This document provides a summary of Surendra Yadav's professional experience and qualifications. He has over 14 years of experience in MEP construction, electrical design, project management, and site management in Qatar and other Gulf countries. Some of the key projects he has worked on include the New College of Engineering at Qatar University, the Worker's Hospital & Integrated Health Centre in Ras Laffan, and the Lusail Multipurpose Hall. He holds certifications as a Grade 1 Electrical Engineer and for fire alarm systems from local authorities in Qatar.
Top profile Call Girls In Sagar [ 7014168258 ] Call Me For Genuine Models We ...
Mep manager surendra yadav 26112016
1. YADAV SURENDRA NARAYAN (www.linkedin.com/in/surendra348)
Contact No.: +974 33663464/31193885; E-mail: surendra348@gmail.com, surendra@etastarmneqatar.com
Assignments in MEP Construction / Project Management / Site Management with an organisation
ETA STAR ENGINEERING DIVISION DOHA, QATAR (Total 14 years Exp. /11 Years in Gulf)
SYNOPSIS
Urban Planning and Development Authority (UPDA) /(KAHRAMAA) certified Grade “1” (Grade
“A”) Electrical Engineer dated 06-04-2011
Qatar Civil Defence Department (QCDD) certified Grade “1” (Grade “A”) for fire Alarm system
dated 08-11-2012
A seasoned professional with over 14 years of experience in MEP Construction, Electrical Designing, Operation
and Maintenance, Quality and Workforce Management.
MEP Manager at NEW COLLEGE OF ENGINEERING project under Qatar University (Since August,
2016 to October, 2016)
Project Manager – Worker Hospital & Integrated Health Centre Ras Laffan (Since March, 2016 to
August 2016)
Worked in Lusail Multipurpose Hall as Project Manager – MEP (Since April, 2015 to Feb 2016) &
Construction Manager – MEP (Since June, 2013 to April 2015)
Previous project assignment was BARWA COMMERCIAL AVENUE TYPE-1 with ETA Star engineering &
Contracting, Doha, Qatar as Construction Manager – Electrical (Since June, 2010 to May 2013)
Previous project assignment was with Voltas Ltd., Abu Dhabi, U. A. E. as Project & Design Engineer.
Proficient in handling deadlines, budgets as well as different personalities to bring various project to a
successful conclusion.
Demonstrated abilities in effective work planning, budgeting and planning as well as implementing various
cost control measures.
An effective communicator with excellent relationship management skills and strong analytical, leadershi p,
decision making, problem solving & organisational abilities.
CORE COMPETENCIES
Site & Construction Management
Identifying, quantifying critical and non-critical risk areas, mitigating & suggesting measures to minimize the
impact of risk, monitoring status of risk throughout the project.
Inspecting project sites to review progress and identifying hindrances. Suggesting corrective actions to
facilitate smooth & fast progress.
Anchoring on-site MEP construction activities as per the given drawings to ensure completion of project within
the time & cost parameters and effective resource utilization to maximize the output.
Electrical Design Engineering
Steering initiatives for managing the design of electrical system drawings (CAD) including fire alarm and
structured cabling design as per local authority regulations and international design standards.
Managing all design calculations like voltage drop, sag, tension, fault diversity and preparing the load
schedules as per local authority regulations.
Coordinating with mechanical, structural and architectural departments at various stages of design for
successful and timely design completion.
Attending technical meetings, resolve ambiguities and impediments.
Scheduling, planning and monitoring the progress of MEP installations at site.
Project Management
Overseeing the complete project conceptualization, basic engineering, detailed engineering, estimation,
planning & implementation of project plans within present budgets and deadlines.
Executing resource planning for optimizing man & machine utilization, reducing wastes for enhancing
productivity and profitability.
