SlideShare una empresa de Scribd logo
1 de 4
CURRICULUM VITAE
1) Personal Details :
Name Suresh Chand Gupta
Date Of Birth 29.08.1958
Nationality Indian
Designation General Manager ( Inspection and
Expediting)
Experience 34 Years in Oil and Gas sector at
Engineers India Limited
Permanent Address H-34/50, Sector-3, Rohini, Delhi
-110085 (India)
Marital Status Married
Contact Details Mobile : +91 9650597938
Mail id: scguptadelhi@yahoo.co.in
2) Educational Qualification:
Institute Degree Year of Passing
Jodhpur University B.E (Mechanical) 1980
Baroda Productivity Council Dip. In Bus. Management 1982
3) Company - Engineers India Limited:
Employed with Engineers India Ltd. (EIL) a Government of India
undertaking in the field for Petroleum refining, Pipe lines, Gas
processing, Off shore engineering, petrochemicals etc. Company was
established in collaboration with Bechtel Corporation USA.
Serving EIL since Jan 6,1981.
4) Job description is as follows:
I am in procurement department of EIL wherein I have following experience:
• Managing Core Expediting Group, Procurement & Develop
Department, Shipping Department and Inspection team
• Expediting leader of HMEL Refinery in Bhatinda
• Procurement and inspection coordinator for Borouge 2 Project of
Abudhabi Polymers Co. - posting at Tecnimont Italy now at Ruwais
Abu Dhabi.
• Sr. Coordinator for purchase for SKIKDA Project of Sonatrach
Algeria and inspection of critical equipments. Posting was at
CPECC China.
• Inspection (vessels, columns, exchangers, piping material, pumps,
pipelines etc.)
• Offshore visits
• Expediting ( shop ordered items for oil and gas project) ,
• Monitoring the progress of orders for the complete Project and
maintenance of overall status of shop ordered item and expediting
thereof.
• Purchase (material for MGCC project of M/s IPCL and line pipes for
GAIL)
• Vendor Development (review of application, assessment of vendor
for registration, preparation of capacity assessment reports) and
inspection of shop ordered items.
This makes me a truly procurement man having in depth exposure of
all aspects of procurement.
5) Chronological summary of career :
Aug 2014 till Date : General Manager ( Inspection) at New Delhi
Managing Core Expediting Group at Delhi, Procurement & Develop Department,
Shipping Department and Inspection team at Delhi.
Dec 08 to Aug 2014 : At EIL Delhi
Expediting Head for HMEL Refinery first and then overall head of expediting
team. Responsible for expediting of Purchase order items for all the Projects
handled by EIL
October 07 till Dec 08: At Tecnimont Milan Italy
Worked as procurement and inspection coordinator for Borouge II project of
ADNOC Abudhabi
There are about 500 orders to be placed for Polyolefins Unit (Petrochemical
Project) being executed by Tecnimont Italy. I am a member of Integrated Project
Management Team and am responsible for procurement, vendor approval,
inspection coordination and expediting of orders. Project is likely to continue till
March 2009.
July 2007 till Sept 07: At EIL New Delhi
Monitored and expedited the progress of LLDPE/ HDPE Swing Unit of IOCL
being done by our company on LSTK basis. Project is worth Rupees 9000 million
and being executed under PMC Uhde India. National and international orders are
being expedited.
2006- June 2007: At China as Procurement coordinator for Skikda Condensate
Topping Project at Algeria of M/s Sonatrach being executed by M/s CPECC of
China. Inspection of critical items.
2001-2005 : At EIL New Delhi
a) Vendor development : Registration of new vendors for items for which less
vendors exists.
b) Assessment of capacity of vendors for linepipe projects for which huge
quantity is required.
c) Approval of vendors list for procurement of Project item
d) Assessing causes of problems and writing report for example causes of ovality
in linepipes, Indian Experience of usage of Spiral welded line pipes etc.
e) inspection of project material.
f) Pojects : IOCL Panipat Refinery, GAIL, HPCL, OIL India , etc.
1997-2000 - At EIL New Delhi: Progress monitoring and expediting of vendors
supplies for Essar Oil Refinery Project. Inspection of spheres, bulk material &
NDT.
1993-1997 – At Baroda: Expediting of material to meet the project schedule.
Inspection of fabricated equipment, bulk material, Line pipes etc. including NDT
thereof. Was visiting engineer to L and T Hazira works where crical equipments
are ordered.
1983-1993 – At EIL New Delhi
i- Expediting of material, coordination of vendors’ deviations and monitoring of
project for vendor supplies. IPCL and ONGC projects were coordinated and
monitored for in time supply of material to site. Inspection of mechanical items,
offshore visits etc.
Purchased material for a Mega Project - MGCC of IPCL now part of Reliance
India. Purchased line pipes for longest pipeline project HBJ Pipe line project.
1982-1983 – Baroda – Expediting and inspection of materials like vessels, heat
exchangers, pumps, valves, lining etc.. Quality control, NDT and shop visits.
11) Foreign postings :
 Italy1990 ( 90 Days) : As company representative for
inspection of material for Gas
Lift Pipe Line project of ONGC
 South Korea 1993 (90 Days) : Inspection of SHW Platform for
ONGC
 South Korea 1998 ( 25 Days) : Inspection of Line pipe material
for GAIL
 China2004 (21 Days) : Inspection of pipes
 China 2006-2007 ( 1.5 Years) : Procurement Coordinator for
Skikda Condensate Topping Project Algeria
 Italy Oct 2007 – till date : Sr. Procurement Coordinator for
Borouge II Project at Abu Dhabi
 Abudhabi 2008 ( 1.5 month) : Sr. Procurement Coordinator
(Part of above assignment)
 Japan and South Korea ( 8days) : Expediting
 Japan : Problem resolution at Hitachi
 USA (Six visits 6 days each) : Inspection and expediting
(2009-2015)
 Offshore assignments for pipe laying, NDT, Platform installation etc.
12) Experience Before Joining Eil & Job Description : Nil
13) Research Papers/Publications/Seminars : Nil
14) Training/Special Courses Attended : RT LEVEL II
ISO Internal Auditors
Course
15) PROFESSIONAL MEMBERSHIP : Certified Chartered
Engineer by Institution
of Engineers India.
(S.C. Gupta)
Phone – 0091-11-47097938/ +91 9650597938
scguptadelhi@yahoo.co.in

