MANAJEMEN PROYEK 
TEKNOLOGI INFORMASI 
LAHIRNYA PROYEK
RUANG LINGKUP BAHASAN 
 Sistem Informasi dalam organisasi 
 Proyek sebagai sarana strategi organisasi 
 Lahirnya proyek internal 
 Proyek internal 
 Proyek eksternal 
2
SISTEM INFORMASI DALAM ORGANISASI 
3
RANTAI NILAI (VALUE CHAIN) 
PERUSAHAAN (M.Porter) 
4 
INFRASTRUKTUR PERUSAHAAN 
LOGISTIK 
KELUAR 
OUT-BOUND 
LOGISTICS 
PEMASAR-AN 
DAN 
PENJUAL-AN 
LOGISTIK 
MASUK 
(INBOUND 
LOGIS-TICS) 
MANAJEMEN SDM 
PENGEMBANGAN TEKNOLOGI 
PEMBELIAN SUMBER DAYA 
OPERASI 
LAYANAN 
PELANG-GAN 
KEUNG-GULAN 
BERSA-ING 
P P 
R E 
O N 
S D 
E U 
S K 
U 
N 
G 
P U 
R T 
O A 
S M 
E A 
S
RANTAI NILAI (VALUE CHAIN) PERUSAHAAN 
dan SISTEM INFORMASI PENDUKUNGNYA 
5 
KOORDINASI ADMINISTRATIF DAN LAYANAN BANTUAN 
SIS: SISTEM INTRANET UNTUK ARUS KERJA KOLABORATIF 
LOGISTIK 
KELUAR 
OUTBOUND 
LOGISTICS 
SIS: 
ON-LINE 
P.O.S. AND 
ORDER 
PROCESS-ING 
PEMASAR-AN 
DAN 
PENJUAL-AN 
SIS: 
INTERAC-TIVE 
TARGETED 
MAR-KETING 
LOGISTIK 
MASUK 
(INBOUND 
LOGISTICS) 
SIS: 
AUTO-MATED 
J.I.T. 
WARE-HOUSING 
MANAJEMEN SDM 
SIS: INTRANET PENGEMBANGAN KARIR UNTUK KARYAWAN 
PENGEMBANGAN TEKNOLOGI 
SIS: EKSTRANET REKAYASA (ENGINEERING) BERBANTUAN 
KOMPUTER, DENGAN PARTNER 
PEMBELIAN SUMBER DAYA 
SIS: E-COMMERCE DENGAN PEMASOK 
OPERASI 
SIS: 
COMPUTER 
AIDED 
FLEXIBLE 
MANU-FACTURING 
SYSTEM 
LAYANAN 
PELANGGAN 
SIS: 
CRM 
KEUNG-GULAN 
BERSAING 
P P 
R E 
O N 
S D 
E U 
S K 
U 
N 
G 
P U 
R T 
O A 
S M 
E A 
S
PROYEK SEBAGAI SARANA STRATEGI 
ORGANISASI 
Strategi TI-SI mendukung 
strategi organisasi 
VISI – MISI - KEBIJAKAN 
TUJUAN 
STRATEGI ORGANISASI 
PROYEK 
STRATEGI 
TI-SI 
PORTOFOLIO 
TI-SI 
STRATEGI 
FUNGSI LAIN 
PORTOFOLIO 
PROGRAM 
TI-SI 
PROYEK 
TI-SI 
PROGRAM 
Portfolio: Sekumpulan 
rencana proyek pendukung 
strategi, baik yg sudah 
berlangsung maupun yg 
belum dibiayai 
Program: Sekumpulan proyek 
yg pengelolaannya dikoordinasi 
agar menguntungkan
Lahirnya Proyek Internal 
Pemicu 1: 
Proyek sudah ada dalam rencana pengembangan 
TI-SI, dan sudah sampai pada saat 
pelaksanaannya 
Pemicu 2: 
Pada salah satu unit kerja ada kebutuhan 
dukungan TI-SI yang sifatnya mendesak
Proyek yang sudah direncanakan 
Urutan kegiatan: 
 Menyusun tinjauan kelayakan, dari aspek: 
 Biaya 
Operasional 
Waktu 
Legal 
 Persetujuan pelaksanaan 
 Penunjukan Manajer Proyek
Proyek yang dipicu kebutuhan mendesak 
Urutan kegiatan: 
1. Pimpinan unit kerja menyatakan kebutuhan 
kepada manajer TI/SI 
2. Manajer TI/SI menunjuk analis sistem untuk 
melakukan diskusi dengan manajer unit 
3. Manajer unit (dibantu analis sistem) 
menyusun proposal yang a.l. menunjukkan 
kelayakan: 
- Biaya - Operasional - Waktu - Legal 
4. Persetujuan pelaksanaan 
5. Penunjukan Manajer Proyek (biasanya analis 
sistem di atas)
ORGANISASI FUNGSIONAL 
Proyek ditangani lewat koordinasi manajer fungsional 
DIREKTUR 
PELAKSANA 
