Project:
The Shard
Location:
London, England
Project completed:
2012
Client:
MACE
Architect:
Renzo Piano
Contractor:
Byrne Bros
Technical Consultants:
OTB Engineering
Concrete Producer:
London Concrete
Market sector:
Buildings
Products used:
MasterGlenium SKY 569,
MasterSet RT 100
Sales contact:
Brian Williams
brian.d.williams@basf.com
The Shard, London
The background
The Shard is a futuristic, inspirational mixed-
use urban village concept tower designed by
architect Renzo Piano. Adjacent to London‘s
busiest strategic transport hub at London
Bridge, the Shard is the tallest building in
Western Europe, standing at 310 metres.
The structure’s core was slip-formed in
reinforced concrete and progressed at an
impressive rate of three metres a day whilst
the basement levels were built top down
simultaneously.
Contact:
BASF plc,
Construction Chemicals,
Earl Road, Cheadle Hulme,
Cheadle, Cheshire,
SK8 6QG, United Kingdom
T: 0044 161 485 6222
F: 0044 161 488 5220
The Shard
BASF assists record-breaking concrete pour
The challenge
Key requirements needed for the concrete on
this project were quality of finish and speed of
curing to support fast-track working without
sacrificing other performance properties.
A massive continuous concrete pour was
planned as part of the construction of the
three-floor basement box, which had a depth
of 13.3 metres and required a total volume of
concrete of 15,000m³.
The Shard
BASF assists record-breaking concrete pour
Image Description
Our solution
Our experts from BASF Construction Chemicals worked with
technical consultant OTB Engineering to supply admixtures for
the concrete being used in the structure’s core and basement
levels to ensure consistent strength, quality and speed of cure.
This resulted in the development of a new product,
MasterGlenium SKY 569, with The Shard project in mind.
MasterGlenium SKY 569 is based on BASF’s Total
Performance Control concept, developed to ensure that ready-
mix producers, contractors and engineers achieve a concrete
that is of the same high quality as originally specified, starting
from production at the batching plant, to delivery and
application into place, followed by the hardening process.
Utilising Rheodynamic concrete technology, it provides a
concrete mix with exceptional placing characteristics and
accelerated cement hydration for early strength development
and high-quality concrete.
Benefits to the customer
 Quality of finish.
 Speed of curing to support fast-track working.
Projects facts at a glance
 The record-breaking concrete pour for the basement’s
construction, the largest UK continuous concrete pour to
date, started at 5 pm on Friday 16th April 2010 and went on
until 4 am on Sunday 18th April.
 The programmed time had been 36 hours for 5,000 m³ of
concrete, using four concrete pumps.
 The actual placement time for 5480 m³ was 35 hours,
beating the schedule both on time and volume.
 The total volume of BASF admixtures used in the pour was
11,000 litres of MasterGlenium SKY 569 and 5,000 liters of
MasterSet RT 100.
 Previously, the UK’s largest continuous concrete pour from
a ready mix supplier was 4,800 m³ (at the new Wembley
Stadium).
Master Builders Solutions from BASF
The Master Builders Solutions brand brings all of BASF’s
expertise together to create chemical solutions for new
construction, maintenance, repair and renovation of structures.
Master Builders Solutions is built on the experience gained from
more than a century in the construction industry.
The know-how and experience of a global community of BASF
construction experts form the core of Master Builders Solutions.
We combine the right elements from our portfolio to solve your
specific construction challenges. We collaborate across areas
of expertise and regions and draw on the experience gained
from countless construction projects worldwide. We leverage
global BASF technologies, as well as our in-depth knowledge of
local building needs, to develop innovations that help make you
more successful and drive sustainable construction.
The comprehensive portfolio under the Master Builders
Solutions brand encompasses concrete admixtures, cement
additives, chemical solutions for underground construction,
waterproofing solutions, sealants, concrete repair & protection
solutions, performance grouts, performance flooring solutions.
Further information is available at
www.master-builders-solutions.basf.co.uk

Más contenido relacionado

La actualidad más candente

O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Booklet
eileen_0692
 
J.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycleJ.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycle
J.S. Daniel
 

La actualidad más candente (20)

Taipei 101
Taipei 101Taipei 101
Taipei 101
 
case study of shanghai world finance centre.
case study of shanghai world finance centre.case study of shanghai world finance centre.
case study of shanghai world finance centre.
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 
Prefabricated
PrefabricatedPrefabricated
Prefabricated
 
High rise building case study
High rise building case study High rise building case study
High rise building case study
 
