Antares Status
Dan Givens
Wallops Site Manager
12 January 2016
CRS Return To Flight Plan
 The Orbital ATK Plan Has the Following
Elements:
 Return Antares to Flight Using New, In-
Production RD-181 Engines
 Launch Cygnus on the Atlas V 401 Launch
Vehicle during the Antares Down-time
− No Significant Atlas Modifications are
Required
 Increased Capability of Atlas V and the New
Antares With RD-181 Engines Allow the
Remaining 13,100kg Obligation to be Delivered
in 4 Missions
 1 Fewer Than the Original Planned 5 Missions
 Subsequent to the Above Plan, We Jointly Decided
With NASA to Convert the OA-6 Mission to an
Atlas V Mission as Well
 Increases Cargo Delivery to ISS During This
Critical Resupply Period by 300kg
2
Orbital ATK
Return to Flight Planning Launch Dates
3
Mission Orbital Working
Launch Dates
Launch
Vehicle
Original
Planned
Upmass
(kg)
Current
Planned
Upmass
(kg)
OA-4* December 2015 Atlas V 2630 3500
OA-6* March 2016 Atlas V 2620 3500
OA-5 May-June 2016 Antares 2620 3200
OA-7 October 2016 Antares 2620 3200
OA-8 June 2017 Antares 2620 3200
OA-9 October 2017 Antares N/A 3200
OA-10 March 2018 Antares N/A 3200
Original
CRS1
Contract
4 Missions
Deliver
13,100 kg
(28,880 lbs)
CRS1
Contract
Extension
Period
* - OA-6 converted from an Antares to an Atlas V to enable increased cargo deliveries to the ISS
OA-11 2018 Antares N/A Competition
OA-12 … Antares N/A Sensitive
CRS2
Contract
2018 – 2024
To Be Awarded
NLT 30 Jan 2016
* - Launched successfully
Cygnus Cargo Resupply Vehicle
Cygnus Evolution to a New Configuration
 Pressurized Cargo Module (PCM)
Heritage: Multi-Purpose Logistics Module (ISS); ATV
Total Payload Mass: 2,300 kg (Standard), 3200-3500 kg (Enhanced)
Pressurized Volume: 18.7 m3, 27 m3
 Service Module (SM)
Heritage: Orbital ATK GEO and LEO missions
Power Generation: 2 Fixed Wing Solar Arrays, 3.5 kW
Compatible with multiple LVs
Standard Cygnus
4
Enhanced Cygnus
Antares 230 Configuration
Development Status Update
 Orbital ATK (OA) has developed a new configuration of Antares – the Antares 230
configuration – that features new stage 1 rocket engines
 RD-181 engines were selected as an ideal replacement for prior AJ26 engines
 Decision was made in consultation with our NASA customer and is now publicly
disclosed
 Directly addresses Orb-3 AIB corrective action #1
 The Antares 230 configuration will be capable of launching a 7000kg Cygnus
(carrying 3200kg of cargo) to ISS as early as May 2016
 Will use existing Stage 1 Core tanks with minor modifications necessary to
accommodate new RD-181 engines – and same upper stack used on Orb-3 with minor
avionics changes
 RD-181 engine development is complete and production is well underway
− Certification testing program complete
− First three flight engines completed acceptance testing and were delivered in July
2015
◦ Acceptance test profile is flight duration at flight power levels, which directly
addresses Orb-3 AIB corrective action #2
 A hot fire Stage Test at Launch Pad 0A in March 2016 will be the major system level
verification activity prior to the OA-5 mission
− The Stage Test will verify operation of the integrated first stage
5
Antares 230
Stage Test Overview
6
 Stage Test Plan For The Upgraded Antares 230 is the Major
Verification Activity Prior to the OA-5 Return to Flight Mission
 The Stage Test Features Two Main Activities
 One Wet Dress Rehearsal (WDR)
 Verify And Demonstrate All Processes And Operations
Required To Properly Configure The Test Article For Engine
Ignition
 One Hot Fire Test
 Verify Operation And Performance Of Integrated First Stage
Featuring Upgraded Propulsion System
 Test Planning (Test Configuration, Schedule, Documentation,
Operations, Etc) Is Underway, Schedule Forecast: March 2016
 Test Article Assembly Has Begun
 Major Partners (NASA, MARS, Energomash, Yuzhnoye, Etc)
Have Been Briefed On Test Plan, And Are Working With
Antares Program In Various Roles To Prepare For The Test
Test Article Mounted To Pad
Pad 0A Repairs and Upgrades Completed
 All Concrete Structure Damage Has Been Repaired, Lightning Masts Replaced and Repair of
Damaged Fueling and Pressure System Piping is Complete.
 Modifications Required to Support RD-181 are Complete
 Modification and Testing of Transporter/Erector Launcher and Hydraulic Systems Complete
 Performance Testing of Pad Systems Completed
7
Antares Integration - HIF High Bay
8
Currently Processing Two Vehicles
Stage Test/OA-7 & OA-5
Stage Test/OA-7 Mission
RD-181 Engines Mated to 0.6 Core at Wallops Island
9
10
OA-5 Mission
Vehicle Integration Status
0000.7 Core Unpacked and Ready for Lift to Rails for Transfer to Dollies
0000.7 Core Transfer to Dollies
OA-5 Mission
Vehicle Integration Status
Aft Bay Removed
RD4A & RD5A Engines Unpacked at HIF
11
Summary
 Orbital ATK is Meeting its Commitment to NASA Under the CRS-1 Contract:
 Deliver the Remaining Cargo Obligation on the Original Contract by the End of 2016
 Deliver Additional Cargo in 2017 Via Extension Missions
 Purchase of Atlas V Missions Restarted Cargo Deliveries to ISS While Antares
Upgrade to the 230 Configuration is Completed
 Antares 230 configuration incorporates new-built RD-181 engines that are an ideal
replacement for the previous AJ26 engines
 RD-181 certification testing program has completed successfully
 RD-181 flight engines will be acceptance tested through a flight-representative profile
 Replacement of the AJ26 engines with the RD-181 engines fully addresses the AIB
recommended corrective actions
 Antares 230 and Pad 0A schedules support the Stage Test in March 2016 followed by
the OA-5 mission in 2Q2016 and OA-7 mission in 4Q2016
12
Orbital ATK Will Be Ready to Restart Cargo Deliveries
to the ISS with Antares Later This Year

