JI POA: LUMMAX CFL
DISTRIBUTION PROGRAMME

CME: “PRIMLIGHT LTD”

PDD DEVELOPER: GFA ENVEST,
SEC BIOMASS
       Valeriia Leznova
       SEC Biomass, Consultant
     Workshop on Programme of Activities, Cologne
     May 25, 2010
Lummax CFL Distribution Programme
Programme objective      Replace up to 2 million ICLs with high efficient
                         Lummax CFLs in the buildings of Ministry of Education of
                         Ukraine:
                         I STAGE: replacement of 150 000 ICLs with CFLs
                         II STAGE: distribution of 185 000 CFLs

Geographical scope:                          Kiev Region, Ukraine
Applicable methodology                       JI specific approach
Target group                   Buildings constructed in the 50ies and 60ies
                               Large persistence of ICLs in the baseline case
Energy saving            up to 260 GWh/year
Expected ERUs            230 th.t CO2eq/year
Participants             Primlight - Coordinating entity
                         GFA ENVEST, SEC Biomass – PDD developer
                         Ministry of Education of Ukraine – objects owner
JI PoA status            PIN is developed, LoE is obtained (15.12.2009) , pre-
                         feasibility study.
Background: Lummax CFL
Distribution Programme
Type of              Working range, Working hours   Working days       Working hours
organization         hours          per day         per year           per year

 Kindergartens         8.00-19.00        9,9              250              2475
School – 1st shift     8.30 – 4.0        3,85             200               770

  School – 2nd          8.30-9.00        9,45             200               890
     shift
 Universities*        8.00-21.30        10,8              220              2376
Administrations         8.00-7.00        8,1              255              2065,5
  Outpatient           8.00-20.00        10                26               260
  department
   Hospitals            24 hours         6,5              365              6022,5
   Industrial           8.00-7.00        8,1              255              2065,5
  enterprises

*According to energy audits carried out in the university buildings.
Will be used for baseline setting.
Programme concept.                    Financing

                                            Sources of
                                            financing
           Distribute CFLs
                                             Financing, %

                        Electricity                 22%
Financing of CFL
   Programme           CO2 Emission                         Own
                                                            funds
                                                            Credit
         Generation of ERUs.                                funds
             ERUs sale                78%
Proposed programme set-up
                 CFLs
                             Programme               CFLs
  LUMMAX                     Coordinator
(CFL producer)              (Primlight LTD)
                  €                                          Buildings
                                              ERUs
                                                             under the
                                                            authority of
                        €                                   Ministry of
                                         ERUs                Education



                            Carbon buyer
Challenges for JI PoA and JI projects
in Ukraine
JI PoA T2: to become operational adoption of amendments
to order #206 (Ukrainian JI procedure) is needed.
JI project are treated by AIEs as CDM projects during
determination/verification: adoption of JI PoA procedure for
T1, DVM for T1, local accreditation procedure of AIEs is
needed.
Lack of available AIEs for JI – strong competition with CDM
projects.
Nature of ERU: difficult to deal with taxation authorities in
terms of revenues from ERUs sale.
Legal uncertainties: rights and responsibilities of
Coordinating entity, ownership of ERUs.
Potential PoA project
 “Regional rehabilitation of district heating system”

 (on the basis of real JI project “Rehabilitation of DH systems in the Crimea” –
                             registered under Track 1)
      Type of implemented equipment            Number of    CO2       Total           JPA types
                                                 units    emission invest-
                                                          reduction ments,
                                                         ths. t/year mln Euro
 New gas-fired boilers for heat generation        176                  6,2      Type A: Rehabilitation
                                                             78                  of boiler equipment
 New economizers                                  122                 1, 45
                                                                                Type B: Installation of
 Cogeneration plant                                1         10        1,5       cogeneration plant
                                                                                Type C: Insulation of
 Insulated pipelines                            516 km       14       3,46            pipelines
                                                                                Type D: Utilization of
 Landfill gas capture and utilization system       1         53         1
                                                                                    landfill gas
TOTAL :
                                                   -        155       13,6
Potential PoA project “Implementation of bioenergy activities in
                                 Ukraine”
Type of equipment                                 Ukrainian    Installed       CO2        Total    Possible types
                                                   market      capacity     emission     invest-      of JPAs
                                                   volume                   reduction    ments,
                                                              MWth   MWel     million   mln Euro
                                                                              t/year
Wood-fired boilers for heat generation, 1-10 MW     1000      500      -      0,56        22,5     Type A: Wood-
Wood-fired boilers for industry, 0.1-5 MW           500       350      -      0,53        15,8     fired boilers for
                                                                                                   heat production
Wood-fired boilers for households, 10-50 kW        53000      1590     -      1,78        55,7
Straw-fired boilers, 0.1-1 MW                      16000      3200     -      3,71        224      Type B: Straw-
Straw-fired boilers, 1-10 MW                        1400      2800     -      3,25        168      fired boilers for
                                                                                                   heat production
Peat-fired boilers, 0.5-1 MW                        1000      750      -      0,84        26,3
                                                                                                    Type C: LFG
                                                                                                   usage for heat
                                                     60        90     60      2,4         30
Landfill gas                                                                                         and power
                                                                                                     production
Small biogas installations (200-600 m3)             1200       86     54      0,44        237      Type D: Energy
Farm biogas installations (600-3000 m3)             1600      434    276      1,08       1130        utilization of
                                                                                                     biogas from
Large biogas installations (>3000 m3 )               40        36     23      0,03        74,4         manure
TOTAL:                                             75800      9836   413     14,62      1983,7
Thank you for attention!


