SlideShare una empresa de Scribd logo
1 de 31
1
Arab International University
Faculty of Business Administration
Management Department
Feasibility Study course
Electric cable car project (Telepherique)
Student name 1-Sami Alfares 2-Loye Adaam 3-Tamim Kbarh
Student ID 201111096 201110075 201010129
Dr Supervisor:
Dr . Serene Dalati Dr. Yasser mashaal
2
Executive summary
The Telepherique the scientific term is (electric cable car), one of the most modern
ways of transportation, the presence of a telepherique in any area is an important tourist
attraction for the region because of the presence of all recreational facilities associated
with it , especially when he meets a global nature and the sea and the mountain .
Location:
Lattakia ( linking Alpedrosah with Kassab. Alpedrosah becauseof its proximity to the
beach and Kassab due to height above sea level and nature of the mountain which
constitutes an attraction for tourists because of the link that region to each other)
Service
Is the tourist producta service aims to transport tourists from the beach area to the
mountain and vice versa via the caravans within specific path and specific height via
particular number of caravans , including certain number of people does not exceed four
people within two stations, one at the bottom and the other at the top and through the
caravan starts from the beach through areas of forest with the density of trees and great
views of the sea to the terms of access to the mountain. It can reach the top of the
mountain through another way( the land route)and that for the tourists who want to
enjoy the other service of this project , which includes hotels, restaurants, swimming
3
pools and all the necessary services for tourists. It is possible to be a service for some of
the surrounding areas .
Height: telepherique route distance line is 6.5 km , It`s speed is 18:00 per second .The
arrival time of tourists to the end of the track is during 20 to 25 minutes.
Number of vehicles 60 truck and strengthen these vehicles with reinforced Plastic to
ensure the safety of passengers .
Market:
This project is the only one in Syria and this project is one of the large-scale projects .
The aim of this project is to attract the largest number of tourists from different parts of
the world, allowing substantial profits and stimulate tourism and increase the national
income of the country.
Within the statistics of the Ministry of Tourism, the number of Arab and foreign
tourists 4148822from May to September.
The estimated proportionof tourists Syrians 1035000local tourists.
(www.syriatourism.org( 2014
/www.cbssyr.sy/
Opportunity
1- Legal environment, particularly in the field of tourism investment.
2- Is a large tourist projects raise the growth rate of the country.
3- The high proportionof tourism, especially in this region, which provides an
opportunity to achieve high profitability.
4- An environment conducive investment by laws that facilitate the work of large
projects.
5- The project raises the tourism revenue by a large margin
4
- Table of Contents
index pag
- CoverSheet 1
- Executive Summary 2
- Table of Contents 4
- Introduction 5
- The Service 5
- MarketEnvironment 7
- Competition 9
- Industry 9
o Technology 11
o Production/Operating Requirements 12
- Business Model 13
o Intellectual Property 14
o Regulations/EnvironmentalIssues 15
o Managementand PersonnelRequirements 15
- Sales Strategy 17
o Advertising Strategy 18
o The Price Strategy 20
- CriticalRisk Factors 23
FinancialProjections -
Referenceslist 24
APPENDEX 25
5
Introduction
The Ministry of Tourism has issued executive instructions of the legislative decree No. /
23 / Date 04/05/2010 private cable car projects, to encourage the government to set up a
large Govt allows most investors think of the pump heads money in such projects
Building a project like this is said and an important tourist attraction and increases the
importance of tourism and the region economically, so they have big opportunity to
start project.
PRODUCT/SERVICE
The cable car is a means of pneumatic conveying is composed in the form wagon or
open chair in other times, but the current project is closed wagon
- The project consists of the first station A away from the seashore of 1.5 km and a
second station B on the surface of the mountain, the distance between stations 6.5
km Any distance 20 minutes per flight distance of 13 km
- Allows the second leg of tourists disembark and enjoy the mountain scenery and
of course can use the telescope to see the details of the cable car trip and
mountain views , and there is within this station ancillary tourist facilities (
restaurants - cafes - Supermarket )
- There on the wire 60 is closed vehicle can accommodateup to 4 people climb it
is one of the stations across someone assistant and someone else is working on
securing the safety of passengers and passenger safety factors confirm, place on a
wire cart through special drive each vehicle is designed to shock-proofglass
reinforced plastic anti- fire and not allow the glass to the tourist views of the
biggest factors of natural and cart path
6
- Upon entering the tourist of the facility from the main station , a station A is cut
ticket per personto enter Eat station which is where there are services and public
facilities with high quality and no plates and signals an indication of safety when
riding vehicles and other means , suchas the means of visual and audio and
passes within a series of facilities collocated ( Supermarket - Bar - Restaurant ) to
be after riding cart.
- Is the ticket for one trip between the two stations , and leaves the choice of
tourists to the revelation of the second leg and get to know the facilities and
services that can be used ( Bar - Restaurant - Supermarket )
- Eat found within the second leg of the telescope allows a group of tourists scenes
details itinerary cart and landscape scenes.
- Display offers service for tour groups and scientific facilities could be referring to
the mechanism of the cable car and a personfrom the marketing department and
give this service only for groups which is the purposeof scientific
- Plant workers specific tasks for each factor
1 - receives a cart after entering the station and is secured disembarkation of the
cart and the end of the journey
2 - pull the cart to the person who secure the safety and readiness of technical
Cart
3 - are losing the vehicle and safety factors and safety
4 - helps passengers in boarding and gives them the safety instructions during the
trip and close the cart and proceed to the station after the second and put them on
the path of the wire.
- Distributed work stations due to a similar process is similar
7
MARKET ENVIRONMENT
SWOT analysis:
Strengths
1 - strong funding
2 - The project consists of the administration to the terms of reference and high skills
3 - Develop strategic plans to reach new targets
4 - Entry of a strong and effective due to the lack of similar projects
5 - The use of modern technologies in the management of labor and management
operating line
6 - Workers trained and continue to renew skills
Weaknesses
1 - the inability to predict the occurrence of risk
2 - Analysis of the ticket plan sales the wrong way
3 - difficult to link to the holidays quickly
4 - failure to resolve technical problems quickly enough
5 - conflict between departments and differing views
Opportunity
1 - The existence of a market absorbs the idea of the project
8
2 - Facilities licenses from government agencies
3 - A new project is the only one in the market
4 - climatic environment in the region
Threats
1 - The emergence of direct competitors in the market in the same field
2 - climatic factors and weather changes
3 - raising the tax rate by the government
4 - low desire for tourists to ride the cable car
5 - Use of the tourist and the preference for alternative means of tourist
- As this project is the first of its kind in the country, there is little incentive for
most people to experience the climb in the cable car , the first period will be
based on the statistics of the Central Bureau of Statistics in Damascus
- The study will be based on that number would be domestic tourism
-
- The project is located in a tourist attraction and can be a percentage of foreign
tourism targeted and based on the statistics of the Ministry of Tourism shall be
according to the following table: ( in appendix)
- The tourists sector have a lot of tourism services , including the so-called tourism
offices and can be a target group to be the source to attract customers and the
number of offices licensed by the Ministry of Tourism office in the country 935
9
- The education sectorthere is in the curriculum of the Ministry of Education
lessons for transportation and no detail about the cable car and can be held jointly
with the Ministry of Education in order to ride in the cable car to allow students
to view this means
COMPETITION
Project on a national level , which is one of the big projects and the location of the
project and consists of its kind that has no direct competitor , but the presence of
competitors is determined indirectly from the weaknesses of the case and sometimes
force , according to the project type competitor
- Competitor indirectly
Supposehas set up a theme park next to the project in the mindset of tourists considered
Tlapt desire to enjoy watching nature
So can we build a strategy to be we focused on the establishment of ancillary projects
Another example of building a restaurant or spa at the top of the mountain would be the
biggest competitors indirectly will be a boytourist Rgah to enjoy from randed the
mountain instead of riding the cable car because the top of the mountain would enable
him to see the landscape so you must set up a strategy to start building projects related
with the project ( great restaurants ( resort ) - an amusement park )
INDUSTRY
- The cable car is a means of pneumatic conveying is composed in the form wagon
or open chair in other times, but the current project is closed wagon
- The cable car project provides a service of great beauty and at the same time is an
easy -to-use operating
- Is the means of transport between the first leg and the second by a closed wagon
iron wire across a distance of 13 km during the time of 20 minutes
10
How does the cable car ?
- Basic thing in running is the wire (cable ), a cable railing the rubber material ,
brass, stainless proportions allow How does it prove the cable on towers
supportive divided by the distance between them depending on the length of
distance and geography of the place should be in some areas to be wire way
vertical by a few and not horizontal.
- Wire transmits electricity to the vehicle and no vehicle in the first two motors , a
core runs on electricity and the engine running when you put it directly on the
