Water and Wastewater Technician
WWWT 1191
Work Experience 2015
Timothy Neufeld
tim.moth.thee@gmail.com
Water and Wastewater Treatment
Distribution / Collection
Solid Waste
PRACTICUM
Student shadows an experienced operator
of the water plant and wastewater plant.
Gradually the student takes over more and
more of an operator’s routine duties until by
the end of the summer the student is fully
operating the plants under normal conditions,
though still under supervision of the training
operator
Unusual situation of a water treatment plant
and a wastewater treatment plant both on the
same site. Operators operate both plants
simultaneously
Wastewater plant is a Level IV plant
Water plant is a Level III plant, soon to be
reassessed as a Level IV plant
There are approximately 20
operators operating the two plants, 4
of which have Level 4 in both Water
and Wastewater Treatment
Aquatera produces around 30 MLD of potable
water and treats around 25 MLD of wastewater
WTP
process
Water is drawn from the Wapiti River into
storage ponds. From wells in the low lift
pumphouse water is brought up to the plant
where Polyaluminium Chloride (PACl) is
injected as coagulant and Polymer is added as
flocculent aid
WTP
process
Water moves through 3
flocculation tanks and
continues on to
sedimentation and tube
settling tanks
PACl is added again pre filtering as
a filter aid.
WTP
process
Filters are dual media, 1.6 m
anthracite above .5 m quartz sand
WTP
process
Chlorine, Cl2 from
tonners, is injected
prior to the filters as
well as the clearwell.
Chlorine is further
added at various
booster stations in
and around Grande
Prairie using
calcium hypochlorite
Disinfection
WTP
process
Water Plant DAF
WWTP
process
Activated Sludge
Biological Nutrient Removal
(ASBNR)
Activated Sludge is the biological treatment
of wastewater using a population of
microorganisms suspended in water
BNR is a sub process of the above,
essentially the biological removal of
Nitrogen and Phosphorus from wastewater
WWTP
process
Raw wastewater is lifted with screw
pumps up to the headworks, where it
passes through a vortex (grit goes to
landfill), through step screen (rags
etc. to landfill), flowing into…
WWTP
process
primary clarifiers
where sludge settles (pumped
to the WW Dissolved Air Flotation (DAF) tank), and
the supernatant flows into the…
ASBNR bioreactors
WWTP
process
where it mixes with high concentrations of bacteria.
This mixed liquor then passes through the various
anaerobic, anoxic, and aerobic zones that make up the
bioreactors. It is in the ASBNR bioreactors where the
bacteria do the majority of their work. Mixed liquor
then goes onto the…
WWTP
process
where
the bacteria rich activated sludge
settles out and the supernatent
becomes the finished plant
effluent, returning to the Wapiti
River
Secondary clarifiers
WWTP
process
Most of activated sludge (bacteria) is returned
(RAS) to the head of the ASBNRs, with any excess
wasted (WAS) to the WW DAF (Dissolved Air
Flotation)
WWTP
process
WW DAF receives primary clarifier sludge as well
as WAS from secondary clarifier
Subnatent of DAF is sent to head of ASBNRs.
Scum is pumped to Autothermal Thermophilic
Aerobic Digestion (ATAD) tanks
ATADs
(aerobic digesters)
WWTP
process
Everything that cannot be
digested is sent to centrifuges,
with the solids going to landfill
and the centrate sent to head of
the ASBNR bioreactors
Operators run both
plants at the same time
24 hours a day, on 12
hour shifts. Operators
also work weeks of 8
hour days consisting
mostly of preventative
maintenance duties.
Work orders include the
plants as well as booster
stations, pumphouses,
and reservoirs in and
around Grande Prairie
OPERATING
SCADA screens are used to observe and adjust process, check
for problems, and respond to alarms OPERATING
Operators do several walk
throughs every shift checking
equipment and process, and
making adjustments as necessary
OPERATING
During walk throughs
operators record data, take
measurements, clean and
calibrate various metering
equipment, collect samples
for lab work…
OPERATING
Lab Testing
Water
6x daily: chlorine,
turbidity of potable,
filter influent, and
raw
2x daily: pH, UVT,
flouride
Daily: total chlorine,
alkalinity (raw and
potable)
Weekly: Bac-T
samples for external
lab testing
Also occasional jar
testing to determine
polymer and PACl
dosages
OPERATING
OPERATING
Lab
Testing
Wastewate
r
Daily: BOD,
CBOD, pH,
Phosphorus,
Ammonia
Nitrogen,
Nitrate,
Nitrite, Total
Kjeldahl
Nitrogen
(TKN), TSS
Weekly:
MLSS,
A large
amount of
data is
collected
during the
day from the
plant and the
lab which
must daily
be entered
into
spreadsheets
OPERATING
Population 70,000
Grande Prairie Regional College
Montrose Cultural Centre – Library, Art Gallery
Sport Multiplex - pool, water park, ice rink, gym, restaurants
Muskoseepi Park and Bear Creek Ravine – parkland, bicycle trails
Thank you
Timothy Neufeld
tim.moth.thee@gmail.com

