SlideShare una empresa de Scribd logo
1 de 4
VANDANA BOLAR
OBJECTIVE -
I want to be a leader who can provide the diversity advantage and inspire
my team to excel and grow to contribute in line with business goals and
priorities.
HIGHLIGHTS OF EXPERIENCE -
 IT Professional with 12 years of experience in Project Management, Test
Factory Operations and Customer Relationship management.
 Working as Project manager responsible for running Test factory operations
and deliverables for our key client in Netherlands.
SKILL Set
Testing domain-
 Defect reporting standardization; wherein a single defect is reported based on
the analysis to reduce the pressure on development teams.
 Continuous testing using In-Sprint automation to ensure early detection of
defects.
 Lean testing is achieved through optimal Test case management, effective
defect manage and regular process refinement.
 Currently leading a team of 6 team leads & 80 engineers
 Have driven Compliance process for Patenting
Managerial -
 Understanding the client’s business requirements and providing them with
optimal Project delivery plan. This involves scope definition, planning, risk
assessment and executing the plan.
 Conduct review meetings to track the progress of projects and ensure timely
completion of project to the clients
 Managing stake-holder communication and ongoing relationship between
Project and client teams
 Skill assessment and training plans
 People management : Hiring and managing high performers
 Manage SLA and client deliverables
Total Experience:
12 Years
Permanent Address:
20/14, 23rd Main Road, Girinagar
T Block, Bangalore – 560 085
Mobile:
+91 - 9886788641
E-mail Id:
vbolar@gmail.com;
Date of Birth:
19th August 1979.
Professional Qualification
Master of Computer Application –
Bangalore University
Areas of Expertise:
Skills:
Test factory operations
Manual/Whitebox testing
People Management
Customer relationship management
Project Management
Transitions
Compliance Management
Programming Languages :
Embedded C, C#, VB, .Net,
Operating Systems : OSEK
Other tools:
Enterprise Tester, Microsoft
TFS, JIRA, Metrowerks Code,
I-System -2008/2009,
VCS, MKS,
AVR Studio 4,
Hi wave debugger,
ZAP debugger,
PolySpace 2009B,
CANTATA ++ 4.0,
 Description
Philips has outsourced Test Factory operations to us and we are accountable
to ensure successful rollout of new applications and products using right test
tools and techniques in DevOps and Agile environment. This project is very
challenging as they have outsourced various aspects of application delivery
to different partners and I am accountable to manage stakeholders from
client team and also vendor project teams. We manage Functional, Mobile,
Performance and Security testing.
 Contribution:
1. Client Account Management through effective communication and regular
meetings.
2. Transitioned critical projects from Onshore to offshore teams, significantly
increasing business revenue to our organization.
3. 100% Operational Quality testing to be in line with FDA standards.
4. Lean testing is achieved through optimal Test case management, effective
defect manage and regular process refinement.
5. Continuous testing using In-Sprint automation to ensure early detection
of defects.
6. E2E testing is a must when multiple interfaces are affected while
implementing a change. Hence tools like SOAP UI, Putty are used along
with database testing to ensure that software change is not affecting
interfacing components.
7. SLA Management, Stakeholder Management, Conflict Management,
Quality Management, Time & Cost Management, Risk Management
8. Continuously improved the performance of the team by employing proven
project management techniques - used schedule compression techniques
to improve team throughput, automating manual task.
9. Used right leadership styles to resolve conflicts, manage crisis and improve
team motivation levels at all time.
10. Track and facilitate knowledge sharing, Analysis & implementation of
defect prevention measures, Process Documentation.
11. Implemented a program to drive regular Skill assessment and
enhancement to meet project requirements.
 Description:
Multimedia Games (MGAM) is dedicated to seek continuous process
improvements. TechM is a CMM-I 5 capable organization and is a good
partner for MGAM in their quest for continuous process improvement. The
continued growth of MGAMs capacity requires a higher level of quality
achievement. MGAM seeks to strengthen their relationship with TechM
through partnering in the goal of improved quality. MGAM produces Class II-
Bingo and Lottery games, Class III games and MForce games. Slot Machines
(Video or Mechanical) are used to play these games. It has a dedicated QA