Más contenido relacionado

La actualidad más candente

CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfRAMPRASADBALLAV1
 
varun kumar resume
varun kumar resumevarun kumar resume
varun kumar resumeVARUN YADAV
 
Dongguan Yuanguan Plastic Mold Co.,Ltd
Dongguan Yuanguan Plastic Mold Co.,LtdDongguan Yuanguan Plastic Mold Co.,Ltd
Dongguan Yuanguan Plastic Mold Co.,LtdSunny Long
 
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016Roger Breedlove
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh
 
CURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit PandyaCURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit PandyaPANDYA PULKIT
 
CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )AdnanAltaf13
 
Sridhar V - Resume - Short April 2015
Sridhar V - Resume - Short April 2015Sridhar V - Resume - Short April 2015
Sridhar V - Resume - Short April 2015Sridhar Venkataraman
 
Manojeet Kumar CV-Inspections
Manojeet Kumar CV-InspectionsManojeet Kumar CV-Inspections
Manojeet Kumar CV-InspectionsManojeet Kumar
 
Anuj resume 21 - copy
Anuj resume 21 - copyAnuj resume 21 - copy
Anuj resume 21 - copyAnuj kumar
 
Resume Tariq QA
Resume Tariq QAResume Tariq QA
Resume Tariq QATariq mohd
 
Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1janarthana raja
 

La actualidad más candente (18)

DIBIN C1
DIBIN C1DIBIN C1
DIBIN C1
 
JIMJITH QC INSPECTOR
JIMJITH QC INSPECTORJIMJITH QC INSPECTOR
JIMJITH QC INSPECTOR
 
CV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdfCV of Ramprasad-converted-compressed.pdf
CV of Ramprasad-converted-compressed.pdf
 
varun kumar resume
varun kumar resumevarun kumar resume
varun kumar resume
 
Dongguan Yuanguan Plastic Mold Co.,Ltd
Dongguan Yuanguan Plastic Mold Co.,LtdDongguan Yuanguan Plastic Mold Co.,Ltd
Dongguan Yuanguan Plastic Mold Co.,Ltd
 
