CONTENT
• Introduction
• Principles of Tendering
• Types of tender
• Tendering Process
• Tender Documents
• Bill of Quantity
• Conclusion
INTRODUCTION
 WHAT IS TENDER?
DEFINITION
• Tendering is the process of choosing the best and cheapest company to supply
goods and services by asking several companies to make offers for supplying the
goods and services.
• Tender is an offer which incorporates the sum of money, time and other
conditions required to carry out the contract obligations in order to complete a
project or a part of it consisting of specified works.
PRINCIPLES OF TENDERING
 There are some basic principles of tendering process :-
• All aspects of the tendering process must be conducted with honestly at all levels of the industry.
• A clear understanding of the rights and obligations of both parties.
• Parties must confirm to all legal obligations.
• Parties must clearly identify ownership.
• Parties must not submit tenders without a firm goal.
• Parties must not engage in any practice which gives improper advantage.
• Condition of tendering must be the same for tender on any particular project.
• Clients must clearly specify their requirements in the tender document and indicate criteria for
evaluation.
• All the information provided in the course of tendering must be protect.
TYPES OF TENDER
The majority builders still obtain much of their work by system of tendering.
There are three principle method of choosing a contractor. They are,
• Open Tender
• Selective Tender
• Negotiated Tender
OPEN TENDER
• This usually takes the form of an
advertisements in a national or local
newspapers inviting contractors to
apply for tendering competition for
carrying out the work. The main
characteristic of which are given
usually the deposit is required in order
to discourage frivolous applications.
The deposit is returnable on
submission of a tender. In this method
allows any contractor to submit a
tender to an advertised project.
SELECTIVE TENDER
• Contractor apply to be included on an
approved list maintain by an
employing body often an architectural
practice, local authority or statutory
body. These organizations have
extensive knowledge and experience
of individual contractors and regularly
review contractor performs and
approval list from such list. There are
able to select contractors most suited
to the contract the number invited will
according to the value of the contract.
NEGOTIATED TENDER
• In this process only well reputed
contractors are been negotiated by
inviting them to submit their tenders.
Client can contractors determine the
perimeters for negotiation before
commencement of the project. The
maintenance of positive relationship
during the negotiation process in
essential.
TENDERING PROCESS
PREPARATION
• Final completion of drawings,
specification, measurement /
take-off process.
• Choose conditions of contract.
• Parties involved: architect,
engineers, QS, client, project
manager.
APPROVAL TO
TENDER
• Discussion and decision on type
of tender to be used.
• Selection of tender:
* Open * Selective * Negotiate
• Parties involved: client,
consultant,
project manager.
DOCUMENTATION
Letter of invitation to tender
• Letter of acceptance
• Bills of quantities
• Relevant drawings
• Schedule of rates
EXAMPLE
TENDER DOCUMENT
STRUCTURAL REPAIRING/ RETROFITTING WORK OF OVER HEAD WATER TANK
IN AVAS VIKAS COLONY, SIKANDRA, AGRA - 282007
APPENDIX
• Period of completion : 4 Months
• Defect Liability period : One year from the date of Completion
• Earnest Money Deposit : Rs.1,20,000/-(Rupees One Lakh Twenty Thousand only)
a)Security Deposit : 5% to be deducted from the Running Bills
b)Performance Guarantee : 5% of the Estimated Cost
• Participation fees : Rs 1000/- ( Rupees One Thousand Only) ( NonRefundable)
incl GST
• Address of site : Avas Vikas Colony,Sikandra Agra
LETTER OF ACCEPTANCE
• Avas Vikas Colony,Agra,UP invites E-bids under two bid system (Technical Bid & Financial Bid ) for STRUCTURAL REPAIRING/ RETROFITTING
WORK OF OVER HEAD WATER TANK IN Avas Vikas Colony,Sikandra Agra at Avas Vikas Colony Sikandra , Agra from well-established and
reputed firms having experience in similar type of works. Interested bidders fulfilling minimum eligibility criteria as mentioned in this tender
document may submit their bid along with the following set of documents. Self certified scanned copies of following documents are required to
be furnished through e-mode in the TECHNICAL BID. However, hard copy of Technical Bid with EMD and Participation fee ( Non-refundable) shall
be sent in physical mode as well so as to reach the Office of Chief General Manager Avas Vikas Parishad Building Sikandra Agra 282007 on or
before 15:00 hrs of 14.10.2020.
1. Proof of documents for similar nature of works carried out with Govt. Departments / PSU’s / reputed Public or Private Organizations etc. in the last