wire and the second engine is a diesel engine , a motor assistant and works in
emergencies.
- Wire is placed on the reel spins quickly and light and rotation is the reason not to
allow the tires friction rail wagons in one place
- When you put the wire on the supporting towers placed on an electrical insulator
, stands tourist on a platform of passenger and assisted two first ensure the safety
of the vehicle (ie confirm doorlock - Confirm the engine ) and the second safety
of people ( sitting right - when an emergency Why do tourists ) cart be on the
wire , but when they enter the station no handle pay it from the path of the wire
and here the first factor comes and drives the cart toward the podium with his
hand to allow for a tourist ride and then push the carriage to the handle , which
converts it to the path of the wire and there is a sensitive devices placed on the
front side of the vehicle linked electronically with the handle opens the handle
when taking the signal from the sensordistance of the existence of safety
- Upon entering the tourist to Cart weight sensors operate automatically and there
is the weight of the weight of each vehicle to ensure the stability of vehicle is
vertical when crossing on the wire
- When the transition to the wire cart primitive trip to the second leg
- In the second leg differs form partially the second leg only where there is an
electronic handle to ensure the safety distance
11
- Tourists can to finish the first part of the journey in the second leg when he
arrived someone opens the doorof the vehicle and can go down and take cart
with his hand to the platform to ride to be able tourist who finished his tour in the
second leg of the back of the station first and there are two people also said their
work in the first station
- Engines are run through the Control Panel Actual which in the first leg and there
is a special room is completely closed and not visible to tourists and there is one
personmanages the process is the most important of these processes
1- Detection of any malfunction within the wire or motor vehicle or through
sensors
2- Continuous evaluation of the efficiency of the work of the wire
3- Detection permanent jobs sensors that are found in vehicles
4- Organize gigs so as not to be a difference in the preparation of vehicles
waiting for the starting inside the station
5- Constant contactwith the controlroom in the second leg
6- Direct contact with the plant workers who help tourists going up and down.
7- Monitor the performance of the work of the vehicles on the wire in a way
direct observation through a window allowing him to watch as much as
possible of the progress Cart.
- It is the second personwithin the controlroom also helps the commander of the
control room and cares about the details and figures and statistics about the
performance of the engines and the weights and the wire and electricity
TECHNOLOGY
The project needs a set of characteristics of technology and can be summarized as
follows :
1- you need the cart to the existence of a sensitive increase in vehicle weight
when the rise of the tourist and it can be both sensitive and wagon works
automatically and no sound when overweight
2- the cable railway is the main part of the project , so manufacturers have
developed and created a system for detecting faults in or proportion of each
failure and the extent of repair this fault , and no cross-accountmeasures led
the cable programmer automatically, the vehicles will go on the cable evenly
12
timetable so put in front of me every vehicle sensitive and delicate rear safety
measures the distance between vehicles.
3- The devices measure the presence of allergies are things that must be
monitored so always been linked to the devices to a central showing the
efficiency of each device on the end of each wagon
4- cut ticket system with boarding a vehicle presence technologies can regulate
the time of entry tourist ride with cart at each of the stations to reduce
congestion
5- Systems and safety when a cup is one of the most important vehicle needs
required by the tourists so was the introduction of a visual and audible and
written and crossing through the graphics reservation tourist safety
6- Panel Differentiation electronic circuit which is turned into electricity
generator and give the last 35 minutes of the time of emergency .
7- Linking all these things with the controlpanel is the prerogative of the parent
company, supplier of engines and maintenance prayer is measured by specific
weather factors and the proportion of Use.
PRODUCTION / OPERATING REQUIREMENTS
After the implementation of the project and the need to start the cable car to the driving
force of an electricity
- The delivery of electricity from the lines the government will arrange for the
project costs are great for that factor to generate electricity will be generated
electricity can 500 / KVA work continuously to ensure serving in and when the
maintenance period shift power to the lines of the government conducts its
regular maintenance and the subject is coordinated by the maintenance
department with periods of power outages the government does not even have a
cable car stop in the case of
- There generating circuit with the promotion of a fed into the engine for 35
minutes through Takven containers and do this circuit in case of an emergency
- The project needs to maintenance team Mobile team steady , according to the
law and the Ministry of Tourism, the team needs to be trained by experts and
technicians manufacturer of engines and have a period of 3 months is the period
13
of control by the manufacturer's maintenance team , the manufacturer of the
engines was agreed with her that the things Maintenance large and rotating at the
hands of experts , which sends them by it to ensure the protection of intellectual
quality and maintenance.
There are many stakeholders with the project, but the most important:
-The owners of the land leased to put the poles wire or wire that passes from territory
they are of two types:
- government
- Private
Systems Act and the Ministry of Tourism, the relationship between the project and the
land owners of public and private
 Government : There are two types of contracts
o either be the government's profit rate measured with the proportionof land
belonging to the government between the Fund and the Ministry of
Husbandry and local tourism
o or to pay rent fixed costs attributable to fund local administration
Choosing the second decadeis less legal costs and better project
 Private
organization contracts with the landowners of the tasks of law section of the
project was agreed on the prices specified by the owners to be paid annually
14
Business Model
Company profit goal and working in the tourism sector and the entertainment
cable car project of the most important projects have
Legal form PARTNERSHIP consists of three partners, including the percentage
of contribution is divided equally:
1-Sami Alfares
2-Loye Adaam
3-Tamim Kbarh
- Highlight the strategy’s strengths and develop this strategy in the company's
objectives example :
- Ancillary building projects
- Construction of a similar project in the area of natural second example (Al
gab Valley - Zabadani Valley – Gabl al shekh valley).
INTELLECTUAL PROPERTY
The cable car project licensed by the Ministry of Tourism Investment idea was
based on a decree laws for implementation of the project proposaland the place
is the proposalof the Ministry of Tourism and place the proposalon the basis of
geographical factors and studies tourism and attractions
15
REGULATIONS / ENVIRONMENTAL ISSUES
Legislative Decree No. / 23 / for the year 2010 is based on the construction of the
project after it issued the Ministry of Tourism and Information Tnfveh explain
more details about the Decree
The facilities provided by the Council of Ministers were many of them
Ministry of Local Administration contracts and regulations concerning
land that passes by the wire
Ministry of tourist facilitate the commercial register the company licenses
and accreditation, decree No. 29 of 2011 Find Solutions for improved corporate
system
Ministry of Transportation as the cable car and the means of transport must
take a license for that, but due to lack of public interest to transfer the license was
canceled and work on the cable car to the benefit of tourism , especially for
tourism
Ministry of Environment and recorded the project as the project is
environmental benefit and the Governor of the integrity of the natural area where
there is
- As the tourism sectoris in its infancy in Syria there are also a lot of
facilities in the contracts , customs and import for this project will evolve in
conjunction with the laws that are issued
Management and Personnel Requirements
16
17
Sales Strategy
- Develop a plan and marketing goals and strategies and policies for the
implementation of these plans , this project and its size will have a plan at the
same time would be great goals , including:
1- access to all Syrian resident idea of the project
2- stimulate every Syrian to experience the ride
3- To encourage all tourists entering all borderpassenger experience
4- Raising the evaluation at the national level between the rest of the country
5- reinforce the notion that the Syrian hands are capable of producing high-
efficiency projects
- Develop policies to implement these goals are easy to access as a single project
in the market and do not wish to direct competitors and the tradition of this
project will be difficult
How attract customers:
1- Through the work efficiency and equipment
2- An idea for a feature on the tourist different from any other experience and the
experience of planting the idea that the cable car will give him energy and a
special feature
- The work in the establishment phase of the project was a great effort and global
experience and access to high quality require payment of large sums of money
and in the end, the customer will be satisfied with the service and would prefer to
repeat the experiment again.
- The initial definition of the service should give tourists an idea that will get
feature suitable for a price that will pay
18
A goal of reaching customers
1- To achieve the desire of tourists.
2- need to satisfy tourist.
3- tourist confirm that the payment amount is compared with the appropriate
Service.
4- tourist satisfaction and his insistence on re- trial.
5- Get tour groups and scientific deduction by the marketing department just for
tourists of local
6- Children under the age of 5 years will have a free card
7- Children between 5 years to 9 years will be worth 40% Discounts
Advertising
The process ofpromoting the idea that the project has begun
Will be many ways for the promotion of the project , including a:
-TV
-Radio
-Direct Mail