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
Willow Oak Operating Partners Cover page and Case Studies 18 May 2016
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_Mech
 
pk
pkpk
pk
 
CURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit PandyaCURRICULAM VITAE_Pulkit Pandya
CURRICULAM VITAE_Pulkit Pandya
 
CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )
 
Sridhar V - Resume - Short April 2015
Sridhar V - Resume - Short April 2015Sridhar V - Resume - Short April 2015
Sridhar V - Resume - Short April 2015
 
Ranjit Singh
Ranjit Singh Ranjit Singh
Ranjit Singh
 
Scratch hardness-tester
Scratch hardness-testerScratch hardness-tester
Scratch hardness-tester
 
Manojeet Kumar CV-Inspections
Manojeet Kumar CV-InspectionsManojeet Kumar CV-Inspections
Manojeet Kumar CV-Inspections
 
Anuj resume 21 - copy
Anuj resume 21 - copyAnuj resume 21 - copy
Anuj resume 21 - copy
 
Resume
ResumeResume
Resume
 
Resume Tariq QA
Resume Tariq QAResume Tariq QA
Resume Tariq QA
 
Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1Copy (2) of Jana CV - Copy.doc( rev6)_1
Copy (2) of Jana CV - Copy.doc( rev6)_1
 

Destacado

Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul A'mal Mohd Hanafiah
 
Ashish kalra CV_Congo
Ashish kalra CV_CongoAshish kalra CV_Congo
Ashish kalra CV_CongoAshish Kalra
 
Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)Vijay Gupta
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah
 
RESUME_Santanu Das Majumdar-27.04.2016
RESUME_Santanu Das Majumdar-27.04.2016RESUME_Santanu Das Majumdar-27.04.2016
RESUME_Santanu Das Majumdar-27.04.2016SANTANU DAS MAJUMDAR
 
VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)VINOTH M
 
Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)Rohit Sharma
 
Chandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & materialChandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & materialChandresh Gupta
 

Destacado (18)

Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
Khoirul Amal Mohd Hanafiah Piping Engineering Aug 2016
 
Ashish kalra CV_Congo
Ashish kalra CV_CongoAshish kalra CV_Congo
Ashish kalra CV_Congo
 
exp cv
exp cvexp cv
exp cv
 
Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)Vijay_Sr Piping Designer(PDS&SP3D)
Vijay_Sr Piping Designer(PDS&SP3D)
 
Saurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CVSaurabh Shah Piping Engineer CV
Saurabh Shah Piping Engineer CV
 
Ramanuja Sharma_CV
Ramanuja Sharma_CVRamanuja Sharma_CV
Ramanuja Sharma_CV
 
CV-NKN-09.05.16
CV-NKN-09.05.16CV-NKN-09.05.16
CV-NKN-09.05.16
 
RESUME-01
RESUME-01RESUME-01
RESUME-01
 
RESUME_Santanu Das Majumdar-27.04.2016
RESUME_Santanu Das Majumdar-27.04.2016RESUME_Santanu Das Majumdar-27.04.2016
RESUME_Santanu Das Majumdar-27.04.2016
 
MAINTENANCE C V
MAINTENANCE C V MAINTENANCE C V
MAINTENANCE C V
 
VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)
 
Pratiksha Jadhav_ Resume
Pratiksha Jadhav_ ResumePratiksha Jadhav_ Resume
Pratiksha Jadhav_ Resume
 
PUSPENDU UPDATED
PUSPENDU UPDATED PUSPENDU UPDATED
PUSPENDU UPDATED
 
Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)Rohit Sharma-Reume(2015)
Rohit Sharma-Reume(2015)
 
Chandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & materialChandresh_Gupta_CV piping Design_layout & material
Chandresh_Gupta_CV piping Design_layout & material
 
CV-Shipyard
CV-ShipyardCV-Shipyard
CV-Shipyard
 
Akhil_CV
Akhil_CVAkhil_CV
Akhil_CV
 
Naveen_Resume (2)
Naveen_Resume (2)Naveen_Resume (2)
Naveen_Resume (2)
 