072014_Bunker Mentality
072014_Bunker Mentality072014_Bunker Mentality
072014_Bunker Mentality
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 
Metropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design ReportMetropol Parasol Surface Structure Design Report
Metropol Parasol Surface Structure Design Report
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
The taipei 101 tower
The taipei 101 towerThe taipei 101 tower
The taipei 101 tower
 
Highrise lecture
Highrise lectureHighrise lecture
Highrise lecture
 
O2 Arena Booklet
O2 Arena BookletO2 Arena Booklet
O2 Arena Booklet
 
Vertical cities presentation
Vertical cities presentationVertical cities presentation
Vertical cities presentation
 
8课
8课8课
8课
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Taipei 101
Taipei 101 Taipei 101
Taipei 101
 
J.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycleJ.S. Daniel paper for high rise building construction cycle
J.S. Daniel paper for high rise building construction cycle
 
Bc open pre fabricated construction system
Bc open pre fabricated construction systemBc open pre fabricated construction system
Bc open pre fabricated construction system
 
Video de taipei 101
Video de taipei 101Video de taipei 101
Video de taipei 101
 
Tall buildings
Tall buildingsTall buildings
Tall buildings
 

Similar a The-Shard

Mega prefab company profile
Mega prefab company profileMega prefab company profile
Mega prefab company profile
bassamnakfour
 
Project_Profile-World-Trade-Center
Project_Profile-World-Trade-CenterProject_Profile-World-Trade-Center
Project_Profile-World-Trade-Center
Tim Thomas
 
MHA Brochure 2013
MHA Brochure 2013MHA Brochure 2013
MHA Brochure 2013
Katie Frost
 
PS Presentation April 16
PS Presentation April 16PS Presentation April 16
PS Presentation April 16
Damian McColgan
 
2014_BRMCA_Award_Excellence_in_Customer_Service_Concrete_Nov_2014
2014_BRMCA_Award_Excellence_in_Customer_Service_Concrete_Nov_20142014_BRMCA_Award_Excellence_in_Customer_Service_Concrete_Nov_2014
2014_BRMCA_Award_Excellence_in_Customer_Service_Concrete_Nov_2014
Wendy Ling
 
JR_AS_BurjKhalifa
JR_AS_BurjKhalifaJR_AS_BurjKhalifa
JR_AS_BurjKhalifa
Tim Thomas
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
Tim Read
 

Similar a The-Shard (20)

Mega prefab company profile
Mega prefab company profileMega prefab company profile
Mega prefab company profile
 
Baytree Dagenham Brochure
Baytree Dagenham BrochureBaytree Dagenham Brochure
Baytree Dagenham Brochure
 
Project_Profile-World-Trade-Center
Project_Profile-World-Trade-CenterProject_Profile-World-Trade-Center
Project_Profile-World-Trade-Center
 
Blavatnik
BlavatnikBlavatnik
Blavatnik
 
Asante uhpc concrete service
Asante  uhpc concrete serviceAsante  uhpc concrete service
Asante uhpc concrete service
 
Refratechnik Burton | Refractory Systems from the Global Market Leader
Refratechnik Burton | Refractory Systems from the Global Market LeaderRefratechnik Burton | Refractory Systems from the Global Market Leader
Refratechnik Burton | Refractory Systems from the Global Market Leader
 
Reshape Your CO2 Footprint With C/Clay
Reshape Your CO2 Footprint With C/ClayReshape Your CO2 Footprint With C/Clay
Reshape Your CO2 Footprint With C/Clay
 
Superior Brochure
Superior BrochureSuperior Brochure
Superior Brochure
 
Steve Bailey CV
Steve Bailey CVSteve Bailey CV
Steve Bailey CV
 
CSC Screeding
CSC ScreedingCSC Screeding
CSC Screeding
 
Best Ready Mix Concrete Supplier in Lahore - Tetra Engineers
Best Ready Mix Concrete Supplier in Lahore - Tetra EngineersBest Ready Mix Concrete Supplier in Lahore - Tetra Engineers
Best Ready Mix Concrete Supplier in Lahore - Tetra Engineers
 
MHA Brochure 2013
MHA Brochure 2013MHA Brochure 2013
MHA Brochure 2013
 
Special-concretes
Special-concretesSpecial-concretes
Special-concretes
 
PS Presentation April 16
PS Presentation April 16PS Presentation April 16
PS Presentation April 16
 