Three financial years only, i.e., 2016-17, 2017-18 & 2018-2019.
2. The estimated cost of the work is Rs 58 lakhs which is based on UP PWD SOR & Market rates
3. Three similar works, each of value not less than 40% of the estimated cost put to tender, or(ii) Two similar works, each of value not less than 60% of
the estimated cost, or (iii) One similar work of value not less than 80% of the estimated cost, all amounts rounded off to a convenient full figure, in the
last 3 years ending on the last day of the month previous to the one in which the tenders are invited ( Similar work should be as per work of repair &
rehabilation only).
4. Proof of valid registration with statutory authorities for Works Contract, GST, any other etc.
5. Arbitration cases pending against the bidders, if any, submit details.
6. Whether black-listed/ put on holiday list/ withdrawal of works etc by any clients in the last 5 years, if any. Give details.
7. Copies of annual turn over details for the last three financial years (including Balance Sheet, Income Tax returns, Profit & Loss
accounts) certified by Chartered Accountant.
8. Profile of the firm.
9. Copy of PAN Card issued by Income tax Department, Govt. of India and details of GST registrations.
10. Scanned copy of Participation Fee (Non-refundable) in the form of Demand Draft/Pay Order for Rs 1000/- (Rs One Thousand
only) in favour of Avas Vikas Parishad Sikandra Agra
11. Scanned copy of EMD in the form of Demand Draft/Pay Order for Rs. 1,20,000/- (Rupees One Lakh Twenty Thousand only in
favor of “Avas Vikas Parishad” payable at Agra.
12. Details of Bank account e.g. Name of Bank, name of branch, type of A/c, along with copy of cancelled Cheque leaf.
13. Duly filled in e-payment proforma /format, duly certified by the Bankers to be enclosed. (Annexure-II).
14. Bidder has to fill and submit the Mandatory Information Form (Annexure I), Terms and conditions as agreed (Annexure III),
Declaration by the bidder (Annexure IV) and list of similar assignments completed in last three years with the Technical Bids.
15. Proof of financial soundness during the last three financial years and attested copy of solvency certificate issued by the
scheduled / nationalized bank.
OTHER INFORMATION PROVIDED
• Special terms & conditions for Tender
• Instructions to Bidders-Tender Submission Procedure
• General instructions for Bidders
• Methodologies for Repair
• SCOPE of Services by Consultant/ Contractor
• General Terms& Conditions
• List of approved manufacturers
• Important Dates
SCOPE OF WORK
• The Scope of Work (SOW) is the area in an
agreement where the work to be performed is
described. The SOW should contain any
milestones, reports, deliverables, and end products
that are expected to be provided by the
performing party.
• The SOW should also contain a time line for all
deliverables. The problem with most Scopes of
Work is a lack of specificity, namely, when the two
parties disagree on what should have been
delivered and a review of the SOW does not
support one interpretation over the other.
• This problem is common in research agreements
and is often where disputes arise. The best way to
avoid this problem is to avoid any and all
ambiguity.
A SCOPE OF WORK SHOULD INCLUDE THE
FOLLOWING COMPONENTS:
• Glossary
• Problem Statement
• Goals of the Agreement
• Objectives of the Agreement/Deliverables
• Administration
• Timeline.
BILL OF QUANTITIES
• A bill of quantities (BOQ) is a document used in
tendering in the construction industry in which
materials, parts, and labor (and their costs) are
itemized. It also (ideally) details the terms and
conditions of the construction or repair contract
and itemizes all work to enable a contractor to
price the work for which he or she is bidding.
DRAWINGS
Civil engineering drawings
are technical civil language
drawings that show the
information regarding
construction buildings and the
land with the site details. These
civil drawings help us understand
the images of construction
buildings and a better way of
construction.
SCHEDULE OF RATE
• Schedule of Rates means any schedule included in the Contract which, in
respect of any section or item of work to be carried out, shows the respective
unit rate of payment for execution of that work and which may also include
lump sums, provisional sums other sums, quantities and prices.
• In this tender the Schedule of Rate is based on the Schedule of Rate of Uttar
Pradesh Public Work Department 2020.
• All the rates should be considered same.
INVITATION
 Based on selection of tendering
methods
• Open / competitive / bid tender –
produce tender notice
• Selective – shot listed contractors
will be invited to tender if they
wish
• Negotiated – only one contractor
is approached- direct entry to
project
PROCESSING
Received tender submitted by contractor.
Tender assessment / evaluation: -
• Completed tenders are received
