INew Stations
1
Public Meeting
Purpose of Today’s Meeting
 City, Metrolinx and TTC are working in partnership on
planning/design of 6 new SmartTrack and 2 new GO stations
in Toronto.
 This is the first round of Public and Stakeholder Consultation
for the new stations.
 Today, we will provide an overview of the station concept
schematics and environmental studies that are part of the
Transit Project Assessment Process for the stations.
 We would like your comments on the proposed approach -
such as opportunities that the new stations provide and how
the stations can be integrated within the local community.
2
Today’s Meeting Agenda
1. Project Overview – Background, Process and Timeline
2. Schematic Station Concepts
3. Questions / Discussion
3
Our Rapid Transit Network Today
4
Our Future Rapid Transit Network
5
What is SmartTrack?
SmartTrack includes:
• Rapid transit along 3 GO rail
corridors (Kitchener, Lakeshore
East, Stouffville) and along Eglinton
Avenue West (Eglinton West LRT)
• 14 rail stations and 8-12 LRT stops,
when the existing/planned rail
stations and the Eglinton West LRT
are taken into account
SmartTrack benefits:
• Better use of the existing rail
infrastructure along these GO rail
corridors in Toronto
• More rapid transit for Toronto
residents and businesses
• All-day two-way service, with trains
every 6-10 minutes during peak
periods and every 15 minutes
during off-peak periods
• Faster and quieter electric trains
• Fare integration
6
SmartTrack increases transit options for Toronto by making better use of
the existing GO rail corridors, while additional, longer-term investments to
increase transit capacity across the city are being planned.
What is Regional Express Rail (RER)?
7
The RER program will bring fast, two-way, all-day GO service to
provincially owned rail corridors. Metrolinx is currently implementing the
RER program, including track and station upgrades.
Metrolinx is transforming the GO rail system to provide:
• Twice the number of trips during weekday rush-hour periods.
• Four times the number of trips at other times.
• Line extensions to new communities.
System Map
8
Transit Project Assessment Process
The City and Metrolinx are
undertaking a Transit Project
Assessment Process (TPAP) under
Ontario Regulation 231/08 to assess
the potential environmental effects
of each of the new stations.
• Public and stakeholder consultation will be
an important component of this process.
• Existing environmental conditions will be
determined and the significance of
specific features will be evaluated.
• Potential impacts of the project on these
features will be identified and
documented.
• Appropriate mitigation measures,
monitoring strategies and future studies
will be recommended.
9
Early 2018
On-going
Fall 2017
Mid 2018
Late 2018
Station Planning and Design
Document Existing Conditions
Assessment Potential Impacts
Public and Stakeholder Consultation
City Council authorization to advance
Public and Stakeholder Consultation
City Council authorization to advance
TPAP Notice of Commencement
Public and Stakeholder Consultation
TPAP Notice of Completion
RFP for Procurement
WE ARE
HERE
New SmartTrack and GO Stations in Toronto
10
• The new SmartTrack/
GO stations build upon
the RER program.
• Within Toronto, 6 new
SmartTrack stations
are planned for the
Stouffville/Lakeshore
East and Kitchener GO
rail corridors and 2 new
GO stations are
planned for the Barrie
GO rail corridor.
Overview of Station Schematics
Station Planning Considerations:
• Platform and station access locations
• Connectivity with TTC surface transit routes
• Accessible transit pick up/drop off
• Pedestrian and cyclist access and local
circulation
• Coordination with related studies and potential
infrastructure improvements, for example:
11
– East Harbour Station with the Unilever Precinct Planning Study
– East Harbour and Gerrard-Carlaw Stations with the Relief Line Project Assessment
– St.Clair-Old Weston Station with St. Clair Transportation Master Plan
– Bloor-Lansdowne Station and King-Liberty with West Toronto Railpath extensions
– Lawrence-Kennedy and Finch-Kennedy stations with Scarborough Subway Extension
– Rail Deck Park at Spadina-Front Station
• Partnerships and property impacts for station elements and opportunities for
integrated station development
existing/planned
stations
Finch-Kennedy SmartTrack Station
• Will focus on integration with TTC buses
Initial Business Case
• Station design needs to be coordinated with the
Finch Avenue grade separation
• Ensure high-quality entrance at Finch Avenue for
transferring passengers
– Provide direct connection to surface transit routes
– Refine number and location of bus bays
• Improve pedestrian, cycling and transit access to the
station
• City Planning not supportive of PPUDO and
Commuter Parking lot
• Provide adequate and convenient bicycle facilities at
the station
• Provide accessible access in close proximity to station
entrance
• Determine location for access roads serving the
station and surrounding area
12
Finch-Kennedy SmartTrack Station
Refined Functional Design
• New grade separation – road under rail.
• Direct link for one of the busiest bus
corridors in Ontario.
• Access from both sides of the rail corridor.
• Good linkages with Finch Avenue East.
• Connections with local transit routes to
provide good station access for transferring
passengers, including the 39 Finch East and
199 Finch Rocket buses.
• Need and location for an access road
serving the station
