MoonMesh is a lunar communication initiative addressing challenges in mission scenarios. Leveraging LoRaWAN mesh networks, it aims to enhance surface-to-surface, surface-to-orbit, and Earth communication. With a three-year development plan, the project prioritizes robust design, risk mitigation, budgeting, and stakeholder engagement for successful lunar connectivity.
3. MISSION
Empower lunar missions, research endeavors, and future
lunar habitats through cutting-edge communication
solutions, seamlessly linking the Moon with Earth and
propelling humanity into new realms of discovery
MoonMesh
4. LACK OF DEDICATED LUNAR
COMMUNICATION INFRASTRUCTURE
Earth Reliance
Strain
Lunar missions strained by
reliance on Earth-based
communication, causing delays
and limiting real-time data
transfer.
Scaling Hurdles
Absence of lunar infrastructure
hampers scalability, restricting
simultaneous missions and
collaborative exploration.
Terrain
Communication Limits
Current infrastructure struggles
with lunar terrain, creating
communication barriers and
reducing coverage on the
Moon.
MoonMesh
5. SOLUTION STATEMENT
MoonMesh addresses the critical gap in lunar
communication infrastructure by deploying an innovative
and robust LoRaWAN-based network across the lunar
surface. Leveraging advanced satellite technology and
ground station mobility, MoonMesh provides seamless
connectivity through the power-efficient LoRaWAN
protocol. Our solution transforms lunar exploration by
enabling real-time data transmission, reliable mission
control, and fostering global collaboration in the cosmos.
MoonMesh
8. COMMUNICATION POSSIBILITIES
• Telemetry Data Transmission
• Remote Command and Control
• Scientific Instrument Data Collection
• Lunar Rover Communication
• Environmental Monitoring
• Inter-base Communication
• Resource Management
• Collaborative Research Data Exchange
• Emergency Communication
• Navigation and Localization
• Real-time Monitoring of Lunar Habitat
• Payload Data Transmission
• Autonomous Mission Control
MoonMesh
10. PLAN FOR PRODUCT LAUNCH
PLANNING
Clearly define
mission goals.
DESIGN
Develop technical
specifications.
RISK
Identify and mitigate
challenges
BUDGET
Plan financial
resources
STAKEHOLDE
RS
Engage and obtain
approvals
MoonMesh
11. TIMELINE - 2025
Q1
Q2
Q3
Q4
1. Planning and Preliminary Development
2. Identify Potential Collaborators and Partners
1. Prepare a Detailed Mission Proposal
2. Engage with Space Agencies and Relevant
Authorities
1. Seek Funding Opportunities
2. Collaborate with Commercial Space Companies
Secure Launch Agreements
MoonMesh
12. MEET OUR TEAM
Umair Iftikhar
President
Muhammad Asif
Chief T echnolog y
Of f icer
Maimoona
Chief O perations
Of f icer
Abubakar
Developm ent Lead
MoonMesh