-Personal contacts
-Associations and trade unions
-Newspaper
-Magazines
-Telephones guide companies
-Billboards ways
-Internet web sites and social networking
-Mobile networks
-From some other forms
19
3- positive attitude from the first experience for the tourist and talk to others for a
fun experience
4- endowment with the overall objective of the tourism sector which is fun and not
to tamper with nature sceneries of nature sends this position in the tourist that the
company deserves that frequented the experience of the ride
About prepare customers expected
- Will be the focal point to this figure is very easy because of the lack of
competition and high quality but costs paid to a marketing plan will be high to
enable the project to attract foreign tourism to experience the cable car and visit
nearby tourist areas
- Put a marketing plan in the financial statements for each year and is considered
one of the most important plans in the project plan, the initial costs are
- Pricing policy according to the laws governing the Ministry of Tourism, there are
degrees of pricing , especially within the tourist establishments that attract
foreign tourism
- Specific pricing for each category and these unmeasurable compared with the
production department in working time and daily and monthly peak days and
months of seasonal
4-5-6-7-8-93+10+11Month
900800Price
20
The Price
- Price tag 099 SP per person includes only ride in the cable car, the price of entry
to the lounge at the station includes a telescope 50 SP
- Offer price by the time for the year and day of the seasonand could be on the
slide
- Every person has the motive in the aviation attract people from motives that are
owned by it easy, and if this is achieved, which will pay the amount Mtmian and
feel satisfied
- When foreign tourists, according to the statistics of the Ministry of Tourism
numbers of tourists who go to the coastalarea does not have any bidder to pay
such an amount for a service they consider worth because they have a
preconceived idea about the experience, especially in the beautiful natural factors
Total revenue in high seasons :
Number of
passengers
In hours
The
number
of
hours
in work
day
The
number
of
flights
The
number
of days
of the
season
6*30
H24048180345600
M18048180259200
L12036180129600
Total1122734400
The price of Ticket900
660960000
21
Total revenue in low seasons :
Number of
passengers
In hours
The
number
of
hours
in work
day
The
number
of
flights
The
number
of days
of the
season
30*3
H1800
M120369064800
L80369043200
Total612108000
The price of Ticket800
86400000
Total revenue per year747360000
22
Other statistic
5-6-7-8-93-4-10-11Month
900800Price
Number of
passengers
In hours
The
number
of
hours
in work
day
The
number
of
flights
The
number
of days
of the
season
30*5
H24048150288000
M18048150216000
L12036150108000
total1122612000
The price of Ticket900
550800000
23
Number of
passengers
In hours
The
number
of
hours
in work
day
The
number
of
flights
The
number
of days
of the
season
30*4
H18048120172800
M1203612086400
L803612057600
‫المجموع‬1020316800
The price of Ticket800
253440000
Total revenue per year804240000
CRITICAL RISK FACTORS
Some of the risk factors and indicators of occurrence:
1- Loss of diesel fuel, which will pay for the costs of the largest institution for the
benefit of electricity and could be a long-term power outage at some times of the
year
2- The aging of the service the tourism sector need to develop a permanent meets
the need and desires of the tourist cable car project is difficult to be developed
entirely
3- The rapid depreciation of the wire
4- Loss of vehicle and people inside because of the depreciation in the wire
5- a surprise in the case of weather and climate change
6- Workers Strike
7- interruption of road workers
8- The presence of a technical malfunction and need experts
9- fire
10- tampering in supporting Towers
11- The presence of large boulders and need greater supportto be removed
24
Financial Projections
References list
Name position References other
Ali Alraee
Building and
construction company 954158084
Oday
Darwesh
Syrian Investment
Agency 4473012 http://www.investinsyria.org
Head Directorate contracts 2210122 http://www.syriatourism.org/
Amer
Aitouni
National Insurance
Company 3348690 www.natinsurance.com
Nasooh
Alkaree Industrial motors
Al marjee near the Ministry
of the Interior
Sameer
Janood Engineer in happy_land 933429909 Baghdad Street
25
APPENDEX
1- The market sigma :
26
2- The number of foreign tourist in 2009 -2010
27
20092010
‫الخليج‬764309705803
‫اردنية‬8827501363644
‫عراقية‬806118897975
‫اللبنانيون‬9217621467701
‫آخرون‬ ‫عرب‬215334219406
‫العرب‬35902734654530
‫الغربية‬ ‫أوروبا‬293890348103
‫الشرقية‬ ‫أوروبا‬9646492208
‫تركية‬381677864988
‫أوروبا‬ ‫مجموع‬7720311305299
‫أمريكا‬7762184196
‫ايرانية‬430880792258
‫آسيا‬77099108264
‫استراليزا‬1597119240
‫آخرون‬ ‫أجانب‬6307769003
‫أجانب‬14366792378260
‫العام‬ ‫المجموع‬50269527032790
‫مغترب‬ ‫سوري‬10649371513060
‫الكلي‬ ‫المجموع‬60918898545849
20092010
‫العرب‬35902734654530
‫أجانب‬14366792378260
‫العام‬ ‫المجموع‬50269527032790
‫مغترب‬ ‫سوري‬10649371513060
‫الكلي‬ ‫المجموع‬60918898545849
/2010-2009/ ‫الجنسية‬ ‫حسب‬ ‫المغترب‬ ‫والسوري‬ ‫واالجانب‬ ‫العرب‬ ‫السياح‬ ‫عدد‬
28
3- The numberof servicesoffice
4- The survey
29
‫استبيان‬
( ‫الكهربائية‬ ‫العربة‬ ‫مشروع‬‫التلفريك‬)‫وجود‬ ، ‫والسياحة‬ ‫النقل‬ ‫وسائل‬ ‫من‬ ‫الحديثة‬ ‫الطرق‬ ‫أكثر‬ ‫من‬ ‫واحد‬ ‫هو‬‫مشروع‬
( ‫الكهربائية‬ ‫العربة‬‫التلفريك‬)‫جميع‬ ‫وجود‬ ‫بسبب‬ ‫المنطقة‬ ‫في‬ ‫مهم‬ ‫سياحي‬ ‫جذب‬ ‫عامل‬ ‫هو‬ ‫مكان‬ ‫أي‬ ‫في‬‫الترفيهية‬ ‫المرافق‬
‫به‬ ‫المرتبطة‬‫.وجود‬ ‫والجبل‬ ‫والبحر‬ ‫عالمي‬ ‫طابع‬ ‫يلتقي‬ ‫عندما‬ ‫خصوصا‬ ‫جذب‬ ‫عوامل‬ ‫وجود‬ ‫أو‬‫الكهربائية‬ ‫العربة‬ ‫مشروع‬
(‫التلفريك‬)‫و‬ ‫كسب‬ ‫منطقة‬ ( ‫مثال‬ ‫الجذب‬ ‫عوامل‬ ‫فيها‬ ‫ويوجد‬ ‫سياحية‬ ‫منطقة‬ ‫في‬ ‫وخاصة‬) ‫البحر‬ ‫شاطئ‬‫الالذقية‬ ‫محافظة‬.
‫مشروع‬( ‫الكهربائية‬ ‫العربة‬‫التلفريك‬)‫العربات‬ ‫من‬ ‫مجموعة‬ ‫على‬ ‫يشتمل‬(‫الكهربائية‬)‫من‬ ‫الركاب‬ ‫تنقل‬ ‫التي‬ ،( ‫االسفل‬
) ‫البحر‬ ‫شاطئ‬‫أعلى‬ ‫إلى‬) ‫الجبل‬ ‫قمة‬ (‫بارتفاع‬‫بين‬ ‫يتراوح‬02‫إلى‬02‫والعكس‬ ‫األرض‬ ‫سطح‬ ‫عن‬ ً‫ا‬‫متر‬"،ً‫ا‬‫صعود‬
‫بطول‬ ،"ً‫ال‬‫ونزو‬6.5‫كم‬‫طولي‬.
: ‫الشخصية‬ ‫المعلومات‬
.............. ‫الجنس‬ ................ ‫العمر‬....................... ‫العلمي‬ ‫المستوى‬
)‫سوري‬ ‫.......................(ليرة‬ ‫الدخل‬ ‫مستوى‬.ً‫ا‬‫شهري‬‫محدد‬ ‫رقم‬ ‫اكتب‬.
‫عد‬ ‫متزوج‬ ‫كنت‬ ‫إذا‬ ..................... ‫االجتماعية‬ ‫الحالة‬‫األسرة‬ ‫أفراد‬ ‫د‬................
1-‫أن‬ ‫تعتقد‬ ‫هل‬‫كسب‬ ‫منطقة‬‫إنشاء‬ ‫وتستحق‬ ‫جميلة‬‫مشروع‬( ‫الكهربائية‬ ‫العربة‬‫التلفريك‬)‫فيه‬‫؟‬ ‫ا‬
○‫نعم‬○‫ال‬
2-‫زيارة‬ ‫في‬ ‫كنت‬ ‫إن‬‫ل‬‫المنطقة‬ ‫هذه‬‫تجربة‬ ‫في‬ ‫ترغب‬ ‫هل‬( ‫الكهربائية‬ ‫العربة‬ ‫وصعود‬‫ال‬‫تلفريك‬)‫؟‬
○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
3-‫بتجربة‬ ً‫ا‬‫سابق‬ ‫قمت‬ ‫هل‬‫ال‬‫أخر‬ ‫مكان‬ ‫في‬ ‫تلفريك‬‫؟‬
○‫نعم‬○‫ال‬
4-‫هل‬‫مسافة‬5.6‫كم‬‫لتكون‬ ‫مناسبة‬‫خدمة‬( ‫الكهربائية‬ ‫العربة‬‫ال‬‫تلفريك‬)‫؟‬ ‫مستحقة‬
○‫نعم‬○‫ال‬
6-‫؟‬ ‫فريك‬ ‫التل‬ ‫لخدمة‬ ‫استخدامك‬ ‫مقومات‬ ‫هي‬ ‫ما‬
○‫السياحة‬○‫نقل‬ ‫وسيلة‬○‫والتسلية‬ ‫للترفيه‬○‫جديدة‬ ‫تجربة‬
5-‫؟‬ ‫جيدة‬ ‫نقل‬ ‫خدمة‬ ‫ستكون‬ ‫بأنها‬ ‫تعتقد‬ ‫هل‬
○‫نعم‬○‫ال‬
7-‫يمكن‬ ‫هل‬( ‫الكهربائية‬ ‫العربة‬‫ال‬‫تلفريك‬)‫؟‬ ‫الثلجي‬ ‫والطقس‬ ‫الشتاء‬ ‫مواسم‬ ‫في‬ ‫وخاصة‬ ‫نقل‬ ‫وسيلة‬ ‫تكون‬ ‫أن‬
○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
30
8-‫تستخدم‬ ‫أن‬ ‫يمكن‬ ‫هل‬‫العر‬( ‫الكهربائية‬ ‫بة‬‫ال‬‫تلفريك‬)‫التقليدية‬ ‫المواصالت‬ ‫ووسائل‬ ‫وثلجي‬ ‫عاصف‬ ‫طقس‬ ‫في‬ ‫نقل‬ ‫كوسيلة‬
‫؟‬ ‫مقطوعة‬
○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
9-‫هي‬ ‫المحطتين‬ ‫بين‬ ‫للوصول‬ ‫المدة‬22‫؟‬ ‫نقل‬ ‫وسيلة‬ ‫كانت‬ ‫إذا‬ ‫السابقة‬ ‫للحالة‬ ‫مناسبة‬ ‫هي‬ ‫هل‬ ‫دقيقة‬
○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
12-‫؟‬ ‫يوميا‬ ‫حدا‬ ‫على‬ ‫موسم‬ ‫كل‬ ‫في‬ ‫التلفريك‬ ‫ركوب‬ ‫فيها‬ ‫ستجرب‬ ‫التي‬ ‫المرات‬ ‫عدد‬ ‫كم‬.‫محدد‬ ‫رقم‬ ‫اكتب‬
........................‫الشتاء‬ ....................... ‫الصيف‬
11-‫هام‬ ‫سياحي‬ ‫جذب‬ ‫عامل‬ ‫ستكون‬ ‫بأنها‬ ‫تعتقد‬ ‫هل‬‫؟‬
○‫نعم‬○‫ال‬
12-‫؟‬ ‫للسياحة‬ ‫الخدمة‬ ‫تستخدم‬ ‫أن‬ ‫تفضل‬ ‫فصل‬ ‫أي‬ ‫في‬
○‫الثلجي‬ ‫الطقس‬ ‫الشتاء‬ ‫فصل‬○) ‫الجبل‬ ‫قمة‬ ‫على‬ ‫فقط‬ ‫(الثلج‬ ‫الشتاء‬ ‫فصل‬○‫الصيف‬ ‫فصل‬
13-‫المناسب‬ ‫الوقت‬ ‫إن‬ ‫للسياحة‬ ‫الخدمة‬ ‫استخدام‬ ‫حال‬ ‫في‬22.‫دقيقة‬
○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
14-‫مركبة‬ ‫كل‬ ‫في‬ ‫مساعد‬ ‫شخص‬ ‫وجود‬
○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
16-‫؟‬ ‫السقف‬ ‫من‬ ‫مفتوحة‬ ‫العربة‬ ‫تكون‬ ‫أن‬ ‫يمكن‬
○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
15-‫ال‬ ‫في‬ ‫الركوب‬ ‫عند‬ ‫وضعيتك‬ ‫تفضل‬ ‫ماذا‬‫؟‬ ‫عربة‬
○‫مريح‬ ‫مقعد‬ ‫على‬ ‫الجلوس‬ ‫وضعية‬○‫للوقوف‬ ‫وسائل‬ ‫استخدام‬ ‫مع‬ ‫واقفا‬
......................................‫أخرى‬
17-‫أفضل‬‫لت‬ ‫الزجاج‬ ‫من‬ ‫مكونة‬ ‫العربة‬ ‫تكون‬ ‫أن‬.‫الطبيعية‬ ‫المناظر‬ ‫مشاهدة‬ ‫لك‬ ‫تيح‬
○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
18-‫ضمن‬ ‫طوارئ‬ ‫هاتف‬ ‫يكون‬ ‫أن‬.‫عربة‬ ‫كل‬
○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
19-‫لأل‬ ‫يمكن‬‫دون‬ ‫طفال‬6.‫الخدمة‬ ‫تجربة‬ ‫سنوات‬
○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
22-‫في‬ ‫أو‬ ‫العربة‬ ‫في‬ ‫الموجودة‬ ‫اإلرشادات‬ ‫شكل‬:‫هي‬ ‫المحطة‬
○‫مكتوبة‬○‫مسموعة‬○ً‫ا‬‫مع‬ ‫االثنين‬
‫أخرى‬..................................................................
21-‫؟‬ ‫واألمان‬ ‫السالمة‬ ‫على‬ ‫للمحافظة‬ ‫عوامل‬ ‫أهم‬ ‫هي‬ ‫ما‬ ‫برأيك‬
..........................................................................................
..........................................................................................
31
..........................................................................................
..........................................................................................
22-‫استعمال‬ ‫يمكن‬.‫للموسيقى‬ ‫العربة‬ ‫ضمن‬ ‫الصوت‬ ‫مكبر‬
○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
23-‫؟‬ ‫ستختاره‬ ‫الذي‬ ‫الموسم‬ ‫في‬ ‫التلفريك‬ ‫ركوب‬ ‫فيها‬ ‫ستجرب‬ ‫التي‬ ‫المرات‬ ‫عدد‬ ‫كم‬ ‫والترفيه‬ ‫للسياحة‬ ‫الخدمة‬ ‫ستجرب‬ ‫كنت‬ ‫إذا‬
‫اكتب‬.‫محدد‬ ‫رقم‬
..........................
24-‫؟‬ ‫التلفريك‬ ‫تجربة‬ ‫مع‬ ‫بالتزامن‬ ‫تريدها‬ ‫التي‬ ‫االخرى‬ ‫الجذب‬ ‫عوامل‬ ‫هي‬ ‫ما‬
........................................................................
........................................................................
........................................................................
.......................................................................
26-‫المناسب‬ ‫السعر‬ ‫هو‬ ‫وما‬ ‫التلفريك‬ ‫ركوب‬ ‫خدمة‬ ‫سعر‬ ‫تكون‬ ‫أن‬ ‫تتوقع‬ ‫ماذا‬‫؟‬.‫محدد‬ ‫رقم‬ ‫اكتب‬
...........................................
25-‫؟اذكرها‬ ‫تذكر‬ ‫ولم‬ ‫موجودة‬ ‫تكون‬ ‫أن‬ ‫أمور‬ ‫يوجد‬ ‫هل‬ ‫برأيك‬
..............................................................................
..............................................................................
..............................................................................
..............................................................................