13
Finch-Kennedy SmartTrack Station
Emerging Station Concept
• Critical rapid transit link for one of the
busiest local bus corridors in Ontario.
• New grade separation – road under rail.
• Access from both sides of the rail corridor.
• Good linkages with Finch Avenue East.
• Connections with local transit routes to
provide good station access for transferring
passengers, including the 39 Finch East and
199 Finch Rocket buses.
• Minimized impact on stable residential
neighbourhood south of Finch
• Platform shifted northward to minimize
impact on stable residential neighbourhood
south of Finch
14
To be determined:
• Design and location of future
access road serving the
station and surround area
Lawrence-Kennedy SmartTrack Station
• Will replace existing Lawrence East Station
• Will focus on integration with TTC buses
Initial Business Case
• Improve entrance at Lawrence Avenue for transferring passengers
• Improve pedestrian, cycling and transit access to the station
• City Planning not supportive of PPUDO and Commuter Parking lot
• Ensure adequate and convenient bicycle facilities at the station
• Provide accessible access in close proximity to main station
entrance
• Shift platform northward to better connect to future development
opportunities, and minimize impacts on existing residential
properties
• Coordinate construction with the future decommissioning of Line
3 Lawrence East
*Initial business case being reviewed by Metrolinx
Lawrence-Kennedy SmartTrack Station
Refined Functional Design
• Better connections to the north –
additional station entrance
• Minimize residential property impact to
the south
• Station will straddle Lawrence Avenue
East and have access from both sides of
the rail corridor.
• Direct connection with Lawrence
Avenue East for transit transfers
16
Lawrence-Kennedy SmartTrack Station
Emerging Station Concept
• Improved station access
• Minimize property impact
• Direct connection with Lawrence Avenue
East for transit transfers
To be determined:
1. Station Phasing with Line 3
2. Local Street Network
3. Integration with Development
17
Station is being reviewed by Metrolinx
Gerrard-Carlaw SmartTrack Station
Initial Business Case
• Platforms located between Logan
and Carlaw
• Entrances at either end of
platforms
• Bus Terminal
• Passenger pick-up and drop-off
facility
• Connection to Relief Line and 506
Streetcar
18
Gerrard-Carlaw SmartTrack Station
Refined Functional Design
• Platforms shifted north – between
Pape and Carlaw
• Access from both sides of the rail
corridor, with good linkages to
surrounding roadways including
Carlaw Street, Gerrard Street East
and Pape Avenue
• Improvements to the
pedestrian/cycling bridge at Pape
are being planned as part of
station
• Connections with local transit
routes to provide good station
access for transferring passengers
19
Gerrard-Carlaw SmartTrack Station
Emerging Station Concept
• Three station accesses with good
connections to Carlaw Street,
Gerrard Street East and Pape
Avenue
• Improvements to the
pedestrian/cycling bridge at Pape
are being planned as part of station
• Being planned as future interchange
station with Relief Line subway
• Connections are planned with local
transit routes to provide good
station access for transferring
passengers, including the 506
Carlton and 505 Dundas streetcars,
and the 72 Pape bus
20
Further consideration needed:
Location/design of accessible pick-
up and drop-off
East Harbour SmartTrack Station
Initial Business Case
• Integration with the
development of adjacent lands
• Rail corridor and bridge
expansion
• Flood protection and Don River
re-naturalization
• Good connection to Relief Line
and Broadview streetcar
extension
• Pedestrian and cycling
connections
• Coordination with Gardiner
Expressway reconfiguration
21
East Harbour SmartTrack Station
Refined Functional Design
• Planning and design of the station is
being integrated with the Unilever
Precinct Planning Study.
• Station will provide rapid transit
access to serve emerging major
employment node for 50,000+ new
jobs.
• The main station entrance will be
from Broadview Avenue extension,
including Broadview Streetcar.
• Station is being planned with excellent
connections to the proposed Relief
Line subway station at Broadview
Avenue and Eastern Avenue.
22
East Harbour SmartTrack Station
Emerging Station Concept
• Planning and design of the station is
being integrated with the Unilever
Precinct Planning Study.
• Station will provide rapid transit
access to serve emerging major
employment node for 50,000+ new
jobs.
• Multiple station entrances, including
from Broadview Avenue extension
and west side of Don River.
• Station is being planned with
excellent connections to the
proposed Relief Line subway station
at Broadview Avenue and Eastern
Avenue.
23
24
Spadina-Front GO Station
Initial Business Case
• Centre-platform serving Barrie
Corridor
• Two access points to Front
Street, including primary
entrance at Front and Spadina
• Potential for platform access
from Puente de Luz bridge
• Relocation of existing above
ground utilities
25
Spadina-Front GO Station
Refined Functional Design
• Expected to be a busy destination
station.
• Access from both sides of the rail
corridor.
• Linkages with surrounding roadways
including Front Street West, Spadina
Avenue, and Bathurst Street.
• Connections with local transit routes
to provide good station access for
transferring passengers, including the
510 Spadina streetcar.
• Planning and design of the station is
