SlideShare una empresa de Scribd logo
1 de 1
Descargar para leer sin conexión
Tel: 781-878-4540, Fax: 781-871-1853, 800-654-4993
nyrej.com Tuesday, June 20, 2017Reprint
New York Real Estate Journal
American Inst. forArchitects 2017 documents:
Striking just the right balance for property owners?
VirginiaTrunkes
Borah, Goldstein,
Altschuler, Nahins
& Goidel, P.C.
Everyyearthatendswitha“7”is
anexcitingtimeforthosewhofollow
trends in construction contracts! It
is when the American Institute for
Architects (AIA) issues an updat-
ed set of its famed standard-form
agreements, which include the
well-known A-101, A-201, B-101,
etc. The AIA continues this tradi-
tion as a service to the industry in
which architects play an integral
role, along with the contractor and
owner. After all, times change,
economies change, and different
business challenges arise, all of
which must be incorporated into
importantcommercialagreements.
Inasmuch as the AIA offers its
agreements for sale, and because it
competes with other organizations
sellingtheirownsetsofagreements
(e.g., ConsensusDOCS), it is eco-
nomically incentivized to keep its
agreements relevant. While the
AIA remains the industry leader, it
is no secret that its agreements tend
to favor the architect in how they
define service scopes and allocate
risk.(Indeed,majorcontractortrade
associations such as theAssociated
General Contractors of America
have chosen to endorse only the
ConsensusDOCS.) These consid-
erations are crucial because every
constructionprojectcontainscertain
inherent and unpredictable risks
which need to be borne–somehow.
Should a property owner use
the AIA agreements “as is?” Or
should the owner modify them, or
use other agreements with varying
service-scope defining and risk
allocation provisions? The answer
depends on the owner’s objectives.
How does the owner view the
separate roles of the architect and
contractor? Following the design
phase, will the architect serve as a
key project administrator and facil-
itator, or as more of a consultant?
Note that it is not uncommon for a
contractor to resist contract terms
affording the architect the ultimate
decision-making authority.
An owner’s preference for which
type of agreement to use may de-
pend on the size of the project or
the owner’s development/renova-
tion experience–or not. While all
three players–owners, architects
and contractors–share the goal of
completinganintactprojectontime
andonbudget,underthetraditional
design-bid-build structure (versus
design-build), the roles and the
responsibilities differ.The contrac-
tor and its team of subcontractors
implement the architect’s drawings
and specifications. The architect
must ensure that his or her vision is
effectuatedproperly,whilethecon-
tractor must be able to implement
its means and methods to perform
the work effectively.
A large, experienced developer
may not want or need an architect
to walk it through the process and
confirm that the contractor is per-
forming (and issuing requisitions)
as anticipated. On the other hand, a
large,experienceddeveloperwork-
ing with a “hot” architect creating
a cutting-edge exterior design may
not want to shove the architect over
to the sidelines.
Provisionsinconstructionagree-
ments reflecting the architect-con-
tractor tension focus on which
party, architect or contractor, com-
municates directly with the owner;
prepares regular project progres-
sion reports; reviews and makes
recommendations on applications
for payment; prepares change
orders and construction change
directives;decidesonwhetherwork
is non-conforming and should be
rejected; chooses disputed mone-
tary amounts; decides on payment
withholding; and is the first-line
negotiator and resolver of disputes.
For the past decade, the A201-
2007 (the A201 is the “keystone”
document adopted by reference in
owner/architect, owner/contractor,
andcontractor/subcontractoragree-
ments) has essentially assigned all
rights to the architect. In contrast,
the ConsensusDOCS Owner-Con-
tractor agreement, the CD 200, has
provided for discussions directly
between the owner and contractor,
andathird-party“disputemitigation
procedure”–with no substantive
reference to the architect.
The new A201-2017 addresses
the architect-contractor tug-of-war
withsomemorecontractor-friendly
terms, e.g., reducing the burden on
the contractor to be aware of poten-
tialcopyrightorpatentinfringement
(§ 3.17). Less contractor-friendly
terms include one which clarifies
that control over the means and
methods is within the sole province
of the contractor, with the unequiv-
ocal corresponding responsibility
forjobsitesafety,includinganaddi-
tional onus on the contractor, in the
event the contract documents give
specific instructions about means
and methods that the contractor
perceives as unsafe, to propose
alternative means and methods, to
be then evaluated by the architect
“solely for conformance with the
design intent for the completed
construction (§ 3.3.1). Other less
contractor-friendly terms include
requiring(versus“endeavorto”)that
theownerandcontractorincludethe
architect in their communications
relating to the architect’s services
(§ 4.2.4); eliminating the provision
absolvingthecontractorfromliabil-
ityfor“rely[ing]upontheadequacy
and accuracy of the performance
and design criteria specified in the
contract documents” (§ 3.12.10.1);
andoutrightpermittingthearchitect
to“order,”versus“authorize,”minor
changes in the work without an up-
ward adjustment to the contractor’s
fee (§ 4.2.8).
The owner should strive for a
comfortable balance preserving
the resource of an independent,
licensed design professional to of-
fer assessments and support, while
also providing an accommodating
climate for its entrusted contractor.
Virginia Trunkes is a partner at Borah,
Goldstein,Altschuler,Nahins & Goidel,
P.C.,New York,N.Y.