(CHIEF EXECUTIVE) 
MANAJER 
FUNGSIONAL 
MANAJER 
FUNGSIONAL 
MANAJER 
FUNGSIONAL 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
KOORDINASI 
PROYEK
ORGANISASI PROYEK 
Proyek ditangani lewat koordinasi manajer 
proyek 
DIREKTUR 
PELAKSANA 
(CEO) 
MANAJER 
PROYEK 
MANAJER 
PROYEK 
MANAJER 
PROYEK 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
KOORDINASI 
PROYEK
PENGORGANISASIAN SECARA MATRIKS 
LEMAH 
DIREKTUR 
PELAKSANA 
( CEO ) 
MANAJER 
FUNGSIONAL 
MANAJER 
FUNGSIONAL 
MANAJER 
FUNGSIONAL 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
KOORDINASI 
PROYEK
PENGORGANISASIAN SECARA 
MATRIKS SEIMBANG 
DIREKTUR 
PELAKSANA 
(CEO) 
MANAJER 
FUNGSIONAL 
MANAJER 
FUNGSIONAL 
KOORDI-NASI 
PROYEK 
STAF 
STAF 
STAF 
STAF 
STAF 
STAF 
MANAJER 
FUNGSIONAL 
STAF 
STAF 
MANAJER PROY
PENGORGANISASIAN SECARA MATRIKS 
KUAT 
DIREKTUR 
PELAKSANA 
( CEO ) 
MANAJER 
FUNGSIONAL 
MANAJER PROYEK-PROYEK 
MANAJER 
FUNGSIONAL 
STAF 
STAF 
STAF 
STAF MAN. PROYEK 
STAF 
STAF 
MAN. PROYEK 
MAN. PROYEK 
KOORDINASI 
PROYEK A 
KOORDINASI 
PROYEK B
PENGARUH STRUKTUR ORGANISASI TERHADAP 
PROYEK 
15 
Karak-teristik 
proyek 
T i p e o r g a n i s a s i 
Fungsio-nal 
Matriks 
lemah 
Matriks 
seimbang 
Matriks 
kuat 
Proyek 
Otoritas Tak ada s.d 
rendah 
Terbatas Rendah s.d 
sedang 
Sedang s.d 
tinggi 
Tinggi s.d 
penuh 
% Personil 
organisasi 
yg full time 
di proyek 
- 0 – 25 % 15% – 60% 50 % – 
95 % 
85 % -- 100 
% 
Peran 
manajer 
proyek 
Tdk penuh 
Waktu 
Tdk penuh 
Waktu 
Penuh 
waktu 
Penuh 
waktu 
Penuh 
waktu 
Sebutan 
manajer 
proyek 
Koord. / 
Pimpinan 
proyek 
Koord. / 
Pimpinan 
proyek 
Manajer 
proyek 
Manajer 
proyek/ 
program 
Manajer 
proyek/ 
program 
Staf admi-nistrasi 
Tdk penuh 
waktu 
Tdk penuh 
waktu 
Tdk penuh 
waktu 
Penuh 
waktu 
Penuh 
waktu
PROPOSAL 
UNTUK PROYEK INTERNAL 
 Usulan formal pembangunan T.I untuk memenuhi 
kebutuhan unit kerja dalam menjalankan fungsinya 
mendukung tercapainya tujuan organisasi 
 Proposal mendefinisikan: 
o Apa yang akan dilakukan 
o Kebutuhan bisnis apa yang akan dipenuhi 
o Bagaimana hasil proyek akan mendukung strategi 
 Memuat business case awal 
 Format sebaiknya baku, menggunakan template
Contoh Template Proposal Internal 
1. Nama Proyek: 
2. Tanggal pengajuan: 
3. Pengusul / sponsor dengan cara untuk kontak: 
4. Persetujuan: (yang menyetujui dan tgl persetujuan) 
5. Masalah bisnis (business case) atau kebutuhan (yang 
perlu solusi) 
6. Tujuan dan sasaran proyek serta kaitannya dengan 
strategi dan sasaran organisasi 
7. Solusi yang diusulkan: (alternatif solusi, dan penjelasan 
dasar pemilihan solusi yang diusulkan jadi proyek) 
8. Hasil yang diharapkan: (dampak /outcome proyek)
Contoh Muatan BUSINESS CASE 
1. Identitas Proyek: (Nama, Tanggal peresmian, Unit 
pengusul, Manajer proyek) 
2. Nomor revisi dokumen: 
3. Manfaat dan Biaya: 
4. Biaya/Sumberdaya: (biaya pembangunan dan operasi 