being coordinated with the City's
proposed Rail Deck Park.
26
Spadina-Front GO Station
Emerging Station Concept
• Expected to be a busy destination
station.
• Access from both sides of the rail
corridor.
• Linkages with surrounding roadways
including Front Street West, Spadina
Avenue, and Bathurst Street.
• Connections with local transit routes
to provide good station access for
transferring passengers, including the
510 Spadina streetcar.
• Planning and design of the station is
being coordinated with the City's
proposed Rail Deck Park.
King-Liberty SmartTrack Station
Initial Business Case
• Track realignment
• Signal upgrades
• Pedestrian and/or cycling bridges
or tunnels
• Repurposing an existing heritage
building as a passenger services
building
27
King-Liberty SmartTrack Station
Refined Functional Design
• Access from both sides of the rail
corridor
– Extension of the planned West
Toronto Railpath
– New overpass of the rail corridor
(King Highline)
– Connections with the Exhibition
GO Station.
• Good linkages with surrounding
roadways, including King Street
West and Sudbury Street.
• Connections with local transit
routes to provide good station
access for transferring
passengers, including the 504
King and 501 Queen streetcars.
28
29
King-Liberty SmartTrack Station
Emerging Station Concept
• Access from both sides of the rail
corridor
– Extension of the planned West Toronto
Railpath
– New overpass of the rail corridor (King
Highline)
– Connections with the Exhibition GO
Station.
• Good linkages with surrounding
roadways, including King Street West
and Sudbury Street.
• Connections with local transit routes
to provide good station access for
transferring passengers, including the
504 King and 501 Queen streetcars.
Bloor-Lansdowne GO Station
Initial Business Case
• Double tracking and track realignment
• Bloor St. bridge widening
• Minimum width edge platforms
• Pedestrian and cycling connections, including
north-south multi-use path
• Passenger pick-up and drop off on Value
Village site
30
31
Bloor-Lansdowne GO Station
Refined Functional Design
• Critical link between GO RER and the TTC Line
2 subway at Lansdowne Station
• Access from both sides of the rail corridor,
including extension of the Greenway Multi-
Use Path to connect with the West Toronto
Railpath south of Dundas Street.
• Linkages with surrounding roadways, including
Bloor Street West, Lansdowne Avenue, and
Sterling Road, as well as the West Toronto
Railpath on the Kitchener GO Rail Corridor.
• Connections with local transit routes to
provide good station access for transferring
passengers, including the 47 Lansdowne bus
32
Bloor-Lansdowne GO Station
Emerging Station Concept
• Critical link between GO RER and the TTC Line
2 subway at Lansdowne Station
• Access from both sides of the rail corridor,
including extension of the Greenway Multi-
Use Path to connect with the West Toronto
Railpath south of Dundas Street.
• Linkages with surrounding roadways,
including Bloor Street West, Lansdowne
Avenue, and Sterling Road, as well as the
West Toronto Railpath on the Kitchener GO
Rail Corridor.
• Connections with local transit routes to
provide good station access for transferring
passengers, including the 47 Lansdowne bus.
33
St. Clair-Old Weston SmartTrack Station
Initial Business Case
• Track realignment
• Signal upgrades
• Island platform – track geometry limits
location
• Rail bridge widening
• Road / rail grade separations
• Passenger pick-up/drop-off facilities
• Bus loop
• Pedestrian and/or cycling bridges or tunnels
St. Clair-Old Weston SmartTrack Station
Refined Functional Design
• Access from both sides of the rail corridor.
• Good linkages with surrounding roadways
including St. Clair Avenue West and Union
Street.
• Connections with local transit routes to
provide good station access for transferring
passengers, including 512 St. Clair streetcar.
• Station planning and design is being
integrated with the St. Clair Transportation
Master Plan (TMP) projects
– Widening of St. Clair Avenue West
– Extensions of Keele Street, Davenport
Road and Gunns Road
34
St. Clair-Old Weston SmartTrack Station
Emerging Station Concept
• Access from both sides of the rail corridor.
• Good linkages with surrounding roadways
including St. Clair Avenue West and Union
Street.
• Connections with local transit routes to
provide good station access for transferring
passengers, including 512 St. Clair streetcar.
• Station planning and design is being
integrated with the St. Clair Transportation
Master Plan (TMP) projects
– Widening of St. Clair Avenue West
– Extensions of Keele Street, Davenport
Road and Gunns Road
35
Discussion Topics
COMMUNITY
CONTEXT
CHALLENGES
OPPORTUNITIES
NEXT STEPS
What will the new stations mean for the future
of your community and the transit network?
What issues or challenges may be encountered
with the introduction of the new station in
your community?
How can the station best be integrated into
your community?
Is there anything else you would like to add?
36
Next Meeting (Early 2018)
37
• Refined station concept plans
• Existing environmental conditions
– Natural environment
– Socio-economic environment
– Cultural environment
• Potential impacts and mitigation measures
Share Your Thoughts and Stay Involved
City of Toronto
email: SmartTrack@toronto.ca
tel: 416-338-2848
fax: 416-392-1591
website: www.smarttrack.to
Metrolinx
email: newstations@metrolinx.com
tel: 416-202-5589
website: www.metrolinx.com/newstations
INew Stations
Thank You

