Health, Security, Safety and Environment (HSE)
Content:
1. Objective
2. Application and Scope
2.1 Application of HSE Directive with underlying documents.
2.2 Scope of HSE Management system
3. Framework for our HSE Management system
4. Our Policy
4.1 Ambitions
4.2 Commitments
4.3 Living our values
5. Leadership and accountability
6. Planning
6.1 Legal requirements, corporate requirements, commitments and document control
6.2 Planning, goals and targets
7. Implementation and execution
7.1 Hazard identification and risk management
7.2 Competence, training, awareness and behaviour
7.3 Information, communication, participation and dialog
7.3.1 HSE information to the public
7.3.2 Dialog with the public
7.3.3 Internal communication and involvement
7.4 Management of change
7.5 Health and Work Environment
7.6 Incident reporting and Investigation
7.7 Projects and/or- expansions, mergers, acquisitions, sales and closedowns.
7.8 Management of contractors, suppliers and partners
7.9 Plant operation, Maintenance of assets, Work Permits and Energy Control
7.10 Moving and storing materials
7.11 Environmental and Product Stewardship
7.12 Security and business travel
7.13 Emergency Preparedness
7.14 Reporting
8. Monitoring, audit and review
9. Control with records.
10. Risk mitigating actions
11. Reference documents
12. Appendixes
13. External document references
1. Objective
This directive describes our HSE policy, lays down our ambitions, commitments, values,
requirements and our HSE management system.
2. Application and Scope
2.1 Application of HSE Directive with underlying documents.
This Directive with underlying documents such as procedures and appendixes is mandatory
for all entities that are wholly-owned by Hydro.
Local legislation will supersede this Directive in areas of conflict. Where local legislation
does not require an adequate level of HSE performance, activities are conducted in a
manner consistent with this Directive and relevant international HSE standards, practices
and guidelines such as issued by International Finance Corporation (IFC), World Bank Group
or similar.
.
2.2 Scope of HSE Management system
The HSE Management system is an integrated part of Norsk Hydro’s Management system.
This directive applies to aspects and activities that have a potential to affect HSE throughout
the entire lifecycle from business development to operation and closure.
For entities in which Hydro has an interest of less than 100 percent and for contractors,
suppliers and commercial contracts we shall exert our influence to create consistency with
this directive, acting reasonably and with respect for other owners' legitimate views in order
to make the directive apply.
3. Framework for our HSE Management system
HSE leadership in Hydro is based on our policy and the principle of continuous improvement.
The figure illustrates the content of the HSE management system and how it fits into the
Plan-Do-Check-Act (PDCA) methodology
Figure 3.1 Hydro’s HSE management system model
4. Our Policy
4.1 Ambitions
Our ambition is to set health, safety, security and environment as core elements of Hydro’s
identity and business success. The company will be recognized for its world class
performance which demonstrates a strong sense of responsibility for people and the
environment. Through innovation and efficient production, we will contribute to the creation of
a more viable society.
4.2 Commitments
At Hydro, our health, safety, security and environmental performance is an integral part of
our everyday business. HSE are essential elements in our partnerships with suppliers and
customers. We demonstrate our commitment to HSE through the way we are organized,
make decisions, operate and cooperate.
We are committed to:
• Identify, assess and manage risks to employees, contractors, visitors, the
environment and our host communities.
• Set clear and ambitious HSE targets
• Ensure that the HSE management system and tools continually improve our
performance
• Demonstrate HSE commitment through hands-on leadership and behaviour
• Be transparent in all HSE issues through active engagement with stakeholders
• Contribute to development of sustainable and environmental friendly technology for
manufacturing of aluminium metal and products
4.3 Living our values
• With respect for energy and resources, invest in innovation so our activities and
products have a minimum adverse impact on the environment
• Have the courage to set ambitious goals for HSE performance during acquisitions
processes and when signing commercial agreements with our partners
• Through foresight, strive to prevent injuries on our premises and avoid occupational
illnesses, property damage and production loss
• Communicate our goals, promote transparency in our HSE reporting and engage in
cooperation with interested parties
• Demonstrate determination in protecting personnel, premises and activities against
conscious and negligent unauthorised actions, balancing the company’s need for
protection and the integrity of employees and third parties.
5. Leadership and accountability
Corporate Management Board (CMB) shall:
• Assist the CEO in deployment of Hydro's policy concerning Health, Security, Safety
and environment, and for the elaboration of corporate HSE steering documents that
are deemed necessary to make Hydro’s policy operational.
All managers shall:
• Demonstrate visible leadership and proactive commitment to HSE excellence through
personal examples, by promoting initiatives, encourage people to work in a safe
manner, conduct site inspections, reviews and behavioural observations
• By involvement of all employees build a sustainable culture and integrate applicable
HSE practices into the business
• Be accountable for compliance with statutory requirements as well as with Hydro's
corporate steering documents and HSE performance in line with Hydro’s policy and
targets.
• Ensure resources and competence essential to establish, implement, maintain and
improve the HSE Management System.
• Show determination and commitment to HSE by driving a continuous improvement
process.
.
Site Manager shall:
• Be responsible for defining the need for and scope of local procedures, and
document it. Scope shall be built on identified hazards, and their associated risks to
be assessed and managed. Systems to handle risks associated with planned or
unplanned changes shall be in place.
All employees (including managers and contractors)
• Shall understand their responsibility and commitment to health, safety, security and
environment and contribute to achievement of Hydro’s obligations and goals as core
elements of Hydro's identity and business success.
• Are responsible for their own health, security and safety by being familiar with the
risks and controlling measures and for executing his or her task in a secure, safe,
healthy, environmental friendly and efficient manner in compliance with applicable
requirements and guidelines.
