Park Lawn / Lake Shore Area TMP
Welcome
2
Workshop Purpose
We’re looking to you for ideas and insights to help guide future
transportation infrastructure planning in the Park Lawn Lake Shore
area. The City is carrying out a Transportation Master Plan (TMP) and
is seeking your feedback on how to improve area transportation
conditions.
Goals
1. Convene many community members and stakeholder organizations
2. Listen and receive information early in the study process
3. Generate list of issues and suggestions from firsthand experience
4. Hold an interactive meeting
5. Introduce the project and areas of focus, the Environmental Assessment (EA) and
TMP process, plus related area projects and connections to the TMP, including the
consultation process
Park Lawn / Lake Shore Area TMP
Study Area
3
Study Purpose
The City’s study will identify
changes needed to improve
transportation options for all
users. It will guide future
infrastructure planning
through a cohesive multi-
modal transportation plan,
bringing together:
• previously planned and
approved infrastructure
projects;
• approved, unbuilt
development; and
• the needs of the people who
live, work, visit and pass
through the area.
Primary Study Area Limits (as shown in above map):
• Park Lawn Road, The Queensway, Windermere Avenue, and Lake Ontario
Secondary Study Area Limits (not shown in above map):
• For the traffic modelling assessment, a broader study area is being
reviewed including development areas west of Park Lawn Road
Park Lawn / Lake Shore Area TMP
TMP Study Process
• Transportation Master Plans are an approved Provincial process to
address infrastructure planning projects under the Environmental
Assessment Act
• It creates a framework for planning a range of infrastructure projects that
may be implemented over a period of time
• Public stakeholder consultation is a key component
• Larger infrastructure recommendations will require further study by
completing Phases 3 and 4 of the Environmental Assessment process
4
Park Lawn / Lake Shore Area TMP
ROAD NETWORK
– New turning lanes at Park Lawn and Lake Shore
are working well
– Change property access points to improve safety
– Create a new link across the Gardiner Expressway
– Improve access to the Gardiner Expressway,
through revisions to the existing on- and off-ramps,
and/or by providing new connections
– Improve access to the Ontario Food Terminal
– Widen Lake Shore Boulevard over the Humber
River; reduce 'choke points' across the Humber
River
– Create layby areas for trucks (for loading /
unloading)
– Restrict Park Lawn Road to local traffic only
– Improve synchronization of traffic lights
TRANSIT
– Concern expressed regarding provision of parking
and public transit to meet projected usage for the
Christie’s Site
– Support for a new GO Station to service the study
area while maintaining Mimico GO Station
– Create a new streetcar line on the Queensway
– Suggestions for revisions to existing bus routes and
access to the Humber Loop
– Improve service frequency; create an
integrated fare structure
– Look at micro-transit options and
express routes to improve local service
– Suggestions for new LRT route
alignments
– Consider other locations for a new
transit hub or transit loop
What Did We Hear ?
5
Note: A detailed summary of the input received is
provided on the resource table and on the study website.
Summary of Comments from
Oct. 5 Stakeholder Workshop
• What does the City need to know about transportation
in the Park Lawn Lake Shore area?
• What transportation improvements could be
considered?
ACTIVE TRANSPORTATION
– Improve connections to the Humber
Loop for pedestrians and cyclists
– Create a continuous east-west bike
lane along Lake Shore Boulevard
– Create separated paths for cycling to
reduce congestion on trails and
pathways
Other comments received were related to:
– Timeline for improvements
– Past and future development decisions /
continued population growth
– Land use scenarios for the former Mr.
Christie’s Site
– Potential loss of green space
– loss of business due to construction or
dedicated Light Rail Transit (LRT), or
dedicated right-of-way restrictions
– Legion Road extension and its efficacy
– Data that will inform this Study