• Arithmetical check
• Reasonable tender sum
• Reasonable completion time
• Capabilities of tenderers under considerations
• Tender recommendation / report – tender board
AWARD CONTRACT
• Pre-award meeting with
contractors – validation of lowest
complying bid
• Validate lowest bid - Pre-contract
meeting with contractor for
contract signing
• Approval by tender board /
treasury (tender exceeds RM10
mill.) – an acceptance of tender
form is issued to tenderer , signed
by the authorized officer
TENDER DOCUMENT
 Documents of tender
• 1. Invitation for bid
• 2. Instruction to bidder
• 3. Standard forms
• 4. Condition of contract
• 5. Form of tender
• 6. Bidding data
• 7. Contract data
• 8. Specifications / general and special
• 9. Bills of quantities (BOQ) with pricing preambles
• 10.Drawings
• 11.Schedules of additional information
• Tender documents are
prepared to seek tenders
(offers).
• Also tender document help to
maintain & protect the
relationship between client &
contractor.
BILL OF QUANTITY
• The survival of any business is heavily depend on the success of commercial
management. When it comes to commercial management in construction
industry, Bill of Quantities (BOQ) is the term which brings attention of every
construction professionals and stakeholders.
• It is one of the communication tool which connects the parties (Client,
consultant & contractor) of construction project. Keith defines, BOQ is a
schedule which categories, details and quantifies the materials and other cost
items to be used in construction project. It is important to know that, direct costs
& indirect costs are to be considered for complete cost of the project which are
covered in different parts of the BOQ.
IT’S IMPORTANCE
 BOQ shall be used in every phase (pre-contract & post-contract) of the project
but need of BOQ differs based on different contract agreements & project. The
major usages are listed below.
• It provides basic idea of the project by giving the quantities to tenderers.
• It defines the extent of the work. (But it should be identified in line with drawings
& specification as well).
• It gives estimated or anticipated contract sum. (very important to client)
• It provides a basis for valuation of variation. (Variation is to be discussed in
detail).
ADVANTAGES
• Save the cost and time of several contractors measuring the same design in order to
calculate their bids for competition.
• Provide a consistent basis for competitive bids so that the contractor who is the
most efficient and least expensive in providing the items of work is likely to be
commissioned for the job.
• Provide an open basis for the contract; the client provides an extensive and clear
statement of the work he/she requires and the contractor states the price at which
he/she is prepared to undertake the job.
• Provide a very strong basis for financial administration of the contract.
TYPES OF BILL OF QUANTITY
• The main use of a bill of quantities in support of a contract is the traditional and
proven means of securing a lump-sum price for carrying out the building works
for the client. SC Quantity Surveyors produce several types of Bills of Quantities
which include
• Firm (to obtain a lump-sum price for a fully designed building project)
• Approximate (subject to re measurement as built)
FIRM BILL OF QUANTITIES
• The reliability of the tender price will
increase in relation to the accuracy of
the quantities provided (i.e. the more
precisely the work is measured and
described). Provided there were no
design changes, then firm bills of
quantities would provide a price at
tender stage, which would equal the
final cost.
APPROXIMATE BILL OF QUANTITIES
• SC Quantity Surveyors can produce
approximate bills of quantities which
are mainly used when there is
insufficient details to prepare firm bills
of quantities or where the client has
decided that the time and cost of a firm
bill of quantities is not warranted.
FORMAT OF BOQ
CONCLUSION
• We can conclude that tendering process and work with tendering method is a
system or process that should use advisably, intelligently. Basically, these things
are the job, duty and responsibilities of the Quantity Surveyor. As a Quantity
Surveyor, we should have a better knowledge about tendering. If not, it is
directly affect to the client, company and also our job of quantity surveying. If
we use tendering method correctly and select a suitable contractor for the
project, it will helps to build the project at the due time, with efficiently, quality
and also can save money. For succeed these hopes of the client, best way is use
the tendering to select suitable contractor. In this presentation and process of
making this report, we got more knowledge about tendering. And also, we tried
our best to describe these information as correctly.
Thank You
For Your Attention
Email :- Tanmaybhatt0@gmail.com