Más contenido relacionado

La actualidad más candente

All about fertilizers - Case study of Pakistan
All about fertilizers - Case study of Pakistan All about fertilizers - Case study of Pakistan
All about fertilizers - Case study of Pakistan Asma Akbar
 
SPACE 22 Destruction ou rénovation des prairies - comment se passer du glyph...
SPACE 22  Destruction ou rénovation des prairies - comment se passer du glyph...SPACE 22  Destruction ou rénovation des prairies - comment se passer du glyph...
SPACE 22 Destruction ou rénovation des prairies - comment se passer du glyph...Institut de l'Elevage - Idele
 
Effect of phosphorus build up on the availabiilty of Zinc in soil in a rice b...
Effect of phosphorus build up on the availabiilty of Zinc in soil in a rice b...Effect of phosphorus build up on the availabiilty of Zinc in soil in a rice b...
Effect of phosphorus build up on the availabiilty of Zinc in soil in a rice b...P.K. Mani
 
Agronomic biofortification of crops with zinc and iron by Vajinder Pal Kalra
Agronomic biofortification of crops with zinc and iron by Vajinder Pal KalraAgronomic biofortification of crops with zinc and iron by Vajinder Pal Kalra
Agronomic biofortification of crops with zinc and iron by Vajinder Pal Kalravajinder kalra
 
Mobile communication systems Introduction
Mobile communication systems IntroductionMobile communication systems Introduction
Mobile communication systems IntroductionNevil Dsouza
 
Nutrient Status and Disorders in Pineapple
Nutrient Status and Disorders in Pineapple Nutrient Status and Disorders in Pineapple
Nutrient Status and Disorders in Pineapple DiwasBhugai1
 
Wi fi ppt project by Mubeen Momin
Wi fi ppt project by Mubeen MominWi fi ppt project by Mubeen Momin
Wi fi ppt project by Mubeen Mominmubeenm50
 
Fertilizers classification By Mr Allah Dad Khan Visiting Professor the Univer...
Fertilizers classification By Mr Allah Dad Khan Visiting Professor the Univer...Fertilizers classification By Mr Allah Dad Khan Visiting Professor the Univer...
Fertilizers classification By Mr Allah Dad Khan Visiting Professor the Univer...Mr.Allah Dad Khan
 
Role of Forestry in Climate Change
Role of Forestry in Climate ChangeRole of Forestry in Climate Change
Role of Forestry in Climate ChangeACX
 

La actualidad más candente (20)

All about fertilizers - Case study of Pakistan
All about fertilizers - Case study of Pakistan All about fertilizers - Case study of Pakistan
All about fertilizers - Case study of Pakistan
 
Agroforestry
AgroforestryAgroforestry
Agroforestry
 
SPACE 22 Destruction ou rénovation des prairies - comment se passer du glyph...
SPACE 22  Destruction ou rénovation des prairies - comment se passer du glyph...SPACE 22  Destruction ou rénovation des prairies - comment se passer du glyph...
SPACE 22 Destruction ou rénovation des prairies - comment se passer du glyph...
 
Effect of phosphorus build up on the availabiilty of Zinc in soil in a rice b...
Effect of phosphorus build up on the availabiilty of Zinc in soil in a rice b...Effect of phosphorus build up on the availabiilty of Zinc in soil in a rice b...
Effect of phosphorus build up on the availabiilty of Zinc in soil in a rice b...
 
WIFI TECHNOLOGY
WIFI TECHNOLOGYWIFI TECHNOLOGY
WIFI TECHNOLOGY
 
wifi ppt
wifi pptwifi ppt
wifi ppt
 
Conservation agriculture cover crops
Conservation agriculture cover cropsConservation agriculture cover crops
Conservation agriculture cover crops
 
Organic Manures
Organic ManuresOrganic Manures
Organic Manures
 
Agronomic biofortification of crops with zinc and iron by Vajinder Pal Kalra
Agronomic biofortification of crops with zinc and iron by Vajinder Pal KalraAgronomic biofortification of crops with zinc and iron by Vajinder Pal Kalra
Agronomic biofortification of crops with zinc and iron by Vajinder Pal Kalra
 
Mobile communication systems Introduction
Mobile communication systems IntroductionMobile communication systems Introduction
Mobile communication systems Introduction
 
Nutrient Status and Disorders in Pineapple
Nutrient Status and Disorders in Pineapple Nutrient Status and Disorders in Pineapple
Nutrient Status and Disorders in Pineapple
 
Wi fi ppt project by Mubeen Momin
Wi fi ppt project by Mubeen MominWi fi ppt project by Mubeen Momin
Wi fi ppt project by Mubeen Momin
 
Mobile computing
Mobile computingMobile computing
Mobile computing
 
3. Soil Organic Matter
3. Soil Organic Matter3. Soil Organic Matter
3. Soil Organic Matter
 
Introduction to fertilizer recommendation and fertilizer blending use cases: ...
Introduction to fertilizer recommendation and fertilizer blending use cases: ...Introduction to fertilizer recommendation and fertilizer blending use cases: ...
Introduction to fertilizer recommendation and fertilizer blending use cases: ...
 
Soil Organic Carbon
Soil Organic CarbonSoil Organic Carbon
Soil Organic Carbon
 
Research Paper on Vermiculture and Vermicomposting
Research Paper on Vermiculture and Vermicomposting  Research Paper on Vermiculture and Vermicomposting
Research Paper on Vermiculture and Vermicomposting
 
Nutrient mining
Nutrient miningNutrient mining
Nutrient mining
 
Fertilizers classification By Mr Allah Dad Khan Visiting Professor the Univer...
Fertilizers classification By Mr Allah Dad Khan Visiting Professor the Univer...Fertilizers classification By Mr Allah Dad Khan Visiting Professor the Univer...
Fertilizers classification By Mr Allah Dad Khan Visiting Professor the Univer...
 