Más contenido relacionado

La actualidad más candente

Product Presentation (2016-01-28).pptx
Product Presentation (2016-01-28).pptxProduct Presentation (2016-01-28).pptx
Product Presentation (2016-01-28).pptxNoSelfie
 
MANUFACTURING OF INSULATORS AT BHEL(IP) Jagdishpur plant
 MANUFACTURING OF INSULATORS AT BHEL(IP) Jagdishpur plant MANUFACTURING OF INSULATORS AT BHEL(IP) Jagdishpur plant
MANUFACTURING OF INSULATORS AT BHEL(IP) Jagdishpur plantAmbesh Singh
 
Design and Fabrication of Water Bottle Crusher
Design and Fabrication of Water Bottle CrusherDesign and Fabrication of Water Bottle Crusher
Design and Fabrication of Water Bottle CrusherIRJET Journal
 
3D PRINTING- POWDER BASED ADDITIVE MANUFACTURING
3D PRINTING- POWDER BASED ADDITIVE MANUFACTURING 3D PRINTING- POWDER BASED ADDITIVE MANUFACTURING
3D PRINTING- POWDER BASED ADDITIVE MANUFACTURING S. Sathishkumar
 
Design considerations and engineering materials
Design considerations and engineering materialsDesign considerations and engineering materials
Design considerations and engineering materialsHimanshi Gupta
 
Hoverbike startup presentation
Hoverbike startup presentationHoverbike startup presentation
Hoverbike startup presentationAlexander Semenov
 
Electrical connectability copper versus aluminum
Electrical connectability   copper versus aluminumElectrical connectability   copper versus aluminum
Electrical connectability copper versus aluminumLeonardo ENERGY
 
Railway Industrial Training
Railway Industrial TrainingRailway Industrial Training
Railway Industrial TrainingLokesh Parihar
 
Solid modeling-Sweep Representation and B-representation
Solid modeling-Sweep Representation and B-representationSolid modeling-Sweep Representation and B-representation
Solid modeling-Sweep Representation and B-representationDestro Destro
 
Manufacturing process & assembly of automobile
Manufacturing process & assembly of automobileManufacturing process & assembly of automobile
Manufacturing process & assembly of automobileYashraj Patil
 

La actualidad más candente (11)

Product Presentation (2016-01-28).pptx
Product Presentation (2016-01-28).pptxProduct Presentation (2016-01-28).pptx
Product Presentation (2016-01-28).pptx
 
MANUFACTURING OF INSULATORS AT BHEL(IP) Jagdishpur plant
 MANUFACTURING OF INSULATORS AT BHEL(IP) Jagdishpur plant MANUFACTURING OF INSULATORS AT BHEL(IP) Jagdishpur plant
MANUFACTURING OF INSULATORS AT BHEL(IP) Jagdishpur plant
 
Design and Fabrication of Water Bottle Crusher
Design and Fabrication of Water Bottle CrusherDesign and Fabrication of Water Bottle Crusher
Design and Fabrication of Water Bottle Crusher
 
3D PRINTING- POWDER BASED ADDITIVE MANUFACTURING
3D PRINTING- POWDER BASED ADDITIVE MANUFACTURING 3D PRINTING- POWDER BASED ADDITIVE MANUFACTURING
3D PRINTING- POWDER BASED ADDITIVE MANUFACTURING
 
Additive Manufacturing in Healthcare Industry
Additive Manufacturing in Healthcare IndustryAdditive Manufacturing in Healthcare Industry
Additive Manufacturing in Healthcare Industry
 
Design considerations and engineering materials
Design considerations and engineering materialsDesign considerations and engineering materials
Design considerations and engineering materials
 
Hoverbike startup presentation
Hoverbike startup presentationHoverbike startup presentation
Hoverbike startup presentation
 
Electrical connectability copper versus aluminum
Electrical connectability   copper versus aluminumElectrical connectability   copper versus aluminum
Electrical connectability copper versus aluminum
 
Railway Industrial Training
Railway Industrial TrainingRailway Industrial Training
Railway Industrial Training
 
Solid modeling-Sweep Representation and B-representation
Solid modeling-Sweep Representation and B-representationSolid modeling-Sweep Representation and B-representation
Solid modeling-Sweep Representation and B-representation
 
Manufacturing process & assembly of automobile
Manufacturing process & assembly of automobileManufacturing process & assembly of automobile
Manufacturing process & assembly of automobile
 

Destacado

Porter's Five Forces & Porter's Value Chain Model
Porter's Five Forces & Porter's Value Chain Model  Porter's Five Forces & Porter's Value Chain Model
Porter's Five Forces & Porter's Value Chain Model msmn671
 
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen OzukumWORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen OzukumIPPAI
 
4 strok petrol engine
4 strok petrol engine4 strok petrol engine
4 strok petrol engineMona Khan
 
4 stroke engine
4 stroke engine4 stroke engine
4 stroke enginebharibabu
 
Self charging solar car seminar report
Self charging solar car seminar reportSelf charging solar car seminar report
Self charging solar car seminar reportAshish Dubey
 
Four stroke petrol engine,,,,WAHLA
Four stroke petrol engine,,,,WAHLAFour stroke petrol engine,,,,WAHLA
Four stroke petrol engine,,,,WAHLABilalwahla
 
Introduction to ROBOTICS
Introduction to ROBOTICSIntroduction to ROBOTICS
Introduction to ROBOTICSelliando dias
 
Maglev Train Paper Presentation, Magnetic Leviation Train, High Speed Magneti...
Maglev Train Paper Presentation, Magnetic Leviation Train, High Speed Magneti...Maglev Train Paper Presentation, Magnetic Leviation Train, High Speed Magneti...
Maglev Train Paper Presentation, Magnetic Leviation Train, High Speed Magneti...SHRIKANT KHATING
 
rear axle ppt
rear axle  pptrear axle  ppt
rear axle pptNk Babul
 
Maglev Train Ppt 1
Maglev Train Ppt 1Maglev Train Ppt 1
Maglev Train Ppt 1shelly yadav
 
ppt on 2 stroke and 4 stroke petrol engine
ppt on 2 stroke and 4 stroke petrol engineppt on 2 stroke and 4 stroke petrol engine
ppt on 2 stroke and 4 stroke petrol engineharshid panchal
 
A seminar report on maglev train
A seminar report on maglev trainA seminar report on maglev train
A seminar report on maglev train007skpk
 

Destacado (18)

Icable business model
Icable business modelIcable business model
Icable business model
 
Porter's Five Forces & Porter's Value Chain Model
Porter's Five Forces & Porter's Value Chain Model  Porter's Five Forces & Porter's Value Chain Model
Porter's Five Forces & Porter's Value Chain Model
 
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen OzukumWORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
WORKSHOP CABLE CAR SHIMLA PRESENTATION FINAL 26 JUN 2014_Dr Toshimanen Ozukum
 