group that conducts functional & acceptance testing of all the game and
platform releases that are developed by MGAM.
Tech Mahindra | Bangalore, India
Project 2
Name:Multimedia Games– Casino
Games
Client:
Multimedia Games.
Organization:
Tech Mahindra
Duration: 48 months
Team Size: 20
Role: Test Manager
Hardware:
Electronic and Mechanical Gaming
Machine
Skills: Manual testing and Domain
Knowledge
Tools: Enterprise Tester, JIRA
Project 1
Name: Test Factory Operations
Client: Philips
Organization:
Tech Mahindra
Duration: 18 months
Team Size: 90
Role: Project Manager
Tools: ALM, Rally, Eloqua,
SoapUI, etc
 Contribution:
1) Onshore to offshore teams, significantly increasing business revenue to
our organization.
2) Improved Quality Control: First Pass fault detection is > 80%.against
the target of 75%.
4) Test execution run rate per person per day: Achieved 30 + against the
target of 25.
5) Defect detection efficiency: Achieved 96% against the target of 90%.
6) Conducted technical trainings for the team as internal faculty.
7) Implemented a program to drive regular Skill assessment and
enhancement to meet project requirements.
8) Creating new test case based on the dynamics and updating them just
in time.
9) End to End Game testing of Class III, Class II- Bingo & Lottery games
and MForce games to ensure certification by ITL
10) Effective usage of Enterprise Tester tool for various types of testing
requirements.
11) Preparing reports and creating decks for Client meetings
12) Implemented tools to help sharing of knowledge and best practices
 Description:
The project involved the verification and validation of EPB3 (Electric Park
Brake) software. The static analysis was performed on the complete EPB
software using PR QA-C Static Source code analyzer – 7.0. The software was
verified for conformance to MISRA C Guidelines. Also run-time analysis was
performed on complete EPB software using PolySpace – 2009B.
Failsafe/White Box Testing for conformance of system reactions according to
the spec under different system failures. These activities were performed for
different releases of the EPB Software.
 Contribution:
1) Responsible for carrying out static & run-time analysis for EPB Software.
2) The test harness and the source code tuning required for the run of
PolySPace and QAC was determined.
3) Procedural documents for QA-C Analysis, PolySpace Analysis, Design
Guidelines, Shared variables Analysis & documenting best practices
4) Worked on Automation of PolySpace and QAC testing by creating wizard.
5) Failsafe Testing is organized to observe system behavior and the display
information to driver whenever some critical faults occur in system.
6) Test plan and test cases were generated for CANTATA testing once the
test harness is done. Test case was executed with more than 95% code
coverage.
7) Reviewing of the work-products & deliverables, applying defect
prevention techniques and delivering zero defect deliverables.
8) At the end of every release, identifying the lessons learnt and creating
training material for the team
9) Trained new team members with various tools, processes and practices
followed in V&V activities.
Project 3
Name: V&V(Testing activities)
(Ford, Volvo, Audi, Daimler,
VW, Hyundai)
Client: TRW Automotive,
Koblenz, Germany
Role: Module Lead
Duration: 54 months.
Team Size: 6
Skills: Embedded C.
Tools: Canoe 7.0, IAR compiler,
QA C 7.0 , PolySpace 2009B,
CANTATA++ 4.0
 Description:
In Electric park Brake software, it requires Task level safety critical feature
which provides extensive checking mechanism about the System /Task level
functioning. This feature called as Program flow diagnostic. The feature
requirement exhibits instruction set Test of Main Micro and the Program Flow
Test Monitor.
The Program Flow Monitor is designed to ensure complete and proper
execution of all the OS Tasks and the various Task/module level functions
called from these OS Tasks thereby ensuring that the program flow is
maintained as per design.
 Contribution:
1) Responsible for analyzing and proposing strategy with accordance to
feasibility for the program flow implementation.
2) Had significant contribution for determining the timing and scheduling of
the Task’s involved in Program flow Test.
3) For pre-emptive scheduler, had suggested new Task for the Program flow
test and its scheduling point.
4) Planning and creating the test schedule.
Project 4
Name: Program Flow
Implementation – Electric Park
Brake ( VW, Audi , BMW)
Client: TRW Automotive, U.K.
Duration: 24 months
Team Size: 2
Role: Module Lead
Hardware: MC9S12DP256 /
MC9S12XDP512V2
Skills: C, OSEK
Tools: Canoe 6.0, Agilent – CRO,
Cosmic (CX6812) / Metrowerks,
I-System