Más contenido relacionado

La actualidad más candente

Pp1 presentation 2
Pp1 presentation 2Pp1 presentation 2
Pp1 presentation 2shensin1015
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTADVj NiroSh
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender NoticeSakshi Kirar
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selectionanojan kanagarathnam
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts finalFitBlar Mit
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdfSaqib Imran
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftMuneesh Methwani
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeepSandeep Yadav
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDFIDHAMUKI
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTVISHNU VIJAYAN
 

La actualidad más candente (20)

Module 4 lecture 1
Module  4 lecture 1Module  4 lecture 1
Module 4 lecture 1
 
Pp1 presentation 2
Pp1 presentation 2Pp1 presentation 2
Pp1 presentation 2
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
SBD - 3 - ICTAD
SBD - 3 - ICTADSBD - 3 - ICTAD
SBD - 3 - ICTAD
 
Nit55
Nit55Nit55
Nit55
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
ACH 216 Lecture 04b (Bidding) Part 2
ACH 216 Lecture 04b (Bidding) Part 2ACH 216 Lecture 04b (Bidding) Part 2
ACH 216 Lecture 04b (Bidding) Part 2
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdf
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Construction tender process
Construction tender processConstruction tender process
Construction tender process
 
Tendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final DraftTendering Bidding & Award of Contract Final Draft
Tendering Bidding & Award of Contract Final Draft
 
Tender
TenderTender
Tender
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Tendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamiaTendering-professional practices-jamia millia islamia
Tendering-professional practices-jamia millia islamia
 
Tendering process cvc_guidelines
Tendering process cvc_guidelinesTendering process cvc_guidelines
Tendering process cvc_guidelines
 
Preparation of bill sandeep
Preparation of bill sandeepPreparation of bill sandeep
Preparation of bill sandeep
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
 

Similar a Tanmay presentation

Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides마 이환
 
Unit V - Contracts.pptx
Unit V - Contracts.pptxUnit V - Contracts.pptx
Unit V - Contracts.pptxjairam131
 
StandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfStandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfPSENTHILMURUGAN2
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesMANTHAN CHAUHAN
 
dsds.ppt
dsds.pptdsds.ppt
dsds.pptpisal3
 
Cattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxCattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxswarnavet05
 
Tendering procedures
Tendering proceduresTendering procedures
Tendering proceduresRotich Kimaru
 
Tender & its process.pptx
Tender & its process.pptxTender & its process.pptx
Tender & its process.pptx2ke21cv405
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentationnipuna_bopage
 
Procurement Management
Procurement ManagementProcurement Management
Procurement Managementlearnafren
 

Similar a Tanmay presentation (20)

Qsct tendering dr_clj
Qsct tendering dr_cljQsct tendering dr_clj
Qsct tendering dr_clj
 
Unit 5 Tendering
Unit 5 Tendering Unit 5 Tendering
Unit 5 Tendering
 
Measurement 4:presentation slides
Measurement 4:presentation slidesMeasurement 4:presentation slides
Measurement 4:presentation slides
 
Unit V - Contracts.pptx
Unit V - Contracts.pptxUnit V - Contracts.pptx
Unit V - Contracts.pptx
 
StandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdfStandardTenderDocument-14122020.pdf
StandardTenderDocument-14122020.pdf
 
Transmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission LinesTransmission Sector & Project Management of Transmission Lines
Transmission Sector & Project Management of Transmission Lines
 
dsds.ppt
dsds.pptdsds.ppt
dsds.ppt
 
Tendering
TenderingTendering
Tendering
 
Notes unit 2A.ppt
Notes unit 2A.pptNotes unit 2A.ppt
Notes unit 2A.ppt
 
Cattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docxCattle+feed+plant+(29-10-2021).docx
Cattle+feed+plant+(29-10-2021).docx
 
Tendering procedures
Tendering proceduresTendering procedures
Tendering procedures
 
contract procedure
contract procedurecontract procedure
contract procedure
 
Tender & its process.pptx
Tender & its process.pptxTender & its process.pptx
Tender & its process.pptx
 
Tendering documentation
Tendering documentationTendering documentation
Tendering documentation
 
Procurement Management
Procurement ManagementProcurement Management
Procurement Management
 