Cable Car Media Plan
Cable Car Media PlanCable Car Media Plan
Cable Car Media Plan
 
A cable car
A cable carA cable car
A cable car
 
4 strok petrol engine
4 strok petrol engine4 strok petrol engine
4 strok petrol engine
 
4 stroke engine
4 stroke engine4 stroke engine
4 stroke engine
 
4 stroke engine
4 stroke engine4 stroke engine
4 stroke engine
 
Self charging solar car seminar report
Self charging solar car seminar reportSelf charging solar car seminar report
Self charging solar car seminar report
 
Four stroke petrol engine,,,,WAHLA
Four stroke petrol engine,,,,WAHLAFour stroke petrol engine,,,,WAHLA
Four stroke petrol engine,,,,WAHLA
 
Introduction to ROBOTICS
Introduction to ROBOTICSIntroduction to ROBOTICS
Introduction to ROBOTICS
 
Maglev Train Paper Presentation, Magnetic Leviation Train, High Speed Magneti...
Maglev Train Paper Presentation, Magnetic Leviation Train, High Speed Magneti...Maglev Train Paper Presentation, Magnetic Leviation Train, High Speed Magneti...
Maglev Train Paper Presentation, Magnetic Leviation Train, High Speed Magneti...
 
solar tree seminar report
solar tree seminar reportsolar tree seminar report
solar tree seminar report
 
rear axle ppt
rear axle  pptrear axle  ppt
rear axle ppt
 
Maglev Train Ppt 1
Maglev Train Ppt 1Maglev Train Ppt 1
Maglev Train Ppt 1
 
Solar Car Presentation
Solar Car Presentation Solar Car Presentation
Solar Car Presentation
 
ppt on 2 stroke and 4 stroke petrol engine
ppt on 2 stroke and 4 stroke petrol engineppt on 2 stroke and 4 stroke petrol engine
ppt on 2 stroke and 4 stroke petrol engine
 
A seminar report on maglev train
A seminar report on maglev trainA seminar report on maglev train
A seminar report on maglev train
 

Similar a Electric cable car project (Telepherique)

Middle East Rail 2016 Prospectus
Middle East Rail 2016 ProspectusMiddle East Rail 2016 Prospectus
Middle East Rail 2016 ProspectusAlex Augusti
 
Multimodal in rail development: popularity and reaping benefits
Multimodal in rail development: popularity and reaping benefitsMultimodal in rail development: popularity and reaping benefits
Multimodal in rail development: popularity and reaping benefitsAtkins
 
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...BRTCoE
 
Vessel efficiency comp glasgow roadmapping
Vessel efficiency comp glasgow roadmappingVessel efficiency comp glasgow roadmapping
Vessel efficiency comp glasgow roadmappingKTN
 
Vessel efficiency UKMIA Adrian Waddams
Vessel efficiency UKMIA Adrian WaddamsVessel efficiency UKMIA Adrian Waddams
Vessel efficiency UKMIA Adrian WaddamsKTN
 
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareShuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareAsadullah Malik
 
Global Tourism Cities Conference 2013 Presentation Material
Global Tourism Cities Conference 2013 Presentation MaterialGlobal Tourism Cities Conference 2013 Presentation Material
Global Tourism Cities Conference 2013 Presentation MaterialKevin Ratnasingam
 
Global vision for railway development
Global vision for railway developmentGlobal vision for railway development
Global vision for railway developmentUICrail
 
Intelligent Transportation Systems (ITS)
Intelligent Transportation Systems (ITS)Intelligent Transportation Systems (ITS)
Intelligent Transportation Systems (ITS)Yash Shah
 
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteTransforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteWRI Ross Center for Sustainable Cities
 
Transforming Transport for shared Prosperity
Transforming Transport for shared ProsperityTransforming Transport for shared Prosperity
Transforming Transport for shared ProsperityPadmaShahi3
 
CHAPTER 1.pptx
CHAPTER 1.pptxCHAPTER 1.pptx
CHAPTER 1.pptxJamieZali
 
Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Piyush KumAr
 
Future Rail Metro Summit Apr 14 -15, 2015
Future Rail  Metro Summit Apr 14 -15, 2015Future Rail  Metro Summit Apr 14 -15, 2015
Future Rail Metro Summit Apr 14 -15, 2015Binu Thankappan
 
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)shrdcinfo
 

Similar a Electric cable car project (Telepherique) (20)

amany cv
amany cvamany cv
amany cv
 
Middle East Rail 2016 Prospectus
Middle East Rail 2016 ProspectusMiddle East Rail 2016 Prospectus
Middle East Rail 2016 Prospectus
 
ITS Forum UAE
ITS Forum UAEITS Forum UAE
ITS Forum UAE
 
Multimodal in rail development: popularity and reaping benefits
Multimodal in rail development: popularity and reaping benefitsMultimodal in rail development: popularity and reaping benefits
Multimodal in rail development: popularity and reaping benefits
 
Cv m ramadan
Cv m ramadanCv m ramadan
Cv m ramadan
 
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
Workshop Innovation in Africa - BRT Lessons from Dar es Salaam by Ronald Lwak...
 
Vessel efficiency comp glasgow roadmapping
Vessel efficiency comp glasgow roadmappingVessel efficiency comp glasgow roadmapping
Vessel efficiency comp glasgow roadmapping
 
Vessel efficiency UKMIA Adrian Waddams
Vessel efficiency UKMIA Adrian WaddamsVessel efficiency UKMIA Adrian Waddams
Vessel efficiency UKMIA Adrian Waddams
 
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS softwareShuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
Shuttle Route Optimization for the Sector # H-12, Islamabad using GIS software
 
Global Tourism Cities Conference 2013 Presentation Material
Global Tourism Cities Conference 2013 Presentation MaterialGlobal Tourism Cities Conference 2013 Presentation Material
Global Tourism Cities Conference 2013 Presentation Material
 
Global vision for railway development
Global vision for railway developmentGlobal vision for railway development
Global vision for railway development
 
Intelligent Transportation Systems (ITS)
Intelligent Transportation Systems (ITS)Intelligent Transportation Systems (ITS)
Intelligent Transportation Systems (ITS)
 
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a PrerequisiteTransforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
Transforming Urban Mobility in Africa: A Strong Institution, a Prerequisite
 
Public Transport
Public TransportPublic Transport
Public Transport
 
Transforming Transport for shared Prosperity
Transforming Transport for shared ProsperityTransforming Transport for shared Prosperity
Transforming Transport for shared Prosperity
 
CHAPTER 1.pptx
CHAPTER 1.pptxCHAPTER 1.pptx
CHAPTER 1.pptx
 
Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief Multi-modal transportation, dissertation brief
Multi-modal transportation, dissertation brief
 
Traffic engineering
Traffic engineeringTraffic engineering
Traffic engineering
 
Future Rail Metro Summit Apr 14 -15, 2015
Future Rail  Metro Summit Apr 14 -15, 2015Future Rail  Metro Summit Apr 14 -15, 2015
Future Rail Metro Summit Apr 14 -15, 2015
 
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
 

Electric cable car project (Telepherique)