Role of Forestry in Climate Change
Role of Forestry in Climate ChangeRole of Forestry in Climate Change
Role of Forestry in Climate Change
 

Similar a SmartTrack Public Meeting Presentation

Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Crosstown TO
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Adina Levin
 
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceToronto Public Consultation Unit
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house Crosstown TO
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation Crosstown TO
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open houseCrosstown TO
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesAdina Levin
 

Similar a SmartTrack Public Meeting Presentation (20)

February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
Scarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 PresentationScarborough Subway Extension - Phase 2 Presentation
Scarborough Subway Extension - Phase 2 Presentation
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Coordinated Transit Planning in Toronto
Coordinated Transit Planning in TorontoCoordinated Transit Planning in Toronto
Coordinated Transit Planning in Toronto
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
 
SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015SmartTrack Presentation - June, 2015
SmartTrack Presentation - June, 2015
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
Toronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting PresentationToronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting Presentation
 
Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17Mt view tcmp community_meeting_2-02-17
Mt view tcmp community_meeting_2-02-17
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
 
SmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network PlanningSmartTrack Presentation- Toronto Transit Network Planning
SmartTrack Presentation- Toronto Transit Network Planning
 
15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation15-03 Relief Line Public Meeting Presentation
15-03 Relief Line Public Meeting Presentation
 
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of ReferenceScarborough Subway Extension Project Assessment - Draft Terms of Reference
Scarborough Subway Extension Project Assessment - Draft Terms of Reference
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open house
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanes
 
Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016Scarborough Transit Town Hall - April 23, 2016
Scarborough Transit Town Hall - April 23, 2016
 

Más de Toronto Public Consultation Unit

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides Toronto Public Consultation Unit
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Toronto Public Consultation Unit
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)Toronto Public Consultation Unit
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 

Más de Toronto Public Consultation Unit (20)

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
Waterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display PanelsWaterfront Transit Reset Phase 2 Display Panels
Waterfront Transit Reset Phase 2 Display Panels
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
 
General information
General informationGeneral information
General information
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards Scarborough Subway TPAP Boards
Scarborough Subway TPAP Boards
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
Scarborough Subway TPAP PIC
Scarborough Subway TPAP PICScarborough Subway TPAP PIC
Scarborough Subway TPAP PIC
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Downsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study BoardsDownsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study Boards
 

Último

Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...kajalverma014
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)NAP Global Network
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...kumargunjan9515
 
Bhubaneswar Call Girls Chandrashekharpur 👉👉 9777949614 Top Class Call Girl S...
Bhubaneswar Call Girls Chandrashekharpur  👉👉 9777949614 Top Class Call Girl S...Bhubaneswar Call Girls Chandrashekharpur  👉👉 9777949614 Top Class Call Girl S...
Bhubaneswar Call Girls Chandrashekharpur 👉👉 9777949614 Top Class Call Girl S...Call Girls Mumbai
 
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...kumargunjan9515
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s educationSERUDS INDIA
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...HyderabadDolls
 
Call Girl Service in West Tripura 9332606886Call Girls Advance Cash On Deliv...
Call Girl Service in West Tripura  9332606886Call Girls Advance Cash On Deliv...Call Girl Service in West Tripura  9332606886Call Girls Advance Cash On Deliv...
Call Girl Service in West Tripura 9332606886Call Girls Advance Cash On Deliv...ruksarkahn825
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCNAP Global Network
 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...HyderabadDolls
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberSareena Khatun
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehousesubs7
 
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberSareena Khatun
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.Christina Parmionova
 
Our nurses, our future. The economic power of care.
Our nurses, our future. The economic power of care.Our nurses, our future. The economic power of care.
Our nurses, our future. The economic power of care.Christina Parmionova
 
Bhubaneswar Call Girls Patia 👉👉 9777949614 Top Class Call Girl Service Avai...
Bhubaneswar Call Girls Patia  👉👉 9777949614  Top Class Call Girl Service Avai...Bhubaneswar Call Girls Patia  👉👉 9777949614  Top Class Call Girl Service Avai...
Bhubaneswar Call Girls Patia 👉👉 9777949614 Top Class Call Girl Service Avai...Call Girls Mumbai
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learningNAP Global Network
 

Último (20)

Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
Cheap Call Girls In Hyderabad Phone No 📞 9352988975 📞 Elite Escort Service Av...
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
 
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...Call Girl Service in Korba   9332606886  High Profile Call Girls You Can Get ...
Call Girl Service in Korba 9332606886 High Profile Call Girls You Can Get ...
 
Bhubaneswar Call Girls Chandrashekharpur 👉👉 9777949614 Top Class Call Girl S...
Bhubaneswar Call Girls Chandrashekharpur  👉👉 9777949614 Top Class Call Girl S...Bhubaneswar Call Girls Chandrashekharpur  👉👉 9777949614 Top Class Call Girl S...
Bhubaneswar Call Girls Chandrashekharpur 👉👉 9777949614 Top Class Call Girl S...
 