Más contenido relacionado

La actualidad más candente

La actualidad más candente (18)

Resume_Chandhru-NOV-2016
Resume_Chandhru-NOV-2016Resume_Chandhru-NOV-2016
Resume_Chandhru-NOV-2016
 
Suma_Halkude_Resume
Suma_Halkude_ResumeSuma_Halkude_Resume
Suma_Halkude_Resume
 
Diljith Abraham -Test Specialist
Diljith Abraham -Test Specialist Diljith Abraham -Test Specialist
Diljith Abraham -Test Specialist
 
Anuradha_Resume_10 Years
Anuradha_Resume_10 YearsAnuradha_Resume_10 Years
Anuradha_Resume_10 Years
 
Shalini Sharma Resume
Shalini Sharma ResumeShalini Sharma Resume
Shalini Sharma Resume
 
Manual Testing Material by Durgasoft
Manual Testing Material by DurgasoftManual Testing Material by Durgasoft
Manual Testing Material by Durgasoft
 
Madhav_Resume
Madhav_ResumeMadhav_Resume
Madhav_Resume
 
Manual Testing Notes
Manual Testing NotesManual Testing Notes
Manual Testing Notes
 
Resume arti soni
Resume arti soniResume arti soni
Resume arti soni
 
Complete testing@uma
Complete testing@umaComplete testing@uma
Complete testing@uma
 
RajivRanjan_Resume
RajivRanjan_ResumeRajivRanjan_Resume
RajivRanjan_Resume
 
NICKESHANIXONRESUME
NICKESHANIXONRESUMENICKESHANIXONRESUME
NICKESHANIXONRESUME
 
K Chandrasekaran
K ChandrasekaranK Chandrasekaran
K Chandrasekaran
 
Software tester_6+ yrs of experience
Software tester_6+ yrs of experienceSoftware tester_6+ yrs of experience
Software tester_6+ yrs of experience
 
Gladwin_Resume_2015
Gladwin_Resume_2015Gladwin_Resume_2015
Gladwin_Resume_2015
 
Gavish_Sharma Resume
Gavish_Sharma ResumeGavish_Sharma Resume
Gavish_Sharma Resume
 
Resume (Oct 2012)
Resume (Oct 2012)Resume (Oct 2012)
Resume (Oct 2012)
 
Sumanth
SumanthSumanth
Sumanth
 

Destacado

Destacado (6)

Cv yogesh sheth-latest2016-slide-share
Cv yogesh sheth-latest2016-slide-shareCv yogesh sheth-latest2016-slide-share
Cv yogesh sheth-latest2016-slide-share
 
KUMAR BHANU PM V2.0
KUMAR BHANU PM V2.0KUMAR BHANU PM V2.0
KUMAR BHANU PM V2.0
 
Exponential organizations
Exponential organizationsExponential organizations
Exponential organizations
 
Resume Pamela Hooyman_20170121
Resume Pamela Hooyman_20170121Resume Pamela Hooyman_20170121
Resume Pamela Hooyman_20170121
 
SriramWriterResume
SriramWriterResumeSriramWriterResume
SriramWriterResume
 
Kumar swaminathan resume -pmp-csm-itil
Kumar swaminathan resume -pmp-csm-itilKumar swaminathan resume -pmp-csm-itil
Kumar swaminathan resume -pmp-csm-itil
 

Similar a Vandana B

Chethan Updated Resume
Chethan Updated ResumeChethan Updated Resume
Chethan Updated ResumeChethan H
 
Mridul_Mandal_Resume_5+yrs_QA
Mridul_Mandal_Resume_5+yrs_QAMridul_Mandal_Resume_5+yrs_QA
Mridul_Mandal_Resume_5+yrs_QAMridul Mandal
 
