DURATION:01-07-2015 to 28-07-2015
AT
Kanti Bijlee Utpadan Nigam Limited
(A Subsidiary of NTPC)
Kanti, Muzaffarpur, Bihar
By- VIMAL VAIBHAV
vmleee@gmail.com
RIT Roorkee
Formerly
• Vaishali Power Generating Company Limited.(VPGCL)
• Owned by “Bihar State Electricity Board”
Currently
• Kanti Bijlee Utpadan Nigam Limited. (KBUN)
• A joint venture of NTPC (64.57%) and BSEB (35.43%)
Features
• It is totally coal fired thermal power station.
Capacity
• There are two units in stage-I each of 110MW under operation.
• Stage-II having capacity of 2x195MW is at stage of completion.
Coal to
Steam
Steam to
Mechanical
Power
Power
Generation
The coal is unloaded either manually or with the help of
wagon tippler into the hopper to the conveyer belt.
Coal is passed through metal detectors in order to remove
metals present in coal.
Stones from coal is removed manually in its journey
through conveyer belt.
Then the coal is passed through vibrating screen where
coal of 5mm is separated from large coals.
Then coal is crushed in crusher and passed through metal
detectors to remove iron particles.
Coal is then supplied from coal bunker to pulverizing mill.
Coal dust comes out of this mill.(KBUNL have ball mills)
At KBUNL water tube boiler is employed for steam generation.
Fuel is burnt in furnace . The pulverized coal is dried by P.A fans and
secondary air is provided by F.D fan for pulverized coal combustion in
the furnace.
Water from boiler is passed through the down comers to the bottom
ring header. From bottom ring header water goes to water walls for
heat absorption and conversion in to steam.
Bottom of furnace is open to allow ash/clinkers to fall freely in to the
bottom ash hopper. And flue gas is used in economizer and reheaters.
Then it is discharged with the help of I.D fan in to atmosphere.
High pressure
turbine
• It is of single
flow design with
eight stages of
blading.
• Each stage has
moving and
stationary
blades.
• Superheated
steam(at 1100⁰c)
from boiler drum
enters in to it.
Intermediate
pressure turbine
• Double flow design
with seven stages
of blading .
• Each stage has
moving and
stationary blades.
• Reheated steam(at
535⁰ c) from H.P
turbine outlet
enters in to it.
Low pressure turbine
• It is also of double flow
design with 6 stages in
front and rear flow
paths.
• Each stage has moving
and stationary blades.
• Stem out of I.P. turbine
directly enters in to it.
Rating Continuous
Active Output 110 MW
Rated Voltage 11000 +/- 5%V
Rated Current 7220 A
Power Factor 0.8 Lagging
Frequency 50 Hz
Excitation System Static type
Field Current at
Rated Output
1335 A
Type of Cooling
System
Hydrogen Cooled
Hydrogen Pressure 2 Ata
No. of H₂ Cooled
Elements
06
Cooling Medium for
H₂
Soft water
 Mechanical power produced at the shaft of
the turbine is used to rotate rotor.
 Rotating Magnetic flux produced by rotor
cuts stator conductor flux and from
electromagnetic induction, electricity is
produced .
 Rotor runs at 3000 rpm, produces 3-phase
voltage at 11kv , and of 50 HZ frequency.
 Oil shielded hydrogen is used for the cooling
purpose of generator.
KBUNL has a capacity to generate 220 MW of
electricity but only one unit is working and
another is under R&M process. 90 MW is
generated out of 110 MW.
The transmission is done through 3-
phase , double circuit system.
With the help of station transformer 11kv
is step up to 220 kv and fed to substation.
Relay circuit
• A protective device that operate during faulty condition and
gives command to circuit breaker to trip. Mainly the
electromagnetic induction relays are used.
Fault Locator
By comparing voltage and current the relay measures the line
impedance up to the point of fault and locate the position of
fault from the previous knowledge of line impedance.
Switchgear
• Switches used in substation for making or breaking the
electrical contacts in convenient way. There are two type of
switches air switch and oil switch.
It is the brain of any substation. All necessary steps about
Transmission , protection, Charging etc. are carried out in the
control room.
Measuring instruments of the control room:-
Voltmeter and Ammeter
• As the names imply they are used for measuring voltage
and current respectively.
Power meter
• Used to measure the power in standard unit of MW or KW.
Circuit screen
• A computer arrangement in which current information
about transmission line is seen.
Battery room
Consists of several batteries and chargers for
emergency purpose.
It consists of following equipments :-
Transformer
• The autotransformer used in power station. It has three
windings primary, secondary and tertiary. The 220kv voltage
is fed as input to primary by step down 132kv fed to KBUNL as
input.
Circuit Breaker (SF6 at KBUNL)
• Used for closing or opening an electrical circuit under normal or
abnormal conditions. These circuit breakers are equipped with
trip coil connected to relay, design to open breaker
automatically
Tower
• We have suspension type tower called as ‘A’ type tower. The
peak point angle is 0⁰ to 2⁰. In this type conductor is
suspended with an insulator. Guard ring Is used to balance
the capacitive current in transmission lines.
Current transformer
• Used to measure the current level such that it can be control
easily.
Bus isolators
• Used to isolate bus bars.
Lightning arrestor
• Used to protect the transmission line and connected
equipment during lightening .
Wave Trap
Wave trap which changes the frequency 50Hz to 500Hz can be
used for communicate between power plants.
Why cylindrical pipes are used in switchyard instead
of wire conductor ?
Why cylindrical pipes are used in switchyard instead
of wire conductor ?
Because of following purpose :-
•Safety.
•Reduce Ferranti Effect.
•Reduce the effect of vibration during opening and closing of
circuit breakers and isolators.
Why motor is used to rotate the shaft of turbine, when
the turbine is not in operation?
Why motor is used to rotate the shaft of turbine, when
the turbine is not in operation?
This is because in case of any fault if
production of plants stops then bearing
motor rotates rotor shaft of turbine
continuously at 65 rpm. This is because if
shaft doesn’t rotate then due to load it may
bend.
THANK
YOU
By- VIMAL VAIBHAV
vmleee@gmail.com
RIT Roorkee