– Cost comparisons of various solutions
Park Lawn / Lake Shore Area TMP
Problem and Opportunity Statement
The Park Lawn Road and Lake Shore Boulevard West area
has limited options to connect to surrounding areas. In
combination with significant growth, increased demands
are placed on the transportation network.
An integrated approach is required to meet the existing and
future needs of a diverse range of users by providing:
• New connections and better access to roads, transit, and pathways;
• Additional safe and convenient crossings of physical barriers;
• Planning for investment in public transit, pedestrian, and cycling networks;
and
• High quality streetscape design
6
Park Lawn / Lake Shore Area TMP
Existing Conditions – Travel Characteristics
7
Transportation Tomorrow Survey (TTS) 2011
• The automobile is the dominant mode of travel from the Primary and Secondary Study Areas (69% and 65%) to
other locations; slightly higher than Etobicoke-York District (64%) and City of Toronto (59%).
• The percentage of people per “Zone” that uses GO Transit is relatively higher for the Secondary Study Area
(4%) in comparison to the other zones (0%, 1% and 1%).
• A lower percentage of people (1%) choose to walk or cycle from the Primary Study Area than from the other
zones (5%, 8%, and 11%).
• The TTS is a household travel survey conducted in the Greater Toronto Area and Hamilton (GTAH) every 5 years;
AM Peak Period
(6 AM to 9 AM)
0% 10% 20% 30% 40% 50% 60% 70% 80%
GO Transit & TTC
GO Transit
Other
Walk or Cycle
TTC
Automobile
Mode Share (%)
Toronto
Etobicoke - York
Secondary Study Area
Primary Study Area
Park Lawn / Lake Shore Area TMP
TTS 2011 – Person-Trips Starting in the Primary Study Area and Ending in
the Downtown, the City of Toronto, and the rest of the GTA
• The majority of all person-trips (71%) that start in the Primary Study Area stay within the City of Toronto and
approximately one quarter (27%) end in Downtown Toronto.
• The majority of person-trips (69%) that start in the Primary Study Area and end in Downtown Toronto are made
using transit services.
• Unlike person-trips to Downtown Toronto, the majority of person-trips (84%) made to other parts of the City and
GTA as a whole are made using automobiles.
Existing Conditions – Travel Characteristics
8
0 100 200 300 400 500 600 700 800 900
Downtown Toronto (DT)
Toronto Excluding DT
GTA excluding Toronto
Person –Trips (AM Peak Period: 6:00AM - 9:00AM)
Destination
Other
Transit
Automobile
Toronto Excluding
Downtown Toronto
Downtown
Toronto
GTA excluding
Toronto
Park Lawn / Lake Shore Area TMP9
Existing Conditions – Active Transportation
This map identified trails and cycling infrastructure that are present within the study area, as well as studies and projects
that are planned and approved as per the City’s Cycling Network Plan.
Park Lawn / Lake Shore Area TMP
Within Primary Study Area:
• Bus route #66B has the highest hourly
ridership in the PM peak period
• Bus route #145 is an express service
providing eastbound service only in
the AM peak period and westbound
service only in the PM peak period.
• Bus route #80 has higher ridership in
the westbound direction in the AM
peak period and a higher ridership in
the eastbound direction in the PM
peak period
• Bus route #66A has higher ridership
travelling southbound (i.e., towards
Humber Loop) in the AM peak period
• Bus route #66B has higher ridership
travelling northbound in the AM peak
period
• Streetcar route #501 is formed of two
service loops, the Neville Park Loop
(east) service, and the Long Branch
GO Station (west) service, that meet
at the Humber Loop
Existing Conditions – TTC Routes/Ridership
10
“Popular Stops” have more than 40 boarding and
alighting passengers every peak period
Park Lawn / Lake Shore Area TMP
Park Lawn GO Station
Metrolinx Recommendations:
• Metrolinx prepared an Initial Business Case for Park
Lawn GO Station – however the station was not
recommended as part of the 10-year RER Station
Plan due to a physically constrained site, construction
challenges and potentially negative impacts on GO
operations.
• Metrolinx Board (June 28, 2016) approved 6 new
SmartTrack stations on the Stouffville/Lakeshore East
and Kitchener GO Corridors, and 2 new Regional