Más contenido relacionado

La actualidad más candente (6)

Contracting Methods
Contracting MethodsContracting Methods
Contracting Methods
 
Architect-Led Design-Build: a PRACTICAL business plan
Architect-Led Design-Build:  a PRACTICAL business planArchitect-Led Design-Build:  a PRACTICAL business plan
Architect-Led Design-Build: a PRACTICAL business plan
 
Benefits of Hiring a General Contractor
Benefits of Hiring a General ContractorBenefits of Hiring a General Contractor
Benefits of Hiring a General Contractor
 
ACH 231 Lecture 06 (Project Delivery)
ACH 231 Lecture 06 (Project Delivery)ACH 231 Lecture 06 (Project Delivery)
ACH 231 Lecture 06 (Project Delivery)
 
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law ConferenceClaim Preparation and Project Records - 2014 Olswang Construction Law Conference
Claim Preparation and Project Records - 2014 Olswang Construction Law Conference
 
The NEW Role of the AIA's Digital Practice Documents
The NEW Role of the AIA's Digital Practice DocumentsThe NEW Role of the AIA's Digital Practice Documents
The NEW Role of the AIA's Digital Practice Documents
 

Similar a Virginia trunkes-nyrej-6.20-article

3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
Praveen Premkumar
 
Construction Contracts Common Interest Developments
Construction Contracts Common Interest DevelopmentsConstruction Contracts Common Interest Developments
Construction Contracts Common Interest Developments
Construction Cicerone
 
Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916
George Wilkinson
 
Behold The Construction Contract
Behold The Construction ContractBehold The Construction Contract
Behold The Construction Contract
GarrettLudwig
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1
reddvise
 
5 Risks Construction Owners Face
5 Risks Construction Owners Face5 Risks Construction Owners Face
5 Risks Construction Owners Face
Mark McCarthy
 
Assignment #1Understanding the Relationships in the.docx
Assignment #1Understanding the Relationships in the.docxAssignment #1Understanding the Relationships in the.docx
Assignment #1Understanding the Relationships in the.docx
davezstarr61655
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)
Melvin Lim
 

Similar a Virginia trunkes-nyrej-6.20-article (20)

3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
 
Types of contracts
Types of contracts   Types of contracts
Types of contracts
 
Construction Contracts Common Interest Developments
Construction Contracts Common Interest DevelopmentsConstruction Contracts Common Interest Developments
Construction Contracts Common Interest Developments
 
Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916Ethics and Integated Design-Build services 062916
Ethics and Integated Design-Build services 062916
 
Behold The Construction Contract
Behold The Construction ContractBehold The Construction Contract
Behold The Construction Contract
 
TE&A news
TE&A newsTE&A news
TE&A news
 
Construction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of ResidencesConstruction Contract Issues for Owners of Residences
Construction Contract Issues for Owners of Residences
 
Ipwea inspire-issue-12- nov-2019- managing contractors (1)
Ipwea inspire-issue-12- nov-2019- managing contractors (1)Ipwea inspire-issue-12- nov-2019- managing contractors (1)
Ipwea inspire-issue-12- nov-2019- managing contractors (1)
 
An Empirical Investigation into the Origins and Causes of Variation Orders in...
An Empirical Investigation into the Origins and Causes of Variation Orders in...An Empirical Investigation into the Origins and Causes of Variation Orders in...
An Empirical Investigation into the Origins and Causes of Variation Orders in...
 