• Immediately report any accident or incident that may cause injuries or damage
• Have the right to and the responsibility to stop unsafe behaviour or refuse to work in
situations that causes harm, and immediately bring these situations to the attention of
those at imminent risk and to the management.
Corporate HSE staff shall:
• Provide governance within the HSE area,
• Have a system in place to ensure that Hydro's activities are carried out in compliance
with this directive and underlying documents
• Ensure ownership of the Health, Security, Safety and Environment processes
• Assist in making information concerning HSE available
• Facilitate cooperation by running an efficient HSE network
• Facilitate the exchange of best practices
As a guiding principle, health, security, safety and environmental issues shall be
resolved at the appropriate organizational level, i.e. as low as possible and practical.
6. Planning
6.1 Legal-and Corporate requirements, commitments and document control
• A system shall be in place at site level to identify and assess all applicable HSE laws,
regulations, approvals, licence, permits and corporate requirements. Documents shall
be kept updated.
• Compliance with legal and other requirements shall be demonstrated through the
implementation of documented procedures on relevant organisational level
• A document control system shall be in place, which fulfils the following requirements:
o Documents shall be approved, maintained updated, accurate, legible and
identifiable.
o Documents shall be securely stored and readily accessible at all locations
required for its effective application.
o Retention time shall be based on legal requirements or as required in
corporate procedures.
o Obsolete documentation and data are properly removed and protected from
unintended use.
.
6.2 Planning, goals and targets
• HSE shall be an integrated part of business planning based on identified significant
HSE issues, risks and opportunities.
• As a result of the business planning process and HSE assessments, the relevant
organisational level shall provide a prioritized list of HSE challenges, set long term
goals, key performance indicators and targets.
7. Implementation and Execution
7.1 Hazard identification and risk management
• Hazards and risks for routine and non routine activities shall be identified, assessed,
prioritised and managed as appropriate HSE impacts of the operation. The
assessment shall take into account health, security and safety, the surrounding
physical, environment, biodiversity, applicable legal requirements and financial
implications.
• Environmental aspects and impacts for all our products shall be fully identified and
assessed throughout the lifecycle of the product.
• Hazards and risks shall be assessed by the appropriate level of management
consistent with the significance of the risk.
• Management is responsible for setting acceptance criteria for a risk. Risk
management decisions shall be documented and the implemented mitigation actions
shall be tracked.
• Risk associated with planned and unplanned changes shall be managed, recorded
and documented whether they are temporary, permanent or due to incremental
change. The required system shall address change events including changes in
personnel, organisation, processes, facilities, physical environment, equipment,
technology, procedures, laws, regulations, standards, materials, intermediates,
products, systems and services.
• HSE risks shall be reviewed in order to verify effective and efficient mitigation control.
For major risks the verification shall take place whenever required.
7.2 Competence, training, awareness and behaviour
• Managers shall ensure that any person(s) under its control performing tasks that can
impact on HSE is (are) competent on the basis of appropriate education, training or
experience and shall retain associated records.
• Inductions comprising Hydro’s HSE objectives, expected behaviour on our premises,
on site hazards, risks and controls shall be conducted for employees, contractors and
visitors at the commencement of their employments or visit.
• Managers shall establish, implement and maintain a procedure to make persons
working under its control aware of consequences, actual potential of work activities
and behaviour, roles and responsibility, importance of compliance with our
procedures including emergency preparedness.
• Employees shall be engaged at all levels in the organisation to make on the job
behavioural observations to reinforce desired HSE behaviour and correct at risk
behaviour.
7.3 Information, communication, participation and dialog.
• The Management shall communicate relevant HSE information including legal or
other requirements to persons working under the control of the organisation and
external interested parties.
7.3.1 HSE information to the public
• Each site with the risk of an injury or damage extending beyond the site’s boundaries
as a result of a major accident, shall inform the public of the risk entailed by the site’s
operations and the potential off-site consequences.
• The information shall be repeated and updated at intervals of not more than three
years, or in the event of modifications that may have significant effect on the risk and
potential off site consequences. The information shall be made permanently available
to the public.
.
7.3.2 Dialogue with the public
• Concerns and complains from neighbours and/or interested parties shall be
registered, acknowledged, investigated and timely responded to.
• Conflicts shall be resolved through consultation and participation whenever possible.
7.3.3 Internal communication and involvement
• HSE Policy and procedures, plans, goals, targets and HSE matters in general shall
be communicated throughout the organisation.
• Employees shall be invited to participate in development, implementation, review and
improvement of our HSE programs.
• HSE performance feedback shall be effective and address key issues. The feedback
shall include HSE incidents and occupational illnesses.
• The business area shall as a part of their HSE performance review, present a
quarterly report. The report shall have focus on progress towards targets, deviations
from targets and corrective measures taken.
7.4 Management of Change
• The management of change shall include an assessment of the impact on HSE
systems and performance ensuring that any negative effect on HSE is mitigated and
those HSE improvement potentials are captured. The change management system
shall ensure that change management actions have been completed, their intended
outcome validated and any unintended or additional risks are identified and managed.
• Change shall timely be communicated to and understood by those who may be
affected.
• When organisational changes are planned, management shall consider ability to
achieve HSE objectives, targets and goals
7.5 Health and work environment