per tahun dengan asumsi perhitungannya) 
 Dikelompokkan atas biaya P/K; P/L; Pelatihan; ATK; 
Jasa konsultansi; dll, 
 Penggunaan SDM, dalam jam
Contoh Muatan BUSINESS CASE (lanjutan) 
5. Sumber Pendanaan 
6. Resiko 
 Faktor resiko 
 Strategi mitigasi 
7. Alasan organisasi untuk melaksanakan proyek 
(justification) 
8. Catatan Tambahan 
 Memuat daftar lampiran sesuai keperluannya
PROYEK PEMERINTAH 
Proyek TI/SI pemerintah diatur dengan: 
Keppres No. 80 tahun 2003 tentang Pedoman 
Pelaksanaan Pengadaan Barang/Jasa Pemerintah 
dan perubahan-perubahannya.
PROYEK PEMERINTAH (lanjutan) 
Perubahan- perubahan terhadap Keppres No. 
80 tahun 2003 
1. Keppres No. 61 tahun 2004 (Perubahan ke-1) 
2. Keppres No. 32 tahun 2005 (Perubahan ke-2) 
3. PP No. 70 tahun 2005 (Perubahan ke-3) 
4. PP No. 8 tahun 2006 (Perubahan ke-4) 
5. PP No. 79 tahun 2006 (Perubahan ke-5) 
6. PP No. 85 tahun 2006 (Perubahan ke-6) 
7. PP No. 95 tahun 2006 (Perubahan ke-7)
PROSEDUR UMUM PELELANGAN 2 TINGKAT 
UNTUK PEKERJAAN TI/SI
DOKUMEN TERKAIT PENGADAAN 
 KAK: Kerangka Acuan Kerja (TOR=Terms of 
Reference) 
 RKS: Rencana Kerja dan Syarat 
 HPS: Harga Perkiraan Sendiri
KERANGKA ACUAN KERJA (KAK) 
TERMS OF REFERENCE (TOR) 
KAK memuat pedoman untuk menyusun proposal 
1. Latar Belakang 
2. Maksud dan Tujuan 
3. Sasaran 
4. Nama dan organisasi pejabat pembuat komitmen 
5. Sumber pendanaan 
6. Lingkup, lokasi kegiatan, data dan fasilitas 
penunjang, serta alih pengetahuan 
7. Jangka waktu pelaksanaan 
8. Tenaga ahli 
9. Keluaran 
10. Laporan
RENCANA KERJA DAN SYARAT (RKS) 
1. Umum 
2. Addendum Dokumen Seleksi 
3. Penyusunan, Penyampaian, dan 
Pembukaan Dokumen Penawaran 
4. Kriteria dan Tata Cara Penilaian Dokumen 
Penawaran (termasuk: Evaluasi 
Administrasi , Evaluasi Teknis, )
HARGA PERKIRAAN SENDIRI (HPS) 
 Disiapkan instansi pemerintah pemberi pekerjaan 
 Merupakan dasar penilaian layak tidaknya biaya yang 
diusulkan konsultan 
 Menggunakan patokan biaya (misalnya yang 
diterbitkan INKINDO), bervariasi sesuai indeks 
daerah.
MUATAN 
USULAN TEKNIS (MUT) 
A. PENDAHULUAN 
B. PENGALAMAN PERUSAHAAN 
C. PEMAHAMAN KAK 
D. TANGGAPAN TERHADAP KAK 
E. APRESIASI INOVASI 
F. PENDEKATAN DAN 
METODOLOGI 
G. RENCANA KERJA 
H. JADUAL PELAKSANAAN 
PEKERJAAN 
I. TENAGA AHLI DAN TANGGUNG 
JAWABNYA 
J. JADUAL PENUGASAN 
TENAGA AHLI 
K. ORGANISASI 
PELAKSANAAN 
PEKERJAAN 
L. LAPORAN 
M. STAF PENDUKUNG 
N. FASILITAS PENDUKUNG 
O. PENUTUP 
LAMPIRAN : 
1. DOKUMEN PENDUKUNG 
2. DAFTAR RIWAYAT 
HIDUP & 
KELENGKAPANNYA 
3. LAIN-LAIN
TUGAS 1 (kelompok) 
 Dengan menggunakan template yang disediakan, 
buatlah proposal pengembangan perangkat lunak 
aplikasi. Misalnya, aplikasi berikut untuk TOKO 
ONLINE. 
NO TUGAS 
1 Situs web 
2 Sistem penjualan 
3 Sistem pemesanan lewat sms 
4 Sistem pembelian 
5 Sistem pembelian otomatis dengan pemasok 
utama