Mahendra-9+yrs-testing-VMware Resume
Mahendra-9+yrs-testing-VMware ResumeMahendra-9+yrs-testing-VMware Resume
Mahendra-9+yrs-testing-VMware Resumemahi aluri
 
Software Test Engineer with 3.6 years of experience
Software Test Engineer with 3.6 years of experienceSoftware Test Engineer with 3.6 years of experience
Software Test Engineer with 3.6 years of experiencevijaya lakshmi
 
Samal biswa manual tester-functional-accessibility
Samal biswa manual tester-functional-accessibilitySamal biswa manual tester-functional-accessibility
Samal biswa manual tester-functional-accessibilitysamal biswa
 
Neha Arora_Resume
Neha Arora_ResumeNeha Arora_Resume
Neha Arora_ResumeNeha Arora
 
Sindhuri 4 plus Testing Resume
Sindhuri 4 plus Testing ResumeSindhuri 4 plus Testing Resume
Sindhuri 4 plus Testing ResumeSindhuri Maram
 
Sridhar Shanmugam
Sridhar ShanmugamSridhar Shanmugam
Sridhar ShanmugamSridhar S
 
Babus Resume
Babus ResumeBabus Resume
Babus Resumeram p
 

Similar a Vandana B (20)

Chethan Updated Resume
Chethan Updated ResumeChethan Updated Resume
Chethan Updated Resume
 
Resume_Chandhru-NOV-2016
Resume_Chandhru-NOV-2016Resume_Chandhru-NOV-2016
Resume_Chandhru-NOV-2016
 
Resume-Ramchandra Gupta
Resume-Ramchandra GuptaResume-Ramchandra Gupta
Resume-Ramchandra Gupta
 
Ganesh_Gopalakrishnan
Ganesh_GopalakrishnanGanesh_Gopalakrishnan
Ganesh_Gopalakrishnan
 
Mridul_Mandal_Resume_5+yrs_QA
Mridul_Mandal_Resume_5+yrs_QAMridul_Mandal_Resume_5+yrs_QA
Mridul_Mandal_Resume_5+yrs_QA
 
Krishna Pingali_Senior Consultant - QA
Krishna Pingali_Senior Consultant - QAKrishna Pingali_Senior Consultant - QA
Krishna Pingali_Senior Consultant - QA
 
Mahendra-9+yrs-testing-VMware Resume
Mahendra-9+yrs-testing-VMware ResumeMahendra-9+yrs-testing-VMware Resume
Mahendra-9+yrs-testing-VMware Resume
 
Pravin_CV_4+years
Pravin_CV_4+yearsPravin_CV_4+years
Pravin_CV_4+years
 
Karthik.S_Resume_Exp 4.11 yrs
Karthik.S_Resume_Exp 4.11 yrsKarthik.S_Resume_Exp 4.11 yrs
Karthik.S_Resume_Exp 4.11 yrs
 
Software Test Engineer with 3.6 years of experience
Software Test Engineer with 3.6 years of experienceSoftware Test Engineer with 3.6 years of experience
Software Test Engineer with 3.6 years of experience
 
reham_cv (1)
reham_cv (1)reham_cv (1)
reham_cv (1)
 
Samal biswa manual tester-functional-accessibility
Samal biswa manual tester-functional-accessibilitySamal biswa manual tester-functional-accessibility
Samal biswa manual tester-functional-accessibility
 
Praveen Kumar Vemuri
Praveen Kumar VemuriPraveen Kumar Vemuri
Praveen Kumar Vemuri
 
VidyaManjunath_CV
VidyaManjunath_CVVidyaManjunath_CV
VidyaManjunath_CV
 
Resume_Sahida Sultana
Resume_Sahida SultanaResume_Sahida Sultana
Resume_Sahida Sultana
 
Neha Arora_Resume
Neha Arora_ResumeNeha Arora_Resume
Neha Arora_Resume
 
Sindhuri 4 plus Testing Resume
Sindhuri 4 plus Testing ResumeSindhuri 4 plus Testing Resume
Sindhuri 4 plus Testing Resume
 
