4. Rain Gardens
& Soil Testing
Rain Garden
Program currently
recruiting
participants in the
Villages of Wilde
Lake, Owen Brown
and Long Reach
5. Google Apps for
Business
Web-based & secure
Business Email (Gmail)
Calendar
Documents
Sites
Video Moving all team members from MS Exchange to Gmail
289 moved to date, that number will double by end of July
Talk All team members will be off of Exchange by the end of
the calendar year
Most will use GAB as a replacement for MS Office
Significant cost savings in licensing fees
Increased efficiency from using cloud-based applications
10. Aquatic Feasibility Studies
Ideas Bubbling Up
The Aquatics Master Plan calls
for 2 feasibility studies
one to study the feasibility
of enclosing an outdoor
pool to an indoor pool
the other to outline what
family-friendly amenity
options are feasible to
replace SplashDown
Anticipated completion of
both during this calendar
year
12. Active Transportation
Connecting Columbia: Pathways for a 21st Century Columbia
Preliminary recommendations
include 50 more miles of
pathways, a pathway hierarchy
of routes and a pilot signage
program
Intended to create a more
interconnected system for
health, transportation and
recreation purposes
14. Village Center Community Plans
Planning for the enhancement and/or repositioning of village centers
CA support for
Village Association
efforts includes
planning advice,
map coordination,
graphics &
concept
development and
document
development
15. As of June 1, 2012,
there has been
dredging for 30 days
Wilde Lake Dredging
Removed
approximately 10,000
cubic yards of the
15,000 under contract
Focusing on area at the north
end of the lake
Moving to small cove adjacent to
Cove Condominiums by mid-
month