Más contenido relacionado

La actualidad más candente

Makalah perincian kegiatan proyek
Makalah perincian kegiatan proyekMakalah perincian kegiatan proyek
Makalah perincian kegiatan proyek
Marobo United
 
Ebook presentasi pengantar manajemen proyek
Ebook   presentasi pengantar manajemen proyekEbook   presentasi pengantar manajemen proyek
Ebook presentasi pengantar manajemen proyek
handasah
 
Pelatihan peg baru-des2010-project-management
Pelatihan peg baru-des2010-project-managementPelatihan peg baru-des2010-project-management
Pelatihan peg baru-des2010-project-management
Ginanjar Saputra
 

La actualidad más candente (20)

Software Project Management - Pengenalan Manajemen Proyek
Software Project Management - Pengenalan Manajemen ProyekSoftware Project Management - Pengenalan Manajemen Proyek
Software Project Management - Pengenalan Manajemen Proyek
 
Manajemen proyek-perangkat-lunak-penjabaran-paper
Manajemen proyek-perangkat-lunak-penjabaran-paperManajemen proyek-perangkat-lunak-penjabaran-paper
Manajemen proyek-perangkat-lunak-penjabaran-paper
 
Ppsi pertemuan-2
Ppsi pertemuan-2Ppsi pertemuan-2
Ppsi pertemuan-2
 
Makalah perincian kegiatan proyek
Makalah perincian kegiatan proyekMakalah perincian kegiatan proyek
Makalah perincian kegiatan proyek
 
Ppsi pertemuan-4
Ppsi pertemuan-4Ppsi pertemuan-4
Ppsi pertemuan-4
 
Modul kuliah Manajemen Proyek
Modul kuliah Manajemen ProyekModul kuliah Manajemen Proyek
Modul kuliah Manajemen Proyek
 
Deskripsi MANAJEMEN PROYEK _Materi Training "PROJECT MANAGEMENT"
Deskripsi MANAJEMEN PROYEK _Materi Training "PROJECT MANAGEMENT"Deskripsi MANAJEMEN PROYEK _Materi Training "PROJECT MANAGEMENT"
Deskripsi MANAJEMEN PROYEK _Materi Training "PROJECT MANAGEMENT"
 
Mpti edisi 1 140207
Mpti edisi 1 140207Mpti edisi 1 140207
Mpti edisi 1 140207
 
3. proses dalam_manajemen_proyek_
3. proses dalam_manajemen_proyek_3. proses dalam_manajemen_proyek_
3. proses dalam_manajemen_proyek_
 
Manajemen Komunikasi Proyek Perangkat Lunak
Manajemen Komunikasi Proyek Perangkat LunakManajemen Komunikasi Proyek Perangkat Lunak
Manajemen Komunikasi Proyek Perangkat Lunak
 
Ppsi pertemuan-5
Ppsi pertemuan-5Ppsi pertemuan-5
Ppsi pertemuan-5
 
Project Management Body of Knowledge
Project Management Body of KnowledgeProject Management Body of Knowledge
Project Management Body of Knowledge
 
Manajemen proyek
Manajemen proyekManajemen proyek
Manajemen proyek
 
Management Scope Project
Management Scope ProjectManagement Scope Project
Management Scope Project
 
Ebook presentasi pengantar manajemen proyek
Ebook   presentasi pengantar manajemen proyekEbook   presentasi pengantar manajemen proyek
Ebook presentasi pengantar manajemen proyek
 
Manajemen proyek sistem informasi 001
Manajemen proyek sistem informasi 001Manajemen proyek sistem informasi 001
Manajemen proyek sistem informasi 001
 
Manajemen Proyek Sistem Informasi
Manajemen Proyek Sistem InformasiManajemen Proyek Sistem Informasi
Manajemen Proyek Sistem Informasi
 
Project Charter
Project CharterProject Charter
Project Charter
 
(2022) Silabus Training _"Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEM...
(2022) Silabus Training _"Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEM...(2022) Silabus Training _"Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEM...
(2022) Silabus Training _"Effective PROJECT MANAGEMENT & PROJECT RISK MANAGEM...
 