Express Rail (RER) Stations on the Barrie GO
Corridor in the City of Toronto.
• Metrolinx Board recommended advising City of
Toronto that Metrolinx will continue to collaborate to
improve the strategic, economic, financial and
operations cases for Park Lawn and bring it forward
for future consideration.
11
Park Lawn / Lake Shore Area TMP
Waterfront Transit “Reset”
12
The Waterfront Transit “Reset” is a partnership between the City, TTC, and Waterfront Toronto to
improve transit across a large portion of the City’s waterfront:
• A Phase 1 study was completed earlier this year;
• Council direction was received in July 2016 to proceed to a Phase 2 study, where:
• Recommended alignment alternatives from Phase 1 will be further evaluated/refined, and;
• The objective is to establish a preferred network solution.
• Results of Phase 2 will be reported to Council in Q2 2017.
We are working closely to coordinate
the TMP with this study, sharing key
findings and opportunities to ensure a
compatible transportation solution.
Park Lawn / Lake Shore Area TMP
This map identifies the potential alignments through the study area determined at the conclusion of the Phase 1
Waterfront Transit “Reset” Study.
• Lake Shore Boulevard is the only potential alignment west of the Humber Loop.
Waterfront Transit “Reset” – Light Rail Transit
13
• East of the Humber
River Loop, two
alternative
alignments will be
evaluated:
1. Using the existing
Queensway
streetcar loop, and
2. A new alignment
on Lake Shore
Boulevard West.
• The preferred
network solution will
be recommended in
Phase 2 of that
Study.
Park Lawn / Lake Shore Area TMP
TTC – Potential Transit Loop Locations
14
Several locations are currently being assessed for a future potential transit loop, including the existing Humber Loop
location, the former Mr. Christie Site, and the bus loop that currently exists at the intersection of Park Lawn Road and
Lake Shore Boulevard West. Other locations may also be considered.
Park Lawn / Lake Shore Area TMP
Potential GO Station Locations
15
The alternative locations that this TMP will study include:
• at the south east corner of the Metrolinx GO line and Park Lawn Road,
• opposite the Park Lawn Road eastbound off ramp, on the north side of the Metrolinx GO line,
• at the existing TTC Humber Loop location, and
• other locations may also be considered.
Park Lawn / Lake Shore Area TMP
Transit Only Lane on Lake Shore Boulevard
16
Potential transit improvements in the area could include the introduction of a morning peak-period, transit only lane (e.g.
physically protected with barrier curbs) in the eastbound direction on Lake Shore Boulevard, between Park Lawn Road
and the Humber Loop. Other transit improvements will be considered as part of the TMP and Waterfront Reset studies.
Park Lawn / Lake Shore Area TMP17
Potential Road Network Improvements
Potential new road network connections and opportunities to reduce congestion are being reviewed as part of this study.
Park Lawn / Lake Shore Area TMP
Study Timelines & Next Steps
18
STEP 1 – 2016 STEP 2 – 2017 STEP 3 – 2017/2018
Communications and
Planning
Stakeholder Meetings Stakeholder Meetings
Stakeholder Meetings Public Event 2 Notice of Study Completion
Public Event 1 Public Event 3 30 Day Review Period
• Review and consider comments received at and following Public Event #1
• Develop alternative solutions and evaluation criteria
• Hold Public Event #2 to present the alternative solutions
• Evaluate alternatives
• Present recommendations at Public Event #3
• Notice of Study Completion
• 30 Day Review Period
Park Lawn / Lake Shore Area TMP
How can you continue to Participate?
19
Please complete a comment sheet and place it in the box provided
or submit written comments via email, mail and/or fax to the following
study team member:
Comment Box
We’ll Keep You Posted!
Please sign up for the project email list to receive updates. You can
also check the website www.toronto.ca/parklawnlakeshore to see
the most recent information.
Robyn Shyllit
Sr. Public Consultation Coordinator
Public Consultation Unit
City of Toronto – Metro Hall
55 John Street, 19th Floor,
Toronto, Ontario M5V 3C6
T: 416.392.3358
Fax: 416-392-2974
TTY: 416-397-0831
E: rshyllit@toronto.ca
THANK YOU !

