Digitising legacy assets
Digitising an asset requires two main tasks:
1. Creating the exact model based on the asset’s original design
2. Ensuring that model is identical to today’s condition of the asset
Two key steps
The first step is usually done by creating a 3-D model of the asset, or its
digital copy, combining all levels including forms, shapes, components,
materials and engineering systems (for complex objects). Usually all those
data must be kept in the original engineering documentation.
For legacy assets, that documentation is kept on paper or in ‘old’ 2-D CAD
files. Creating a single, 3-D digital model from them is mainly done manually,
though some operations are semi-automated.
That work requires engineering work hours, which immediately raises the cost
and time component of the initiative. For some large assets, this can become
a significant endeavour.
Digitising an original design
The original design is converted into digitial model
The second part is performed by applying the actual measurements to the
original model. This step is required because of the need to ensure that any
changes made during construction have been captured.
Normally, the design drawings had to be updated with ‘as-built’ drawings if
the changes were made during construction/fabrication of the asset.
However, in many cases the ‘as-built’ drawings were not created; hence they
must be created during asset digitising process.
Various measurement methods are used in this case. Mainly, there are three
options: manual measurements, comparing the model to photo/video data,
and laser scanning.
Ensuring it mirrors actual object
The designed model need to mirror actual object
“Laser scanning”, also known as “3D mapping” or “high definition surveying
(HDS)”, is the most quick but accurate way of providing the object’s shape. It
is being performed both indoors and outdoors with various types of
equipment available on the professional market. The result of laser scanning
is a 3-D drawing of the object performed with high accuracy. However, it does
not recognize any physical properties of the object apart from its shape. Laser
scanning can provide us with knowledge of the actual shape and, along with
analysing images of the object, can show if there are any missing parts or
changes.
The comparison process will include all data available, its alignment with the
original 3-D model, identifying the differences, and deciding on the correction.
In the construction industry, this process is called “Scan to BIM” or “point
cloud to BIM” and it is not automated.
Laser scanning and Scan-to-BIM
Laser scanning
Laser scanning
Laser scanning
Converting data from 3-D scanning into BIM
(“scan-to-BIM”)
Converting data from 3-D scanning into BIM
(“scan-to-BIM”)
Converting data from 3-D scanning into BIM
(“scan-to-BIM”)
Many actions required for creating digital models can be automated. Some
automation can be based on well-known methods and contemporary
software. Some can be developed using existing methods. However, some
methods have to be invented. Combining all of above can create a platform
able to automate the creation of the digital models.
Realistically, it is difficult to say at this point of time when that platform will be
able to provide complete automation, though manual input will still be
required at some point. However, there will be a substantial decrease of the
level of manual input, especially engineering hours, required to re-create the
model as the platform will dramatically simplify the digitisation process.
That simplification will allow massive numbers of assets to obtain a digital
form, which in turn will enable using various applications with it.
Automation
Our plan is to offer a high degree of automation and conduct constant work
and research and improve the process over time.
The platform will include both AI elements, specifically for computer vision
and analytical algorithms which, when combined, can enable the software to
“read” the drawings and build the models.
A specific case will be shown in the next presentation.
Automation
Turning old drawings into clean vector format
Some key methods, which have been developed and are available on the
market, will be used in the software:
- De-noising the original drawings
- Raster to vector conversions (the processing of scanned drawings and
defining symbols and lines).
- Recognising symbols
- Assigning the meaning to symbols
- Applying photo and video data to the drawing
- Applying 3-D scanning data to the drawing.
Key methods already developed
The methods can be developed based on existing algorithms and some
dataset training:
(when the software understands the role of the symbol on the drawing)
- Understanding key areas of the drawing
- Understanding the type of product and materials
- Determining the service graphics from the main lines of the object
- Determining the differences between drawings, photo, scanned images
Key methods can be developed
Actual object
BIM
Actual object
BIM
BIM
Actual object
Critical new algorithms required:
1. Combining all drawings into one 3-D model. Essentially converting a 2-D to
a 3-D model.
2. Assembling parts into complex components and components into overall
product
Its work is explained in the next presentation.
New algorithms
Creating 3-D model from the 2-D drawing
Creating 3-D model from the 2-D drawing
Creating complex assemblies of components
Thank you
This was Presentation 2 of 3 outlining
the DII business case.
Presentation 3 walks through the process of creating a 3-D
model from the 2-D drawing.
www.dii.ai

Más contenido relacionado

La actualidad más candente

Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeema
Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeemaDigital_Twin_GUC_IE _AvinashMisra_&_AvinashNeema
Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeema
Avinash Misra
 

La actualidad más candente (20)

08258937bigdata en la industria 4.0
08258937bigdata en la industria 4.008258937bigdata en la industria 4.0
08258937bigdata en la industria 4.0
 
Digital twin
Digital twinDigital twin
Digital twin
 
IBM Watson Internet of Things: Introducing Digital Twin
IBM Watson Internet of Things: Introducing Digital TwinIBM Watson Internet of Things: Introducing Digital Twin
IBM Watson Internet of Things: Introducing Digital Twin
 