Pelatihan peg baru-des2010-project-management
Pelatihan peg baru-des2010-project-managementPelatihan peg baru-des2010-project-management
Pelatihan peg baru-des2010-project-management
 

Destacado (9)

team_management
team_managementteam_management
team_management
 
Modul praktikum algoritma
Modul praktikum algoritmaModul praktikum algoritma
Modul praktikum algoritma
 
Business Case Development
Business Case DevelopmentBusiness Case Development
Business Case Development
 
Customer value& satisfaction
Customer value& satisfactionCustomer value& satisfaction
Customer value& satisfaction
 
Business Case (lovely illustrated)
Business Case (lovely illustrated)Business Case (lovely illustrated)
Business Case (lovely illustrated)
 
Crm 3 rantai nilai crm
Crm 3 rantai nilai crmCrm 3 rantai nilai crm
Crm 3 rantai nilai crm
 
Project Management: Business Case
Project Management: Business CaseProject Management: Business Case
Project Management: Business Case
 
Fungsi CRM - Customer Service
Fungsi CRM - Customer ServiceFungsi CRM - Customer Service
Fungsi CRM - Customer Service
 
Manajemen Risiko - Identifikasi Risiko
Manajemen Risiko - Identifikasi RisikoManajemen Risiko - Identifikasi Risiko
Manajemen Risiko - Identifikasi Risiko
 

Similar a Pertemuan 3 manajemen proyek ibsi

Bisnis dan Investasi Untuk Civil Engineering
Bisnis dan Investasi Untuk Civil EngineeringBisnis dan Investasi Untuk Civil Engineering
Bisnis dan Investasi Untuk Civil Engineering
rickyimanda99
 
06. Manajemen Batasan Proyek.pdf
06. Manajemen Batasan Proyek.pdf06. Manajemen Batasan Proyek.pdf
06. Manajemen Batasan Proyek.pdf
holid nuer
 
0009-P01-ManajemenProyekSistemInformasi.pdf
0009-P01-ManajemenProyekSistemInformasi.pdf0009-P01-ManajemenProyekSistemInformasi.pdf
0009-P01-ManajemenProyekSistemInformasi.pdf
AskariB1
 

Similar a Pertemuan 3 manajemen proyek ibsi (20)

PMBOK 6 Summary: Module 2 (Planning Processes)
PMBOK 6 Summary: Module 2 (Planning Processes)PMBOK 6 Summary: Module 2 (Planning Processes)
PMBOK 6 Summary: Module 2 (Planning Processes)
 
Format kak
Format kakFormat kak
Format kak
 
PERENCANAAN PROYEK.pptx
PERENCANAAN PROYEK.pptxPERENCANAAN PROYEK.pptx
PERENCANAAN PROYEK.pptx
 
PERENCANAAN PROYEK manajemen waktu.pptx
PERENCANAAN PROYEK manajemen waktu.pptxPERENCANAAN PROYEK manajemen waktu.pptx
PERENCANAAN PROYEK manajemen waktu.pptx
 
0009-P01.pdf
0009-P01.pdf0009-P01.pdf
0009-P01.pdf
 
3_Perencanaan Proyek dan Project Charter.pptx
3_Perencanaan Proyek dan Project Charter.pptx3_Perencanaan Proyek dan Project Charter.pptx
3_Perencanaan Proyek dan Project Charter.pptx
 
Tugas 4 project charter
Tugas 4   project charterTugas 4   project charter
Tugas 4 project charter
 
2. Manajemen Proyek PL.pptx
2. Manajemen Proyek PL.pptx2. Manajemen Proyek PL.pptx
2. Manajemen Proyek PL.pptx
 
Bisnis dan Investasi Untuk Civil Engineering
Bisnis dan Investasi Untuk Civil EngineeringBisnis dan Investasi Untuk Civil Engineering
Bisnis dan Investasi Untuk Civil Engineering
 
Projectcharter
ProjectcharterProjectcharter
Projectcharter
 
Project charter
Project charterProject charter
Project charter
 
06. Manajemen Batasan Proyek.pdf
06. Manajemen Batasan Proyek.pdf06. Manajemen Batasan Proyek.pdf
06. Manajemen Batasan Proyek.pdf
 