Guide to Construction Procurement Strategies
Guide to Construction Procurement StrategiesGuide to Construction Procurement Strategies
Guide to Construction Procurement Strategies
 
Contractual Steps for Smooth Delivery of Infrastructure Projects
Contractual Steps for Smooth Delivery of Infrastructure ProjectsContractual Steps for Smooth Delivery of Infrastructure Projects
Contractual Steps for Smooth Delivery of Infrastructure Projects
 
Your Construction Subcontract. The 23 Points That Matter Most
Your Construction Subcontract. The 23 Points That Matter MostYour Construction Subcontract. The 23 Points That Matter Most
Your Construction Subcontract. The 23 Points That Matter Most
 
Against all odds
Against all odds Against all odds
Against all odds
 
What has changed since the crash of 2008
What has changed since the crash of 2008What has changed since the crash of 2008
What has changed since the crash of 2008
 
Risk Mitigation In Construction Contracts
Risk Mitigation In Construction ContractsRisk Mitigation In Construction Contracts
Risk Mitigation In Construction Contracts
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1
 
5 Risks Construction Owners Face
5 Risks Construction Owners Face5 Risks Construction Owners Face
5 Risks Construction Owners Face
 
Assignment #1Understanding the Relationships in the.docx
Assignment #1Understanding the Relationships in the.docxAssignment #1Understanding the Relationships in the.docx
Assignment #1Understanding the Relationships in the.docx
 
early morning retirement center
early morning retirement centerearly morning retirement center
early morning retirement center
 
Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)Seminar Presentation Slides (Chapter 2)
Seminar Presentation Slides (Chapter 2)
 

Más de Virginia Trunkes (7)

Settlement Releases and Waiving the "Unknown"
Settlement Releases and Waiving the "Unknown"Settlement Releases and Waiving the "Unknown"
Settlement Releases and Waiving the "Unknown"
 
Apartment Building Residents Get Dogged About Acquiring Emotional Support Pets
Apartment Building Residents Get Dogged About Acquiring Emotional Support PetsApartment Building Residents Get Dogged About Acquiring Emotional Support Pets
Apartment Building Residents Get Dogged About Acquiring Emotional Support Pets
 
Scan0001
Scan0001Scan0001
Scan0001
 
Nylj sept 13 2013
Nylj sept 13 2013Nylj sept 13 2013
Nylj sept 13 2013
 
10 ksb tory burch foundation_cohort 2_application final
10 ksb tory burch foundation_cohort 2_application final10 ksb tory burch foundation_cohort 2_application final
10 ksb tory burch foundation_cohort 2_application final
 
Lowdown on the Latest Labor Legislation
Lowdown on the Latest Labor LegislationLowdown on the Latest Labor Legislation
Lowdown on the Latest Labor Legislation
 
1880s business development
1880s business development1880s business development
1880s business development
 

Último

~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
asmaqueen5
 
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
ApartmentWala1
 
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
delhi24hrs1
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
ApartmentWala1
 
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
asmaqueen5
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ - Mainstreet Equity Corp.
 

Último (20)

Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsJaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
 
Best Interior Design Services in Haldwani
Best Interior Design Services in HaldwaniBest Interior Design Services in Haldwani
Best Interior Design Services in Haldwani
 
Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)
 
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
 
Retail Space for Lease - 1221 W. Main St., Sun Prairie, WI
Retail Space for Lease - 1221 W. Main St., Sun Prairie, WIRetail Space for Lease - 1221 W. Main St., Sun Prairie, WI
Retail Space for Lease - 1221 W. Main St., Sun Prairie, WI
 
Kohinoor Courtyard One Wakad Pune | Elegant Living Spaces
Kohinoor Courtyard One Wakad Pune | Elegant Living SpacesKohinoor Courtyard One Wakad Pune | Elegant Living Spaces
Kohinoor Courtyard One Wakad Pune | Elegant Living Spaces
 
Rohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfRohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdf
 
SVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property BroadcastSVN Live 5.6.24 Weekly Property Broadcast
SVN Live 5.6.24 Weekly Property Broadcast
 
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
Cheap Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 1 (Gurgaon)
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
 
construction material procurement in India
construction material procurement in Indiaconstruction material procurement in India
construction material procurement in India
 
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
 
Prestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdfPrestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdf
 
Ganga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdfGanga Platinum Kharadi Pune brochure.pdf
Ganga Platinum Kharadi Pune brochure.pdf
 
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdfThe Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
The Gale at Godrej Park World Hinjewadi Pune Brochure.pdf
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
 
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing TurkeyYedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
 