Más contenido relacionado

La actualidad más candente

Progress on Skylon and SABRE
Progress on Skylon and SABREProgress on Skylon and SABRE
Progress on Skylon and SABREA. Rocketeer
 
AAE_537_SABRE_Final_Report.docx
AAE_537_SABRE_Final_Report.docxAAE_537_SABRE_Final_Report.docx
AAE_537_SABRE_Final_Report.docxJulian Wang
 
Blue Origin: Powered by Rocket Fuel & AWS
Blue Origin: Powered by Rocket Fuel & AWSBlue Origin: Powered by Rocket Fuel & AWS
Blue Origin: Powered by Rocket Fuel & AWSAmazon Web Services
 
Ares V: Supporting Space Exploration from LEO to Beyond
Ares V: Supporting Space Exploration from LEO to BeyondAres V: Supporting Space Exploration from LEO to Beyond
Ares V: Supporting Space Exploration from LEO to BeyondAmerican Astronautical Society
 
Smart mobility homepage localization
Smart mobility homepage localizationSmart mobility homepage localization
Smart mobility homepage localizationhabbang
 
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail Adaptive Corporation
 
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Sergio A. Guerra
 
1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and TrackingATUL RAJ
 
Design of 9 story frame
Design of 9 story frameDesign of 9 story frame
Design of 9 story frameaileencv
 
C-GeoSPARQL: Streaming geospatial support on C-SPARQL
C-GeoSPARQL: Streaming geospatial support on C-SPARQLC-GeoSPARQL: Streaming geospatial support on C-SPARQL
C-GeoSPARQL: Streaming geospatial support on C-SPARQLAlexander Dejonghe
 
Reliability Assessment of L40 Stage GSLV Mk II
Reliability Assessment of L40 Stage GSLV Mk IIReliability Assessment of L40 Stage GSLV Mk II
Reliability Assessment of L40 Stage GSLV Mk IIIRJET Journal
 

La actualidad más candente (20)

Progress on Skylon and SABRE
Progress on Skylon and SABREProgress on Skylon and SABRE
Progress on Skylon and SABRE
 
Richard Parker
Richard ParkerRichard Parker
Richard Parker
 
AAE_537_SABRE_Final_Report.docx
AAE_537_SABRE_Final_Report.docxAAE_537_SABRE_Final_Report.docx
AAE_537_SABRE_Final_Report.docx
 