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
Call Girls AS Rao Nagar - 8250092165 Our call girls are sure to provide you w...
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
Call Girl Service in West Tripura 9332606886Call Girls Advance Cash On Deliv...
Call Girl Service in West Tripura  9332606886Call Girls Advance Cash On Deliv...Call Girl Service in West Tripura  9332606886Call Girls Advance Cash On Deliv...
Call Girl Service in West Tripura 9332606886Call Girls Advance Cash On Deliv...
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
Nagerbazar @ Independent Call Girls Kolkata - 450+ Call Girl Cash Payment 800...
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
 
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie WhitehouseTime, Stress & Work Life Balance for Clerks with Beckie Whitehouse
Time, Stress & Work Life Balance for Clerks with Beckie Whitehouse
 
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Umbergaon / 8250092165 Genuine Call girls with real Photos and Number
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
tOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTRtOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTR
 
Our nurses, our future. The economic power of care.
Our nurses, our future. The economic power of care.Our nurses, our future. The economic power of care.
Our nurses, our future. The economic power of care.
 
Bhubaneswar Call Girls Patia 👉👉 9777949614 Top Class Call Girl Service Avai...
Bhubaneswar Call Girls Patia  👉👉 9777949614  Top Class Call Girl Service Avai...Bhubaneswar Call Girls Patia  👉👉 9777949614  Top Class Call Girl Service Avai...
Bhubaneswar Call Girls Patia 👉👉 9777949614 Top Class Call Girl Service Avai...
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 