DRT Portfolio Works
DRT Portfolio WorksDRT Portfolio Works
DRT Portfolio Works
 
2014_BRMCA_Award_Excellence_in_Customer_Service_Concrete_Nov_2014
2014_BRMCA_Award_Excellence_in_Customer_Service_Concrete_Nov_20142014_BRMCA_Award_Excellence_in_Customer_Service_Concrete_Nov_2014
2014_BRMCA_Award_Excellence_in_Customer_Service_Concrete_Nov_2014
 
profile
profileprofile
profile
 
BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9 BIM and the drywall cover up - A case for division 9
BIM and the drywall cover up - A case for division 9
 
JR_AS_BurjKhalifa
JR_AS_BurjKhalifaJR_AS_BurjKhalifa
JR_AS_BurjKhalifa
 
Tim Read CV January 2016
Tim Read CV January 2016Tim Read CV January 2016
Tim Read CV January 2016
 

The-Shard

  • 1. Project: The Shard Location: London, England Project completed: 2012 Client: MACE Architect: Renzo Piano Contractor: Byrne Bros Technical Consultants: OTB Engineering Concrete Producer: London Concrete Market sector: Buildings Products used: MasterGlenium SKY 569, MasterSet RT 100 Sales contact: Brian Williams brian.d.williams@basf.com The Shard, London The background The Shard is a futuristic, inspirational mixed- use urban village concept tower designed by architect Renzo Piano. Adjacent to London‘s busiest strategic transport hub at London Bridge, the Shard is the tallest building in Western Europe, standing at 310 metres. The structure’s core was slip-formed in reinforced concrete and progressed at an impressive rate of three metres a day whilst the basement levels were built top down simultaneously. Contact: BASF plc, Construction Chemicals, Earl Road, Cheadle Hulme, Cheadle, Cheshire, SK8 6QG, United Kingdom T: 0044 161 485 6222 F: 0044 161 488 5220 The Shard BASF assists record-breaking concrete pour The challenge Key requirements needed for the concrete on this project were quality of finish and speed of curing to support fast-track working without sacrificing other performance properties. A massive continuous concrete pour was planned as part of the construction of the three-floor basement box, which had a depth of 13.3 metres and required a total volume of concrete of 15,000m³.
  • 2. The Shard BASF assists record-breaking concrete pour Image Description Our solution Our experts from BASF Construction Chemicals worked with technical consultant OTB Engineering to supply admixtures for the concrete being used in the structure’s core and basement levels to ensure consistent strength, quality and speed of cure. This resulted in the development of a new product, MasterGlenium SKY 569, with The Shard project in mind. MasterGlenium SKY 569 is based on BASF’s Total Performance Control concept, developed to ensure that ready- mix producers, contractors and engineers achieve a concrete that is of the same high quality as originally specified, starting from production at the batching plant, to delivery and application into place, followed by the hardening process. Utilising Rheodynamic concrete technology, it provides a concrete mix with exceptional placing characteristics and accelerated cement hydration for early strength development and high-quality concrete. Benefits to the customer  Quality of finish.  Speed of curing to support fast-track working. Projects facts at a glance  The record-breaking concrete pour for the basement’s construction, the largest UK continuous concrete pour to date, started at 5 pm on Friday 16th April 2010 and went on until 4 am on Sunday 18th April.  The programmed time had been 36 hours for 5,000 m³ of concrete, using four concrete pumps.  The actual placement time for 5480 m³ was 35 hours, beating the schedule both on time and volume.  The total volume of BASF admixtures used in the pour was 11,000 litres of MasterGlenium SKY 569 and 5,000 liters of MasterSet RT 100.  Previously, the UK’s largest continuous concrete pour from a ready mix supplier was 4,800 m³ (at the new Wembley Stadium). Master Builders Solutions from BASF The Master Builders Solutions brand brings all of BASF’s expertise together to create chemical solutions for new construction, maintenance, repair and renovation of structures. Master Builders Solutions is built on the experience gained from more than a century in the construction industry. The know-how and experience of a global community of BASF construction experts form the core of Master Builders Solutions. We combine the right elements from our portfolio to solve your specific construction challenges. We collaborate across areas of expertise and regions and draw on the experience gained from countless construction projects worldwide. We leverage global BASF technologies, as well as our in-depth knowledge of local building needs, to develop innovations that help make you more successful and drive sustainable construction. The comprehensive portfolio under the Master Builders Solutions brand encompasses concrete admixtures, cement additives, chemical solutions for underground construction, waterproofing solutions, sealants, concrete repair & protection solutions, performance grouts, performance flooring solutions. Further information is available at www.master-builders-solutions.basf.co.uk