Contracts & tenders
Contracts & tendersContracts & tenders
Contracts & tenders
 
Tenders for construction
Tenders for constructionTenders for construction
Tenders for construction
 
tendering
 tendering tendering
tendering
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
Tpt's tendering process at a glance
Tpt's tendering process at a glanceTpt's tendering process at a glance
Tpt's tendering process at a glance
 

Último

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 

Último (20)

IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 

Tanmay presentation

  • 1. MINI PROJECT Work related to preparation of Bill of Quantities and Tender Document Submitted By :- Submitted To:- Tanmay Bhatt Er.Mukta Yadav 1700400024 CE IV year RBS Engineering Technical Campus , Bichpuri, Agra
  • 2. CONTENT • Introduction • Principles of Tendering • Types of tender • Tendering Process • Tender Documents • Bill of Quantity • Conclusion
  • 3. INTRODUCTION  WHAT IS TENDER? DEFINITION • Tendering is the process of choosing the best and cheapest company to supply goods and services by asking several companies to make offers for supplying the goods and services. • Tender is an offer which incorporates the sum of money, time and other conditions required to carry out the contract obligations in order to complete a project or a part of it consisting of specified works.
  • 4. PRINCIPLES OF TENDERING  There are some basic principles of tendering process :- • All aspects of the tendering process must be conducted with honestly at all levels of the industry. • A clear understanding of the rights and obligations of both parties. • Parties must confirm to all legal obligations. • Parties must clearly identify ownership. • Parties must not submit tenders without a firm goal. • Parties must not engage in any practice which gives improper advantage. • Condition of tendering must be the same for tender on any particular project. • Clients must clearly specify their requirements in the tender document and indicate criteria for evaluation. • All the information provided in the course of tendering must be protect.
  • 5. TYPES OF TENDER The majority builders still obtain much of their work by system of tendering. There are three principle method of choosing a contractor. They are, • Open Tender • Selective Tender • Negotiated Tender
  • 6. OPEN TENDER • This usually takes the form of an advertisements in a national or local newspapers inviting contractors to apply for tendering competition for carrying out the work. The main characteristic of which are given usually the deposit is required in order to discourage frivolous applications. The deposit is returnable on submission of a tender. In this method allows any contractor to submit a tender to an advertised project.
  • 7. SELECTIVE TENDER • Contractor apply to be included on an approved list maintain by an employing body often an architectural practice, local authority or statutory body. These organizations have extensive knowledge and experience of individual contractors and regularly review contractor performs and approval list from such list. There are able to select contractors most suited to the contract the number invited will according to the value of the contract.
  • 8. NEGOTIATED TENDER • In this process only well reputed contractors are been negotiated by inviting them to submit their tenders. Client can contractors determine the perimeters for negotiation before commencement of the project. The maintenance of positive relationship during the negotiation process in essential.
  • 10. PREPARATION • Final completion of drawings, specification, measurement / take-off process. • Choose conditions of contract. • Parties involved: architect, engineers, QS, client, project manager.
  • 11. APPROVAL TO TENDER • Discussion and decision on type of tender to be used. • Selection of tender: * Open * Selective * Negotiate • Parties involved: client, consultant, project manager.
  • 12. DOCUMENTATION Letter of invitation to tender • Letter of acceptance • Bills of quantities • Relevant drawings • Schedule of rates
  • 14. TENDER DOCUMENT STRUCTURAL REPAIRING/ RETROFITTING WORK OF OVER HEAD WATER TANK IN AVAS VIKAS COLONY, SIKANDRA, AGRA - 282007
  • 15. APPENDIX • Period of completion : 4 Months • Defect Liability period : One year from the date of Completion • Earnest Money Deposit : Rs.1,20,000/-(Rupees One Lakh Twenty Thousand only) a)Security Deposit : 5% to be deducted from the Running Bills b)Performance Guarantee : 5% of the Estimated Cost • Participation fees : Rs 1000/- ( Rupees One Thousand Only) ( NonRefundable) incl GST • Address of site : Avas Vikas Colony,Sikandra Agra