• Systems, plans and programmes shall be established and implemented to identify,
analyse, evaluate and enhance the health and well being of workers and contractors
through providing a work environment where occupational health hazards are
managed and reduced to a minimum
7.6 Incident reporting and Investigation
• The management culture shall ensure the recognition, response, reporting and
analysis of incidents including near misses.
• Appropriate corrective actions shall be implemented and applicable learning shall be
shared within the company.
.
7.7 Projects and/or- expansions, mergers, acquisitions, sales and closedowns.
• Hazard identification and management of HSE risks and opportunities is an integral
part of all projects through planning, design, approval, procurement, construction,
commissioning and decommissioning.
• Environmental Impact Assessments (Environmental studies) shall be carried out for
new major projects/major expansions, mergers, acquisitions, sales and closedowns,
and shall be done in accordance with national and/or international validated
standards or methodologies.
• When determining viability of a new business case for Hydro in a geographical area
with no existing operations ongoing, a high level review of all relevant HSE aspects
shall be done.
7.8 Management of contractors, suppliers and partners
• The contracting of services, the purchase or lease of equipment and materials, and
activities with partners shall be carried out so as to minimise any adverse HSE
consequences.
.
7.9 Plant operation, Maintenance of assets, Work Permits and Energy Control
• All plants and equipment shall be operated, maintained, inspected and tested using
systems and procedures that manage HSE risks.
.
7.10 Moving- and storing materials
• All storage facilities shall be designed operated and maintained in accordance with
local and national regulations, recognised codes and standards and shall comply with
the engineering and operational standards for the owner of the storage facility.
• When commodity is loaded, transported and unloaded, company regulations, national
and international laws shall be adhered to.
• A Hydro representative shall be in control of the process of transporting goods, and
be physically present when relevant.
7.11 Environmental and Product Stewardship
On Climate we are committed to being in the forefront in the framework design, in our own
emissions reductions and in the development of sustainable systems. We will continue to
develop our business, products and solutions in a way that will support global green house
gas emission reductions in a life cycle perspective. We will limit emissions from our
production through better operations and through development and implementation of new
technologies. When we make major investment decisions we will take into account the
expected future cost of green house gas emissions in order to support the choice of climate
benign solutions. We will develop a trading capacity to manage our green house gas portfolio
and to provide incentives to reduce operational emissions.
On Biodiversity we will respect the IUCN classification of protected areas and management
regulations applicable to them. We will take actions to avoid or mitigate impacts on
biodiversity from our operations. This will include compensatory measures to conserve
biodiversity in sensitive areas. When we do our Environmental and Social Impact
Assessments we will consider primary and secondary effects on biodiversity. In connection
with our activities we will monitor biodiversity. We will contribute to the development of a
better knowledge on the effects on biodiversity of our business, actively support the
development of frameworks on biodiversity conservation and engage in partnerships and
stakeholder dialogue to meet our ambitions.
Our ambition is to manage our use of freshwater in a sustainable way. We will assess and
manage water use and discharges as a part of our environmental management system. We
will take available water resources and competing demands for these resources into
consideration for new projects as well as for existing production facilities. We emphasize
consultation with stakeholders when developing business ventures which require significant
amounts of water. We also support the development of effective water governance
frameworks and build up of local capacity
For our value chain we will:
• The lifecycle HSE impacts associated with resources, materials, processes and
products shall be minimised and managed.
.
7.12 Security and business travel
• Security hazards shall be identified and associated risks assessed and managed.
7.13 Emergency Preparedness
• Procedures and resources shall be in place to effectively respond to crises and
emergency situations.
7.14 Reporting
• Data for HSE incidents, work related illness and sick leave shall be identified,
classified and reported at BA/Sector/Unit/Site level.
8. Monitoring, audit and review
The intent of monitoring, audit and review is to drive continuous improvement.
• HSE performance shall regularly be measured, monitored, recorded and analysed
with results and reported according to fixed schedules to Corporate Management
Board and others as appropriate.
• Corporate HSE staff shall conduct self assessments for monitoring of compliance with
corporate HSE procedures. Based on the self assessment results, the Business Area
shall eventually prepare and execute improvements plans.
• Systems shall be in place to identify and report non-compliances.
• Local Mangers and Sector Managers shall annually review the suitability, adequacy
and effectiveness of their HSE- system and procedures.
• Internal and external audit results, incident reports, performance reports and relevant
views from stakeholders shall be included in the review. Reviews shall be
documented with recommendations for improvement. Corporate- and BA/Sector HSE
audits will be conducted according to an annual plan
9. Control with records.
Records are established to provide evidence of compliance with requirements.
• Managers shall establish and maintain records as necessary to demonstrate
compliance to legislation and our HSE management system.
• Managers shall have in place a procedure for identification, storage, protection,
retrieval, retention, and disposal of records.
• Medical records shall be stored according to national legislation. (In case of sale or
closedown of a production plant, all records shall be securely retained and
maintained by Hydro, unless otherwise agreed in sales contract
10. Risk mitigating actions
• Based on risk assessments and reviews, Managers shall plan and implement
preventive actions in order to avoid non-compliances.
• Managers shall respond to and manage non-compliances by investigating causes,
plan and implement corrective actions.
• Managers shall review and document effectiveness and efficiency of such actions to
avoid recurrence.