  • 1. 1 Arab International University Faculty of Business Administration Management Department Feasibility Study course Electric cable car project (Telepherique) Student name 1-Sami Alfares 2-Loye Adaam 3-Tamim Kbarh Student ID 201111096 201110075 201010129 Dr Supervisor: Dr . Serene Dalati Dr. Yasser mashaal
  • 2. 2 Executive summary The Telepherique the scientific term is (electric cable car), one of the most modern ways of transportation, the presence of a telepherique in any area is an important tourist attraction for the region because of the presence of all recreational facilities associated with it , especially when he meets a global nature and the sea and the mountain . Location: Lattakia ( linking Alpedrosah with Kassab. Alpedrosah becauseof its proximity to the beach and Kassab due to height above sea level and nature of the mountain which constitutes an attraction for tourists because of the link that region to each other) Service Is the tourist producta service aims to transport tourists from the beach area to the mountain and vice versa via the caravans within specific path and specific height via particular number of caravans , including certain number of people does not exceed four people within two stations, one at the bottom and the other at the top and through the caravan starts from the beach through areas of forest with the density of trees and great views of the sea to the terms of access to the mountain. It can reach the top of the mountain through another way( the land route)and that for the tourists who want to enjoy the other service of this project , which includes hotels, restaurants, swimming
  • 3. 3 pools and all the necessary services for tourists. It is possible to be a service for some of the surrounding areas . Height: telepherique route distance line is 6.5 km , It`s speed is 18:00 per second .The arrival time of tourists to the end of the track is during 20 to 25 minutes. Number of vehicles 60 truck and strengthen these vehicles with reinforced Plastic to ensure the safety of passengers . Market: This project is the only one in Syria and this project is one of the large-scale projects . The aim of this project is to attract the largest number of tourists from different parts of the world, allowing substantial profits and stimulate tourism and increase the national income of the country. Within the statistics of the Ministry of Tourism, the number of Arab and foreign tourists 4148822from May to September. The estimated proportionof tourists Syrians 1035000local tourists. (www.syriatourism.org( 2014 /www.cbssyr.sy/ Opportunity 1- Legal environment, particularly in the field of tourism investment. 2- Is a large tourist projects raise the growth rate of the country. 3- The high proportionof tourism, especially in this region, which provides an opportunity to achieve high profitability. 4- An environment conducive investment by laws that facilitate the work of large projects. 5- The project raises the tourism revenue by a large margin
  • 4. 4 - Table of Contents index pag - CoverSheet 1 - Executive Summary 2 - Table of Contents 4 - Introduction 5 - The Service 5 - MarketEnvironment 7 - Competition 9 - Industry 9 o Technology 11 o Production/Operating Requirements 12 - Business Model 13 o Intellectual Property 14 o Regulations/EnvironmentalIssues 15 o Managementand PersonnelRequirements 15 - Sales Strategy 17 o Advertising Strategy 18 o The Price Strategy 20 - CriticalRisk Factors 23 FinancialProjections - Referenceslist 24 APPENDEX 25
  • 5. 5 Introduction The Ministry of Tourism has issued executive instructions of the legislative decree No. / 23 / Date 04/05/2010 private cable car projects, to encourage the government to set up a large Govt allows most investors think of the pump heads money in such projects Building a project like this is said and an important tourist attraction and increases the importance of tourism and the region economically, so they have big opportunity to start project. PRODUCT/SERVICE The cable car is a means of pneumatic conveying is composed in the form wagon or open chair in other times, but the current project is closed wagon - The project consists of the first station A away from the seashore of 1.5 km and a second station B on the surface of the mountain, the distance between stations 6.5 km Any distance 20 minutes per flight distance of 13 km - Allows the second leg of tourists disembark and enjoy the mountain scenery and of course can use the telescope to see the details of the cable car trip and mountain views , and there is within this station ancillary tourist facilities ( restaurants - cafes - Supermarket ) - There on the wire 60 is closed vehicle can accommodateup to 4 people climb it is one of the stations across someone assistant and someone else is working on securing the safety of passengers and passenger safety factors confirm, place on a wire cart through special drive each vehicle is designed to shock-proofglass reinforced plastic anti- fire and not allow the glass to the tourist views of the biggest factors of natural and cart path
  • 6. 6 - Upon entering the tourist of the facility from the main station , a station A is cut ticket per personto enter Eat station which is where there are services and public facilities with high quality and no plates and signals an indication of safety when riding vehicles and other means , suchas the means of visual and audio and passes within a series of facilities collocated ( Supermarket - Bar - Restaurant ) to be after riding cart. - Is the ticket for one trip between the two stations , and leaves the choice of tourists to the revelation of the second leg and get to know the facilities and services that can be used ( Bar - Restaurant - Supermarket ) - Eat found within the second leg of the telescope allows a group of tourists scenes details itinerary cart and landscape scenes. - Display offers service for tour groups and scientific facilities could be referring to the mechanism of the cable car and a personfrom the marketing department and give this service only for groups which is the purposeof scientific - Plant workers specific tasks for each factor 1 - receives a cart after entering the station and is secured disembarkation of the cart and the end of the journey 2 - pull the cart to the person who secure the safety and readiness of technical Cart 3 - are losing the vehicle and safety factors and safety 4 - helps passengers in boarding and gives them the safety instructions during the trip and close the cart and proceed to the station after the second and put them on the path of the wire. - Distributed work stations due to a similar process is similar
  • 7. 7 MARKET ENVIRONMENT SWOT analysis: Strengths 1 - strong funding 2 - The project consists of the administration to the terms of reference and high skills 3 - Develop strategic plans to reach new targets 4 - Entry of a strong and effective due to the lack of similar projects 5 - The use of modern technologies in the management of labor and management operating line 6 - Workers trained and continue to renew skills Weaknesses 1 - the inability to predict the occurrence of risk 2 - Analysis of the ticket plan sales the wrong way 3 - difficult to link to the holidays quickly 4 - failure to resolve technical problems quickly enough 5 - conflict between departments and differing views Opportunity 1 - The existence of a market absorbs the idea of the project
  • 8. 8 2 - Facilities licenses from government agencies 3 - A new project is the only one in the market 4 - climatic environment in the region Threats 1 - The emergence of direct competitors in the market in the same field 2 - climatic factors and weather changes 3 - raising the tax rate by the government 4 - low desire for tourists to ride the cable car 5 - Use of the tourist and the preference for alternative means of tourist - As this project is the first of its kind in the country, there is little incentive for most people to experience the climb in the cable car , the first period will be based on the statistics of the Central Bureau of Statistics in Damascus - The study will be based on that number would be domestic tourism - - The project is located in a tourist attraction and can be a percentage of foreign tourism targeted and based on the statistics of the Ministry of Tourism shall be according to the following table: ( in appendix) - The tourists sector have a lot of tourism services , including the so-called tourism offices and can be a target group to be the source to attract customers and the number of offices licensed by the Ministry of Tourism office in the country 935
  • 9. 9 - The education sectorthere is in the curriculum of the Ministry of Education lessons for transportation and no detail about the cable car and can be held jointly with the Ministry of Education in order to ride in the cable car to allow students to view this means COMPETITION Project on a national level , which is one of the big projects and the location of the project and consists of its kind that has no direct competitor , but the presence of competitors is determined indirectly from the weaknesses of the case and sometimes force , according to the project type competitor - Competitor indirectly Supposehas set up a theme park next to the project in the mindset of tourists considered Tlapt desire to enjoy watching nature So can we build a strategy to be we focused on the establishment of ancillary projects Another example of building a restaurant or spa at the top of the mountain would be the biggest competitors indirectly will be a boytourist Rgah to enjoy from randed the mountain instead of riding the cable car because the top of the mountain would enable him to see the landscape so you must set up a strategy to start building projects related with the project ( great restaurants ( resort ) - an amusement park ) INDUSTRY - The cable car is a means of pneumatic conveying is composed in the form wagon or open chair in other times, but the current project is closed wagon - The cable car project provides a service of great beauty and at the same time is an easy -to-use operating - Is the means of transport between the first leg and the second by a closed wagon iron wire across a distance of 13 km during the time of 20 minutes