2. CAREER CONTOUR
Jun’2010- Continue with ETA STAR ENGINEERING & CONTRACTING, MNE DIVISION DOHA, QATAR
Construction Manager - Electrical & MEP - Project Manager
1. NEW COLLEGE OF ENGINEERING, QATAR UNIVERSITY
Role:
MEP Manager at NEW COLLEGE OF ENGINEERING project under Qatar University
Assigned on August 2016 in middle stage of project at 28% progress to handle:
145 Mn of MEP work with hi-tech classrooms and laboratory
7x1600 Transformer, 3x1000 KVA DG set, 69 AHU, 456 FCU, 3 heat exchanger, AV system, CCTV, PAVA,
FAS, ACS etc
Project under execution phase with 32% progress
2. WORKERS HOSPITAL & INTEGERATED HEALTH CENTER RAS LAFFAN
Role:
MEP Manager at Workers Hospital RAS LAFFAN project
Assigned on March 2016 in middle stage of project to handle at 35% progressed:
232 Mn of MEP overall project consisting main hospital with 252 bed capacity and Integrated health facility
Project executed up to 70%
Involved with detail design development and budget estimates.
Budget planning & Material scheduling
Healthcare experience
In-depth knowledge of HTM 06-01 and HTM 06-02, HTM in critical medical locations and AE/AP/CP etc
In-depth knowledge of BS7671, including Section 710 Medical Locations, Medical Electrical (ME) systems
including IPS
Associated HTM’s such as Medical Gases and Water Quality
Construction planning & scheduling
Progress monitoring
Dealing with supervisory consultants
Review the project plans and specifications, scheduling, possible cost savings measures and potential
construction problems.
Monitor and maintain the project construction schedule on a weekly basis.
Deal with the Consultants regarding any errors, discrepancies or omissions contained within the Consultant’s
design drawings
3. LUSAIL MULTIPURPOSE HALL (INDOOR STADIUM OF 15,500 SITTING CAPACITY)
Role:
Successfully completed the project for the event 24th
MEN`S HANDBALL WORLDCUP, QATAR 2015
Building Includes: Field of Play, Warm up halls, Changing rooms, Lounges, Medical centre, Concourses,
Spectator seating, VIP/VVIP area, Ticketing offices, Food and Beverage service, Restaurants, Cafes, Rentable
spaces, Office spaces, Event & Competition supporting facilities, Media and Broadcasting facilities, Prayer
rooms
Dealing with Government Authorities like KAHRAMAA, QATAR Civil defence, Urban Planning & Municipality
division, Sea/air Port clearance
Planning, controlling & managing site manpower including 16 Engineers, 40 supervisors & 1500 man powers
Overseeing the work progress, records and resolving the delay issues
Controlling & Monitoring of material take off, submittal & delivery
Highlights:
Successfully completed the construction of LUSAIL MULTIPURPOSE HALL, presently at handover stage
Co-ordination with client & monitoring site execution as per design.
4. BARWA COMMERCIAL AVENUE (RESIDENTIAL & COMMERCIAL PROJECT)
Role:
Co-ordination with consultant, main contractor & others sub-contractor to execute the site work timely
Critical material follow up with national & International supplier/manufacturer for urgent delivery
Dealing with Government Authorities like KAHRAMAA, QATAR Civil defence, Urban Planning & Municipality
division, Sea/air Port clearance
Planning, controlling & managing site manpower including 10 Engineers, 25 supervisors & 600 man powers
Overseeing the work progress, records and resolving the delay issues
Controlling & Monitoring of material take off, submittal & delivery
Close out of NCR/SM issues
3. Developing of design changes and shop drawings modification through field changes request.
Raising RFI for correct design.
Highlights:
Successfully completed the construction of BARWA COMMERCIAL AVENUE, test on completion certificated
and handover the project.
Co-ordination with client & monitoring site execution as per design.
Apr’08-Nov’09 with Voltas Ltd. Abu Dhabi, U.A.E.
Project / Design Engineer
5. FERRARI EXPERIENCE PROJECT (A THEME PARK)
Role:
Handling the design work of MV, LV switchgear, MDB, SMDB & DB, etc.
Monitoring the selection of transformer & DG set for emergency load.
Managing complete power & lighting system as well as the ride requirement of project.
Studying the contract documents, specifications, drawings and addendums for work execution.
Ensuring the execution of work as per standard of ADDC/DEWA regulations.
Taking care of MV/LV switch gear installations & underground cable pulling as well as the termination of cable
as per ADDC rules.
Developing 2500 design and 1500 shop drawings.
Raising RFI and guiding the construction team for correct execution at site.
Administering sub-contractor and conducting quality check as per ADDC regulations and obtaining approval
from ADDC for the project execution.
Projects Handled:
Ferrari Experience – A theme park with ALDER/BESIX at YAS Island for Project Cost: 2 Billion USD.