Más contenido relacionado

La actualidad más candente

A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety InductionJames McCann
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05txsafety1
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptssuser0ebdc3
 
Safety Officer Duties
Safety Officer DutiesSafety Officer Duties
Safety Officer DutiesTaqvi11
 
RedPixel OHS Presentation
RedPixel OHS PresentationRedPixel OHS Presentation
RedPixel OHS PresentationHelenYOH
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templatesDwarika Bhushan Sharma
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templatesDwarika Bhushan Sharma
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan genericfirstpick
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety inductionGanesan Raju
 
40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdf40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdfKarnav Rana
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...Dwarika Bhushan Sharma
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementationDr Madhu Aman Sharma
 

La actualidad más candente (20)

A Part 1 Safety Induction
A  Part 1 Safety InductionA  Part 1 Safety Induction
A Part 1 Safety Induction
 
Hse plan
Hse planHse plan
Hse plan
 
Essential Elements to an Effective Safety Program
Essential Elements to an Effective Safety ProgramEssential Elements to an Effective Safety Program
Essential Elements to an Effective Safety Program
 
New Employee Orientation 05
New Employee Orientation 05New Employee Orientation 05
New Employee Orientation 05
 
Project EHS Plan
Project EHS PlanProject EHS Plan
Project EHS Plan
 
HSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.pptHSE-INDUCTION-TRAINING.ppt
HSE-INDUCTION-TRAINING.ppt
 
Night work safety
Night work safetyNight work safety
Night work safety
 
General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)General HSE Training (Level 1 & 2)
General HSE Training (Level 1 & 2)
 
Safety Officer Duties
Safety Officer DutiesSafety Officer Duties
Safety Officer Duties
 
Man and machine interface
Man and machine interfaceMan and machine interface
Man and machine interface
 
Workplace hazards
Workplace hazardsWorkplace hazards
Workplace hazards
 
RedPixel OHS Presentation
RedPixel OHS PresentationRedPixel OHS Presentation
RedPixel OHS Presentation
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
 
6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates6 excavations (temporary works) risk assessment templates
6 excavations (temporary works) risk assessment templates
 
Health and safety plan generic
Health and safety plan genericHealth and safety plan generic
Health and safety plan generic
 
Health and safety induction
Health and safety inductionHealth and safety induction
Health and safety induction
 
40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdf40 DUTIES OF A SAFETY OFFICER.pdf
40 DUTIES OF A SAFETY OFFICER.pdf
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...
 
Occupational health and safety implementation
Occupational health and safety implementationOccupational health and safety implementation
Occupational health and safety implementation
 
Construction Safety Training
Construction Safety TrainingConstruction Safety Training
Construction Safety Training
 

Similar a HSE policy

HSE Management.pptx
HSE Management.pptxHSE Management.pptx
HSE Management.pptxfawad71
 
Monib Traboulsi CV 2015
Monib Traboulsi CV 2015Monib Traboulsi CV 2015
Monib Traboulsi CV 2015traboulsi
 
UFR Hse supervision Resume
UFR Hse supervision ResumeUFR Hse supervision Resume
UFR Hse supervision Resumeolorunyomi wale
 
Mohammed Omari CV updated[1]
Mohammed Omari CV updated[1]Mohammed Omari CV updated[1]
Mohammed Omari CV updated[1]Mohammed Al Omari
 