Más contenido relacionado

La actualidad más candente

Final assignment mk ng
Final assignment mk ngFinal assignment mk ng
Final assignment mk ngManKwanNg1
 
How DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakesHow DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakesbiomeshubha
 
CDD DEWATS Modules
CDD DEWATS ModulesCDD DEWATS Modules
CDD DEWATS ModulesCDD Society
 
Dewats Modules Final
Dewats Modules FinalDewats Modules Final
Dewats Modules Finalmohan
 
WaterTreatmentTechnologies_AdvancedAmberpackMunicipal-v-2
WaterTreatmentTechnologies_AdvancedAmberpackMunicipal-v-2WaterTreatmentTechnologies_AdvancedAmberpackMunicipal-v-2
WaterTreatmentTechnologies_AdvancedAmberpackMunicipal-v-2Tim Oman
 
Presentation on water treatment plant
Presentation on water treatment plantPresentation on water treatment plant
Presentation on water treatment plantAnoop Kumar
 
chemical company in Northern Spain uses mobile ion exchange system to meet wa...
chemical company in Northern Spain uses mobile ion exchange system to meet wa...chemical company in Northern Spain uses mobile ion exchange system to meet wa...
chemical company in Northern Spain uses mobile ion exchange system to meet wa...Dustin Powell, MBA
 

La actualidad más candente (9)

Abstract32808 mecham
Abstract32808 mechamAbstract32808 mecham
Abstract32808 mecham
 
Water systems
Water systemsWater systems
Water systems
 
Final assignment mk ng
Final assignment mk ngFinal assignment mk ng
Final assignment mk ng
 
How DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakesHow DEWATS can be implemented to bio-remediate lakes
How DEWATS can be implemented to bio-remediate lakes
 
CDD DEWATS Modules
CDD DEWATS ModulesCDD DEWATS Modules
CDD DEWATS Modules
 
Dewats Modules Final
Dewats Modules FinalDewats Modules Final
Dewats Modules Final
 
WaterTreatmentTechnologies_AdvancedAmberpackMunicipal-v-2
WaterTreatmentTechnologies_AdvancedAmberpackMunicipal-v-2WaterTreatmentTechnologies_AdvancedAmberpackMunicipal-v-2
WaterTreatmentTechnologies_AdvancedAmberpackMunicipal-v-2
 
Presentation on water treatment plant
Presentation on water treatment plantPresentation on water treatment plant
Presentation on water treatment plant
 
chemical company in Northern Spain uses mobile ion exchange system to meet wa...
chemical company in Northern Spain uses mobile ion exchange system to meet wa...chemical company in Northern Spain uses mobile ion exchange system to meet wa...
chemical company in Northern Spain uses mobile ion exchange system to meet wa...
 