Más contenido relacionado

La actualidad más candente

NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')Tejasvi Anant
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plantravi kant
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCADITYA ARYAN
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC SimhadriAshish Uppu
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,ReportMAHENDRA MEENA
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
panki thermal power plant presentation c&i.ppt
panki thermal power plant presentation c&i.pptpanki thermal power plant presentation c&i.ppt
panki thermal power plant presentation c&i.pptVikas Tiwari
 
power point presentation over thermal power plant
power point presentation over thermal power plantpower point presentation over thermal power plant
power point presentation over thermal power plantAnis Haider
 
Ntpc information
Ntpc informationNtpc information
Ntpc informationNTPC
 
Concentric Winding (EED)
Concentric Winding (EED)Concentric Winding (EED)
Concentric Winding (EED)Rajal Patel
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant vishal patel
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...Navin Pathak
 
thermal power plant NTPC singrauli
thermal power plant NTPC singrauli thermal power plant NTPC singrauli
thermal power plant NTPC singrauli Ram Narayan Shah
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadPawan Agrawal
 

La actualidad más candente (20)

NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
NTPC KORBA CHHATTISGARH coal to electricity by tejasvi anant (tan 90')
 
Ntpc training ppt
Ntpc training pptNtpc training ppt
Ntpc training ppt
 
kota thermal power plant
kota thermal power plantkota thermal power plant
kota thermal power plant
 
INTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPCINTERNSHIP REPORT NTPC
INTERNSHIP REPORT NTPC
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Ntpc
NtpcNtpc
Ntpc
 
Project Report on Industrial Summer Training at NTPC Simhadri
 Project Report on Industrial Summer Training at NTPC Simhadri Project Report on Industrial Summer Training at NTPC Simhadri
Project Report on Industrial Summer Training at NTPC Simhadri
 
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report Kalisindh Super  Thermal Power Plant,Jhalawar,Rajasthan ,Report
Kalisindh Super Thermal Power Plant,Jhalawar,Rajasthan ,Report
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
panki thermal power plant presentation c&i.ppt
panki thermal power plant presentation c&i.pptpanki thermal power plant presentation c&i.ppt
panki thermal power plant presentation c&i.ppt
 
power point presentation over thermal power plant
power point presentation over thermal power plantpower point presentation over thermal power plant
power point presentation over thermal power plant
 
Ntpc information
Ntpc informationNtpc information
Ntpc information
 
Concentric Winding (EED)
Concentric Winding (EED)Concentric Winding (EED)
Concentric Winding (EED)
 
TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant TPS training report Gandhinagar, coal base power plant
TPS training report Gandhinagar, coal base power plant
 
Training NTPC
Training NTPCTraining NTPC
Training NTPC
 
Steam turbine
Steam turbineSteam turbine
Steam turbine
 
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...Summer training report at uttpar pradesh rajay viduat utpadan          nigam ...
Summer training report at uttpar pradesh rajay viduat utpadan nigam ...
 