Digital twin
Digital twinDigital twin
Digital twin
 
Digital twin
Digital twinDigital twin
Digital twin
 
Digital twins ppt
Digital twins pptDigital twins ppt
Digital twins ppt
 
Digital Twin: A radical new approach to IoT
Digital Twin: A radical new approach to IoTDigital Twin: A radical new approach to IoT
Digital Twin: A radical new approach to IoT
 
Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeema
Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeemaDigital_Twin_GUC_IE _AvinashMisra_&_AvinashNeema
Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeema
 
Virtual Property vs. Digital Twin
Virtual Property vs. Digital TwinVirtual Property vs. Digital Twin
Virtual Property vs. Digital Twin
 
Digital twin
Digital twinDigital twin
Digital twin
 
DW2020 Data Models - FIWARE Platform
DW2020 Data Models - FIWARE PlatformDW2020 Data Models - FIWARE Platform
DW2020 Data Models - FIWARE Platform
 
Drive digital transformation to digital twin
Drive digital transformation to digital twinDrive digital transformation to digital twin
Drive digital transformation to digital twin
 
Revit architecture course - cadd centre lucknow
Revit architecture course - cadd centre lucknowRevit architecture course - cadd centre lucknow
Revit architecture course - cadd centre lucknow
 
Creating Smart Buildings through Digital Twins
Creating Smart Buildings through Digital TwinsCreating Smart Buildings through Digital Twins
Creating Smart Buildings through Digital Twins
 
Cognitive Digital Twin by Fariz Saračević
Cognitive Digital Twin by Fariz SaračevićCognitive Digital Twin by Fariz Saračević
Cognitive Digital Twin by Fariz Saračević
 
Digital Twin: Starting the journey
Digital Twin: Starting the journeyDigital Twin: Starting the journey
Digital Twin: Starting the journey
 
Revit introduction class
Revit  introduction classRevit  introduction class
Revit introduction class
 
The digital twin story
The digital twin storyThe digital twin story
The digital twin story
 
Internet of Things - AMECSE
Internet of Things - AMECSEInternet of Things - AMECSE
Internet of Things - AMECSE
 
Digital twins
Digital twinsDigital twins
Digital twins
 

Similar a DII p2

Software app slides
Software app slidesSoftware app slides
Software app slides
ahmong4
 
The Poster of Application of terrestrial 3D laser scanning in building inform...
The Poster of Application of terrestrial 3D laser scanning in building inform...The Poster of Application of terrestrial 3D laser scanning in building inform...
The Poster of Application of terrestrial 3D laser scanning in building inform...
Martin Ma
 

Similar a DII p2 (20)

3 d modeling using bim ppt
3 d modeling using bim ppt3 d modeling using bim ppt
3 d modeling using bim ppt
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
The Poster of Application of terrestrial 3D laser scanning in building inform...
The Poster of Application of terrestrial 3D laser scanning in building inform...The Poster of Application of terrestrial 3D laser scanning in building inform...
The Poster of Application of terrestrial 3D laser scanning in building inform...
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
Software
Software Software
Software
 
Group 14 presentation.pptx
Group 14 presentation.pptxGroup 14 presentation.pptx
Group 14 presentation.pptx
 
Product Design and CAD.pptx
Product Design and CAD.pptxProduct Design and CAD.pptx
Product Design and CAD.pptx
 
Nx file
Nx fileNx file
Nx file
 
Nx file
Nx fileNx file
Nx file
 
Software presentation
Software presentationSoftware presentation
Software presentation
 
Construction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7DConstruction Supply Chain Management (Group Assignment) - BIM 7D
Construction Supply Chain Management (Group Assignment) - BIM 7D
 
Software app present (QS)
Software app present (QS)Software app present (QS)
Software app present (QS)
 
report rp
report rp report rp
report rp
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group report
 
The Ultimate Guide to Scan to BIM
The Ultimate Guide to Scan to BIMThe Ultimate Guide to Scan to BIM
The Ultimate Guide to Scan to BIM
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
Rapid prototyping and tooling
Rapid prototyping and toolingRapid prototyping and tooling
Rapid prototyping and tooling
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
Software application (QS)
Software application (QS)Software application (QS)
Software application (QS)
 

Más de VitaKrasulya (6)

Discovery prsnt 260x200_4+4_ukr2_create_2021_compressed
Discovery prsnt 260x200_4+4_ukr2_create_2021_compressedDiscovery prsnt 260x200_4+4_ukr2_create_2021_compressed
Discovery prsnt 260x200_4+4_ukr2_create_2021_compressed
 
Discovery prsnt 260x200_4+4_ukr2_create_2021
Discovery prsnt 260x200_4+4_ukr2_create_2021Discovery prsnt 260x200_4+4_ukr2_create_2021
Discovery prsnt 260x200_4+4_ukr2_create_2021
 
