation through railway track
 
Steam power plant
Steam power plant Steam power plant
Steam power plant
 
Amit
AmitAmit
Amit
 
Wireless+power+transmission+via+solar+power+satellite
Wireless+power+transmission+via+solar+power+satelliteWireless+power+transmission+via+solar+power+satellite
Wireless+power+transmission+via+solar+power+satellite
 
Sub stations-air insulated substations
Sub stations-air insulated substationsSub stations-air insulated substations
Sub stations-air insulated substations
 

Similar a Estimation of a_pole_mounted_substation

Whitepaper-Energy-Harvesting
Whitepaper-Energy-HarvestingWhitepaper-Energy-Harvesting
Whitepaper-Energy-Harvesting
Forrest Huff
 
Facilities Planning at KE
Facilities Planning at KEFacilities Planning at KE
Facilities Planning at KE
Habib Ali Khan
 

Similar a Estimation of a_pole_mounted_substation (20)

USM_Mechanical and Electrical Engineers in Land Development Projects
USM_Mechanical and Electrical Engineers in Land Development Projects USM_Mechanical and Electrical Engineers in Land Development Projects
USM_Mechanical and Electrical Engineers in Land Development Projects
 
Industry tech overview by golden coffee business & investment consulting
Industry tech overview by golden coffee business & investment consultingIndustry tech overview by golden coffee business & investment consulting
Industry tech overview by golden coffee business & investment consulting
 
Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)Designing Solar PV Systems ( Utility Scale)
Designing Solar PV Systems ( Utility Scale)
 
Defence presentation.pptx
Defence presentation.pptxDefence presentation.pptx
Defence presentation.pptx
 
Energy harvesting-low-power-sensor-systems
Energy harvesting-low-power-sensor-systemsEnergy harvesting-low-power-sensor-systems
Energy harvesting-low-power-sensor-systems
 
Whitepaper-Energy-Harvesting
Whitepaper-Energy-HarvestingWhitepaper-Energy-Harvesting
Whitepaper-Energy-Harvesting
 
Energy harvesting-low-power-sensor-systems
Energy harvesting-low-power-sensor-systemsEnergy harvesting-low-power-sensor-systems
Energy harvesting-low-power-sensor-systems
 
Training at 132 kv substation
Training at 132 kv substation Training at 132 kv substation
Training at 132 kv substation
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
 
Low power in vlsi with upf basics part 1
Low power in vlsi with upf basics part 1Low power in vlsi with upf basics part 1
Low power in vlsi with upf basics part 1
 
Footsteppowergenerationsystem
FootsteppowergenerationsystemFootsteppowergenerationsystem
Footsteppowergenerationsystem
 
substation topic.docx
substation topic.docxsubstation topic.docx
substation topic.docx
 
Low power embedded system design
Low power embedded system designLow power embedded system design
Low power embedded system design
 
Substations
SubstationsSubstations
Substations
 
5 Reasons You Need the Latest Generation of iPDU
5 Reasons You Need the Latest Generation of iPDU5 Reasons You Need the Latest Generation of iPDU
5 Reasons You Need the Latest Generation of iPDU
 
Phase 4
Phase 4Phase 4
Phase 4
 
Substation journal
Substation  journalSubstation  journal
Substation journal
 
Related RE work (LT, 11kV & 33kV)
Related RE work (LT, 11kV & 33kV)Related RE work (LT, 11kV & 33kV)
Related RE work (LT, 11kV & 33kV)
 
Facilities Planning at KE
Facilities Planning at KEFacilities Planning at KE
Facilities Planning at KE
 
EMCLO PROJECT: EMC DESIGN METHODOLOGY FOR LAYOUT OPTIMIZATION
EMCLO PROJECT: EMC DESIGN METHODOLOGY FOR LAYOUT OPTIMIZATIONEMCLO PROJECT: EMC DESIGN METHODOLOGY FOR LAYOUT OPTIMIZATION
EMCLO PROJECT: EMC DESIGN METHODOLOGY FOR LAYOUT OPTIMIZATION
 

Último

Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Último (20)

Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableNanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKOTA 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KOTA 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 

Estimation of a_pole_mounted_substation

  • 1. Estimating of A Pole mounted substation Prepared By :
  • 2. INTRODUCTION Estimating is defined as a method by which we can get an approximation of the material, investment involved, and the time to be taken for the completion of Electrification project Normally it can be enlisted under following four headings. - Estimating the quantity of the material and the cost involved. - Analysis of cost or selling price. - Maintaining proper accounts. - Provision of selling aids .
  • 3. ESSENTIAL ELEMENTS OF ESTIMATING Specification of material. Latest market cost of material. Calculation of material and labour cost. Knowledge of purchase system.
  • 4. SUBSTATION Substations are serves as a source of energy supply for the local area of distribution. Their main functions are to receive energy transmitted at high voltage from the generating stations, reduce the voltage to a value appropriate for distribution and provide facilities for switching.
  • 5. CLASSIFICATION OF SUBSTATION 1) Indoor type. In such substation the apparatus is installed within the substation building. The equipment on primary side may be T.P.M.O. circuit breakers, H.T fuse The equipment on secondary side may be distribution switch board .
  • 6. pole mounted substations. 2) Outdoor type. Plinth mounted substation.
  • 7. ADVANTAGES OF OUTDOOR SUBSTATION The constructional works is needed is much smaller than the indoor substations. Less quantity of building material is needed. The extension of the scheme is easier, whenever needed. Whole of the equipment can viewed, which makes fault location easier.
  • 8.  
  • 9. ESTIMATING OF 11KV/440V POLE MOUNTED OUTDOOR SUBSTATION
  • 10.  
  • 11. 40x6 mm,M.S flat with nut & bolt. 2nos 2nos H.T grade, , porcelain body, glazed
  • 12.  
  • 13.  
  • 14.  
  • 15. CONCLUSION Estimating of substation plays an important role in distribution of electrical energy, because substation is the heart of distribution system of electrical energy. So we have to consider both all points before estimating of a substation. Generally we should estimate in such a way that the cost involved should be low and further addition of new parts can be easily done for the fulfillment of rise in power demand.