0009-P01_merged.pdf
0009-P01_merged.pdf0009-P01_merged.pdf
0009-P01_merged.pdf
 
Manajemen proyek
Manajemen proyekManajemen proyek
Manajemen proyek
 
06 Format - Tatang A Taufik
06  Format - Tatang A Taufik06  Format - Tatang A Taufik
06 Format - Tatang A Taufik
 
0009-P01.pdf
0009-P01.pdf0009-P01.pdf
0009-P01.pdf
 
pemaparan-sop.ppt
pemaparan-sop.pptpemaparan-sop.ppt
pemaparan-sop.ppt
 
Manajamen Proyek_P1_7 Sep 2022.pdf
Manajamen  Proyek_P1_7 Sep 2022.pdfManajamen  Proyek_P1_7 Sep 2022.pdf
Manajamen Proyek_P1_7 Sep 2022.pdf
 
0009-P01-ManajemenProyekSistemInformasi.pdf
0009-P01-ManajemenProyekSistemInformasi.pdf0009-P01-ManajemenProyekSistemInformasi.pdf
0009-P01-ManajemenProyekSistemInformasi.pdf
 
manajemen-integrasi-proyek-2.ppt
manajemen-integrasi-proyek-2.pptmanajemen-integrasi-proyek-2.ppt
manajemen-integrasi-proyek-2.ppt
 