Destacado

Orgullo colombiano yeka
Orgullo colombiano yekaOrgullo colombiano yeka
Orgullo colombiano yekajessicaflo
 
Pcishrinktofitpresentation 151125162550-lva1-app6891
Pcishrinktofitpresentation 151125162550-lva1-app6891Pcishrinktofitpresentation 151125162550-lva1-app6891
Pcishrinktofitpresentation 151125162550-lva1-app6891Risk Crew
 
JAGarcia _Portfolio
JAGarcia _PortfolioJAGarcia _Portfolio
JAGarcia _PortfolioJhune Garcia
 
Feria del arte en bogotá arte y teatro - eltiempo
Feria del arte en bogotá   arte y teatro - eltiempoFeria del arte en bogotá   arte y teatro - eltiempo
Feria del arte en bogotá arte y teatro - eltiempoangiepalacios24
 

Destacado (11)

Orgullo colombiano yeka
Orgullo colombiano yekaOrgullo colombiano yeka
Orgullo colombiano yeka
 
Pcishrinktofitpresentation 151125162550-lva1-app6891
Pcishrinktofitpresentation 151125162550-lva1-app6891Pcishrinktofitpresentation 151125162550-lva1-app6891
Pcishrinktofitpresentation 151125162550-lva1-app6891
 
TPLプレゼン
TPLプレゼンTPLプレゼン
TPLプレゼン
 
TCFLEFTalk
TCFLEFTalkTCFLEFTalk
TCFLEFTalk
 
JAGarcia _Portfolio
JAGarcia _PortfolioJAGarcia _Portfolio
JAGarcia _Portfolio
 
JAGarcia _CV
JAGarcia _CVJAGarcia _CV
JAGarcia _CV
 
Feria del arte en bogotá arte y teatro - eltiempo
Feria del arte en bogotá   arte y teatro - eltiempoFeria del arte en bogotá   arte y teatro - eltiempo
Feria del arte en bogotá arte y teatro - eltiempo
 
Basics of seo
Basics of seoBasics of seo
Basics of seo
 
2.02.07 varroosis
2.02.07 varroosis2.02.07 varroosis
2.02.07 varroosis
 
Viviendas precarias
Viviendas precariasViviendas precarias
Viviendas precarias
 
clase de deporte
clase de deporteclase de deporte
clase de deporte
 

Similar a NAIT 2015 WE

Ashu kumar ppt
Ashu kumar pptAshu kumar ppt
Ashu kumar pptAshu Kumar
 
ITIKI's Water Safety Plan
ITIKI's Water Safety PlanITIKI's Water Safety Plan
ITIKI's Water Safety PlanLynda Shelley
 
Waste water treatment
Waste water treatmentWaste water treatment
Waste water treatmentAtul Patel
 
INTERNSHIP PRESENTATION- AMR DAIRY
INTERNSHIP PRESENTATION- AMR DAIRYINTERNSHIP PRESENTATION- AMR DAIRY
INTERNSHIP PRESENTATION- AMR DAIRYDHRUYEN HADIYA
 
Internship Report of Unicol Mirpurkhas (Ethanol Distillery)
Internship Report of Unicol Mirpurkhas (Ethanol Distillery)Internship Report of Unicol Mirpurkhas (Ethanol Distillery)
Internship Report of Unicol Mirpurkhas (Ethanol Distillery)Talal Khan
 
waste water treatment.project
waste water treatment.projectwaste water treatment.project
waste water treatment.projectSUDHIRPASWAN3
 
Effluent treatment plant
Effluent treatment plantEffluent treatment plant
Effluent treatment plantsovendra kumar
 
New base special 24 april 2014
New base special  24  april 2014New base special  24  april 2014
New base special 24 april 2014Khaled Al Awadi
 
NCIT civil (NVQ 5, Sri Lanka) field reports
NCIT civil (NVQ 5, Sri Lanka) field reportsNCIT civil (NVQ 5, Sri Lanka) field reports
NCIT civil (NVQ 5, Sri Lanka) field reportsLAKSHITHA RAJAPAKSHA
 
Wast cy402 industrial wastewater treatment process
Wast cy402 industrial wastewater treatment processWast cy402 industrial wastewater treatment process
Wast cy402 industrial wastewater treatment processjojotaguinod
 
IRSP Water Quality Monitoring Protocol
IRSP Water Quality Monitoring ProtocolIRSP Water Quality Monitoring Protocol
IRSP Water Quality Monitoring ProtocolZia Rahman
 