   Valeriia Leznova
   SEC “Biomass”, Consultant
   tel: 0038(044) 456 94 62
   e-mail: leznova@biomass.kiev.ua
   www.biomass.kiev.ua

Más contenido relacionado

La actualidad más candente

Siliken Corporate Presentation
Siliken Corporate PresentationSiliken Corporate Presentation
Siliken Corporate PresentationSiliken
 
AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1AREVA
 
Marginal Emissions Rates in Energy System Change | Dr A.D. Hawkes
Marginal Emissions Rates in Energy System Change | Dr A.D. HawkesMarginal Emissions Rates in Energy System Change | Dr A.D. Hawkes
Marginal Emissions Rates in Energy System Change | Dr A.D. Hawkesicarb
 
Philippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentationPhilippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentationGlobal CCS Institute
 
Towards an age of renewables
Towards an age of renewablesTowards an age of renewables
Towards an age of renewablesSuat Furkan ISIK
 
Sgcp12 smith-nationalgrid
Sgcp12 smith-nationalgridSgcp12 smith-nationalgrid
Sgcp12 smith-nationalgridJustin Hayward
 
Chandgana Presentation
Chandgana PresentationChandgana Presentation
Chandgana PresentationProphecy Corp
 
Geo-thermal Energy
Geo-thermal EnergyGeo-thermal Energy
Geo-thermal EnergyUnisolar
 
BUSINESS CASES
BUSINESS CASESBUSINESS CASES
BUSINESS CASESpvsinbloom
 
Tsvetelina Filipova - Energy Community Treaty
Tsvetelina Filipova - Energy Community TreatyTsvetelina Filipova - Energy Community Treaty
Tsvetelina Filipova - Energy Community TreatyNALED Serbia
 
The potential of Energy Efficiency through motors and transformers in Europe
The potential of Energy Efficiency through motors and transformers in EuropeThe potential of Energy Efficiency through motors and transformers in Europe
The potential of Energy Efficiency through motors and transformers in Europefernando nuño
 
Case studies on NAMAs in tunisia and mexico
Case studies on NAMAs in tunisia and mexicoCase studies on NAMAs in tunisia and mexico
Case studies on NAMAs in tunisia and mexicoRCREEE
 
E Mobility Lohse Busch6 April2011
E Mobility Lohse Busch6 April2011E Mobility Lohse Busch6 April2011
E Mobility Lohse Busch6 April2011HaiderExecuteSearch
 
What are the energy challenges for Europe?
What are the energy challenges for Europe?What are the energy challenges for Europe?
What are the energy challenges for Europe?London Business School
 
What is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, CamcoWhat is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, Camcocrifcambs
 
Cyprus Energy Market
Cyprus Energy MarketCyprus Energy Market
Cyprus Energy MarketSeanergies
 

La actualidad más candente (20)

Siliken Corporate Presentation
Siliken Corporate PresentationSiliken Corporate Presentation
Siliken Corporate Presentation
 
BORUSAN EnBW Enerji
BORUSAN EnBW EnerjiBORUSAN EnBW Enerji
BORUSAN EnBW Enerji
 
What are the limits to current policy success?
What are the limits to current policy success?What are the limits to current policy success?
What are the limits to current policy success?
 
AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1AREVA, business & strategy overview - April 2009 - Appendix1
AREVA, business & strategy overview - April 2009 - Appendix1
 
Marginal Emissions Rates in Energy System Change | Dr A.D. Hawkes
Marginal Emissions Rates in Energy System Change | Dr A.D. HawkesMarginal Emissions Rates in Energy System Change | Dr A.D. Hawkes
Marginal Emissions Rates in Energy System Change | Dr A.D. Hawkes
 
Philippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentationPhilippe Joubert Alstom CCS presentation
Philippe Joubert Alstom CCS presentation
 
Towards an age of renewables
Towards an age of renewablesTowards an age of renewables
Towards an age of renewables
 
Sgcp12 smith-nationalgrid
Sgcp12 smith-nationalgridSgcp12 smith-nationalgrid
Sgcp12 smith-nationalgrid
 
Chandgana Presentation
Chandgana PresentationChandgana Presentation
Chandgana Presentation
 
Geo-thermal Energy
Geo-thermal EnergyGeo-thermal Energy
Geo-thermal Energy
 
BUSINESS CASES
BUSINESS CASESBUSINESS CASES
BUSINESS CASES
 
Tsvetelina Filipova - Energy Community Treaty
Tsvetelina Filipova - Energy Community TreatyTsvetelina Filipova - Energy Community Treaty
Tsvetelina Filipova - Energy Community Treaty
 
The potential of Energy Efficiency through motors and transformers in Europe
The potential of Energy Efficiency through motors and transformers in EuropeThe potential of Energy Efficiency through motors and transformers in Europe
The potential of Energy Efficiency through motors and transformers in Europe
 
Case studies on NAMAs in tunisia and mexico
Case studies on NAMAs in tunisia and mexicoCase studies on NAMAs in tunisia and mexico
Case studies on NAMAs in tunisia and mexico
 
E Mobility Lohse Busch6 April2011
E Mobility Lohse Busch6 April2011E Mobility Lohse Busch6 April2011
E Mobility Lohse Busch6 April2011
 
What are the energy challenges for Europe?
What are the energy challenges for Europe?What are the energy challenges for Europe?
What are the energy challenges for Europe?
 
What is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, CamcoWhat is Cambridshire's potential for renewable energy? – Duncan Price, Camco
What is Cambridshire's potential for renewable energy? – Duncan Price, Camco
 
1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...
1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...
1er FUNSEAM Symposium - FCC Project Alejandro Seco - FCC ENERGY IN LATIN AMER...
 
E.on
E.onE.on
E.on
 
Cyprus Energy Market
Cyprus Energy MarketCyprus Energy Market
Cyprus Energy Market
 

Similar a Leznova JI Po A

Value Partners 9 Energy Summit Sole24Ore
Value Partners 9 Energy Summit Sole24OreValue Partners 9 Energy Summit Sole24Ore
Value Partners 9 Energy Summit Sole24OreAlessandro Leona
 
Infrastructure and new energies from planning to realization_Value Partners
Infrastructure and new energies from planning to realization_Value PartnersInfrastructure and new energies from planning to realization_Value Partners
Infrastructure and new energies from planning to realization_Value PartnersValue Partners
 
The Post-2020 Cost- Competitiveness of CCS
The Post-2020 Cost- Competitiveness of CCSThe Post-2020 Cost- Competitiveness of CCS
The Post-2020 Cost- Competitiveness of CCScanaleenergia
 
Government action to incentivise energy efficiency and deliver deregulation
Government action to incentivise energy efficiency and deliver deregulationGovernment action to incentivise energy efficiency and deliver deregulation
Government action to incentivise energy efficiency and deliver deregulationCeramics 2011
 
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Blake Morgan
 
EPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicEPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicJeffrey Phillips
 
Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07Michael P Totten
 
Manuel Romero_Pequeños Sist. para Centrales Solares Termoeléctricas
Manuel Romero_Pequeños Sist. para Centrales Solares TermoeléctricasManuel Romero_Pequeños Sist. para Centrales Solares Termoeléctricas
Manuel Romero_Pequeños Sist. para Centrales Solares TermoeléctricasIMDEA Energia
 
Stephen Long eu legislation and insulation
Stephen Long eu legislation and insulationStephen Long eu legislation and insulation
Stephen Long eu legislation and insulationnetplusz
 
Energetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaEnergetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaInsulin Angel
 
Kiomars dabbagh use of photovoltaic modules in desert climates
Kiomars dabbagh   use of photovoltaic modules in desert climatesKiomars dabbagh   use of photovoltaic modules in desert climates
Kiomars dabbagh use of photovoltaic modules in desert climatessarah7887
 
John mullins presentation
John mullins presentationJohn mullins presentation
John mullins presentationGreen17Creative
 
Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010Tuong Do
 
Copper's Contribution to Combat Climate Change
Copper's Contribution to Combat Climate ChangeCopper's Contribution to Combat Climate Change
Copper's Contribution to Combat Climate ChangeLeonardo ENERGY
 
Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...
Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...
Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...IEA DSM Implementing Agreement (IA)
 
Smart Grid
Smart GridSmart Grid
Smart GridEmTech
 
Day 1 session 1: Energy Efficiency in the EU.. What's Next?
Day 1 session 1: Energy Efficiency in the EU.. What's Next?  Day 1 session 1: Energy Efficiency in the EU.. What's Next?
Day 1 session 1: Energy Efficiency in the EU.. What's Next? RCREEE
 

Similar a Leznova JI Po A (20)

Introduction of CO2 Reduction Technologies in Steelworks
Introduction of  CO2 Reduction Technologies in SteelworksIntroduction of  CO2 Reduction Technologies in Steelworks
Introduction of CO2 Reduction Technologies in Steelworks
 
Value Partners 9 Energy Summit Sole24Ore
Value Partners 9 Energy Summit Sole24OreValue Partners 9 Energy Summit Sole24Ore
Value Partners 9 Energy Summit Sole24Ore
 
Infrastructure and new energies from planning to realization_Value Partners
Infrastructure and new energies from planning to realization_Value PartnersInfrastructure and new energies from planning to realization_Value Partners
Infrastructure and new energies from planning to realization_Value Partners
 
The Post-2020 Cost- Competitiveness of CCS
The Post-2020 Cost- Competitiveness of CCSThe Post-2020 Cost- Competitiveness of CCS
The Post-2020 Cost- Competitiveness of CCS
 
Government action to incentivise energy efficiency and deliver deregulation
Government action to incentivise energy efficiency and deliver deregulationGovernment action to incentivise energy efficiency and deliver deregulation
Government action to incentivise energy efficiency and deliver deregulation
 
Techno-economic assessment and global sensitivity analysis for biomass-based ...
Techno-economic assessment and global sensitivity analysis for biomass-based ...Techno-economic assessment and global sensitivity analysis for biomass-based ...
Techno-economic assessment and global sensitivity analysis for biomass-based ...
 
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
Carter Jonas presentation for Blake Lapthorn green breakfast on 4 May 2011
 
EPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For KpicEPRI Low CO2 Emission Coal R&D For Kpic
EPRI Low CO2 Emission Coal R&D For Kpic
 
Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07Tnc Wind Presentation 01 07
Tnc Wind Presentation 01 07
 
Manuel Romero_Pequeños Sist. para Centrales Solares Termoeléctricas
Manuel Romero_Pequeños Sist. para Centrales Solares TermoeléctricasManuel Romero_Pequeños Sist. para Centrales Solares Termoeléctricas
Manuel Romero_Pequeños Sist. para Centrales Solares Termoeléctricas
 
Stephen Long eu legislation and insulation
Stephen Long eu legislation and insulationStephen Long eu legislation and insulation
Stephen Long eu legislation and insulation
 
Energetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and TunisiaEnergetic payback time of PV: In Germany and Tunisia
Energetic payback time of PV: In Germany and Tunisia
 
Kiomars dabbagh use of photovoltaic modules in desert climates
Kiomars dabbagh   use of photovoltaic modules in desert climatesKiomars dabbagh   use of photovoltaic modules in desert climates
Kiomars dabbagh use of photovoltaic modules in desert climates
 
John mullins presentation
John mullins presentationJohn mullins presentation
John mullins presentation
 
Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010Photovoltaics - Markets and Technologies 2010
Photovoltaics - Markets and Technologies 2010
 
Copper's Contribution to Combat Climate Change
Copper's Contribution to Combat Climate ChangeCopper's Contribution to Combat Climate Change
Copper's Contribution to Combat Climate Change
 
Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...
Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...
Demand Side Management (DSM) and Energy Efficiency – Elements for Optimizing ...
 
Smart Grid
Smart GridSmart Grid
Smart Grid
 
Carbon Capture
Carbon CaptureCarbon Capture
Carbon Capture
 
Day 1 session 1: Energy Efficiency in the EU.. What's Next?
Day 1 session 1: Energy Efficiency in the EU.. What's Next?  Day 1 session 1: Energy Efficiency in the EU.. What's Next?
Day 1 session 1: Energy Efficiency in the EU.. What's Next?
 