Discovery prsnt 260x200_4+4_eng_create2021_compressed
Discovery prsnt 260x200_4+4_eng_create2021_compressedDiscovery prsnt 260x200_4+4_eng_create2021_compressed
Discovery prsnt 260x200_4+4_eng_create2021_compressed
 
Discovery prsnt 260x200_4+4_eng_create2021
Discovery prsnt 260x200_4+4_eng_create2021Discovery prsnt 260x200_4+4_eng_create2021
Discovery prsnt 260x200_4+4_eng_create2021
 
DII deck v3 3
DII deck v3 3DII deck v3 3
DII deck v3 3
 
Presentation
PresentationPresentation
Presentation
 

Último

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 

DII p2

  • 2. Digitising an asset requires two main tasks: 1. Creating the exact model based on the asset’s original design 2. Ensuring that model is identical to today’s condition of the asset Two key steps
  • 3. The first step is usually done by creating a 3-D model of the asset, or its digital copy, combining all levels including forms, shapes, components, materials and engineering systems (for complex objects). Usually all those data must be kept in the original engineering documentation. For legacy assets, that documentation is kept on paper or in ‘old’ 2-D CAD files. Creating a single, 3-D digital model from them is mainly done manually, though some operations are semi-automated. That work requires engineering work hours, which immediately raises the cost and time component of the initiative. For some large assets, this can become a significant endeavour. Digitising an original design
  • 4. The original design is converted into digitial model
  • 5. The second part is performed by applying the actual measurements to the original model. This step is required because of the need to ensure that any changes made during construction have been captured. Normally, the design drawings had to be updated with ‘as-built’ drawings if the changes were made during construction/fabrication of the asset. However, in many cases the ‘as-built’ drawings were not created; hence they must be created during asset digitising process. Various measurement methods are used in this case. Mainly, there are three options: manual measurements, comparing the model to photo/video data, and laser scanning. Ensuring it mirrors actual object
  • 6. The designed model need to mirror actual object
  • 7. “Laser scanning”, also known as “3D mapping” or “high definition surveying (HDS)”, is the most quick but accurate way of providing the object’s shape. It is being performed both indoors and outdoors with various types of equipment available on the professional market. The result of laser scanning is a 3-D drawing of the object performed with high accuracy. However, it does not recognize any physical properties of the object apart from its shape. Laser scanning can provide us with knowledge of the actual shape and, along with analysing images of the object, can show if there are any missing parts or changes. The comparison process will include all data available, its alignment with the original 3-D model, identifying the differences, and deciding on the correction. In the construction industry, this process is called “Scan to BIM” or “point cloud to BIM” and it is not automated. Laser scanning and Scan-to-BIM
  • 11. Converting data from 3-D scanning into BIM (“scan-to-BIM”)
  • 12. Converting data from 3-D scanning into BIM (“scan-to-BIM”)
  • 13. Converting data from 3-D scanning into BIM (“scan-to-BIM”)
  • 14. Many actions required for creating digital models can be automated. Some automation can be based on well-known methods and contemporary software. Some can be developed using existing methods. However, some methods have to be invented. Combining all of above can create a platform able to automate the creation of the digital models. Realistically, it is difficult to say at this point of time when that platform will be able to provide complete automation, though manual input will still be required at some point. However, there will be a substantial decrease of the level of manual input, especially engineering hours, required to re-create the model as the platform will dramatically simplify the digitisation process. That simplification will allow massive numbers of assets to obtain a digital form, which in turn will enable using various applications with it. Automation
  • 15. Our plan is to offer a high degree of automation and conduct constant work and research and improve the process over time. The platform will include both AI elements, specifically for computer vision and analytical algorithms which, when combined, can enable the software to “read” the drawings and build the models. A specific case will be shown in the next presentation. Automation
  • 16. Turning old drawings into clean vector format
  • 17. Some key methods, which have been developed and are available on the market, will be used in the software: - De-noising the original drawings - Raster to vector conversions (the processing of scanned drawings and defining symbols and lines). - Recognising symbols - Assigning the meaning to symbols - Applying photo and video data to the drawing - Applying 3-D scanning data to the drawing. Key methods already developed
  • 18. The methods can be developed based on existing algorithms and some dataset training: (when the software understands the role of the symbol on the drawing) - Understanding key areas of the drawing - Understanding the type of product and materials - Determining the service graphics from the main lines of the object - Determining the differences between drawings, photo, scanned images Key methods can be developed
  • 22. Critical new algorithms required: 1. Combining all drawings into one 3-D model. Essentially converting a 2-D to a 3-D model. 2. Assembling parts into complex components and components into overall product Its work is explained in the next presentation. New algorithms
  • 23. Creating 3-D model from the 2-D drawing
  • 24. Creating 3-D model from the 2-D drawing
  • 26. Thank you This was Presentation 2 of 3 outlining the DII business case. Presentation 3 walks through the process of creating a 3-D model from the 2-D drawing. www.dii.ai