thermal power plant NTPC singrauli
thermal power plant NTPC singrauli thermal power plant NTPC singrauli
thermal power plant NTPC singrauli
 
Industrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC FaridabadIndustrial Training Report on NTPC Faridabad
Industrial Training Report on NTPC Faridabad
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 

Similar a KBUNL - NTPC KANTI MUZAFFARPUR BIHAR

GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training ReportUtsav Yagnik
 
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)Lakhan Vadher
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationShubhra Dhyani
 
Internship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power stationInternship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power stationmalikavita731
 
Internship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptxInternship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptxmalikavita731
 
Internship PPT final ukai thermal power station
Internship PPT final ukai thermal power stationInternship PPT final ukai thermal power station
Internship PPT final ukai thermal power stationmalikavita731
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYRohitashav Goyal
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationSaumyadip Moitra
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfDevesh54
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptAshutosh Srivastava
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportArijit Basu
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING Om Prakash
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plantNipak Banerjee
 
tps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptxtps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptxAnandNakum
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxShubhoDas5
 

Similar a KBUNL - NTPC KANTI MUZAFFARPUR BIHAR (20)

NTPC,muzaffarpur
NTPC,muzaffarpurNTPC,muzaffarpur
NTPC,muzaffarpur
 
thermal power station
thermal power stationthermal power station
thermal power station
 
ntpc khalgaon
ntpc khalgaonntpc khalgaon
ntpc khalgaon
 
GSECL Electrical branch Training Report
GSECL Electrical branch Training ReportGSECL Electrical branch Training Report
GSECL Electrical branch Training Report
 
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
 
IPGCL/PPCL Training presentation
IPGCL/PPCL Training presentationIPGCL/PPCL Training presentation
IPGCL/PPCL Training presentation
 
Internship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power stationInternship PPT final.pptx on ukai thermal power station
Internship PPT final.pptx on ukai thermal power station
 
Internship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptxInternship PPT ukai thermal power station .pptx
Internship PPT ukai thermal power station .pptx
 
Internship PPT final ukai thermal power station
Internship PPT final ukai thermal power stationInternship PPT final ukai thermal power station
Internship PPT final ukai thermal power station
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITY
 
ntpc
ntpcntpc
ntpc
 
Durgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentationDurgapur Projects Limited: Vocational training presentation
Durgapur Projects Limited: Vocational training presentation
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
 
Industrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation pptIndustrial summer training on 220 kv substation ppt
Industrial summer training on 220 kv substation ppt
 
WBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training ReportWBSETCL Subhash Gram 220KV Substation Training Report
WBSETCL Subhash Gram 220KV Substation Training Report
 
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
FEROZE GANDHI UNCHAHAR THERMAL POWER PLANT(NTPC UNCHAHAR) SUMMER TRAINING
 
ntpc ppt
ntpc pptntpc ppt
ntpc ppt
 
Vocational training at mejia thermal power plant
Vocational training at mejia thermal power plantVocational training at mejia thermal power plant
Vocational training at mejia thermal power plant
 
tps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptxtps 180150109049 180150109078.pptx
tps 180150109049 180150109078.pptx
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 

Último

VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 

Último (20)