Pertemuan 3 manajemen proyek ibsi

  • 1. MANAJEMEN PROYEK TEKNOLOGI INFORMASI LAHIRNYA PROYEK
  • 2. RUANG LINGKUP BAHASAN  Sistem Informasi dalam organisasi  Proyek sebagai sarana strategi organisasi  Lahirnya proyek internal  Proyek internal  Proyek eksternal 2
  • 3. SISTEM INFORMASI DALAM ORGANISASI 3
  • 4. RANTAI NILAI (VALUE CHAIN) PERUSAHAAN (M.Porter) 4 INFRASTRUKTUR PERUSAHAAN LOGISTIK KELUAR OUT-BOUND LOGISTICS PEMASAR-AN DAN PENJUAL-AN LOGISTIK MASUK (INBOUND LOGIS-TICS) MANAJEMEN SDM PENGEMBANGAN TEKNOLOGI PEMBELIAN SUMBER DAYA OPERASI LAYANAN PELANG-GAN KEUNG-GULAN BERSA-ING P P R E O N S D E U S K U N G P U R T O A S M E A S
  • 5. RANTAI NILAI (VALUE CHAIN) PERUSAHAAN dan SISTEM INFORMASI PENDUKUNGNYA 5 KOORDINASI ADMINISTRATIF DAN LAYANAN BANTUAN SIS: SISTEM INTRANET UNTUK ARUS KERJA KOLABORATIF LOGISTIK KELUAR OUTBOUND LOGISTICS SIS: ON-LINE P.O.S. AND ORDER PROCESS-ING PEMASAR-AN DAN PENJUAL-AN SIS: INTERAC-TIVE TARGETED MAR-KETING LOGISTIK MASUK (INBOUND LOGISTICS) SIS: AUTO-MATED J.I.T. WARE-HOUSING MANAJEMEN SDM SIS: INTRANET PENGEMBANGAN KARIR UNTUK KARYAWAN PENGEMBANGAN TEKNOLOGI SIS: EKSTRANET REKAYASA (ENGINEERING) BERBANTUAN KOMPUTER, DENGAN PARTNER PEMBELIAN SUMBER DAYA SIS: E-COMMERCE DENGAN PEMASOK OPERASI SIS: COMPUTER AIDED FLEXIBLE MANU-FACTURING SYSTEM LAYANAN PELANGGAN SIS: CRM KEUNG-GULAN BERSAING P P R E O N S D E U S K U N G P U R T O A S M E A S
  • 6. PROYEK SEBAGAI SARANA STRATEGI ORGANISASI Strategi TI-SI mendukung strategi organisasi VISI – MISI - KEBIJAKAN TUJUAN STRATEGI ORGANISASI PROYEK STRATEGI TI-SI PORTOFOLIO TI-SI STRATEGI FUNGSI LAIN PORTOFOLIO PROGRAM TI-SI PROYEK TI-SI PROGRAM Portfolio: Sekumpulan rencana proyek pendukung strategi, baik yg sudah berlangsung maupun yg belum dibiayai Program: Sekumpulan proyek yg pengelolaannya dikoordinasi agar menguntungkan
  • 7. Lahirnya Proyek Internal Pemicu 1: Proyek sudah ada dalam rencana pengembangan TI-SI, dan sudah sampai pada saat pelaksanaannya Pemicu 2: Pada salah satu unit kerja ada kebutuhan dukungan TI-SI yang sifatnya mendesak
  • 8. Proyek yang sudah direncanakan Urutan kegiatan:  Menyusun tinjauan kelayakan, dari aspek:  Biaya Operasional Waktu Legal  Persetujuan pelaksanaan  Penunjukan Manajer Proyek
  • 9. Proyek yang dipicu kebutuhan mendesak Urutan kegiatan: 1. Pimpinan unit kerja menyatakan kebutuhan kepada manajer TI/SI 2. Manajer TI/SI menunjuk analis sistem untuk melakukan diskusi dengan manajer unit 3. Manajer unit (dibantu analis sistem) menyusun proposal yang a.l. menunjukkan kelayakan: - Biaya - Operasional - Waktu - Legal 4. Persetujuan pelaksanaan 5. Penunjukan Manajer Proyek (biasanya analis sistem di atas)
  • 10. ORGANISASI FUNGSIONAL Proyek ditangani lewat koordinasi manajer fungsional DIREKTUR PELAKSANA (CHIEF EXECUTIVE) MANAJER FUNGSIONAL MANAJER FUNGSIONAL MANAJER FUNGSIONAL STAF STAF STAF STAF STAF STAF STAF STAF STAF KOORDINASI PROYEK
  • 11. ORGANISASI PROYEK Proyek ditangani lewat koordinasi manajer proyek DIREKTUR PELAKSANA (CEO) MANAJER PROYEK MANAJER PROYEK MANAJER PROYEK STAF STAF STAF STAF STAF STAF STAF STAF STAF KOORDINASI PROYEK
  • 12. PENGORGANISASIAN SECARA MATRIKS LEMAH DIREKTUR PELAKSANA ( CEO ) MANAJER FUNGSIONAL MANAJER FUNGSIONAL MANAJER FUNGSIONAL STAF STAF STAF STAF STAF STAF STAF STAF STAF KOORDINASI PROYEK
  • 13. PENGORGANISASIAN SECARA MATRIKS SEIMBANG DIREKTUR PELAKSANA (CEO) MANAJER FUNGSIONAL MANAJER FUNGSIONAL KOORDI-NASI PROYEK STAF STAF STAF STAF STAF STAF MANAJER FUNGSIONAL STAF STAF MANAJER PROY
  • 14. PENGORGANISASIAN SECARA MATRIKS KUAT DIREKTUR PELAKSANA ( CEO ) MANAJER FUNGSIONAL MANAJER PROYEK-PROYEK MANAJER FUNGSIONAL STAF STAF STAF STAF MAN. PROYEK STAF STAF MAN. PROYEK MAN. PROYEK KOORDINASI PROYEK A KOORDINASI PROYEK B
  • 15. PENGARUH STRUKTUR ORGANISASI TERHADAP PROYEK 15 Karak-teristik proyek T i p e o r g a n i s a s i Fungsio-nal Matriks lemah Matriks seimbang Matriks kuat Proyek Otoritas Tak ada s.d rendah Terbatas Rendah s.d sedang Sedang s.d tinggi Tinggi s.d penuh % Personil organisasi yg full time di proyek - 0 – 25 % 15% – 60% 50 % – 95 % 85 % -- 100 % Peran manajer proyek Tdk penuh Waktu Tdk penuh Waktu Penuh waktu Penuh waktu Penuh waktu Sebutan manajer proyek Koord. / Pimpinan proyek Koord. / Pimpinan proyek Manajer proyek Manajer proyek/ program Manajer proyek/ program Staf admi-nistrasi Tdk penuh waktu Tdk penuh waktu Tdk penuh waktu Penuh waktu Penuh waktu