Building Material - wastewater treatment
Building Material - wastewater treatmentBuilding Material - wastewater treatment
Building Material - wastewater treatmentSze Ting Kuek
 
Building Services Presentation Slide
Building Services Presentation SlideBuilding Services Presentation Slide
Building Services Presentation Slidebee_by
 
Internship Report of Jamshoro Power Company Limited (JPCL)
Internship Report of Jamshoro Power Company Limited (JPCL)Internship Report of Jamshoro Power Company Limited (JPCL)
Internship Report of Jamshoro Power Company Limited (JPCL)Aamir Ali Seelro
 

Similar a NAIT 2015 WE (20)

Ashu kumar ppt
Ashu kumar pptAshu kumar ppt
Ashu kumar ppt
 
ITIKI's Water Safety Plan
ITIKI's Water Safety PlanITIKI's Water Safety Plan
ITIKI's Water Safety Plan
 
Waste water treatment
Waste water treatmentWaste water treatment
Waste water treatment
 
INTERN
INTERNINTERN
INTERN
 
INTERNSHIP PRESENTATION- AMR DAIRY
INTERNSHIP PRESENTATION- AMR DAIRYINTERNSHIP PRESENTATION- AMR DAIRY
INTERNSHIP PRESENTATION- AMR DAIRY
 
WTP Visit.PDF
WTP Visit.PDFWTP Visit.PDF
WTP Visit.PDF
 
Internship Report of Unicol Mirpurkhas (Ethanol Distillery)
Internship Report of Unicol Mirpurkhas (Ethanol Distillery)Internship Report of Unicol Mirpurkhas (Ethanol Distillery)
Internship Report of Unicol Mirpurkhas (Ethanol Distillery)
 
waste water treatment.project
waste water treatment.projectwaste water treatment.project
waste water treatment.project
 
Effluent treatment plant
Effluent treatment plantEffluent treatment plant
Effluent treatment plant
 
UASB.pptx
UASB.pptxUASB.pptx
UASB.pptx
 
DesalinationProcess
DesalinationProcessDesalinationProcess
DesalinationProcess
 
New base special 24 april 2014
New base special  24  april 2014New base special  24  april 2014
New base special 24 april 2014
 
NCIT civil (NVQ 5, Sri Lanka) field reports
NCIT civil (NVQ 5, Sri Lanka) field reportsNCIT civil (NVQ 5, Sri Lanka) field reports
NCIT civil (NVQ 5, Sri Lanka) field reports
 
Sewage treatment
Sewage treatmentSewage treatment
Sewage treatment
 
Wast cy402 industrial wastewater treatment process
Wast cy402 industrial wastewater treatment processWast cy402 industrial wastewater treatment process
Wast cy402 industrial wastewater treatment process
 
IRSP Water Quality Monitoring Protocol
IRSP Water Quality Monitoring ProtocolIRSP Water Quality Monitoring Protocol
IRSP Water Quality Monitoring Protocol
 
Building Material - wastewater treatment
Building Material - wastewater treatmentBuilding Material - wastewater treatment
Building Material - wastewater treatment
 
Building Services Presentation Slide
Building Services Presentation SlideBuilding Services Presentation Slide
Building Services Presentation Slide
 
Wastewater Treatment Plants
Wastewater Treatment PlantsWastewater Treatment Plants
Wastewater Treatment Plants
 
Internship Report of Jamshoro Power Company Limited (JPCL)
Internship Report of Jamshoro Power Company Limited (JPCL)Internship Report of Jamshoro Power Company Limited (JPCL)
Internship Report of Jamshoro Power Company Limited (JPCL)
 