  • 16. LETTER OF ACCEPTANCE • Avas Vikas Colony,Agra,UP invites E-bids under two bid system (Technical Bid & Financial Bid ) for STRUCTURAL REPAIRING/ RETROFITTING WORK OF OVER HEAD WATER TANK IN Avas Vikas Colony,Sikandra Agra at Avas Vikas Colony Sikandra , Agra from well-established and reputed firms having experience in similar type of works. Interested bidders fulfilling minimum eligibility criteria as mentioned in this tender document may submit their bid along with the following set of documents. Self certified scanned copies of following documents are required to be furnished through e-mode in the TECHNICAL BID. However, hard copy of Technical Bid with EMD and Participation fee ( Non-refundable) shall be sent in physical mode as well so as to reach the Office of Chief General Manager Avas Vikas Parishad Building Sikandra Agra 282007 on or before 15:00 hrs of 14.10.2020. 1. Proof of documents for similar nature of works carried out with Govt. Departments / PSU’s / reputed Public or Private Organizations etc. in the last Three financial years only, i.e., 2016-17, 2017-18 & 2018-2019. 2. The estimated cost of the work is Rs 58 lakhs which is based on UP PWD SOR & Market rates 3. Three similar works, each of value not less than 40% of the estimated cost put to tender, or(ii) Two similar works, each of value not less than 60% of the estimated cost, or (iii) One similar work of value not less than 80% of the estimated cost, all amounts rounded off to a convenient full figure, in the last 3 years ending on the last day of the month previous to the one in which the tenders are invited ( Similar work should be as per work of repair & rehabilation only). 4. Proof of valid registration with statutory authorities for Works Contract, GST, any other etc. 5. Arbitration cases pending against the bidders, if any, submit details. 6. Whether black-listed/ put on holiday list/ withdrawal of works etc by any clients in the last 5 years, if any. Give details.
  • 17. 7. Copies of annual turn over details for the last three financial years (including Balance Sheet, Income Tax returns, Profit & Loss accounts) certified by Chartered Accountant. 8. Profile of the firm. 9. Copy of PAN Card issued by Income tax Department, Govt. of India and details of GST registrations. 10. Scanned copy of Participation Fee (Non-refundable) in the form of Demand Draft/Pay Order for Rs 1000/- (Rs One Thousand only) in favour of Avas Vikas Parishad Sikandra Agra 11. Scanned copy of EMD in the form of Demand Draft/Pay Order for Rs. 1,20,000/- (Rupees One Lakh Twenty Thousand only in favor of “Avas Vikas Parishad” payable at Agra. 12. Details of Bank account e.g. Name of Bank, name of branch, type of A/c, along with copy of cancelled Cheque leaf. 13. Duly filled in e-payment proforma /format, duly certified by the Bankers to be enclosed. (Annexure-II). 14. Bidder has to fill and submit the Mandatory Information Form (Annexure I), Terms and conditions as agreed (Annexure III), Declaration by the bidder (Annexure IV) and list of similar assignments completed in last three years with the Technical Bids. 15. Proof of financial soundness during the last three financial years and attested copy of solvency certificate issued by the scheduled / nationalized bank.
  • 18. OTHER INFORMATION PROVIDED • Special terms & conditions for Tender • Instructions to Bidders-Tender Submission Procedure • General instructions for Bidders • Methodologies for Repair • SCOPE of Services by Consultant/ Contractor • General Terms& Conditions • List of approved manufacturers • Important Dates
  • 19. SCOPE OF WORK • The Scope of Work (SOW) is the area in an agreement where the work to be performed is described. The SOW should contain any milestones, reports, deliverables, and end products that are expected to be provided by the performing party. • The SOW should also contain a time line for all deliverables. The problem with most Scopes of Work is a lack of specificity, namely, when the two parties disagree on what should have been delivered and a review of the SOW does not support one interpretation over the other. • This problem is common in research agreements and is often where disputes arise. The best way to avoid this problem is to avoid any and all ambiguity.
  • 20. A SCOPE OF WORK SHOULD INCLUDE THE FOLLOWING COMPONENTS: • Glossary • Problem Statement • Goals of the Agreement • Objectives of the Agreement/Deliverables • Administration • Timeline.
  • 21.
  • 22. BILL OF QUANTITIES • A bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.
  • 23.
  • 24. DRAWINGS Civil engineering drawings are technical civil language drawings that show the information regarding construction buildings and the land with the site details. These civil drawings help us understand the images of construction buildings and a better way of construction.
  • 25.
  • 26. SCHEDULE OF RATE • Schedule of Rates means any schedule included in the Contract which, in respect of any section or item of work to be carried out, shows the respective unit rate of payment for execution of that work and which may also include lump sums, provisional sums other sums, quantities and prices. • In this tender the Schedule of Rate is based on the Schedule of Rate of Uttar Pradesh Public Work Department 2020. • All the rates should be considered same.
  • 27. INVITATION  Based on selection of tendering methods • Open / competitive / bid tender – produce tender notice • Selective – shot listed contractors will be invited to tender if they wish • Negotiated – only one contractor is approached- direct entry to project