SmartTrack Public Meeting Presentation

  • 2. Purpose of Today’s Meeting  City, Metrolinx and TTC are working in partnership on planning/design of 6 new SmartTrack and 2 new GO stations in Toronto.  This is the first round of Public and Stakeholder Consultation for the new stations.  Today, we will provide an overview of the station concept schematics and environmental studies that are part of the Transit Project Assessment Process for the stations.  We would like your comments on the proposed approach - such as opportunities that the new stations provide and how the stations can be integrated within the local community. 2
  • 3. Today’s Meeting Agenda 1. Project Overview – Background, Process and Timeline 2. Schematic Station Concepts 3. Questions / Discussion 3
  • 4. Our Rapid Transit Network Today 4
  • 5. Our Future Rapid Transit Network 5
  • 6. What is SmartTrack? SmartTrack includes: • Rapid transit along 3 GO rail corridors (Kitchener, Lakeshore East, Stouffville) and along Eglinton Avenue West (Eglinton West LRT) • 14 rail stations and 8-12 LRT stops, when the existing/planned rail stations and the Eglinton West LRT are taken into account SmartTrack benefits: • Better use of the existing rail infrastructure along these GO rail corridors in Toronto • More rapid transit for Toronto residents and businesses • All-day two-way service, with trains every 6-10 minutes during peak periods and every 15 minutes during off-peak periods • Faster and quieter electric trains • Fare integration 6 SmartTrack increases transit options for Toronto by making better use of the existing GO rail corridors, while additional, longer-term investments to increase transit capacity across the city are being planned.
  • 7. What is Regional Express Rail (RER)? 7 The RER program will bring fast, two-way, all-day GO service to provincially owned rail corridors. Metrolinx is currently implementing the RER program, including track and station upgrades. Metrolinx is transforming the GO rail system to provide: • Twice the number of trips during weekday rush-hour periods. • Four times the number of trips at other times. • Line extensions to new communities.
  • 9. Transit Project Assessment Process The City and Metrolinx are undertaking a Transit Project Assessment Process (TPAP) under Ontario Regulation 231/08 to assess the potential environmental effects of each of the new stations. • Public and stakeholder consultation will be an important component of this process. • Existing environmental conditions will be determined and the significance of specific features will be evaluated. • Potential impacts of the project on these features will be identified and documented. • Appropriate mitigation measures, monitoring strategies and future studies will be recommended. 9 Early 2018 On-going Fall 2017 Mid 2018 Late 2018 Station Planning and Design Document Existing Conditions Assessment Potential Impacts Public and Stakeholder Consultation City Council authorization to advance Public and Stakeholder Consultation City Council authorization to advance TPAP Notice of Commencement Public and Stakeholder Consultation TPAP Notice of Completion RFP for Procurement WE ARE HERE
  • 10. New SmartTrack and GO Stations in Toronto 10 • The new SmartTrack/ GO stations build upon the RER program. • Within Toronto, 6 new SmartTrack stations are planned for the Stouffville/Lakeshore East and Kitchener GO rail corridors and 2 new GO stations are planned for the Barrie GO rail corridor.
  • 11. Overview of Station Schematics Station Planning Considerations: • Platform and station access locations • Connectivity with TTC surface transit routes • Accessible transit pick up/drop off • Pedestrian and cyclist access and local circulation • Coordination with related studies and potential infrastructure improvements, for example: 11 – East Harbour Station with the Unilever Precinct Planning Study – East Harbour and Gerrard-Carlaw Stations with the Relief Line Project Assessment – St.Clair-Old Weston Station with St. Clair Transportation Master Plan – Bloor-Lansdowne Station and King-Liberty with West Toronto Railpath extensions – Lawrence-Kennedy and Finch-Kennedy stations with Scarborough Subway Extension – Rail Deck Park at Spadina-Front Station • Partnerships and property impacts for station elements and opportunities for integrated station development existing/planned stations
  • 12. Finch-Kennedy SmartTrack Station • Will focus on integration with TTC buses Initial Business Case • Station design needs to be coordinated with the Finch Avenue grade separation • Ensure high-quality entrance at Finch Avenue for transferring passengers – Provide direct connection to surface transit routes – Refine number and location of bus bays • Improve pedestrian, cycling and transit access to the station • City Planning not supportive of PPUDO and Commuter Parking lot • Provide adequate and convenient bicycle facilities at the station • Provide accessible access in close proximity to station entrance • Determine location for access roads serving the station and surrounding area 12
  • 13. Finch-Kennedy SmartTrack Station Refined Functional Design • New grade separation – road under rail. • Direct link for one of the busiest bus corridors in Ontario. • Access from both sides of the rail corridor. • Good linkages with Finch Avenue East. • Connections with local transit routes to provide good station access for transferring passengers, including the 39 Finch East and 199 Finch Rocket buses. • Need and location for an access road serving the station 13
  • 14. Finch-Kennedy SmartTrack Station Emerging Station Concept • Critical rapid transit link for one of the busiest local bus corridors in Ontario. • New grade separation – road under rail. • Access from both sides of the rail corridor. • Good linkages with Finch Avenue East. • Connections with local transit routes to provide good station access for transferring passengers, including the 39 Finch East and 199 Finch Rocket buses. • Minimized impact on stable residential neighbourhood south of Finch • Platform shifted northward to minimize impact on stable residential neighbourhood south of Finch 14 To be determined: • Design and location of future access road serving the station and surround area
  • 15. Lawrence-Kennedy SmartTrack Station • Will replace existing Lawrence East Station • Will focus on integration with TTC buses Initial Business Case • Improve entrance at Lawrence Avenue for transferring passengers • Improve pedestrian, cycling and transit access to the station • City Planning not supportive of PPUDO and Commuter Parking lot • Ensure adequate and convenient bicycle facilities at the station • Provide accessible access in close proximity to main station entrance • Shift platform northward to better connect to future development opportunities, and minimize impacts on existing residential properties • Coordinate construction with the future decommissioning of Line 3 Lawrence East *Initial business case being reviewed by Metrolinx
  • 16. Lawrence-Kennedy SmartTrack Station Refined Functional Design • Better connections to the north – additional station entrance • Minimize residential property impact to the south • Station will straddle Lawrence Avenue East and have access from both sides of the rail corridor. • Direct connection with Lawrence Avenue East for transit transfers 16
  • 17. Lawrence-Kennedy SmartTrack Station Emerging Station Concept • Improved station access • Minimize property impact • Direct connection with Lawrence Avenue East for transit transfers To be determined: 1. Station Phasing with Line 3 2. Local Street Network 3. Integration with Development 17 Station is being reviewed by Metrolinx
  • 18. Gerrard-Carlaw SmartTrack Station Initial Business Case • Platforms located between Logan and Carlaw • Entrances at either end of platforms • Bus Terminal • Passenger pick-up and drop-off facility • Connection to Relief Line and 506 Streetcar 18
  • 19. Gerrard-Carlaw SmartTrack Station Refined Functional Design • Platforms shifted north – between Pape and Carlaw • Access from both sides of the rail corridor, with good linkages to surrounding roadways including Carlaw Street, Gerrard Street East and Pape Avenue • Improvements to the pedestrian/cycling bridge at Pape are being planned as part of station • Connections with local transit routes to provide good station access for transferring passengers 19