Similar a CV SCGupta Nov 15-1

Similar a CV SCGupta Nov 15-1 (20)

A Datta -Resume
A Datta -ResumeA Datta -Resume
A Datta -Resume
 
CV-Pon
CV-PonCV-Pon
CV-Pon
 
CV-PM
CV-PMCV-PM
CV-PM
 
Prabhakar_CV
Prabhakar_CVPrabhakar_CV
Prabhakar_CV
 
VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7VIPUL VICHARE_CURRICULUM_VITAE_7
VIPUL VICHARE_CURRICULUM_VITAE_7
 
MANOJ CV
MANOJ CVMANOJ CV
MANOJ CV
 
CV copy-2
CV copy-2CV copy-2
CV copy-2
 
Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)Resume-Manish Gupta (Static Equipment)
Resume-Manish Gupta (Static Equipment)
 
Resume Tariq mohd
Resume Tariq mohdResume Tariq mohd
Resume Tariq mohd
 
CV-PM Ponraj
CV-PM PonrajCV-PM Ponraj
CV-PM Ponraj
 
Resume
ResumeResume
Resume
 
Cv copy 2 (1)
Cv copy 2 (1)Cv copy 2 (1)
Cv copy 2 (1)
 
subhash__cv
subhash__cvsubhash__cv
subhash__cv
 
RESUME.pdf
RESUME.pdfRESUME.pdf
RESUME.pdf
 
RESUME.pdf
RESUME.pdfRESUME.pdf
RESUME.pdf
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_Mech
 
Anil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_MechAnil Deshmukh_cv_BE_Mech
Anil Deshmukh_cv_BE_Mech
 
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experienceResume_Mechanical(Static  Equipments Engineer) SRP 9.5 yrs experience
Resume_Mechanical(Static Equipments Engineer) SRP 9.5 yrs experience
 
CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)CV_SUKANTA DALAI (PIPING DESIGNER)
CV_SUKANTA DALAI (PIPING DESIGNER)
 
Hari -QA-QC Engineer
Hari -QA-QC EngineerHari -QA-QC Engineer
Hari -QA-QC Engineer
 