Más contenido relacionado

La actualidad más candente

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016VDOT Northern Virginia
 
Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)knelischer
 
EIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationEIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationCirculateSD
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingCirculateSD
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingVDOT Northern Virginia
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Toronto Public Consultation Unit
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]knelischer
 
Scarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportScarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportToronto Public Consultation Unit
 
Mount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewMount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewCrosstown TO
 

La actualidad más candente (20)

East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
 
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016Fairfax County Parkway Study Meeting, June 2016
Fairfax County Parkway Study Meeting, June 2016
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)Emery village pic #1 boards v4 (reduced)
Emery village pic #1 boards v4 (reduced)
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
EIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentationEIR Scoping Meeting 7 18-17 presentation
EIR Scoping Meeting 7 18-17 presentation
 
Clairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee MeetingClairemont CPG Ad Hoc Subcommittee Meeting
Clairemont CPG Ad Hoc Subcommittee Meeting
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
 
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
REimagining Yonge Street - Public Open House 1 Display Panels [may 25-16]
 
Scarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation ReportScarborough Subway Extension - Phase 1 Consultation Report
Scarborough Subway Extension - Phase 1 Consultation Report
 
Scarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of ReferenceScarborough Subway Extension - Terms of Reference
Scarborough Subway Extension - Terms of Reference
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
 
Mount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design ReviewMount Dennis Mobility Hub Update and Station Design Review
Mount Dennis Mobility Hub Update and Station Design Review
 

Similar a Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display Panels

Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...Fairfax County
 
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceToronto Public Consultation Unit
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentationdirectionsto2050
 
I-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the BeltwayI-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the BeltwayFairfax County
 
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Toronto Public Consultation Unit
 
System Reimagining August Board Meeting (Plan Revisions)
System Reimagining August Board Meeting (Plan Revisions)System Reimagining August Board Meeting (Plan Revisions)
System Reimagining August Board Meeting (Plan Revisions)Geoff Carleton
 
Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Toronto Public Consultation Unit
 

Similar a Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display Panels (20)

Highland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master PlanHighland Creek Village Transportation Master Plan
Highland Creek Village Transportation Master Plan
 
Toronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting PresentationToronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting Presentation
 
June Relief Line Update
June Relief Line UpdateJune Relief Line Update
June Relief Line Update
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
 
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
Fairfax County and Franconia-Springfield Parkways - Alternatives Analysis and...
 
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
 
Cycle 2 Business and Industry Presentation
Cycle 2 Business and Industry PresentationCycle 2 Business and Industry Presentation
Cycle 2 Business and Industry Presentation
 
I-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the BeltwayI-66 Multimodal Improvements Inside the Beltway
I-66 Multimodal Improvements Inside the Beltway
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
Scarborough Subway Extension Stakeholder Advisory Group Meeting 1
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
Relief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation PresentationRelief Line Project Assessment Phase 1A Consultation Presentation
Relief Line Project Assessment Phase 1A Consultation Presentation
 
GoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT ProjectGoTriangle Update on DOLRT Project
GoTriangle Update on DOLRT Project
 
System Reimagining August Board Meeting (Plan Revisions)
System Reimagining August Board Meeting (Plan Revisions)System Reimagining August Board Meeting (Plan Revisions)
System Reimagining August Board Meeting (Plan Revisions)
 
Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
 
Scarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation PlanScarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation Plan
 

Más de Toronto Public Consultation Unit

Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Toronto Public Consultation Unit
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)Toronto Public Consultation Unit
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Toronto Public Consultation Unit
 

Más de Toronto Public Consultation Unit (19)

Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
 
General information
General informationGeneral information
General information
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 
Downsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study BoardsDownsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study Boards
 
Downsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study MapsDownsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study Maps
 
Transit Network Plan Update and Financial Strategy
 Transit Network Plan Update and Financial Strategy Transit Network Plan Update and Financial Strategy
Transit Network Plan Update and Financial Strategy
 
King-Liberty Pedestrian / Cycling Bridge
King-Liberty Pedestrian / Cycling Bridge King-Liberty Pedestrian / Cycling Bridge
King-Liberty Pedestrian / Cycling Bridge
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
Glen Road Pedestrian Bridge Environmental Assessment Study - PIC #1
 

Último

An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCNAP Global Network
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlEdouardHusson
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30JSchaus & Associates
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...nehasharma67844
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisChristina Parmionova
 
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
SMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptxSMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptx
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptxShovan Prita Paul .
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'NAP Global Network
 
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hourCall Girls in Nagpur High Profile
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
celebrity 💋 Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity 💋 Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...Call Girls in Nagpur High Profile
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
 

Último (20)

