This document describes the Lummax CFL Distribution Programme in Ukraine. The programme aims to replace up to 2 million incandescent light bulbs (ICLs) with high-efficient compact fluorescent lamps (CFLs) in buildings of the Ministry of Education of Ukraine. It will be implemented in two stages - replacing 150,000 ICLs with CFLs in the first stage and distributing 185,000 additional CFLs in the second stage. The programme is expected to save up to 260 GWh per year in energy and reduce CO2 emissions by 230,000 tons per year through the sale of emission reduction units (ERUs).
Day 1 session 1: Energy Efficiency in the EU.. What's Next?
Leznova JI Po A
1. JI POA: LUMMAX CFL
DISTRIBUTION PROGRAMME
CME: “PRIMLIGHT LTD”
PDD DEVELOPER: GFA ENVEST,
SEC BIOMASS
Valeriia Leznova
SEC Biomass, Consultant
Workshop on Programme of Activities, Cologne
May 25, 2010
2. Lummax CFL Distribution Programme
Programme objective Replace up to 2 million ICLs with high efficient
Lummax CFLs in the buildings of Ministry of Education of
Ukraine:
I STAGE: replacement of 150 000 ICLs with CFLs
II STAGE: distribution of 185 000 CFLs
Geographical scope: Kiev Region, Ukraine
Applicable methodology JI specific approach
Target group Buildings constructed in the 50ies and 60ies
Large persistence of ICLs in the baseline case
Energy saving up to 260 GWh/year
Expected ERUs 230 th.t CO2eq/year
Participants Primlight - Coordinating entity
GFA ENVEST, SEC Biomass – PDD developer
Ministry of Education of Ukraine – objects owner
JI PoA status PIN is developed, LoE is obtained (15.12.2009) , pre-
feasibility study.
3. Background: Lummax CFL
Distribution Programme
Type of Working range, Working hours Working days Working hours
organization hours per day per year per year
Kindergartens 8.00-19.00 9,9 250 2475
School – 1st shift 8.30 – 4.0 3,85 200 770
School – 2nd 8.30-9.00 9,45 200 890
shift
Universities* 8.00-21.30 10,8 220 2376
Administrations 8.00-7.00 8,1 255 2065,5
Outpatient 8.00-20.00 10 26 260
department
Hospitals 24 hours 6,5 365 6022,5
Industrial 8.00-7.00 8,1 255 2065,5
enterprises
*According to energy audits carried out in the university buildings.
Will be used for baseline setting.
4. Programme concept. Financing
Sources of
financing
Distribute CFLs
Financing, %
Electricity 22%
Financing of CFL
Programme CO2 Emission Own
funds
Credit
Generation of ERUs. funds
ERUs sale 78%
5. Proposed programme set-up
CFLs
Programme CFLs
LUMMAX Coordinator
(CFL producer) (Primlight LTD)
€ Buildings
ERUs
under the
authority of
€ Ministry of
ERUs Education
Carbon buyer
6. Challenges for JI PoA and JI projects
in Ukraine
JI PoA T2: to become operational adoption of amendments
to order #206 (Ukrainian JI procedure) is needed.
JI project are treated by AIEs as CDM projects during
determination/verification: adoption of JI PoA procedure for
T1, DVM for T1, local accreditation procedure of AIEs is
needed.
Lack of available AIEs for JI – strong competition with CDM
projects.
Nature of ERU: difficult to deal with taxation authorities in
terms of revenues from ERUs sale.
Legal uncertainties: rights and responsibilities of
Coordinating entity, ownership of ERUs.
7. Potential PoA project
“Regional rehabilitation of district heating system”
(on the basis of real JI project “Rehabilitation of DH systems in the Crimea” –
registered under Track 1)
Type of implemented equipment Number of CO2 Total JPA types
units emission invest-
reduction ments,
ths. t/year mln Euro
New gas-fired boilers for heat generation 176 6,2 Type A: Rehabilitation
78 of boiler equipment
New economizers 122 1, 45
Type B: Installation of
Cogeneration plant 1 10 1,5 cogeneration plant
Type C: Insulation of
Insulated pipelines 516 km 14 3,46 pipelines
Type D: Utilization of
Landfill gas capture and utilization system 1 53 1
landfill gas
TOTAL :
- 155 13,6
8. Potential PoA project “Implementation of bioenergy activities in
Ukraine”
Type of equipment Ukrainian Installed CO2 Total Possible types
market capacity emission invest- of JPAs
volume reduction ments,
MWth MWel million mln Euro
t/year
Wood-fired boilers for heat generation, 1-10 MW 1000 500 - 0,56 22,5 Type A: Wood-
Wood-fired boilers for industry, 0.1-5 MW 500 350 - 0,53 15,8 fired boilers for
heat production
Wood-fired boilers for households, 10-50 kW 53000 1590 - 1,78 55,7
Straw-fired boilers, 0.1-1 MW 16000 3200 - 3,71 224 Type B: Straw-
Straw-fired boilers, 1-10 MW 1400 2800 - 3,25 168 fired boilers for
heat production
Peat-fired boilers, 0.5-1 MW 1000 750 - 0,84 26,3
Type C: LFG
usage for heat
60 90 60 2,4 30
Landfill gas and power
production
Small biogas installations (200-600 m3) 1200 86 54 0,44 237 Type D: Energy
Farm biogas installations (600-3000 m3) 1600 434 276 1,08 1130 utilization of
biogas from
Large biogas installations (>3000 m3 ) 40 36 23 0,03 74,4 manure
TOTAL: 75800 9836 413 14,62 1983,7
9. Thank you for attention!
Valeriia Leznova
SEC “Biomass”, Consultant
tel: 0038(044) 456 94 62
e-mail: leznova@biomass.kiev.ua