  • 28. PROCESSING Received tender submitted by contractor. Tender assessment / evaluation: - • Completed tenders are received • Arithmetical check • Reasonable tender sum • Reasonable completion time • Capabilities of tenderers under considerations • Tender recommendation / report – tender board
  • 29. AWARD CONTRACT • Pre-award meeting with contractors – validation of lowest complying bid • Validate lowest bid - Pre-contract meeting with contractor for contract signing • Approval by tender board / treasury (tender exceeds RM10 mill.) – an acceptance of tender form is issued to tenderer , signed by the authorized officer
  • 30. TENDER DOCUMENT  Documents of tender • 1. Invitation for bid • 2. Instruction to bidder • 3. Standard forms • 4. Condition of contract • 5. Form of tender • 6. Bidding data • 7. Contract data • 8. Specifications / general and special • 9. Bills of quantities (BOQ) with pricing preambles • 10.Drawings • 11.Schedules of additional information • Tender documents are prepared to seek tenders (offers). • Also tender document help to maintain & protect the relationship between client & contractor.
  • 31. BILL OF QUANTITY • The survival of any business is heavily depend on the success of commercial management. When it comes to commercial management in construction industry, Bill of Quantities (BOQ) is the term which brings attention of every construction professionals and stakeholders. • It is one of the communication tool which connects the parties (Client, consultant & contractor) of construction project. Keith defines, BOQ is a schedule which categories, details and quantifies the materials and other cost items to be used in construction project. It is important to know that, direct costs & indirect costs are to be considered for complete cost of the project which are covered in different parts of the BOQ.
  • 32. IT’S IMPORTANCE  BOQ shall be used in every phase (pre-contract & post-contract) of the project but need of BOQ differs based on different contract agreements & project. The major usages are listed below. • It provides basic idea of the project by giving the quantities to tenderers. • It defines the extent of the work. (But it should be identified in line with drawings & specification as well). • It gives estimated or anticipated contract sum. (very important to client) • It provides a basis for valuation of variation. (Variation is to be discussed in detail).
  • 33. ADVANTAGES • Save the cost and time of several contractors measuring the same design in order to calculate their bids for competition. • Provide a consistent basis for competitive bids so that the contractor who is the most efficient and least expensive in providing the items of work is likely to be commissioned for the job. • Provide an open basis for the contract; the client provides an extensive and clear statement of the work he/she requires and the contractor states the price at which he/she is prepared to undertake the job. • Provide a very strong basis for financial administration of the contract.
  • 34. TYPES OF BILL OF QUANTITY • The main use of a bill of quantities in support of a contract is the traditional and proven means of securing a lump-sum price for carrying out the building works for the client. SC Quantity Surveyors produce several types of Bills of Quantities which include • Firm (to obtain a lump-sum price for a fully designed building project) • Approximate (subject to re measurement as built)
  • 35. FIRM BILL OF QUANTITIES • The reliability of the tender price will increase in relation to the accuracy of the quantities provided (i.e. the more precisely the work is measured and described). Provided there were no design changes, then firm bills of quantities would provide a price at tender stage, which would equal the final cost. APPROXIMATE BILL OF QUANTITIES • SC Quantity Surveyors can produce approximate bills of quantities which are mainly used when there is insufficient details to prepare firm bills of quantities or where the client has decided that the time and cost of a firm bill of quantities is not warranted.
  • 37. CONCLUSION • We can conclude that tendering process and work with tendering method is a system or process that should use advisably, intelligently. Basically, these things are the job, duty and responsibilities of the Quantity Surveyor. As a Quantity Surveyor, we should have a better knowledge about tendering. If not, it is directly affect to the client, company and also our job of quantity surveying. If we use tendering method correctly and select a suitable contractor for the project, it will helps to build the project at the due time, with efficiently, quality and also can save money. For succeed these hopes of the client, best way is use the tendering to select suitable contractor. In this presentation and process of making this report, we got more knowledge about tendering. And also, we tried our best to describe these information as correctly.
  • 38. Thank You For Your Attention Email :- Tanmaybhatt0@gmail.com