An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...Call Girls In datia Escorts ☎️7427069034  🔝 💃 Enjoy 24/7 Escort Service Enjoy...
Call Girls In datia Escorts ☎️7427069034 🔝 💃 Enjoy 24/7 Escort Service Enjoy...
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
SMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptxSMART BANGLADESH  I    PPTX   I    SLIDE   IShovan Prita Paul.pptx
SMART BANGLADESH I PPTX I SLIDE IShovan Prita Paul.pptx
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
 
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Patna Escorts Just Dail 8250092165 service available anytime 24 hour
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Agra 7001035870 Whatsapp Number, 24/07 Booking
 
celebrity 💋 Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...celebrity 💋 Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...
celebrity 💋 Nagpur Escorts Just Dail 8250092165 service available anytime 24 ...
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 

Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display Panels

  • 1. Park Lawn / Lake Shore Area TMP Public Event 1 Community Workshops Nov. 24 & Dec. 3, 2016
  • 2. Park Lawn / Lake Shore Area TMP Welcome 2 Workshop Purpose We’re looking to you for ideas and insights to help guide future transportation infrastructure planning in the Park Lawn Lake Shore area. The City is carrying out a Transportation Master Plan (TMP) and is seeking your feedback on how to improve area transportation conditions. Goals 1. Convene many community members and stakeholder organizations 2. Listen and receive information early in the study process 3. Generate list of issues and suggestions from firsthand experience 4. Hold an interactive meeting 5. Introduce the project and areas of focus, the Environmental Assessment (EA) and TMP process, plus related area projects and connections to the TMP, including the consultation process
  • 3. Park Lawn / Lake Shore Area TMP Study Area 3 Study Purpose The City’s study will identify changes needed to improve transportation options for all users. It will guide future infrastructure planning through a cohesive multi- modal transportation plan, bringing together: • previously planned and approved infrastructure projects; • approved, unbuilt development; and • the needs of the people who live, work, visit and pass through the area. Primary Study Area Limits (as shown in above map): • Park Lawn Road, The Queensway, Windermere Avenue, and Lake Ontario Secondary Study Area Limits (not shown in above map): • For the traffic modelling assessment, a broader study area is being reviewed including development areas west of Park Lawn Road
  • 4. Park Lawn / Lake Shore Area TMP TMP Study Process • Transportation Master Plans are an approved Provincial process to address infrastructure planning projects under the Environmental Assessment Act • It creates a framework for planning a range of infrastructure projects that may be implemented over a period of time • Public stakeholder consultation is a key component • Larger infrastructure recommendations will require further study by completing Phases 3 and 4 of the Environmental Assessment process 4
  • 5. Park Lawn / Lake Shore Area TMP ROAD NETWORK – New turning lanes at Park Lawn and Lake Shore are working well – Change property access points to improve safety – Create a new link across the Gardiner Expressway – Improve access to the Gardiner Expressway, through revisions to the existing on- and off-ramps, and/or by providing new connections – Improve access to the Ontario Food Terminal – Widen Lake Shore Boulevard over the Humber River; reduce 'choke points' across the Humber River – Create layby areas for trucks (for loading / unloading) – Restrict Park Lawn Road to local traffic only – Improve synchronization of traffic lights TRANSIT – Concern expressed regarding provision of parking and public transit to meet projected usage for the Christie’s Site – Support for a new GO Station to service the study area while maintaining Mimico GO Station – Create a new streetcar line on the Queensway – Suggestions for revisions to existing bus routes and access to the Humber Loop – Improve service frequency; create an integrated fare structure – Look at micro-transit options and express routes to improve local service – Suggestions for new LRT route alignments – Consider other locations for a new transit hub or transit loop What Did We Hear ? 