ANTHONY A. BERNALDO SAFETY OFFICER SUPERVISOR(CV)
ANTHONY A. BERNALDO  SAFETY OFFICER SUPERVISOR(CV)ANTHONY A. BERNALDO  SAFETY OFFICER SUPERVISOR(CV)
ANTHONY A. BERNALDO SAFETY OFFICER SUPERVISOR(CV)Anthony Bernaldo
 
June 2017 long desc.cv hse manager
June 2017  long desc.cv hse manager June 2017  long desc.cv hse manager
June 2017 long desc.cv hse manager Fabio Berti
 
Operations integrity management system exxon mobil
Operations integrity management system   exxon mobilOperations integrity management system   exxon mobil
Operations integrity management system exxon mobilfaisal anggarda
 
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)TyCarreg
 

Similar a HSE policy (20)

HSE Management.pptx
HSE Management.pptxHSE Management.pptx
HSE Management.pptx
 
Health and Safety.pdf
Health and Safety.pdfHealth and Safety.pdf
Health and Safety.pdf
 
JAVAID_CV_HSE N
JAVAID_CV_HSE NJAVAID_CV_HSE N
JAVAID_CV_HSE N
 
My CV
My CVMy CV
My CV
 
Health And Safety Policy
Health And Safety PolicyHealth And Safety Policy
Health And Safety Policy
 
Bradley Huber Resume 2016
Bradley Huber Resume 2016Bradley Huber Resume 2016
Bradley Huber Resume 2016
 
Monib Traboulsi CV 2015
Monib Traboulsi CV 2015Monib Traboulsi CV 2015
Monib Traboulsi CV 2015
 
UFR Hse supervision Resume
UFR Hse supervision ResumeUFR Hse supervision Resume
UFR Hse supervision Resume
 
Christos-J-June2016
Christos-J-June2016Christos-J-June2016
Christos-J-June2016
 
Mohammed Omari CV updated[1]
Mohammed Omari CV updated[1]Mohammed Omari CV updated[1]
Mohammed Omari CV updated[1]
 
AKEEM CV
AKEEM CVAKEEM CV
AKEEM CV
 
AKEEM CV
AKEEM CVAKEEM CV
AKEEM CV
 
HSEQ (IMS) by Saad Abdul Wahab
HSEQ (IMS) by Saad Abdul WahabHSEQ (IMS) by Saad Abdul Wahab
HSEQ (IMS) by Saad Abdul Wahab
 
ANTHONY A. BERNALDO SAFETY OFFICER SUPERVISOR(CV)
ANTHONY A. BERNALDO  SAFETY OFFICER SUPERVISOR(CV)ANTHONY A. BERNALDO  SAFETY OFFICER SUPERVISOR(CV)
ANTHONY A. BERNALDO SAFETY OFFICER SUPERVISOR(CV)
 
June 2017 long desc.cv hse manager
June 2017  long desc.cv hse manager June 2017  long desc.cv hse manager
June 2017 long desc.cv hse manager
 
Operations integrity management system exxon mobil
Operations integrity management system   exxon mobilOperations integrity management system   exxon mobil
Operations integrity management system exxon mobil
 
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)
Ty Carreg group Health & Safety Policy (Policy 003 - rev 7)
 
.credit-suisse Environmental Policy
.credit-suisse Environmental Policy.credit-suisse Environmental Policy
.credit-suisse Environmental Policy
 
credit-suisse Environmental Policy
credit-suisse Environmental Policycredit-suisse Environmental Policy
credit-suisse Environmental Policy
 
credit-suisse Environmental Policy
credit-suisse Environmental Policycredit-suisse Environmental Policy
credit-suisse Environmental Policy
 

Último

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 

Último (20)

Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 

HSE policy

  • 1. Health, Security, Safety and Environment (HSE) Content: 1. Objective 2. Application and Scope 2.1 Application of HSE Directive with underlying documents. 2.2 Scope of HSE Management system 3. Framework for our HSE Management system 4. Our Policy 4.1 Ambitions 4.2 Commitments 4.3 Living our values 5. Leadership and accountability 6. Planning 6.1 Legal requirements, corporate requirements, commitments and document control 6.2 Planning, goals and targets 7. Implementation and execution 7.1 Hazard identification and risk management 7.2 Competence, training, awareness and behaviour 7.3 Information, communication, participation and dialog 7.3.1 HSE information to the public 7.3.2 Dialog with the public 7.3.3 Internal communication and involvement 7.4 Management of change 7.5 Health and Work Environment 7.6 Incident reporting and Investigation 7.7 Projects and/or- expansions, mergers, acquisitions, sales and closedowns. 7.8 Management of contractors, suppliers and partners 7.9 Plant operation, Maintenance of assets, Work Permits and Energy Control 7.10 Moving and storing materials 7.11 Environmental and Product Stewardship 7.12 Security and business travel 7.13 Emergency Preparedness 7.14 Reporting 8. Monitoring, audit and review 9. Control with records. 10. Risk mitigating actions 11. Reference documents 12. Appendixes 13. External document references
  • 2. 1. Objective This directive describes our HSE policy, lays down our ambitions, commitments, values, requirements and our HSE management system. 2. Application and Scope 2.1 Application of HSE Directive with underlying documents. This Directive with underlying documents such as procedures and appendixes is mandatory for all entities that are wholly-owned by Hydro. Local legislation will supersede this Directive in areas of conflict. Where local legislation does not require an adequate level of HSE performance, activities are conducted in a manner consistent with this Directive and relevant international HSE standards, practices and guidelines such as issued by International Finance Corporation (IFC), World Bank Group or similar. . 2.2 Scope of HSE Management system The HSE Management system is an integrated part of Norsk Hydro’s Management system. This directive applies to aspects and activities that have a potential to affect HSE throughout the entire lifecycle from business development to operation and closure. For entities in which Hydro has an interest of less than 100 percent and for contractors, suppliers and commercial contracts we shall exert our influence to create consistency with this directive, acting reasonably and with respect for other owners' legitimate views in order to make the directive apply. 3. Framework for our HSE Management system HSE leadership in Hydro is based on our policy and the principle of continuous improvement. The figure illustrates the content of the HSE management system and how it fits into the Plan-Do-Check-Act (PDCA) methodology
  • 3. Figure 3.1 Hydro’s HSE management system model 4. Our Policy 4.1 Ambitions Our ambition is to set health, safety, security and environment as core elements of Hydro’s identity and business success. The company will be recognized for its world class performance which demonstrates a strong sense of responsibility for people and the environment. Through innovation and efficient production, we will contribute to the creation of a more viable society. 4.2 Commitments At Hydro, our health, safety, security and environmental performance is an integral part of our everyday business. HSE are essential elements in our partnerships with suppliers and customers. We demonstrate our commitment to HSE through the way we are organized, make decisions, operate and cooperate. We are committed to: • Identify, assess and manage risks to employees, contractors, visitors, the environment and our host communities. • Set clear and ambitious HSE targets • Ensure that the HSE management system and tools continually improve our performance • Demonstrate HSE commitment through hands-on leadership and behaviour • Be transparent in all HSE issues through active engagement with stakeholders
  • 4. • Contribute to development of sustainable and environmental friendly technology for manufacturing of aluminium metal and products 4.3 Living our values • With respect for energy and resources, invest in innovation so our activities and products have a minimum adverse impact on the environment • Have the courage to set ambitious goals for HSE performance during acquisitions processes and when signing commercial agreements with our partners • Through foresight, strive to prevent injuries on our premises and avoid occupational illnesses, property damage and production loss • Communicate our goals, promote transparency in our HSE reporting and engage in cooperation with interested parties • Demonstrate determination in protecting personnel, premises and activities against conscious and negligent unauthorised actions, balancing the company’s need for protection and the integrity of employees and third parties. 5. Leadership and accountability Corporate Management Board (CMB) shall: • Assist the CEO in deployment of Hydro's policy concerning Health, Security, Safety and environment, and for the elaboration of corporate HSE steering documents that are deemed necessary to make Hydro’s policy operational. All managers shall: • Demonstrate visible leadership and proactive commitment to HSE excellence through personal examples, by promoting initiatives, encourage people to work in a safe manner, conduct site inspections, reviews and behavioural observations • By involvement of all employees build a sustainable culture and integrate applicable HSE practices into the business • Be accountable for compliance with statutory requirements as well as with Hydro's corporate steering documents and HSE performance in line with Hydro’s policy and targets. • Ensure resources and competence essential to establish, implement, maintain and improve the HSE Management System. • Show determination and commitment to HSE by driving a continuous improvement process. . Site Manager shall: • Be responsible for defining the need for and scope of local procedures, and document it. Scope shall be built on identified hazards, and their associated risks to be assessed and managed. Systems to handle risks associated with planned or unplanned changes shall be in place. All employees (including managers and contractors) • Shall understand their responsibility and commitment to health, safety, security and environment and contribute to achievement of Hydro’s obligations and goals as core elements of Hydro's identity and business success. • Are responsible for their own health, security and safety by being familiar with the risks and controlling measures and for executing his or her task in a secure, safe, healthy, environmental friendly and efficient manner in compliance with applicable requirements and guidelines. • Immediately report any accident or incident that may cause injuries or damage