  • 16. PROPOSAL UNTUK PROYEK INTERNAL  Usulan formal pembangunan T.I untuk memenuhi kebutuhan unit kerja dalam menjalankan fungsinya mendukung tercapainya tujuan organisasi  Proposal mendefinisikan: o Apa yang akan dilakukan o Kebutuhan bisnis apa yang akan dipenuhi o Bagaimana hasil proyek akan mendukung strategi  Memuat business case awal  Format sebaiknya baku, menggunakan template
  • 17. Contoh Template Proposal Internal 1. Nama Proyek: 2. Tanggal pengajuan: 3. Pengusul / sponsor dengan cara untuk kontak: 4. Persetujuan: (yang menyetujui dan tgl persetujuan) 5. Masalah bisnis (business case) atau kebutuhan (yang perlu solusi) 6. Tujuan dan sasaran proyek serta kaitannya dengan strategi dan sasaran organisasi 7. Solusi yang diusulkan: (alternatif solusi, dan penjelasan dasar pemilihan solusi yang diusulkan jadi proyek) 8. Hasil yang diharapkan: (dampak /outcome proyek)
  • 18. Contoh Muatan BUSINESS CASE 1. Identitas Proyek: (Nama, Tanggal peresmian, Unit pengusul, Manajer proyek) 2. Nomor revisi dokumen: 3. Manfaat dan Biaya: 4. Biaya/Sumberdaya: (biaya pembangunan dan operasi per tahun dengan asumsi perhitungannya)  Dikelompokkan atas biaya P/K; P/L; Pelatihan; ATK; Jasa konsultansi; dll,  Penggunaan SDM, dalam jam
  • 19. Contoh Muatan BUSINESS CASE (lanjutan) 5. Sumber Pendanaan 6. Resiko  Faktor resiko  Strategi mitigasi 7. Alasan organisasi untuk melaksanakan proyek (justification) 8. Catatan Tambahan  Memuat daftar lampiran sesuai keperluannya
  • 20. PROYEK PEMERINTAH Proyek TI/SI pemerintah diatur dengan: Keppres No. 80 tahun 2003 tentang Pedoman Pelaksanaan Pengadaan Barang/Jasa Pemerintah dan perubahan-perubahannya.
  • 21. PROYEK PEMERINTAH (lanjutan) Perubahan- perubahan terhadap Keppres No. 80 tahun 2003 1. Keppres No. 61 tahun 2004 (Perubahan ke-1) 2. Keppres No. 32 tahun 2005 (Perubahan ke-2) 3. PP No. 70 tahun 2005 (Perubahan ke-3) 4. PP No. 8 tahun 2006 (Perubahan ke-4) 5. PP No. 79 tahun 2006 (Perubahan ke-5) 6. PP No. 85 tahun 2006 (Perubahan ke-6) 7. PP No. 95 tahun 2006 (Perubahan ke-7)
  • 22. PROSEDUR UMUM PELELANGAN 2 TINGKAT UNTUK PEKERJAAN TI/SI
  • 23. DOKUMEN TERKAIT PENGADAAN  KAK: Kerangka Acuan Kerja (TOR=Terms of Reference)  RKS: Rencana Kerja dan Syarat  HPS: Harga Perkiraan Sendiri
  • 24. KERANGKA ACUAN KERJA (KAK) TERMS OF REFERENCE (TOR) KAK memuat pedoman untuk menyusun proposal 1. Latar Belakang 2. Maksud dan Tujuan 3. Sasaran 4. Nama dan organisasi pejabat pembuat komitmen 5. Sumber pendanaan 6. Lingkup, lokasi kegiatan, data dan fasilitas penunjang, serta alih pengetahuan 7. Jangka waktu pelaksanaan 8. Tenaga ahli 9. Keluaran 10. Laporan
  • 25. RENCANA KERJA DAN SYARAT (RKS) 1. Umum 2. Addendum Dokumen Seleksi 3. Penyusunan, Penyampaian, dan Pembukaan Dokumen Penawaran 4. Kriteria dan Tata Cara Penilaian Dokumen Penawaran (termasuk: Evaluasi Administrasi , Evaluasi Teknis, )
  • 26. HARGA PERKIRAAN SENDIRI (HPS)  Disiapkan instansi pemerintah pemberi pekerjaan  Merupakan dasar penilaian layak tidaknya biaya yang diusulkan konsultan  Menggunakan patokan biaya (misalnya yang diterbitkan INKINDO), bervariasi sesuai indeks daerah.
  • 27. MUATAN USULAN TEKNIS (MUT) A. PENDAHULUAN B. PENGALAMAN PERUSAHAAN C. PEMAHAMAN KAK D. TANGGAPAN TERHADAP KAK E. APRESIASI INOVASI F. PENDEKATAN DAN METODOLOGI G. RENCANA KERJA H. JADUAL PELAKSANAAN PEKERJAAN I. TENAGA AHLI DAN TANGGUNG JAWABNYA J. JADUAL PENUGASAN TENAGA AHLI K. ORGANISASI PELAKSANAAN PEKERJAAN L. LAPORAN M. STAF PENDUKUNG N. FASILITAS PENDUKUNG O. PENUTUP LAMPIRAN : 1. DOKUMEN PENDUKUNG 2. DAFTAR RIWAYAT HIDUP & KELENGKAPANNYA 3. LAIN-LAIN
  • 28. TUGAS 1 (kelompok)  Dengan menggunakan template yang disediakan, buatlah proposal pengembangan perangkat lunak aplikasi. Misalnya, aplikasi berikut untuk TOKO ONLINE. NO TUGAS 1 Situs web 2 Sistem penjualan 3 Sistem pemesanan lewat sms 4 Sistem pembelian 5 Sistem pembelian otomatis dengan pemasok utama