  • 10. 10 How does the cable car ? - Basic thing in running is the wire (cable ), a cable railing the rubber material , brass, stainless proportions allow How does it prove the cable on towers supportive divided by the distance between them depending on the length of distance and geography of the place should be in some areas to be wire way vertical by a few and not horizontal. - Wire transmits electricity to the vehicle and no vehicle in the first two motors , a core runs on electricity and the engine running when you put it directly on the wire and the second engine is a diesel engine , a motor assistant and works in emergencies. - Wire is placed on the reel spins quickly and light and rotation is the reason not to allow the tires friction rail wagons in one place - When you put the wire on the supporting towers placed on an electrical insulator , stands tourist on a platform of passenger and assisted two first ensure the safety of the vehicle (ie confirm doorlock - Confirm the engine ) and the second safety of people ( sitting right - when an emergency Why do tourists ) cart be on the wire , but when they enter the station no handle pay it from the path of the wire and here the first factor comes and drives the cart toward the podium with his hand to allow for a tourist ride and then push the carriage to the handle , which converts it to the path of the wire and there is a sensitive devices placed on the front side of the vehicle linked electronically with the handle opens the handle when taking the signal from the sensordistance of the existence of safety - Upon entering the tourist to Cart weight sensors operate automatically and there is the weight of the weight of each vehicle to ensure the stability of vehicle is vertical when crossing on the wire - When the transition to the wire cart primitive trip to the second leg - In the second leg differs form partially the second leg only where there is an electronic handle to ensure the safety distance
  • 11. 11 - Tourists can to finish the first part of the journey in the second leg when he arrived someone opens the doorof the vehicle and can go down and take cart with his hand to the platform to ride to be able tourist who finished his tour in the second leg of the back of the station first and there are two people also said their work in the first station - Engines are run through the Control Panel Actual which in the first leg and there is a special room is completely closed and not visible to tourists and there is one personmanages the process is the most important of these processes 1- Detection of any malfunction within the wire or motor vehicle or through sensors 2- Continuous evaluation of the efficiency of the work of the wire 3- Detection permanent jobs sensors that are found in vehicles 4- Organize gigs so as not to be a difference in the preparation of vehicles waiting for the starting inside the station 5- Constant contactwith the controlroom in the second leg 6- Direct contact with the plant workers who help tourists going up and down. 7- Monitor the performance of the work of the vehicles on the wire in a way direct observation through a window allowing him to watch as much as possible of the progress Cart. - It is the second personwithin the controlroom also helps the commander of the control room and cares about the details and figures and statistics about the performance of the engines and the weights and the wire and electricity TECHNOLOGY The project needs a set of characteristics of technology and can be summarized as follows : 1- you need the cart to the existence of a sensitive increase in vehicle weight when the rise of the tourist and it can be both sensitive and wagon works automatically and no sound when overweight 2- the cable railway is the main part of the project , so manufacturers have developed and created a system for detecting faults in or proportion of each failure and the extent of repair this fault , and no cross-accountmeasures led the cable programmer automatically, the vehicles will go on the cable evenly
  • 12. 12 timetable so put in front of me every vehicle sensitive and delicate rear safety measures the distance between vehicles. 3- The devices measure the presence of allergies are things that must be monitored so always been linked to the devices to a central showing the efficiency of each device on the end of each wagon 4- cut ticket system with boarding a vehicle presence technologies can regulate the time of entry tourist ride with cart at each of the stations to reduce congestion 5- Systems and safety when a cup is one of the most important vehicle needs required by the tourists so was the introduction of a visual and audible and written and crossing through the graphics reservation tourist safety 6- Panel Differentiation electronic circuit which is turned into electricity generator and give the last 35 minutes of the time of emergency . 7- Linking all these things with the controlpanel is the prerogative of the parent company, supplier of engines and maintenance prayer is measured by specific weather factors and the proportion of Use. PRODUCTION / OPERATING REQUIREMENTS After the implementation of the project and the need to start the cable car to the driving force of an electricity - The delivery of electricity from the lines the government will arrange for the project costs are great for that factor to generate electricity will be generated electricity can 500 / KVA work continuously to ensure serving in and when the maintenance period shift power to the lines of the government conducts its regular maintenance and the subject is coordinated by the maintenance department with periods of power outages the government does not even have a cable car stop in the case of - There generating circuit with the promotion of a fed into the engine for 35 minutes through Takven containers and do this circuit in case of an emergency - The project needs to maintenance team Mobile team steady , according to the law and the Ministry of Tourism, the team needs to be trained by experts and technicians manufacturer of engines and have a period of 3 months is the period
  • 13. 13 of control by the manufacturer's maintenance team , the manufacturer of the engines was agreed with her that the things Maintenance large and rotating at the hands of experts , which sends them by it to ensure the protection of intellectual quality and maintenance. There are many stakeholders with the project, but the most important: -The owners of the land leased to put the poles wire or wire that passes from territory they are of two types: - government - Private Systems Act and the Ministry of Tourism, the relationship between the project and the land owners of public and private  Government : There are two types of contracts o either be the government's profit rate measured with the proportionof land belonging to the government between the Fund and the Ministry of Husbandry and local tourism o or to pay rent fixed costs attributable to fund local administration Choosing the second decadeis less legal costs and better project  Private organization contracts with the landowners of the tasks of law section of the project was agreed on the prices specified by the owners to be paid annually
  • 14. 14 Business Model Company profit goal and working in the tourism sector and the entertainment cable car project of the most important projects have Legal form PARTNERSHIP consists of three partners, including the percentage of contribution is divided equally: 1-Sami Alfares 2-Loye Adaam 3-Tamim Kbarh - Highlight the strategy’s strengths and develop this strategy in the company's objectives example : - Ancillary building projects - Construction of a similar project in the area of natural second example (Al gab Valley - Zabadani Valley – Gabl al shekh valley). INTELLECTUAL PROPERTY The cable car project licensed by the Ministry of Tourism Investment idea was based on a decree laws for implementation of the project proposaland the place is the proposalof the Ministry of Tourism and place the proposalon the basis of geographical factors and studies tourism and attractions
  • 15. 15 REGULATIONS / ENVIRONMENTAL ISSUES Legislative Decree No. / 23 / for the year 2010 is based on the construction of the project after it issued the Ministry of Tourism and Information Tnfveh explain more details about the Decree The facilities provided by the Council of Ministers were many of them Ministry of Local Administration contracts and regulations concerning land that passes by the wire Ministry of tourist facilitate the commercial register the company licenses and accreditation, decree No. 29 of 2011 Find Solutions for improved corporate system Ministry of Transportation as the cable car and the means of transport must take a license for that, but due to lack of public interest to transfer the license was canceled and work on the cable car to the benefit of tourism , especially for tourism Ministry of Environment and recorded the project as the project is environmental benefit and the Governor of the integrity of the natural area where there is - As the tourism sectoris in its infancy in Syria there are also a lot of facilities in the contracts , customs and import for this project will evolve in conjunction with the laws that are issued Management and Personnel Requirements
  • 16. 16
  • 17. 17 Sales Strategy - Develop a plan and marketing goals and strategies and policies for the implementation of these plans , this project and its size will have a plan at the same time would be great goals , including: 1- access to all Syrian resident idea of the project 2- stimulate every Syrian to experience the ride 3- To encourage all tourists entering all borderpassenger experience 4- Raising the evaluation at the national level between the rest of the country 5- reinforce the notion that the Syrian hands are capable of producing high- efficiency projects - Develop policies to implement these goals are easy to access as a single project in the market and do not wish to direct competitors and the tradition of this project will be difficult How attract customers: 1- Through the work efficiency and equipment 2- An idea for a feature on the tourist different from any other experience and the experience of planting the idea that the cable car will give him energy and a special feature - The work in the establishment phase of the project was a great effort and global experience and access to high quality require payment of large sums of money and in the end, the customer will be satisfied with the service and would prefer to repeat the experiment again. - The initial definition of the service should give tourists an idea that will get feature suitable for a price that will pay
  • 18. 18 A goal of reaching customers 1- To achieve the desire of tourists. 2- need to satisfy tourist. 3- tourist confirm that the payment amount is compared with the appropriate Service. 4- tourist satisfaction and his insistence on re- trial. 5- Get tour groups and scientific deduction by the marketing department just for tourists of local 6- Children under the age of 5 years will have a free card 7- Children between 5 years to 9 years will be worth 40% Discounts Advertising The process ofpromoting the idea that the project has begun Will be many ways for the promotion of the project , including a: -TV -Radio -Direct Mail -Personal contacts -Associations and trade unions -Newspaper -Magazines -Telephones guide companies -Billboards ways -Internet web sites and social networking -Mobile networks -From some other forms