Blue Origin: Powered by Rocket Fuel & AWS
Blue Origin: Powered by Rocket Fuel & AWSBlue Origin: Powered by Rocket Fuel & AWS
Blue Origin: Powered by Rocket Fuel & AWS
 
Ares V: Supporting Space Exploration from LEO to Beyond
Ares V: Supporting Space Exploration from LEO to BeyondAres V: Supporting Space Exploration from LEO to Beyond
Ares V: Supporting Space Exploration from LEO to Beyond
 
Smart mobility homepage localization
Smart mobility homepage localizationSmart mobility homepage localization
Smart mobility homepage localization
 
Tutorial #1 - SACS Basic
Tutorial #1 - SACS BasicTutorial #1 - SACS Basic
Tutorial #1 - SACS Basic
 
Resume-Aerothermo-updatedzil
Resume-Aerothermo-updatedzilResume-Aerothermo-updatedzil
Resume-Aerothermo-updatedzil
 
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
 
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
 
1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking
 
Design of 9 story frame
Design of 9 story frameDesign of 9 story frame
Design of 9 story frame
 
Atlas v usersguide2010
Atlas v usersguide2010Atlas v usersguide2010
Atlas v usersguide2010
 
C-GeoSPARQL: Streaming geospatial support on C-SPARQL
C-GeoSPARQL: Streaming geospatial support on C-SPARQLC-GeoSPARQL: Streaming geospatial support on C-SPARQL
C-GeoSPARQL: Streaming geospatial support on C-SPARQL
 
benayad-CV
benayad-CVbenayad-CV
benayad-CV
 
Reliability Assessment of L40 Stage GSLV Mk II
Reliability Assessment of L40 Stage GSLV Mk IIReliability Assessment of L40 Stage GSLV Mk II
Reliability Assessment of L40 Stage GSLV Mk II
 
Ousep abstract
Ousep  abstractOusep  abstract
Ousep abstract
 
High Altitude
High AltitudeHigh Altitude
High Altitude
 
Tangguh LNG Project
Tangguh LNG ProjectTangguh LNG Project
Tangguh LNG Project
 
Tutorial #5 - SACS Basic
Tutorial #5 - SACS BasicTutorial #5 - SACS Basic
Tutorial #5 - SACS Basic
 

Destacado

How OrbitalATK is Leveraging the IIoT and Visual Factory Technology to Drive ...
How OrbitalATK is Leveraging the IIoT and Visual Factory Technology to Drive ...How OrbitalATK is Leveraging the IIoT and Visual Factory Technology to Drive ...
How OrbitalATK is Leveraging the IIoT and Visual Factory Technology to Drive ...Synchrono
 
Astronauts and Robots 2015: Frank Culbertson, Orbital ATK
Astronauts and Robots 2015: Frank Culbertson, Orbital ATKAstronauts and Robots 2015: Frank Culbertson, Orbital ATK
Astronauts and Robots 2015: Frank Culbertson, Orbital ATKAmerican Astronautical Society
 
Miami University 2016 Cleveland Research Company Stock Pitch Competition Winner
Miami University 2016 Cleveland Research Company Stock Pitch Competition WinnerMiami University 2016 Cleveland Research Company Stock Pitch Competition Winner
Miami University 2016 Cleveland Research Company Stock Pitch Competition WinnerMichael T. Loffredo
 
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...WallopsIslandRegionalAlliance
 
NASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce UnderwoodNASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce UnderwoodWallopsIslandRegionalAlliance
 
Brad Pande Resume Rev. 6-May-2015
Brad Pande Resume Rev. 6-May-2015Brad Pande Resume Rev. 6-May-2015
Brad Pande Resume Rev. 6-May-2015Brad Pande
 
Club reverse engineering - Prototypage rapide : du concept au produit
Club reverse engineering - Prototypage rapide : du concept au produitClub reverse engineering - Prototypage rapide : du concept au produit
Club reverse engineering - Prototypage rapide : du concept au produitMarseille Innovation
 
Visual factory.......................................a need for the century
Visual factory.......................................a need for the centuryVisual factory.......................................a need for the century
Visual factory.......................................a need for the centuryNikita Bhatkar
 
Lockheed Martin Case Study_Final Draft
Lockheed Martin Case Study_Final DraftLockheed Martin Case Study_Final Draft
Lockheed Martin Case Study_Final DraftZach Kloska
 