Resume
ResumeResume
Resume
 
Sridhar Shanmugam
Sridhar ShanmugamSridhar Shanmugam
Sridhar Shanmugam
 
Babus Resume
Babus ResumeBabus Resume
Babus Resume
 

Vandana B

  • 1. VANDANA BOLAR OBJECTIVE - I want to be a leader who can provide the diversity advantage and inspire my team to excel and grow to contribute in line with business goals and priorities. HIGHLIGHTS OF EXPERIENCE -  IT Professional with 12 years of experience in Project Management, Test Factory Operations and Customer Relationship management.  Working as Project manager responsible for running Test factory operations and deliverables for our key client in Netherlands. SKILL Set Testing domain-  Defect reporting standardization; wherein a single defect is reported based on the analysis to reduce the pressure on development teams.  Continuous testing using In-Sprint automation to ensure early detection of defects.  Lean testing is achieved through optimal Test case management, effective defect manage and regular process refinement.  Currently leading a team of 6 team leads & 80 engineers  Have driven Compliance process for Patenting Managerial -  Understanding the client’s business requirements and providing them with optimal Project delivery plan. This involves scope definition, planning, risk assessment and executing the plan.  Conduct review meetings to track the progress of projects and ensure timely completion of project to the clients  Managing stake-holder communication and ongoing relationship between Project and client teams  Skill assessment and training plans  People management : Hiring and managing high performers  Manage SLA and client deliverables Total Experience: 12 Years Permanent Address: 20/14, 23rd Main Road, Girinagar T Block, Bangalore – 560 085 Mobile: +91 - 9886788641 E-mail Id: vbolar@gmail.com; Date of Birth: 19th August 1979. Professional Qualification Master of Computer Application – Bangalore University Areas of Expertise: Skills: Test factory operations Manual/Whitebox testing People Management Customer relationship management Project Management Transitions Compliance Management Programming Languages : Embedded C, C#, VB, .Net, Operating Systems : OSEK Other tools: Enterprise Tester, Microsoft TFS, JIRA, Metrowerks Code, I-System -2008/2009, VCS, MKS, AVR Studio 4, Hi wave debugger, ZAP debugger, PolySpace 2009B, CANTATA ++ 4.0,
  • 2.  Description Philips has outsourced Test Factory operations to us and we are accountable to ensure successful rollout of new applications and products using right test tools and techniques in DevOps and Agile environment. This project is very challenging as they have outsourced various aspects of application delivery to different partners and I am accountable to manage stakeholders from client team and also vendor project teams. We manage Functional, Mobile, Performance and Security testing.  Contribution: 1. Client Account Management through effective communication and regular meetings. 2. Transitioned critical projects from Onshore to offshore teams, significantly increasing business revenue to our organization. 3. 100% Operational Quality testing to be in line with FDA standards. 4. Lean testing is achieved through optimal Test case management, effective defect manage and regular process refinement. 5. Continuous testing using In-Sprint automation to ensure early detection of defects. 6. E2E testing is a must when multiple interfaces are affected while implementing a change. Hence tools like SOAP UI, Putty are used along with database testing to ensure that software change is not affecting interfacing components. 7. SLA Management, Stakeholder Management, Conflict Management, Quality Management, Time & Cost Management, Risk Management 8. Continuously improved the performance of the team by employing proven project management techniques - used schedule compression techniques to improve team throughput, automating manual task. 9. Used right leadership styles to resolve conflicts, manage crisis and improve team motivation levels at all time. 10. Track and facilitate knowledge sharing, Analysis & implementation of defect prevention measures, Process Documentation. 11. Implemented a program to drive regular Skill assessment and enhancement to meet project requirements.  Description: Multimedia Games (MGAM) is dedicated to seek continuous process improvements. TechM is a CMM-I 5 capable organization and is a good partner for MGAM in their quest for continuous process improvement. The continued growth of MGAMs capacity requires a higher level of quality achievement. MGAM seeks to strengthen their relationship with TechM through partnering in the goal of improved quality. MGAM produces Class II- Bingo and Lottery games, Class III games and MForce games. Slot Machines (Video or Mechanical) are used to play these games. It has a dedicated QA group that conducts functional & acceptance testing of all the game and platform releases that are developed by MGAM. Tech Mahindra | Bangalore, India Project 2 Name:Multimedia Games– Casino Games Client: Multimedia Games. Organization: Tech Mahindra Duration: 48 months Team Size: 20 Role: Test Manager Hardware: Electronic and Mechanical Gaming Machine Skills: Manual testing and Domain Knowledge Tools: Enterprise Tester, JIRA Project 1 Name: Test Factory Operations Client: Philips Organization: Tech Mahindra Duration: 18 months Team Size: 90 Role: Project Manager Tools: ALM, Rally, Eloqua, SoapUI, etc