5 Note: A detailed summary of the input received is provided on the resource table and on the study website. Summary of Comments from Oct. 5 Stakeholder Workshop • What does the City need to know about transportation in the Park Lawn Lake Shore area? • What transportation improvements could be considered? ACTIVE TRANSPORTATION – Improve connections to the Humber Loop for pedestrians and cyclists – Create a continuous east-west bike lane along Lake Shore Boulevard – Create separated paths for cycling to reduce congestion on trails and pathways Other comments received were related to: – Timeline for improvements – Past and future development decisions / continued population growth – Land use scenarios for the former Mr. Christie’s Site – Potential loss of green space – loss of business due to construction or dedicated Light Rail Transit (LRT), or dedicated right-of-way restrictions – Legion Road extension and its efficacy – Data that will inform this Study – Cost comparisons of various solutions
  • 6. Park Lawn / Lake Shore Area TMP Problem and Opportunity Statement The Park Lawn Road and Lake Shore Boulevard West area has limited options to connect to surrounding areas. In combination with significant growth, increased demands are placed on the transportation network. An integrated approach is required to meet the existing and future needs of a diverse range of users by providing: • New connections and better access to roads, transit, and pathways; • Additional safe and convenient crossings of physical barriers; • Planning for investment in public transit, pedestrian, and cycling networks; and • High quality streetscape design 6
  • 7. Park Lawn / Lake Shore Area TMP Existing Conditions – Travel Characteristics 7 Transportation Tomorrow Survey (TTS) 2011 • The automobile is the dominant mode of travel from the Primary and Secondary Study Areas (69% and 65%) to other locations; slightly higher than Etobicoke-York District (64%) and City of Toronto (59%). • The percentage of people per “Zone” that uses GO Transit is relatively higher for the Secondary Study Area (4%) in comparison to the other zones (0%, 1% and 1%). • A lower percentage of people (1%) choose to walk or cycle from the Primary Study Area than from the other zones (5%, 8%, and 11%). • The TTS is a household travel survey conducted in the Greater Toronto Area and Hamilton (GTAH) every 5 years; AM Peak Period (6 AM to 9 AM) 0% 10% 20% 30% 40% 50% 60% 70% 80% GO Transit & TTC GO Transit Other Walk or Cycle TTC Automobile Mode Share (%) Toronto Etobicoke - York Secondary Study Area Primary Study Area
  • 8. Park Lawn / Lake Shore Area TMP TTS 2011 – Person-Trips Starting in the Primary Study Area and Ending in the Downtown, the City of Toronto, and the rest of the GTA • The majority of all person-trips (71%) that start in the Primary Study Area stay within the City of Toronto and approximately one quarter (27%) end in Downtown Toronto. • The majority of person-trips (69%) that start in the Primary Study Area and end in Downtown Toronto are made using transit services. • Unlike person-trips to Downtown Toronto, the majority of person-trips (84%) made to other parts of the City and GTA as a whole are made using automobiles. Existing Conditions – Travel Characteristics 8 0 100 200 300 400 500 600 700 800 900 Downtown Toronto (DT) Toronto Excluding DT GTA excluding Toronto Person –Trips (AM Peak Period: 6:00AM - 9:00AM) Destination Other Transit Automobile Toronto Excluding Downtown Toronto Downtown Toronto GTA excluding Toronto
  • 9. Park Lawn / Lake Shore Area TMP9 Existing Conditions – Active Transportation This map identified trails and cycling infrastructure that are present within the study area, as well as studies and projects that are planned and approved as per the City’s Cycling Network Plan.
  • 10. Park Lawn / Lake Shore Area TMP Within Primary Study Area: • Bus route #66B has the highest hourly ridership in the PM peak period • Bus route #145 is an express service providing eastbound service only in the AM peak period and westbound service only in the PM peak period. • Bus route #80 has higher ridership in the westbound direction in the AM peak period and a higher ridership in the eastbound direction in the PM peak period • Bus route #66A has higher ridership travelling southbound (i.e., towards Humber Loop) in the AM peak period • Bus route #66B has higher ridership travelling northbound in the AM peak period • Streetcar route #501 is formed of two service loops, the Neville Park Loop (east) service, and the Long Branch GO Station (west) service, that meet at the Humber Loop Existing Conditions – TTC Routes/Ridership 10 “Popular Stops” have more than 40 boarding and alighting passengers every peak period