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 

KBUNL - NTPC KANTI MUZAFFARPUR BIHAR

  • 1. DURATION:01-07-2015 to 28-07-2015 AT Kanti Bijlee Utpadan Nigam Limited (A Subsidiary of NTPC) Kanti, Muzaffarpur, Bihar By- VIMAL VAIBHAV vmleee@gmail.com RIT Roorkee
  • 2. Formerly • Vaishali Power Generating Company Limited.(VPGCL) • Owned by “Bihar State Electricity Board” Currently • Kanti Bijlee Utpadan Nigam Limited. (KBUN) • A joint venture of NTPC (64.57%) and BSEB (35.43%) Features • It is totally coal fired thermal power station. Capacity • There are two units in stage-I each of 110MW under operation. • Stage-II having capacity of 2x195MW is at stage of completion.
  • 4. The coal is unloaded either manually or with the help of wagon tippler into the hopper to the conveyer belt. Coal is passed through metal detectors in order to remove metals present in coal. Stones from coal is removed manually in its journey through conveyer belt. Then the coal is passed through vibrating screen where coal of 5mm is separated from large coals. Then coal is crushed in crusher and passed through metal detectors to remove iron particles. Coal is then supplied from coal bunker to pulverizing mill. Coal dust comes out of this mill.(KBUNL have ball mills)
  • 5.
  • 6. At KBUNL water tube boiler is employed for steam generation. Fuel is burnt in furnace . The pulverized coal is dried by P.A fans and secondary air is provided by F.D fan for pulverized coal combustion in the furnace. Water from boiler is passed through the down comers to the bottom ring header. From bottom ring header water goes to water walls for heat absorption and conversion in to steam. Bottom of furnace is open to allow ash/clinkers to fall freely in to the bottom ash hopper. And flue gas is used in economizer and reheaters. Then it is discharged with the help of I.D fan in to atmosphere.
  • 7.
  • 8.
  • 9. High pressure turbine • It is of single flow design with eight stages of blading. • Each stage has moving and stationary blades. • Superheated steam(at 1100⁰c) from boiler drum enters in to it. Intermediate pressure turbine • Double flow design with seven stages of blading . • Each stage has moving and stationary blades. • Reheated steam(at 535⁰ c) from H.P turbine outlet enters in to it. Low pressure turbine • It is also of double flow design with 6 stages in front and rear flow paths. • Each stage has moving and stationary blades. • Stem out of I.P. turbine directly enters in to it.
  • 10. Rating Continuous Active Output 110 MW Rated Voltage 11000 +/- 5%V Rated Current 7220 A Power Factor 0.8 Lagging Frequency 50 Hz Excitation System Static type Field Current at Rated Output 1335 A Type of Cooling System Hydrogen Cooled Hydrogen Pressure 2 Ata No. of H₂ Cooled Elements 06 Cooling Medium for H₂ Soft water
  • 11.  Mechanical power produced at the shaft of the turbine is used to rotate rotor.  Rotating Magnetic flux produced by rotor cuts stator conductor flux and from electromagnetic induction, electricity is produced .  Rotor runs at 3000 rpm, produces 3-phase voltage at 11kv , and of 50 HZ frequency.  Oil shielded hydrogen is used for the cooling purpose of generator.
  • 12. KBUNL has a capacity to generate 220 MW of electricity but only one unit is working and another is under R&M process. 90 MW is generated out of 110 MW. The transmission is done through 3- phase , double circuit system. With the help of station transformer 11kv is step up to 220 kv and fed to substation.
  • 13. Relay circuit • A protective device that operate during faulty condition and gives command to circuit breaker to trip. Mainly the electromagnetic induction relays are used. Fault Locator By comparing voltage and current the relay measures the line impedance up to the point of fault and locate the position of fault from the previous knowledge of line impedance. Switchgear • Switches used in substation for making or breaking the electrical contacts in convenient way. There are two type of switches air switch and oil switch. It is the brain of any substation. All necessary steps about Transmission , protection, Charging etc. are carried out in the control room. Measuring instruments of the control room:-
  • 14. Voltmeter and Ammeter • As the names imply they are used for measuring voltage and current respectively. Power meter • Used to measure the power in standard unit of MW or KW. Circuit screen • A computer arrangement in which current information about transmission line is seen. Battery room Consists of several batteries and chargers for emergency purpose.
  • 15. It consists of following equipments :- Transformer • The autotransformer used in power station. It has three windings primary, secondary and tertiary. The 220kv voltage is fed as input to primary by step down 132kv fed to KBUNL as input. Circuit Breaker (SF6 at KBUNL) • Used for closing or opening an electrical circuit under normal or abnormal conditions. These circuit breakers are equipped with trip coil connected to relay, design to open breaker automatically Tower • We have suspension type tower called as ‘A’ type tower. The peak point angle is 0⁰ to 2⁰. In this type conductor is suspended with an insulator. Guard ring Is used to balance the capacitive current in transmission lines.
  • 16. Current transformer • Used to measure the current level such that it can be control easily. Bus isolators • Used to isolate bus bars. Lightning arrestor • Used to protect the transmission line and connected equipment during lightening . Wave Trap Wave trap which changes the frequency 50Hz to 500Hz can be used for communicate between power plants.
  • 17. Why cylindrical pipes are used in switchyard instead of wire conductor ?
  • 18. Why cylindrical pipes are used in switchyard instead of wire conductor ? Because of following purpose :- •Safety. •Reduce Ferranti Effect. •Reduce the effect of vibration during opening and closing of circuit breakers and isolators.
  • 19. Why motor is used to rotate the shaft of turbine, when the turbine is not in operation?
  • 20. Why motor is used to rotate the shaft of turbine, when the turbine is not in operation? This is because in case of any fault if production of plants stops then bearing motor rotates rotor shaft of turbine continuously at 65 rpm. This is because if shaft doesn’t rotate then due to load it may bend.