NAIT 2015 WE

  • 1. Water and Wastewater Technician WWWT 1191 Work Experience 2015 Timothy Neufeld tim.moth.thee@gmail.com
  • 2. Water and Wastewater Treatment Distribution / Collection Solid Waste
  • 3. PRACTICUM Student shadows an experienced operator of the water plant and wastewater plant. Gradually the student takes over more and more of an operator’s routine duties until by the end of the summer the student is fully operating the plants under normal conditions, though still under supervision of the training operator
  • 4. Unusual situation of a water treatment plant and a wastewater treatment plant both on the same site. Operators operate both plants simultaneously Wastewater plant is a Level IV plant Water plant is a Level III plant, soon to be reassessed as a Level IV plant
  • 5. There are approximately 20 operators operating the two plants, 4 of which have Level 4 in both Water and Wastewater Treatment Aquatera produces around 30 MLD of potable water and treats around 25 MLD of wastewater
  • 6. WTP process Water is drawn from the Wapiti River into storage ponds. From wells in the low lift pumphouse water is brought up to the plant where Polyaluminium Chloride (PACl) is injected as coagulant and Polymer is added as flocculent aid
  • 7. WTP process Water moves through 3 flocculation tanks and continues on to sedimentation and tube settling tanks
  • 8. PACl is added again pre filtering as a filter aid. WTP process Filters are dual media, 1.6 m anthracite above .5 m quartz sand
  • 9. WTP process Chlorine, Cl2 from tonners, is injected prior to the filters as well as the clearwell. Chlorine is further added at various booster stations in and around Grande Prairie using calcium hypochlorite Disinfection
  • 11. WWTP process Activated Sludge Biological Nutrient Removal (ASBNR) Activated Sludge is the biological treatment of wastewater using a population of microorganisms suspended in water BNR is a sub process of the above, essentially the biological removal of Nitrogen and Phosphorus from wastewater
  • 12. WWTP process Raw wastewater is lifted with screw pumps up to the headworks, where it passes through a vortex (grit goes to landfill), through step screen (rags etc. to landfill), flowing into…
  • 13. WWTP process primary clarifiers where sludge settles (pumped to the WW Dissolved Air Flotation (DAF) tank), and the supernatant flows into the…
  • 14. ASBNR bioreactors WWTP process where it mixes with high concentrations of bacteria. This mixed liquor then passes through the various anaerobic, anoxic, and aerobic zones that make up the bioreactors. It is in the ASBNR bioreactors where the bacteria do the majority of their work. Mixed liquor then goes onto the…
  • 15. WWTP process where the bacteria rich activated sludge settles out and the supernatent becomes the finished plant effluent, returning to the Wapiti River Secondary clarifiers
  • 16. WWTP process Most of activated sludge (bacteria) is returned (RAS) to the head of the ASBNRs, with any excess wasted (WAS) to the WW DAF (Dissolved Air Flotation)
  • 17. WWTP process WW DAF receives primary clarifier sludge as well as WAS from secondary clarifier Subnatent of DAF is sent to head of ASBNRs. Scum is pumped to Autothermal Thermophilic Aerobic Digestion (ATAD) tanks
  • 18. ATADs (aerobic digesters) WWTP process Everything that cannot be digested is sent to centrifuges, with the solids going to landfill and the centrate sent to head of the ASBNR bioreactors
  • 19. Operators run both plants at the same time 24 hours a day, on 12 hour shifts. Operators also work weeks of 8 hour days consisting mostly of preventative maintenance duties. Work orders include the plants as well as booster stations, pumphouses, and reservoirs in and around Grande Prairie OPERATING
  • 20. SCADA screens are used to observe and adjust process, check for problems, and respond to alarms OPERATING
  • 21. Operators do several walk throughs every shift checking equipment and process, and making adjustments as necessary OPERATING
  • 22. During walk throughs operators record data, take measurements, clean and calibrate various metering equipment, collect samples for lab work… OPERATING
  • 23. Lab Testing Water 6x daily: chlorine, turbidity of potable, filter influent, and raw 2x daily: pH, UVT, flouride Daily: total chlorine, alkalinity (raw and potable) Weekly: Bac-T samples for external lab testing Also occasional jar testing to determine polymer and PACl dosages OPERATING
  • 25. A large amount of data is collected during the day from the plant and the lab which must daily be entered into spreadsheets OPERATING
  • 26. Population 70,000 Grande Prairie Regional College Montrose Cultural Centre – Library, Art Gallery Sport Multiplex - pool, water park, ice rink, gym, restaurants Muskoseepi Park and Bear Creek Ravine – parkland, bicycle trails