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
 
Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024
 

Virginia trunkes-nyrej-6.20-article

  • 1. Tel: 781-878-4540, Fax: 781-871-1853, 800-654-4993 nyrej.com Tuesday, June 20, 2017Reprint New York Real Estate Journal American Inst. forArchitects 2017 documents: Striking just the right balance for property owners? VirginiaTrunkes Borah, Goldstein, Altschuler, Nahins & Goidel, P.C. Everyyearthatendswitha“7”is anexcitingtimeforthosewhofollow trends in construction contracts! It is when the American Institute for Architects (AIA) issues an updat- ed set of its famed standard-form agreements, which include the well-known A-101, A-201, B-101, etc. The AIA continues this tradi- tion as a service to the industry in which architects play an integral role, along with the contractor and owner. After all, times change, economies change, and different business challenges arise, all of which must be incorporated into importantcommercialagreements. Inasmuch as the AIA offers its agreements for sale, and because it competes with other organizations sellingtheirownsetsofagreements (e.g., ConsensusDOCS), it is eco- nomically incentivized to keep its agreements relevant. While the AIA remains the industry leader, it is no secret that its agreements tend to favor the architect in how they define service scopes and allocate risk.(Indeed,majorcontractortrade associations such as theAssociated General Contractors of America have chosen to endorse only the ConsensusDOCS.) These consid- erations are crucial because every constructionprojectcontainscertain inherent and unpredictable risks which need to be borne–somehow. Should a property owner use the AIA agreements “as is?” Or should the owner modify them, or use other agreements with varying service-scope defining and risk allocation provisions? The answer depends on the owner’s objectives. How does the owner view the separate roles of the architect and contractor? Following the design phase, will the architect serve as a key project administrator and facil- itator, or as more of a consultant? Note that it is not uncommon for a contractor to resist contract terms affording the architect the ultimate decision-making authority. An owner’s preference for which type of agreement to use may de- pend on the size of the project or the owner’s development/renova- tion experience–or not. While all three players–owners, architects and contractors–share the goal of completinganintactprojectontime andonbudget,underthetraditional design-bid-build structure (versus design-build), the roles and the responsibilities differ.The contrac- tor and its team of subcontractors implement the architect’s drawings and specifications. The architect must ensure that his or her vision is effectuatedproperly,whilethecon- tractor must be able to implement its means and methods to perform the work effectively. A large, experienced developer may not want or need an architect to walk it through the process and confirm that the contractor is per- forming (and issuing requisitions) as anticipated. On the other hand, a large,experienceddeveloperwork- ing with a “hot” architect creating a cutting-edge exterior design may not want to shove the architect over to the sidelines. Provisionsinconstructionagree- ments reflecting the architect-con- tractor tension focus on which party, architect or contractor, com- municates directly with the owner; prepares regular project progres- sion reports; reviews and makes recommendations on applications for payment; prepares change orders and construction change directives;decidesonwhetherwork is non-conforming and should be rejected; chooses disputed mone- tary amounts; decides on payment withholding; and is the first-line negotiator and resolver of disputes. For the past decade, the A201- 2007 (the A201 is the “keystone” document adopted by reference in owner/architect, owner/contractor, andcontractor/subcontractoragree- ments) has essentially assigned all rights to the architect. In contrast, the ConsensusDOCS Owner-Con- tractor agreement, the CD 200, has provided for discussions directly between the owner and contractor, andathird-party“disputemitigation procedure”–with no substantive reference to the architect. The new A201-2017 addresses the architect-contractor tug-of-war withsomemorecontractor-friendly terms, e.g., reducing the burden on the contractor to be aware of poten- tialcopyrightorpatentinfringement (§ 3.17). Less contractor-friendly terms include one which clarifies that control over the means and methods is within the sole province of the contractor, with the unequiv- ocal corresponding responsibility forjobsitesafety,includinganaddi- tional onus on the contractor, in the event the contract documents give specific instructions about means and methods that the contractor perceives as unsafe, to propose alternative means and methods, to be then evaluated by the architect “solely for conformance with the design intent for the completed construction (§ 3.3.1). Other less contractor-friendly terms include requiring(versus“endeavorto”)that theownerandcontractorincludethe architect in their communications relating to the architect’s services (§ 4.2.4); eliminating the provision absolvingthecontractorfromliabil- ityfor“rely[ing]upontheadequacy and accuracy of the performance and design criteria specified in the contract documents” (§ 3.12.10.1); andoutrightpermittingthearchitect to“order,”versus“authorize,”minor changes in the work without an up- ward adjustment to the contractor’s fee (§ 4.2.8). The owner should strive for a comfortable balance preserving the resource of an independent, licensed design professional to of- fer assessments and support, while also providing an accommodating climate for its entrusted contractor. Virginia Trunkes is a partner at Borah, Goldstein,Altschuler,Nahins & Goidel, P.C.,New York,N.Y.