Working with 36 MW power for project 6 Nos. of Sub-Stations, 18 Nos. of 2000 KVA Transformer of ABB and
its distribution system for Ferrari Experience project, A unique theme park in the world designed by JRA,
USA and exhibition place of Ferrari world brand
Highlights:
Successfully developed the design system for Ferrari experience project- theme park as new concept and it
was highly appreciated by everyone and accepted by client haply.
Took initiatives to execute projects on time and within budgets.
Designed of speciality lighting system and its service provider. Provided complete solution and it was
accepted by consultant JRA and client ALDAR-BESIX.
Original design was done by ROSSER i.e. completed as per ADDC.
Got Employee of the Month Award.
Oct’06-Apr’08 with Rezayat Co. Ltd. with NCC, Yanbu, Saudi Arabia
Electrical / Project Engineer
6. Yanbu Technical University and Royal Prince House at Yanbu, KSA
Role:
Studying the contract documents, specifications, drawings and addendums for work execution.
Installing and testing of transformer, LV Pane, MDB, DB and Lift, etc.
Handling the arrangements for mobilization of plant, machinery and offices.
Generating material submittal for 2500, 2000 KVA distribution transformer.
Implementing works as per the quality standards set by MARAFIQ 22/13/.4 KV distribution line.
Overseeing the work progress, records and resolving the delay issues.
Following KSA standards and implementing the same for the project execution.
Suggesting solutions for the possible problem in future.
Interacting with sub-contractor personnel for cable pulling & RMU installation.
Reviewing shop drawings and following up the approval from Royal Commission, Yanbu.
Preparing material submittals and follow-up for approval from consultant.
Taking care of the material estimation and overall management.
Managing Site Supervision & Quality Control for Electrical Manhole, Duct, Termination and PMS Unit.
Administering the preparation for charge of transformer after site test certificate.
4. Systems and Equipments Handled:
Temporary Power System Design, ELV System-Fire Alarm, CCTV, Burger Alarm, AV System, Intercom
Monitoring System, Data System and UPS Design.
Highlights:
Successfully completed 60 Million Riyal Project.
Project completed - Yanbu Technical University and Royal Prince House at Yanbu, KSA.
Purchased Electrical Equipment of 21 million.
Developed 1500 Shop Drawings.
Re-design of lighting system of prince house at Yanbu, it was accepted by Royal commission Yanbu and
executed projects on time and within budgets.
Long lead item like transformer was on hold from six month i.e. got approval and managed temporary system
to handover the project on time with temporary transformer.
Oct’05-Jul’06 with Bajra Guru Const. Co. P. Ltd., Kathmandu, Nepal
Project Engineer cum Branch Manager
7. Khanar-Biratchowk 33 kV Transmission Line Project, NEA & Nepal Electricity Authority, Eighth
Power Project
Role:
Handling overall construction, contract management and quality control.
Reviewing the design, drawings and quantity estimates.
Generating work schedules, working drawings and contract completion report.
Taking care of plants and equipment as well as handling progress monitoring & reporting.
Managing Technical Management and Interacting with NEA and Supervisory Team of Employer for Smooth
Completion of Projects.
Projects Handled:
Nepal Electricity Authority, Eighth Power Project of 2500 km length of 33 kv transmission line and
50,000 km length of 11kv distribution line, 250 distribution transformer installation, charges, handover to
client.
Khanar-Biratchowk 33 kV Transmission Line Project, NEA.
1.5 MVA of Sub-Station with 33kv/11kv Distribution Line Installation, Testing and Handover to Client.
Community Based Rural Electrification (CBRE) of NEA, with 600 km of 11kv Live with 10000 km of 0.4kv
Line and 50 Transformers, Cable Termination, Testing and Charged as well as Handover to Client.
Highlights:
Successfully handled the overall design verification, execution and review of 1.5 MVA sub-station.
Managed the overall design and review of 33/11/0.4 KV transmission line.
Overall design Review of 33/11/0.4 KV transmission line.
Ideated completely new route for 33/11KV line with newly design and cost saving for client.
Apr’00-Nov’01 with Hyatt Regency, Kathmandu, Nepal
Multi Skilled Technician
Role:
Handling the works related to plumbing at water treatment plant.
Coordinating with technical support team for the smooth functioning of projects.