  • 20. Gerrard-Carlaw SmartTrack Station Emerging Station Concept • Three station accesses with good connections to Carlaw Street, Gerrard Street East and Pape Avenue • Improvements to the pedestrian/cycling bridge at Pape are being planned as part of station • Being planned as future interchange station with Relief Line subway • Connections are planned with local transit routes to provide good station access for transferring passengers, including the 506 Carlton and 505 Dundas streetcars, and the 72 Pape bus 20 Further consideration needed: Location/design of accessible pick- up and drop-off
  • 21. East Harbour SmartTrack Station Initial Business Case • Integration with the development of adjacent lands • Rail corridor and bridge expansion • Flood protection and Don River re-naturalization • Good connection to Relief Line and Broadview streetcar extension • Pedestrian and cycling connections • Coordination with Gardiner Expressway reconfiguration 21
  • 22. East Harbour SmartTrack Station Refined Functional Design • Planning and design of the station is being integrated with the Unilever Precinct Planning Study. • Station will provide rapid transit access to serve emerging major employment node for 50,000+ new jobs. • The main station entrance will be from Broadview Avenue extension, including Broadview Streetcar. • Station is being planned with excellent connections to the proposed Relief Line subway station at Broadview Avenue and Eastern Avenue. 22
  • 23. East Harbour SmartTrack Station Emerging Station Concept • Planning and design of the station is being integrated with the Unilever Precinct Planning Study. • Station will provide rapid transit access to serve emerging major employment node for 50,000+ new jobs. • Multiple station entrances, including from Broadview Avenue extension and west side of Don River. • Station is being planned with excellent connections to the proposed Relief Line subway station at Broadview Avenue and Eastern Avenue. 23
  • 24. 24 Spadina-Front GO Station Initial Business Case • Centre-platform serving Barrie Corridor • Two access points to Front Street, including primary entrance at Front and Spadina • Potential for platform access from Puente de Luz bridge • Relocation of existing above ground utilities
  • 25. 25 Spadina-Front GO Station Refined Functional Design • Expected to be a busy destination station. • Access from both sides of the rail corridor. • Linkages with surrounding roadways including Front Street West, Spadina Avenue, and Bathurst Street. • Connections with local transit routes to provide good station access for transferring passengers, including the 510 Spadina streetcar. • Planning and design of the station is being coordinated with the City's proposed Rail Deck Park.
  • 26. 26 Spadina-Front GO Station Emerging Station Concept • Expected to be a busy destination station. • Access from both sides of the rail corridor. • Linkages with surrounding roadways including Front Street West, Spadina Avenue, and Bathurst Street. • Connections with local transit routes to provide good station access for transferring passengers, including the 510 Spadina streetcar. • Planning and design of the station is being coordinated with the City's proposed Rail Deck Park.
  • 27. King-Liberty SmartTrack Station Initial Business Case • Track realignment • Signal upgrades • Pedestrian and/or cycling bridges or tunnels • Repurposing an existing heritage building as a passenger services building 27
  • 28. King-Liberty SmartTrack Station Refined Functional Design • Access from both sides of the rail corridor – Extension of the planned West Toronto Railpath – New overpass of the rail corridor (King Highline) – Connections with the Exhibition GO Station. • Good linkages with surrounding roadways, including King Street West and Sudbury Street. • Connections with local transit routes to provide good station access for transferring passengers, including the 504 King and 501 Queen streetcars. 28
  • 29. 29 King-Liberty SmartTrack Station Emerging Station Concept • Access from both sides of the rail corridor – Extension of the planned West Toronto Railpath – New overpass of the rail corridor (King Highline) – Connections with the Exhibition GO Station. • Good linkages with surrounding roadways, including King Street West and Sudbury Street. • Connections with local transit routes to provide good station access for transferring passengers, including the 504 King and 501 Queen streetcars.
  • 30. Bloor-Lansdowne GO Station Initial Business Case • Double tracking and track realignment • Bloor St. bridge widening • Minimum width edge platforms • Pedestrian and cycling connections, including north-south multi-use path • Passenger pick-up and drop off on Value Village site 30
  • 31. 31 Bloor-Lansdowne GO Station Refined Functional Design • Critical link between GO RER and the TTC Line 2 subway at Lansdowne Station • Access from both sides of the rail corridor, including extension of the Greenway Multi- Use Path to connect with the West Toronto Railpath south of Dundas Street. • Linkages with surrounding roadways, including Bloor Street West, Lansdowne Avenue, and Sterling Road, as well as the West Toronto Railpath on the Kitchener GO Rail Corridor. • Connections with local transit routes to provide good station access for transferring passengers, including the 47 Lansdowne bus
  • 32. 32 Bloor-Lansdowne GO Station Emerging Station Concept • Critical link between GO RER and the TTC Line 2 subway at Lansdowne Station • Access from both sides of the rail corridor, including extension of the Greenway Multi- Use Path to connect with the West Toronto Railpath south of Dundas Street. • Linkages with surrounding roadways, including Bloor Street West, Lansdowne Avenue, and Sterling Road, as well as the West Toronto Railpath on the Kitchener GO Rail Corridor. • Connections with local transit routes to provide good station access for transferring passengers, including the 47 Lansdowne bus.
  • 33. 33 St. Clair-Old Weston SmartTrack Station Initial Business Case • Track realignment • Signal upgrades • Island platform – track geometry limits location • Rail bridge widening • Road / rail grade separations • Passenger pick-up/drop-off facilities • Bus loop • Pedestrian and/or cycling bridges or tunnels
  • 34. St. Clair-Old Weston SmartTrack Station Refined Functional Design • Access from both sides of the rail corridor. • Good linkages with surrounding roadways including St. Clair Avenue West and Union Street. • Connections with local transit routes to provide good station access for transferring passengers, including 512 St. Clair streetcar. • Station planning and design is being integrated with the St. Clair Transportation Master Plan (TMP) projects – Widening of St. Clair Avenue West – Extensions of Keele Street, Davenport Road and Gunns Road 34
  • 35. St. Clair-Old Weston SmartTrack Station Emerging Station Concept • Access from both sides of the rail corridor. • Good linkages with surrounding roadways including St. Clair Avenue West and Union Street. • Connections with local transit routes to provide good station access for transferring passengers, including 512 St. Clair streetcar. • Station planning and design is being integrated with the St. Clair Transportation Master Plan (TMP) projects – Widening of St. Clair Avenue West – Extensions of Keele Street, Davenport Road and Gunns Road 35
  • 36. Discussion Topics COMMUNITY CONTEXT CHALLENGES OPPORTUNITIES NEXT STEPS What will the new stations mean for the future of your community and the transit network? What issues or challenges may be encountered with the introduction of the new station in your community? How can the station best be integrated into your community? Is there anything else you would like to add? 36
  • 37. Next Meeting (Early 2018) 37 • Refined station concept plans • Existing environmental conditions – Natural environment – Socio-economic environment – Cultural environment • Potential impacts and mitigation measures Share Your Thoughts and Stay Involved City of Toronto email: SmartTrack@toronto.ca tel: 416-338-2848 fax: 416-392-1591 website: www.smarttrack.to Metrolinx email: newstations@metrolinx.com tel: 416-202-5589 website: www.metrolinx.com/newstations