Soutenance MBA-MCI - Pourquoi les marques se doivent d'intégrer l'impression ...
Soutenance MBA-MCI - Pourquoi les marques se doivent d'intégrer l'impression ...Soutenance MBA-MCI - Pourquoi les marques se doivent d'intégrer l'impression ...
Soutenance MBA-MCI - Pourquoi les marques se doivent d'intégrer l'impression ...Guillaume Riottot
 
10 principes gouvernant la fabrication additive / impression 3D
10 principes gouvernant la fabrication additive / impression 3D10 principes gouvernant la fabrication additive / impression 3D
10 principes gouvernant la fabrication additive / impression 3DChristian HOHMANN
 

Destacado (16)

ObritalATK
ObritalATKObritalATK
ObritalATK
 
MARS Update, Presented by Dale Nash
MARS Update, Presented by Dale NashMARS Update, Presented by Dale Nash
MARS Update, Presented by Dale Nash
 
How OrbitalATK is Leveraging the IIoT and Visual Factory Technology to Drive ...
How OrbitalATK is Leveraging the IIoT and Visual Factory Technology to Drive ...How OrbitalATK is Leveraging the IIoT and Visual Factory Technology to Drive ...
How OrbitalATK is Leveraging the IIoT and Visual Factory Technology to Drive ...
 
Astronauts and Robots 2015: Frank Culbertson, Orbital ATK
Astronauts and Robots 2015: Frank Culbertson, Orbital ATKAstronauts and Robots 2015: Frank Culbertson, Orbital ATK
Astronauts and Robots 2015: Frank Culbertson, Orbital ATK
 
Miami University 2016 Cleveland Research Company Stock Pitch Competition Winner
Miami University 2016 Cleveland Research Company Stock Pitch Competition WinnerMiami University 2016 Cleveland Research Company Stock Pitch Competition Winner
Miami University 2016 Cleveland Research Company Stock Pitch Competition Winner
 
NASA: More Than You Imagine
NASA: More Than You ImagineNASA: More Than You Imagine
NASA: More Than You Imagine
 
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
 
NASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce UnderwoodNASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce Underwood
 
Phong_Vo
Phong_VoPhong_Vo
Phong_Vo
 
Brad Pande Resume Rev. 6-May-2015
Brad Pande Resume Rev. 6-May-2015Brad Pande Resume Rev. 6-May-2015
Brad Pande Resume Rev. 6-May-2015
 
Prototypage IoT avec logiciel/matériel libre
Prototypage IoT avec logiciel/matériel librePrototypage IoT avec logiciel/matériel libre
Prototypage IoT avec logiciel/matériel libre
 
Club reverse engineering - Prototypage rapide : du concept au produit
Club reverse engineering - Prototypage rapide : du concept au produitClub reverse engineering - Prototypage rapide : du concept au produit
Club reverse engineering - Prototypage rapide : du concept au produit
 
Visual factory.......................................a need for the century
Visual factory.......................................a need for the centuryVisual factory.......................................a need for the century
Visual factory.......................................a need for the century
 
Lockheed Martin Case Study_Final Draft
Lockheed Martin Case Study_Final DraftLockheed Martin Case Study_Final Draft
Lockheed Martin Case Study_Final Draft
 
Soutenance MBA-MCI - Pourquoi les marques se doivent d'intégrer l'impression ...
Soutenance MBA-MCI - Pourquoi les marques se doivent d'intégrer l'impression ...Soutenance MBA-MCI - Pourquoi les marques se doivent d'intégrer l'impression ...
Soutenance MBA-MCI - Pourquoi les marques se doivent d'intégrer l'impression ...
 
10 principes gouvernant la fabrication additive / impression 3D
10 principes gouvernant la fabrication additive / impression 3D10 principes gouvernant la fabrication additive / impression 3D
10 principes gouvernant la fabrication additive / impression 3D
 

Similar a Antares Status, Presented by Dan Givens

Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...Dave Callen
 
Cryogenic rocket engine
Cryogenic rocket engineCryogenic rocket engine
Cryogenic rocket engineGaurav Singh
 
Eit norsk romfartseventyr @ First Tuesday Bergen
Eit norsk romfartseventyr @ First Tuesday BergenEit norsk romfartseventyr @ First Tuesday Bergen
Eit norsk romfartseventyr @ First Tuesday BergenFirst Tuesday Bergen
 
Robert White Portfolio
Robert White PortfolioRobert White Portfolio
Robert White PortfolioRobert White
 