  • 11. Park Lawn / Lake Shore Area TMP Park Lawn GO Station Metrolinx Recommendations: • Metrolinx prepared an Initial Business Case for Park Lawn GO Station – however the station was not recommended as part of the 10-year RER Station Plan due to a physically constrained site, construction challenges and potentially negative impacts on GO operations. • Metrolinx Board (June 28, 2016) approved 6 new SmartTrack stations on the Stouffville/Lakeshore East and Kitchener GO Corridors, and 2 new Regional Express Rail (RER) Stations on the Barrie GO Corridor in the City of Toronto. • Metrolinx Board recommended advising City of Toronto that Metrolinx will continue to collaborate to improve the strategic, economic, financial and operations cases for Park Lawn and bring it forward for future consideration. 11
  • 12. Park Lawn / Lake Shore Area TMP Waterfront Transit “Reset” 12 The Waterfront Transit “Reset” is a partnership between the City, TTC, and Waterfront Toronto to improve transit across a large portion of the City’s waterfront: • A Phase 1 study was completed earlier this year; • Council direction was received in July 2016 to proceed to a Phase 2 study, where: • Recommended alignment alternatives from Phase 1 will be further evaluated/refined, and; • The objective is to establish a preferred network solution. • Results of Phase 2 will be reported to Council in Q2 2017. We are working closely to coordinate the TMP with this study, sharing key findings and opportunities to ensure a compatible transportation solution.
  • 13. Park Lawn / Lake Shore Area TMP This map identifies the potential alignments through the study area determined at the conclusion of the Phase 1 Waterfront Transit “Reset” Study. • Lake Shore Boulevard is the only potential alignment west of the Humber Loop. Waterfront Transit “Reset” – Light Rail Transit 13 • East of the Humber River Loop, two alternative alignments will be evaluated: 1. Using the existing Queensway streetcar loop, and 2. A new alignment on Lake Shore Boulevard West. • The preferred network solution will be recommended in Phase 2 of that Study.
  • 14. Park Lawn / Lake Shore Area TMP TTC – Potential Transit Loop Locations 14 Several locations are currently being assessed for a future potential transit loop, including the existing Humber Loop location, the former Mr. Christie Site, and the bus loop that currently exists at the intersection of Park Lawn Road and Lake Shore Boulevard West. Other locations may also be considered.
  • 15. Park Lawn / Lake Shore Area TMP Potential GO Station Locations 15 The alternative locations that this TMP will study include: • at the south east corner of the Metrolinx GO line and Park Lawn Road, • opposite the Park Lawn Road eastbound off ramp, on the north side of the Metrolinx GO line, • at the existing TTC Humber Loop location, and • other locations may also be considered.
  • 16. Park Lawn / Lake Shore Area TMP Transit Only Lane on Lake Shore Boulevard 16 Potential transit improvements in the area could include the introduction of a morning peak-period, transit only lane (e.g. physically protected with barrier curbs) in the eastbound direction on Lake Shore Boulevard, between Park Lawn Road and the Humber Loop. Other transit improvements will be considered as part of the TMP and Waterfront Reset studies.
  • 17. Park Lawn / Lake Shore Area TMP17 Potential Road Network Improvements Potential new road network connections and opportunities to reduce congestion are being reviewed as part of this study.
  • 18. Park Lawn / Lake Shore Area TMP Study Timelines & Next Steps 18 STEP 1 – 2016 STEP 2 – 2017 STEP 3 – 2017/2018 Communications and Planning Stakeholder Meetings Stakeholder Meetings Stakeholder Meetings Public Event 2 Notice of Study Completion Public Event 1 Public Event 3 30 Day Review Period • Review and consider comments received at and following Public Event #1 • Develop alternative solutions and evaluation criteria • Hold Public Event #2 to present the alternative solutions • Evaluate alternatives • Present recommendations at Public Event #3 • Notice of Study Completion • 30 Day Review Period
  • 19. Park Lawn / Lake Shore Area TMP How can you continue to Participate? 19 Please complete a comment sheet and place it in the box provided or submit written comments via email, mail and/or fax to the following study team member: Comment Box We’ll Keep You Posted! Please sign up for the project email list to receive updates. You can also check the website www.toronto.ca/parklawnlakeshore to see the most recent information. Robyn Shyllit Sr. Public Consultation Coordinator Public Consultation Unit City of Toronto – Metro Hall 55 John Street, 19th Floor, Toronto, Ontario M5V 3C6 T: 416.392.3358 Fax: 416-392-2974 TTY: 416-397-0831 E: rshyllit@toronto.ca THANK YOU !