  • 19. 19 3- positive attitude from the first experience for the tourist and talk to others for a fun experience 4- endowment with the overall objective of the tourism sector which is fun and not to tamper with nature sceneries of nature sends this position in the tourist that the company deserves that frequented the experience of the ride About prepare customers expected - Will be the focal point to this figure is very easy because of the lack of competition and high quality but costs paid to a marketing plan will be high to enable the project to attract foreign tourism to experience the cable car and visit nearby tourist areas - Put a marketing plan in the financial statements for each year and is considered one of the most important plans in the project plan, the initial costs are - Pricing policy according to the laws governing the Ministry of Tourism, there are degrees of pricing , especially within the tourist establishments that attract foreign tourism - Specific pricing for each category and these unmeasurable compared with the production department in working time and daily and monthly peak days and months of seasonal 4-5-6-7-8-93+10+11Month 900800Price
  • 20. 20 The Price - Price tag 099 SP per person includes only ride in the cable car, the price of entry to the lounge at the station includes a telescope 50 SP - Offer price by the time for the year and day of the seasonand could be on the slide - Every person has the motive in the aviation attract people from motives that are owned by it easy, and if this is achieved, which will pay the amount Mtmian and feel satisfied - When foreign tourists, according to the statistics of the Ministry of Tourism numbers of tourists who go to the coastalarea does not have any bidder to pay such an amount for a service they consider worth because they have a preconceived idea about the experience, especially in the beautiful natural factors Total revenue in high seasons : Number of passengers In hours The number of hours in work day The number of flights The number of days of the season 6*30 H24048180345600 M18048180259200 L12036180129600 Total1122734400 The price of Ticket900 660960000
  • 21. 21 Total revenue in low seasons : Number of passengers In hours The number of hours in work day The number of flights The number of days of the season 30*3 H1800 M120369064800 L80369043200 Total612108000 The price of Ticket800 86400000 Total revenue per year747360000
  • 22. 22 Other statistic 5-6-7-8-93-4-10-11Month 900800Price Number of passengers In hours The number of hours in work day The number of flights The number of days of the season 30*5 H24048150288000 M18048150216000 L12036150108000 total1122612000 The price of Ticket900 550800000
  • 23. 23 Number of passengers In hours The number of hours in work day The number of flights The number of days of the season 30*4 H18048120172800 M1203612086400 L803612057600 ‫المجموع‬1020316800 The price of Ticket800 253440000 Total revenue per year804240000 CRITICAL RISK FACTORS Some of the risk factors and indicators of occurrence: 1- Loss of diesel fuel, which will pay for the costs of the largest institution for the benefit of electricity and could be a long-term power outage at some times of the year 2- The aging of the service the tourism sector need to develop a permanent meets the need and desires of the tourist cable car project is difficult to be developed entirely 3- The rapid depreciation of the wire 4- Loss of vehicle and people inside because of the depreciation in the wire 5- a surprise in the case of weather and climate change 6- Workers Strike 7- interruption of road workers 8- The presence of a technical malfunction and need experts 9- fire 10- tampering in supporting Towers 11- The presence of large boulders and need greater supportto be removed
  • 24. 24 Financial Projections References list Name position References other Ali Alraee Building and construction company 954158084 Oday Darwesh Syrian Investment Agency 4473012 http://www.investinsyria.org Head Directorate contracts 2210122 http://www.syriatourism.org/ Amer Aitouni National Insurance Company 3348690 www.natinsurance.com Nasooh Alkaree Industrial motors Al marjee near the Ministry of the Interior Sameer Janood Engineer in happy_land 933429909 Baghdad Street
  • 26. 26 2- The number of foreign tourist in 2009 -2010
  • 27. 27 20092010 ‫الخليج‬764309705803 ‫اردنية‬8827501363644 ‫عراقية‬806118897975 ‫اللبنانيون‬9217621467701 ‫آخرون‬ ‫عرب‬215334219406 ‫العرب‬35902734654530 ‫الغربية‬ ‫أوروبا‬293890348103 ‫الشرقية‬ ‫أوروبا‬9646492208 ‫تركية‬381677864988 ‫أوروبا‬ ‫مجموع‬7720311305299 ‫أمريكا‬7762184196 ‫ايرانية‬430880792258 ‫آسيا‬77099108264 ‫استراليزا‬1597119240 ‫آخرون‬ ‫أجانب‬6307769003 ‫أجانب‬14366792378260 ‫العام‬ ‫المجموع‬50269527032790 ‫مغترب‬ ‫سوري‬10649371513060 ‫الكلي‬ ‫المجموع‬60918898545849 20092010 ‫العرب‬35902734654530 ‫أجانب‬14366792378260 ‫العام‬ ‫المجموع‬50269527032790 ‫مغترب‬ ‫سوري‬10649371513060 ‫الكلي‬ ‫المجموع‬60918898545849 /2010-2009/ ‫الجنسية‬ ‫حسب‬ ‫المغترب‬ ‫والسوري‬ ‫واالجانب‬ ‫العرب‬ ‫السياح‬ ‫عدد‬
  • 28. 28 3- The numberof servicesoffice 4- The survey
  • 29. 29 ‫استبيان‬ ( ‫الكهربائية‬ ‫العربة‬ ‫مشروع‬‫التلفريك‬)‫وجود‬ ، ‫والسياحة‬ ‫النقل‬ ‫وسائل‬ ‫من‬ ‫الحديثة‬ ‫الطرق‬ ‫أكثر‬ ‫من‬ ‫واحد‬ ‫هو‬‫مشروع‬ ( ‫الكهربائية‬ ‫العربة‬‫التلفريك‬)‫جميع‬ ‫وجود‬ ‫بسبب‬ ‫المنطقة‬ ‫في‬ ‫مهم‬ ‫سياحي‬ ‫جذب‬ ‫عامل‬ ‫هو‬ ‫مكان‬ ‫أي‬ ‫في‬‫الترفيهية‬ ‫المرافق‬ ‫به‬ ‫المرتبطة‬‫.وجود‬ ‫والجبل‬ ‫والبحر‬ ‫عالمي‬ ‫طابع‬ ‫يلتقي‬ ‫عندما‬ ‫خصوصا‬ ‫جذب‬ ‫عوامل‬ ‫وجود‬ ‫أو‬‫الكهربائية‬ ‫العربة‬ ‫مشروع‬ (‫التلفريك‬)‫و‬ ‫كسب‬ ‫منطقة‬ ( ‫مثال‬ ‫الجذب‬ ‫عوامل‬ ‫فيها‬ ‫ويوجد‬ ‫سياحية‬ ‫منطقة‬ ‫في‬ ‫وخاصة‬) ‫البحر‬ ‫شاطئ‬‫الالذقية‬ ‫محافظة‬. ‫مشروع‬( ‫الكهربائية‬ ‫العربة‬‫التلفريك‬)‫العربات‬ ‫من‬ ‫مجموعة‬ ‫على‬ ‫يشتمل‬(‫الكهربائية‬)‫من‬ ‫الركاب‬ ‫تنقل‬ ‫التي‬ ،( ‫االسفل‬ ) ‫البحر‬ ‫شاطئ‬‫أعلى‬ ‫إلى‬) ‫الجبل‬ ‫قمة‬ (‫بارتفاع‬‫بين‬ ‫يتراوح‬02‫إلى‬02‫والعكس‬ ‫األرض‬ ‫سطح‬ ‫عن‬ ً‫ا‬‫متر‬"،ً‫ا‬‫صعود‬ ‫بطول‬ ،"ً‫ال‬‫ونزو‬6.5‫كم‬‫طولي‬. : ‫الشخصية‬ ‫المعلومات‬ .............. ‫الجنس‬ ................ ‫العمر‬....................... ‫العلمي‬ ‫المستوى‬ )‫سوري‬ ‫.......................(ليرة‬ ‫الدخل‬ ‫مستوى‬.ً‫ا‬‫شهري‬‫محدد‬ ‫رقم‬ ‫اكتب‬. ‫عد‬ ‫متزوج‬ ‫كنت‬ ‫إذا‬ ..................... ‫االجتماعية‬ ‫الحالة‬‫األسرة‬ ‫أفراد‬ ‫د‬................ 1-‫أن‬ ‫تعتقد‬ ‫هل‬‫كسب‬ ‫منطقة‬‫إنشاء‬ ‫وتستحق‬ ‫جميلة‬‫مشروع‬( ‫الكهربائية‬ ‫العربة‬‫التلفريك‬)‫فيه‬‫؟‬ ‫ا‬ ○‫نعم‬○‫ال‬ 2-‫زيارة‬ ‫في‬ ‫كنت‬ ‫إن‬‫ل‬‫المنطقة‬ ‫هذه‬‫تجربة‬ ‫في‬ ‫ترغب‬ ‫هل‬( ‫الكهربائية‬ ‫العربة‬ ‫وصعود‬‫ال‬‫تلفريك‬)‫؟‬ ○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬ 3-‫بتجربة‬ ً‫ا‬‫سابق‬ ‫قمت‬ ‫هل‬‫ال‬‫أخر‬ ‫مكان‬ ‫في‬ ‫تلفريك‬‫؟‬ ○‫نعم‬○‫ال‬ 4-‫هل‬‫مسافة‬5.6‫كم‬‫لتكون‬ ‫مناسبة‬‫خدمة‬( ‫الكهربائية‬ ‫العربة‬‫ال‬‫تلفريك‬)‫؟‬ ‫مستحقة‬ ○‫نعم‬○‫ال‬ 6-‫؟‬ ‫فريك‬ ‫التل‬ ‫لخدمة‬ ‫استخدامك‬ ‫مقومات‬ ‫هي‬ ‫ما‬ ○‫السياحة‬○‫نقل‬ ‫وسيلة‬○‫والتسلية‬ ‫للترفيه‬○‫جديدة‬ ‫تجربة‬ 5-‫؟‬ ‫جيدة‬ ‫نقل‬ ‫خدمة‬ ‫ستكون‬ ‫بأنها‬ ‫تعتقد‬ ‫هل‬ ○‫نعم‬○‫ال‬ 7-‫يمكن‬ ‫هل‬( ‫الكهربائية‬ ‫العربة‬‫ال‬‫تلفريك‬)‫؟‬ ‫الثلجي‬ ‫والطقس‬ ‫الشتاء‬ ‫مواسم‬ ‫في‬ ‫وخاصة‬ ‫نقل‬ ‫وسيلة‬ ‫تكون‬ ‫أن‬ ○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬
  • 30. 30 8-‫تستخدم‬ ‫أن‬ ‫يمكن‬ ‫هل‬‫العر‬( ‫الكهربائية‬ ‫بة‬‫ال‬‫تلفريك‬)‫التقليدية‬ ‫المواصالت‬ ‫ووسائل‬ ‫وثلجي‬ ‫عاصف‬ ‫طقس‬ ‫في‬ ‫نقل‬ ‫كوسيلة‬ ‫؟‬ ‫مقطوعة‬ ○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬ 9-‫هي‬ ‫المحطتين‬ ‫بين‬ ‫للوصول‬ ‫المدة‬22‫؟‬ ‫نقل‬ ‫وسيلة‬ ‫كانت‬ ‫إذا‬ ‫السابقة‬ ‫للحالة‬ ‫مناسبة‬ ‫هي‬ ‫هل‬ ‫دقيقة‬ ○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬ 12-‫؟‬ ‫يوميا‬ ‫حدا‬ ‫على‬ ‫موسم‬ ‫كل‬ ‫في‬ ‫التلفريك‬ ‫ركوب‬ ‫فيها‬ ‫ستجرب‬ ‫التي‬ ‫المرات‬ ‫عدد‬ ‫كم‬.‫محدد‬ ‫رقم‬ ‫اكتب‬ ........................‫الشتاء‬ ....................... ‫الصيف‬ 11-‫هام‬ ‫سياحي‬ ‫جذب‬ ‫عامل‬ ‫ستكون‬ ‫بأنها‬ ‫تعتقد‬ ‫هل‬‫؟‬ ○‫نعم‬○‫ال‬ 12-‫؟‬ ‫للسياحة‬ ‫الخدمة‬ ‫تستخدم‬ ‫أن‬ ‫تفضل‬ ‫فصل‬ ‫أي‬ ‫في‬ ○‫الثلجي‬ ‫الطقس‬ ‫الشتاء‬ ‫فصل‬○) ‫الجبل‬ ‫قمة‬ ‫على‬ ‫فقط‬ ‫(الثلج‬ ‫الشتاء‬ ‫فصل‬○‫الصيف‬ ‫فصل‬ 13-‫المناسب‬ ‫الوقت‬ ‫إن‬ ‫للسياحة‬ ‫الخدمة‬ ‫استخدام‬ ‫حال‬ ‫في‬22.‫دقيقة‬ ○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬ 14-‫مركبة‬ ‫كل‬ ‫في‬ ‫مساعد‬ ‫شخص‬ ‫وجود‬ ○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬ 16-‫؟‬ ‫السقف‬ ‫من‬ ‫مفتوحة‬ ‫العربة‬ ‫تكون‬ ‫أن‬ ‫يمكن‬ ○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬ 15-‫ال‬ ‫في‬ ‫الركوب‬ ‫عند‬ ‫وضعيتك‬ ‫تفضل‬ ‫ماذا‬‫؟‬ ‫عربة‬ ○‫مريح‬ ‫مقعد‬ ‫على‬ ‫الجلوس‬ ‫وضعية‬○‫للوقوف‬ ‫وسائل‬ ‫استخدام‬ ‫مع‬ ‫واقفا‬ ......................................‫أخرى‬ 17-‫أفضل‬‫لت‬ ‫الزجاج‬ ‫من‬ ‫مكونة‬ ‫العربة‬ ‫تكون‬ ‫أن‬.‫الطبيعية‬ ‫المناظر‬ ‫مشاهدة‬ ‫لك‬ ‫تيح‬ ○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬ 18-‫ضمن‬ ‫طوارئ‬ ‫هاتف‬ ‫يكون‬ ‫أن‬.‫عربة‬ ‫كل‬ ○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬ 19-‫لأل‬ ‫يمكن‬‫دون‬ ‫طفال‬6.‫الخدمة‬ ‫تجربة‬ ‫سنوات‬ ○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬ 22-‫في‬ ‫أو‬ ‫العربة‬ ‫في‬ ‫الموجودة‬ ‫اإلرشادات‬ ‫شكل‬:‫هي‬ ‫المحطة‬ ○‫مكتوبة‬○‫مسموعة‬○ً‫ا‬‫مع‬ ‫االثنين‬ ‫أخرى‬.................................................................. 21-‫؟‬ ‫واألمان‬ ‫السالمة‬ ‫على‬ ‫للمحافظة‬ ‫عوامل‬ ‫أهم‬ ‫هي‬ ‫ما‬ ‫برأيك‬ .......................................................................................... ..........................................................................................
  • 31. 31 .......................................................................................... .......................................................................................... 22-‫استعمال‬ ‫يمكن‬.‫للموسيقى‬ ‫العربة‬ ‫ضمن‬ ‫الصوت‬ ‫مكبر‬ ○‫بشدة‬ ‫أوافق‬○‫أوافق‬○‫متأكد‬ ‫غير‬○‫أوافق‬ ‫ال‬○‫بشدة‬ ‫أوافق‬ ‫ال‬ 23-‫؟‬ ‫ستختاره‬ ‫الذي‬ ‫الموسم‬ ‫في‬ ‫التلفريك‬ ‫ركوب‬ ‫فيها‬ ‫ستجرب‬ ‫التي‬ ‫المرات‬ ‫عدد‬ ‫كم‬ ‫والترفيه‬ ‫للسياحة‬ ‫الخدمة‬ ‫ستجرب‬ ‫كنت‬ ‫إذا‬ ‫اكتب‬.‫محدد‬ ‫رقم‬ .......................... 24-‫؟‬ ‫التلفريك‬ ‫تجربة‬ ‫مع‬ ‫بالتزامن‬ ‫تريدها‬ ‫التي‬ ‫االخرى‬ ‫الجذب‬ ‫عوامل‬ ‫هي‬ ‫ما‬ ........................................................................ ........................................................................ ........................................................................ ....................................................................... 26-‫المناسب‬ ‫السعر‬ ‫هو‬ ‫وما‬ ‫التلفريك‬ ‫ركوب‬ ‫خدمة‬ ‫سعر‬ ‫تكون‬ ‫أن‬ ‫تتوقع‬ ‫ماذا‬‫؟‬.‫محدد‬ ‫رقم‬ ‫اكتب‬ ........................................... 25-‫؟اذكرها‬ ‫تذكر‬ ‫ولم‬ ‫موجودة‬ ‫تكون‬ ‫أن‬ ‫أمور‬ ‫يوجد‬ ‫هل‬ ‫برأيك‬ .............................................................................. .............................................................................. .............................................................................. ..............................................................................