  • 3.  Contribution: 1) Onshore to offshore teams, significantly increasing business revenue to our organization. 2) Improved Quality Control: First Pass fault detection is > 80%.against the target of 75%. 4) Test execution run rate per person per day: Achieved 30 + against the target of 25. 5) Defect detection efficiency: Achieved 96% against the target of 90%. 6) Conducted technical trainings for the team as internal faculty. 7) Implemented a program to drive regular Skill assessment and enhancement to meet project requirements. 8) Creating new test case based on the dynamics and updating them just in time. 9) End to End Game testing of Class III, Class II- Bingo & Lottery games and MForce games to ensure certification by ITL 10) Effective usage of Enterprise Tester tool for various types of testing requirements. 11) Preparing reports and creating decks for Client meetings 12) Implemented tools to help sharing of knowledge and best practices  Description: The project involved the verification and validation of EPB3 (Electric Park Brake) software. The static analysis was performed on the complete EPB software using PR QA-C Static Source code analyzer – 7.0. The software was verified for conformance to MISRA C Guidelines. Also run-time analysis was performed on complete EPB software using PolySpace – 2009B. Failsafe/White Box Testing for conformance of system reactions according to the spec under different system failures. These activities were performed for different releases of the EPB Software.  Contribution: 1) Responsible for carrying out static & run-time analysis for EPB Software. 2) The test harness and the source code tuning required for the run of PolySPace and QAC was determined. 3) Procedural documents for QA-C Analysis, PolySpace Analysis, Design Guidelines, Shared variables Analysis & documenting best practices 4) Worked on Automation of PolySpace and QAC testing by creating wizard. 5) Failsafe Testing is organized to observe system behavior and the display information to driver whenever some critical faults occur in system. 6) Test plan and test cases were generated for CANTATA testing once the test harness is done. Test case was executed with more than 95% code coverage. 7) Reviewing of the work-products & deliverables, applying defect prevention techniques and delivering zero defect deliverables. 8) At the end of every release, identifying the lessons learnt and creating training material for the team 9) Trained new team members with various tools, processes and practices followed in V&V activities. Project 3 Name: V&V(Testing activities) (Ford, Volvo, Audi, Daimler, VW, Hyundai) Client: TRW Automotive, Koblenz, Germany Role: Module Lead Duration: 54 months. Team Size: 6 Skills: Embedded C. Tools: Canoe 7.0, IAR compiler, QA C 7.0 , PolySpace 2009B, CANTATA++ 4.0
  • 4.  Description: In Electric park Brake software, it requires Task level safety critical feature which provides extensive checking mechanism about the System /Task level functioning. This feature called as Program flow diagnostic. The feature requirement exhibits instruction set Test of Main Micro and the Program Flow Test Monitor. The Program Flow Monitor is designed to ensure complete and proper execution of all the OS Tasks and the various Task/module level functions called from these OS Tasks thereby ensuring that the program flow is maintained as per design.  Contribution: 1) Responsible for analyzing and proposing strategy with accordance to feasibility for the program flow implementation. 2) Had significant contribution for determining the timing and scheduling of the Task’s involved in Program flow Test. 3) For pre-emptive scheduler, had suggested new Task for the Program flow test and its scheduling point. 4) Planning and creating the test schedule. Project 4 Name: Program Flow Implementation – Electric Park Brake ( VW, Audi , BMW) Client: TRW Automotive, U.K. Duration: 24 months Team Size: 2 Role: Module Lead Hardware: MC9S12DP256 / MC9S12XDP512V2 Skills: C, OSEK Tools: Canoe 6.0, Agilent – CRO, Cosmic (CX6812) / Metrowerks, I-System