  • 5. • Have the right to and the responsibility to stop unsafe behaviour or refuse to work in situations that causes harm, and immediately bring these situations to the attention of those at imminent risk and to the management. Corporate HSE staff shall: • Provide governance within the HSE area, • Have a system in place to ensure that Hydro's activities are carried out in compliance with this directive and underlying documents • Ensure ownership of the Health, Security, Safety and Environment processes • Assist in making information concerning HSE available • Facilitate cooperation by running an efficient HSE network • Facilitate the exchange of best practices As a guiding principle, health, security, safety and environmental issues shall be resolved at the appropriate organizational level, i.e. as low as possible and practical. 6. Planning 6.1 Legal-and Corporate requirements, commitments and document control • A system shall be in place at site level to identify and assess all applicable HSE laws, regulations, approvals, licence, permits and corporate requirements. Documents shall be kept updated. • Compliance with legal and other requirements shall be demonstrated through the implementation of documented procedures on relevant organisational level • A document control system shall be in place, which fulfils the following requirements: o Documents shall be approved, maintained updated, accurate, legible and identifiable. o Documents shall be securely stored and readily accessible at all locations required for its effective application. o Retention time shall be based on legal requirements or as required in corporate procedures. o Obsolete documentation and data are properly removed and protected from unintended use. . 6.2 Planning, goals and targets • HSE shall be an integrated part of business planning based on identified significant HSE issues, risks and opportunities. • As a result of the business planning process and HSE assessments, the relevant organisational level shall provide a prioritized list of HSE challenges, set long term goals, key performance indicators and targets. 7. Implementation and Execution 7.1 Hazard identification and risk management • Hazards and risks for routine and non routine activities shall be identified, assessed, prioritised and managed as appropriate HSE impacts of the operation. The assessment shall take into account health, security and safety, the surrounding physical, environment, biodiversity, applicable legal requirements and financial implications. • Environmental aspects and impacts for all our products shall be fully identified and assessed throughout the lifecycle of the product.
  • 6. • Hazards and risks shall be assessed by the appropriate level of management consistent with the significance of the risk. • Management is responsible for setting acceptance criteria for a risk. Risk management decisions shall be documented and the implemented mitigation actions shall be tracked. • Risk associated with planned and unplanned changes shall be managed, recorded and documented whether they are temporary, permanent or due to incremental change. The required system shall address change events including changes in personnel, organisation, processes, facilities, physical environment, equipment, technology, procedures, laws, regulations, standards, materials, intermediates, products, systems and services. • HSE risks shall be reviewed in order to verify effective and efficient mitigation control. For major risks the verification shall take place whenever required. 7.2 Competence, training, awareness and behaviour • Managers shall ensure that any person(s) under its control performing tasks that can impact on HSE is (are) competent on the basis of appropriate education, training or experience and shall retain associated records. • Inductions comprising Hydro’s HSE objectives, expected behaviour on our premises, on site hazards, risks and controls shall be conducted for employees, contractors and visitors at the commencement of their employments or visit. • Managers shall establish, implement and maintain a procedure to make persons working under its control aware of consequences, actual potential of work activities and behaviour, roles and responsibility, importance of compliance with our procedures including emergency preparedness. • Employees shall be engaged at all levels in the organisation to make on the job behavioural observations to reinforce desired HSE behaviour and correct at risk behaviour. 7.3 Information, communication, participation and dialog. • The Management shall communicate relevant HSE information including legal or other requirements to persons working under the control of the organisation and external interested parties. 7.3.1 HSE information to the public • Each site with the risk of an injury or damage extending beyond the site’s boundaries as a result of a major accident, shall inform the public of the risk entailed by the site’s operations and the potential off-site consequences. • The information shall be repeated and updated at intervals of not more than three years, or in the event of modifications that may have significant effect on the risk and potential off site consequences. The information shall be made permanently available to the public. . 7.3.2 Dialogue with the public • Concerns and complains from neighbours and/or interested parties shall be registered, acknowledged, investigated and timely responded to. • Conflicts shall be resolved through consultation and participation whenever possible. 7.3.3 Internal communication and involvement • HSE Policy and procedures, plans, goals, targets and HSE matters in general shall be communicated throughout the organisation. • Employees shall be invited to participate in development, implementation, review and improvement of our HSE programs.