CV SCGupta Nov 15-1

  • 1. CURRICULUM VITAE 1) Personal Details : Name Suresh Chand Gupta Date Of Birth 29.08.1958 Nationality Indian Designation General Manager ( Inspection and Expediting) Experience 34 Years in Oil and Gas sector at Engineers India Limited Permanent Address H-34/50, Sector-3, Rohini, Delhi -110085 (India) Marital Status Married Contact Details Mobile : +91 9650597938 Mail id: scguptadelhi@yahoo.co.in 2) Educational Qualification: Institute Degree Year of Passing Jodhpur University B.E (Mechanical) 1980 Baroda Productivity Council Dip. In Bus. Management 1982 3) Company - Engineers India Limited: Employed with Engineers India Ltd. (EIL) a Government of India undertaking in the field for Petroleum refining, Pipe lines, Gas processing, Off shore engineering, petrochemicals etc. Company was established in collaboration with Bechtel Corporation USA. Serving EIL since Jan 6,1981. 4) Job description is as follows: I am in procurement department of EIL wherein I have following experience: • Managing Core Expediting Group, Procurement & Develop Department, Shipping Department and Inspection team • Expediting leader of HMEL Refinery in Bhatinda • Procurement and inspection coordinator for Borouge 2 Project of Abudhabi Polymers Co. - posting at Tecnimont Italy now at Ruwais Abu Dhabi. • Sr. Coordinator for purchase for SKIKDA Project of Sonatrach Algeria and inspection of critical equipments. Posting was at CPECC China. • Inspection (vessels, columns, exchangers, piping material, pumps, pipelines etc.)
  • 2. • Offshore visits • Expediting ( shop ordered items for oil and gas project) , • Monitoring the progress of orders for the complete Project and maintenance of overall status of shop ordered item and expediting thereof. • Purchase (material for MGCC project of M/s IPCL and line pipes for GAIL) • Vendor Development (review of application, assessment of vendor for registration, preparation of capacity assessment reports) and inspection of shop ordered items. This makes me a truly procurement man having in depth exposure of all aspects of procurement. 5) Chronological summary of career : Aug 2014 till Date : General Manager ( Inspection) at New Delhi Managing Core Expediting Group at Delhi, Procurement & Develop Department, Shipping Department and Inspection team at Delhi. Dec 08 to Aug 2014 : At EIL Delhi Expediting Head for HMEL Refinery first and then overall head of expediting team. Responsible for expediting of Purchase order items for all the Projects handled by EIL October 07 till Dec 08: At Tecnimont Milan Italy Worked as procurement and inspection coordinator for Borouge II project of ADNOC Abudhabi There are about 500 orders to be placed for Polyolefins Unit (Petrochemical Project) being executed by Tecnimont Italy. I am a member of Integrated Project Management Team and am responsible for procurement, vendor approval, inspection coordination and expediting of orders. Project is likely to continue till March 2009. July 2007 till Sept 07: At EIL New Delhi Monitored and expedited the progress of LLDPE/ HDPE Swing Unit of IOCL being done by our company on LSTK basis. Project is worth Rupees 9000 million and being executed under PMC Uhde India. National and international orders are being expedited. 2006- June 2007: At China as Procurement coordinator for Skikda Condensate Topping Project at Algeria of M/s Sonatrach being executed by M/s CPECC of China. Inspection of critical items. 2001-2005 : At EIL New Delhi
  • 3. a) Vendor development : Registration of new vendors for items for which less vendors exists. b) Assessment of capacity of vendors for linepipe projects for which huge quantity is required. c) Approval of vendors list for procurement of Project item d) Assessing causes of problems and writing report for example causes of ovality in linepipes, Indian Experience of usage of Spiral welded line pipes etc. e) inspection of project material. f) Pojects : IOCL Panipat Refinery, GAIL, HPCL, OIL India , etc. 1997-2000 - At EIL New Delhi: Progress monitoring and expediting of vendors supplies for Essar Oil Refinery Project. Inspection of spheres, bulk material & NDT. 1993-1997 – At Baroda: Expediting of material to meet the project schedule. Inspection of fabricated equipment, bulk material, Line pipes etc. including NDT thereof. Was visiting engineer to L and T Hazira works where crical equipments are ordered. 1983-1993 – At EIL New Delhi i- Expediting of material, coordination of vendors’ deviations and monitoring of project for vendor supplies. IPCL and ONGC projects were coordinated and monitored for in time supply of material to site. Inspection of mechanical items, offshore visits etc. Purchased material for a Mega Project - MGCC of IPCL now part of Reliance India. Purchased line pipes for longest pipeline project HBJ Pipe line project. 1982-1983 – Baroda – Expediting and inspection of materials like vessels, heat exchangers, pumps, valves, lining etc.. Quality control, NDT and shop visits. 11) Foreign postings :  Italy1990 ( 90 Days) : As company representative for inspection of material for Gas Lift Pipe Line project of ONGC  South Korea 1993 (90 Days) : Inspection of SHW Platform for ONGC  South Korea 1998 ( 25 Days) : Inspection of Line pipe material for GAIL  China2004 (21 Days) : Inspection of pipes
  • 4.  China 2006-2007 ( 1.5 Years) : Procurement Coordinator for Skikda Condensate Topping Project Algeria  Italy Oct 2007 – till date : Sr. Procurement Coordinator for Borouge II Project at Abu Dhabi  Abudhabi 2008 ( 1.5 month) : Sr. Procurement Coordinator (Part of above assignment)  Japan and South Korea ( 8days) : Expediting  Japan : Problem resolution at Hitachi  USA (Six visits 6 days each) : Inspection and expediting (2009-2015)  Offshore assignments for pipe laying, NDT, Platform installation etc. 12) Experience Before Joining Eil & Job Description : Nil 13) Research Papers/Publications/Seminars : Nil 14) Training/Special Courses Attended : RT LEVEL II ISO Internal Auditors Course 15) PROFESSIONAL MEMBERSHIP : Certified Chartered Engineer by Institution of Engineers India. (S.C. Gupta) Phone – 0091-11-47097938/ +91 9650597938 scguptadelhi@yahoo.co.in