Conducting the testing of Transformer, LV Panel, DG Set, Chillers, Pumps, etc.
Attending the training by Contractor for multiskilled field.
Taking care of LV House, DG Set / Boiler House.
Managing fault / panel monitoring and resolving it with Power, Mechanical and HVAC Equipment.
Systems and Equipment Handled:
HT & LT DB, TOD Meter, VCB, TR-2*750KVA, LT*1600KVA*2, ACB, MCCB, LDB and PDB.
BMS Controlled Automation System in LV Panel and Auto DG Set Start Up by BMS.
UPS 500 KVA, Data System, Public Address System, Security Alarm System and Building Automation System.
HVAC System, Chillers 400 T *2, Boiler 3 T*2, AHU, FCU, Chilled Water Pump, Cooling Tower and Accessories,
Splitter Type and Window Type A/C, etc.
5. LT panel of 3200 KVA load, 750 kV 2 no’s DG set.
ELV System like Fire Alarm System, AV System, CATV, CCTV, etc.
HP Pump, Ion Exchanger WTP and Sewage Treatment Plant.
Audio-Visual System, OHP, Mixture and Computer Based System Control.
Sep’98-Jan’00 with Nepal Battery Company Ltd., Kathmandu, Nepal
Trainee Manufacturing Supervisor
Role:
Handling Material Estimation, Quality Control & Packaging.
Coordinating with Safety Officer and Quality Control Facilitator.
Taking care of preventive and breakdown maintenance.
Projects Handled:
Successfully supervised and completed Photo Voltaic Project at Home and Rural Electrification System
Design.
ACADEMIA
2005 B.E. in Electrical Engineering from T.U. Institute of Engineering, Pulchowk Campus, Kathmandu.
1998 Diploma in Mechanical Engineering from T.U. Institute of Engineering, Purwanchal Campus, Dharan.
1995 10th
from Shree Secondary school, Diman, SLC board from Govt. of Nepal, Sanothimi, Bhaktapur.
IT Skills
Well versed with MS-office, AutoCAD, Mat Lab and other programmes.
Conversant with Fortran77, C, C++ and Visual Basic 6.0.
Basic computer knowledge.
PERSONAL DOSSIER
Date of Birth: 3rd September 1978
Languages Known: English, Hindi, Nepali and Urdu
Present Address: ETA Star Engineering & Contracting WLL, BCA Type-1
M&E Div. P.O. Box 23773 Doha Qatar
Phone: +974.3366.3464 /31193885
Specialization: Advance Power System
Photovoltaic System
6. S.N. CLIENTS PROJECT NAME LOCATION TYPE OF DURA MEP
1
MSHEIREB
PROPERTIES/CQBC/TQ
PHASE-1B DOHA CITY HIGH RISE BUILDING 565 Mn
2 QATAR UNIVERSITY/ADE
NEW COLLEGE OF
ENGINEERING
DUHAIL UNIVERISTY 3 145 Mn
3
PRIVATE ENGINEERING
OFFICE/QACC
WORKERS HOSPITAL &
INTEGERATED HEALTH
CENTER
RAS LAFFAN HOSPITAL 6 232 Mn
4 QOC(MOYS)/CCC MULTIPURPOSE HALL LUSAIL STADUIM INDOOR 36 335 Mn
5 BARWA PROPERTIES
BARWA COMMERCIAL
AVENUE
INDUSTRAIL
AREA
COMMERCIAL &
RESIDENTAIL
36 245 Mn
6 ALDAR PROPERTIES
FERRARI EXPERIENCE
PROJECT
YAS ISLAND THEME PARK 19 450 Mn
7 ROYAL COMMISSION
Yanbu Technical
University and Royal
Prince House
YANBU UNIVERISTY 18 70 Mn
8
NEPAL ELECTRICITY
AUTHORITY
33 kV Line Project &
Eighth Power Project
Khanar-
Biratchowk
HIGH VOLTAGE
WORK
10 50 Mn (NRs)
9
TARAGOUN HOTEL
ASSOCIATION
Hyatt Regency Kathmandu HOTEL 5 STAR 21 70 Mn (NRs)
10
EVEREADY INDUSTRIES
INDIA
Nepal Battery Company
Ltd.
Kathmandu
CELL
MANUFACTURING
15