  • 7. • HSE performance feedback shall be effective and address key issues. The feedback shall include HSE incidents and occupational illnesses. • The business area shall as a part of their HSE performance review, present a quarterly report. The report shall have focus on progress towards targets, deviations from targets and corrective measures taken. 7.4 Management of Change • The management of change shall include an assessment of the impact on HSE systems and performance ensuring that any negative effect on HSE is mitigated and those HSE improvement potentials are captured. The change management system shall ensure that change management actions have been completed, their intended outcome validated and any unintended or additional risks are identified and managed. • Change shall timely be communicated to and understood by those who may be affected. • When organisational changes are planned, management shall consider ability to achieve HSE objectives, targets and goals 7.5 Health and work environment • Systems, plans and programmes shall be established and implemented to identify, analyse, evaluate and enhance the health and well being of workers and contractors through providing a work environment where occupational health hazards are managed and reduced to a minimum 7.6 Incident reporting and Investigation • The management culture shall ensure the recognition, response, reporting and analysis of incidents including near misses. • Appropriate corrective actions shall be implemented and applicable learning shall be shared within the company. . 7.7 Projects and/or- expansions, mergers, acquisitions, sales and closedowns. • Hazard identification and management of HSE risks and opportunities is an integral part of all projects through planning, design, approval, procurement, construction, commissioning and decommissioning. • Environmental Impact Assessments (Environmental studies) shall be carried out for new major projects/major expansions, mergers, acquisitions, sales and closedowns, and shall be done in accordance with national and/or international validated standards or methodologies. • When determining viability of a new business case for Hydro in a geographical area with no existing operations ongoing, a high level review of all relevant HSE aspects shall be done. 7.8 Management of contractors, suppliers and partners • The contracting of services, the purchase or lease of equipment and materials, and activities with partners shall be carried out so as to minimise any adverse HSE consequences. . 7.9 Plant operation, Maintenance of assets, Work Permits and Energy Control • All plants and equipment shall be operated, maintained, inspected and tested using systems and procedures that manage HSE risks. . 7.10 Moving- and storing materials • All storage facilities shall be designed operated and maintained in accordance with local and national regulations, recognised codes and standards and shall comply with the engineering and operational standards for the owner of the storage facility.
  • 8. • When commodity is loaded, transported and unloaded, company regulations, national and international laws shall be adhered to. • A Hydro representative shall be in control of the process of transporting goods, and be physically present when relevant. 7.11 Environmental and Product Stewardship On Climate we are committed to being in the forefront in the framework design, in our own emissions reductions and in the development of sustainable systems. We will continue to develop our business, products and solutions in a way that will support global green house gas emission reductions in a life cycle perspective. We will limit emissions from our production through better operations and through development and implementation of new technologies. When we make major investment decisions we will take into account the expected future cost of green house gas emissions in order to support the choice of climate benign solutions. We will develop a trading capacity to manage our green house gas portfolio and to provide incentives to reduce operational emissions. On Biodiversity we will respect the IUCN classification of protected areas and management regulations applicable to them. We will take actions to avoid or mitigate impacts on biodiversity from our operations. This will include compensatory measures to conserve biodiversity in sensitive areas. When we do our Environmental and Social Impact Assessments we will consider primary and secondary effects on biodiversity. In connection with our activities we will monitor biodiversity. We will contribute to the development of a better knowledge on the effects on biodiversity of our business, actively support the development of frameworks on biodiversity conservation and engage in partnerships and stakeholder dialogue to meet our ambitions. Our ambition is to manage our use of freshwater in a sustainable way. We will assess and manage water use and discharges as a part of our environmental management system. We will take available water resources and competing demands for these resources into consideration for new projects as well as for existing production facilities. We emphasize consultation with stakeholders when developing business ventures which require significant amounts of water. We also support the development of effective water governance frameworks and build up of local capacity For our value chain we will: • The lifecycle HSE impacts associated with resources, materials, processes and products shall be minimised and managed. . 7.12 Security and business travel • Security hazards shall be identified and associated risks assessed and managed. 7.13 Emergency Preparedness • Procedures and resources shall be in place to effectively respond to crises and emergency situations. 7.14 Reporting • Data for HSE incidents, work related illness and sick leave shall be identified, classified and reported at BA/Sector/Unit/Site level.
  • 9. 8. Monitoring, audit and review The intent of monitoring, audit and review is to drive continuous improvement. • HSE performance shall regularly be measured, monitored, recorded and analysed with results and reported according to fixed schedules to Corporate Management Board and others as appropriate. • Corporate HSE staff shall conduct self assessments for monitoring of compliance with corporate HSE procedures. Based on the self assessment results, the Business Area shall eventually prepare and execute improvements plans. • Systems shall be in place to identify and report non-compliances. • Local Mangers and Sector Managers shall annually review the suitability, adequacy and effectiveness of their HSE- system and procedures. • Internal and external audit results, incident reports, performance reports and relevant views from stakeholders shall be included in the review. Reviews shall be documented with recommendations for improvement. Corporate- and BA/Sector HSE audits will be conducted according to an annual plan 9. Control with records. Records are established to provide evidence of compliance with requirements. • Managers shall establish and maintain records as necessary to demonstrate compliance to legislation and our HSE management system. • Managers shall have in place a procedure for identification, storage, protection, retrieval, retention, and disposal of records. • Medical records shall be stored according to national legislation. (In case of sale or closedown of a production plant, all records shall be securely retained and maintained by Hydro, unless otherwise agreed in sales contract 10. Risk mitigating actions • Based on risk assessments and reviews, Managers shall plan and implement preventive actions in order to avoid non-compliances. • Managers shall respond to and manage non-compliances by investigating causes, plan and implement corrective actions. • Managers shall review and document effectiveness and efficiency of such actions to avoid recurrence.