Leznova JI Po A

  • 1. JI POA: LUMMAX CFL DISTRIBUTION PROGRAMME CME: “PRIMLIGHT LTD” PDD DEVELOPER: GFA ENVEST, SEC BIOMASS Valeriia Leznova SEC Biomass, Consultant Workshop on Programme of Activities, Cologne May 25, 2010
  • 2. Lummax CFL Distribution Programme Programme objective Replace up to 2 million ICLs with high efficient Lummax CFLs in the buildings of Ministry of Education of Ukraine: I STAGE: replacement of 150 000 ICLs with CFLs II STAGE: distribution of 185 000 CFLs Geographical scope: Kiev Region, Ukraine Applicable methodology JI specific approach Target group Buildings constructed in the 50ies and 60ies Large persistence of ICLs in the baseline case Energy saving up to 260 GWh/year Expected ERUs 230 th.t CO2eq/year Participants Primlight - Coordinating entity GFA ENVEST, SEC Biomass – PDD developer Ministry of Education of Ukraine – objects owner JI PoA status PIN is developed, LoE is obtained (15.12.2009) , pre- feasibility study.
  • 3. Background: Lummax CFL Distribution Programme Type of Working range, Working hours Working days Working hours organization hours per day per year per year Kindergartens 8.00-19.00 9,9 250 2475 School – 1st shift 8.30 – 4.0 3,85 200 770 School – 2nd 8.30-9.00 9,45 200 890 shift Universities* 8.00-21.30 10,8 220 2376 Administrations 8.00-7.00 8,1 255 2065,5 Outpatient 8.00-20.00 10 26 260 department Hospitals 24 hours 6,5 365 6022,5 Industrial 8.00-7.00 8,1 255 2065,5 enterprises *According to energy audits carried out in the university buildings. Will be used for baseline setting.
  • 4. Programme concept. Financing Sources of financing Distribute CFLs Financing, % Electricity 22% Financing of CFL Programme CO2 Emission Own funds Credit Generation of ERUs. funds ERUs sale 78%
  • 5. Proposed programme set-up CFLs Programme CFLs LUMMAX Coordinator (CFL producer) (Primlight LTD) € Buildings ERUs under the authority of € Ministry of ERUs Education Carbon buyer
  • 6. Challenges for JI PoA and JI projects in Ukraine JI PoA T2: to become operational adoption of amendments to order #206 (Ukrainian JI procedure) is needed. JI project are treated by AIEs as CDM projects during determination/verification: adoption of JI PoA procedure for T1, DVM for T1, local accreditation procedure of AIEs is needed. Lack of available AIEs for JI – strong competition with CDM projects. Nature of ERU: difficult to deal with taxation authorities in terms of revenues from ERUs sale. Legal uncertainties: rights and responsibilities of Coordinating entity, ownership of ERUs.
  • 7. Potential PoA project “Regional rehabilitation of district heating system” (on the basis of real JI project “Rehabilitation of DH systems in the Crimea” – registered under Track 1) Type of implemented equipment Number of CO2 Total JPA types units emission invest- reduction ments, ths. t/year mln Euro New gas-fired boilers for heat generation 176 6,2 Type A: Rehabilitation 78 of boiler equipment New economizers 122 1, 45 Type B: Installation of Cogeneration plant 1 10 1,5 cogeneration plant Type C: Insulation of Insulated pipelines 516 km 14 3,46 pipelines Type D: Utilization of Landfill gas capture and utilization system 1 53 1 landfill gas TOTAL : - 155 13,6
  • 8. Potential PoA project “Implementation of bioenergy activities in Ukraine” Type of equipment Ukrainian Installed CO2 Total Possible types market capacity emission invest- of JPAs volume reduction ments, MWth MWel million mln Euro t/year Wood-fired boilers for heat generation, 1-10 MW 1000 500 - 0,56 22,5 Type A: Wood- Wood-fired boilers for industry, 0.1-5 MW 500 350 - 0,53 15,8 fired boilers for heat production Wood-fired boilers for households, 10-50 kW 53000 1590 - 1,78 55,7 Straw-fired boilers, 0.1-1 MW 16000 3200 - 3,71 224 Type B: Straw- Straw-fired boilers, 1-10 MW 1400 2800 - 3,25 168 fired boilers for heat production Peat-fired boilers, 0.5-1 MW 1000 750 - 0,84 26,3 Type C: LFG usage for heat 60 90 60 2,4 30 Landfill gas and power production Small biogas installations (200-600 m3) 1200 86 54 0,44 237 Type D: Energy Farm biogas installations (600-3000 m3) 1600 434 276 1,08 1130 utilization of biogas from Large biogas installations (>3000 m3 ) 40 36 23 0,03 74,4 manure TOTAL: 75800 9836 413 14,62 1983,7
  • 9. Thank you for attention! Valeriia Leznova SEC “Biomass”, Consultant tel: 0038(044) 456 94 62 e-mail: leznova@biomass.kiev.ua www.biomass.kiev.ua