AIAA-2009-4948
AIAA-2009-4948AIAA-2009-4948
AIAA-2009-4948Phil Eaton
 
Paper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management ChallengesPaper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management ChallengesDave Callen
 
COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13Dmitry Tseitlin
 
COTS_lessons learned_2013_nov_13
COTS_lessons learned_2013_nov_13COTS_lessons learned_2013_nov_13
COTS_lessons learned_2013_nov_13Dmitry Tseitlin
 
Research lunar hopper_defense_verison
Research lunar hopper_defense_verisonResearch lunar hopper_defense_verison
Research lunar hopper_defense_verisonMichael Boazzo
 
Conceptual design and architecture of turkish communication satellite turksat...
Conceptual design and architecture of turkish communication satellite turksat...Conceptual design and architecture of turkish communication satellite turksat...
Conceptual design and architecture of turkish communication satellite turksat...Atılay Mayadağ
 
Cots lessons learned_2013_nov13
Cots lessons learned_2013_nov13Cots lessons learned_2013_nov13
Cots lessons learned_2013_nov13Dmitry Tseitlin
 
NASA_CCO_status-2013 update
NASA_CCO_status-2013 updateNASA_CCO_status-2013 update
NASA_CCO_status-2013 updateDmitry Tseitlin
 
ASTRAEUS Final Report
ASTRAEUS Final ReportASTRAEUS Final Report
ASTRAEUS Final ReportDavid Torre
 

Similar a Antares Status, Presented by Dan Givens (20)

IG-13-016
IG-13-016IG-13-016
IG-13-016
 
GPS II F12
GPS II F12GPS II F12
GPS II F12
 
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
 
GSFC_Servicing_Workshop
GSFC_Servicing_WorkshopGSFC_Servicing_Workshop
GSFC_Servicing_Workshop
 
Cryogenic rocket engine
Cryogenic rocket engineCryogenic rocket engine
Cryogenic rocket engine
 
Ianson
IansonIanson
Ianson
 
Eit norsk romfartseventyr @ First Tuesday Bergen
Eit norsk romfartseventyr @ First Tuesday BergenEit norsk romfartseventyr @ First Tuesday Bergen
Eit norsk romfartseventyr @ First Tuesday Bergen
 
Robert White Portfolio
Robert White PortfolioRobert White Portfolio
Robert White Portfolio
 
AIAA-2009-4948
AIAA-2009-4948AIAA-2009-4948
AIAA-2009-4948
 
Paper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management ChallengesPaper - SmallSat 1999 Management Challenges
Paper - SmallSat 1999 Management Challenges
 
COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13COTS lessons learned_2013_nov13
COTS lessons learned_2013_nov13
 
COTS_lessons learned_2013_nov_13
COTS_lessons learned_2013_nov_13COTS_lessons learned_2013_nov_13
COTS_lessons learned_2013_nov_13
 
Goddard 2015: Pamela Melroy, DARPA
Goddard 2015: Pamela Melroy, DARPAGoddard 2015: Pamela Melroy, DARPA
Goddard 2015: Pamela Melroy, DARPA
 
Research lunar hopper_defense_verison
Research lunar hopper_defense_verisonResearch lunar hopper_defense_verison
Research lunar hopper_defense_verison
 
Conceptual design and architecture of turkish communication satellite turksat...
Conceptual design and architecture of turkish communication satellite turksat...Conceptual design and architecture of turkish communication satellite turksat...
Conceptual design and architecture of turkish communication satellite turksat...
 
Cots lessons learned_2013_nov13
Cots lessons learned_2013_nov13Cots lessons learned_2013_nov13
Cots lessons learned_2013_nov13
 
X-69
X-69X-69
X-69
 
NASA_CCO_status-2013 update
NASA_CCO_status-2013 updateNASA_CCO_status-2013 update
NASA_CCO_status-2013 update
 
Von Braun Symposium 2008: SpaceX
Von Braun Symposium 2008: SpaceXVon Braun Symposium 2008: SpaceX
Von Braun Symposium 2008: SpaceX
 
ASTRAEUS Final Report
ASTRAEUS Final ReportASTRAEUS Final Report
ASTRAEUS Final Report
 

Más de WallopsIslandRegionalAlliance

Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15WallopsIslandRegionalAlliance
 
Goddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris ScoleseGoddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris ScoleseWallopsIslandRegionalAlliance
 
NAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. RobinsonNAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. RobinsonWallopsIslandRegionalAlliance
 
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...WallopsIslandRegionalAlliance
 
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...WallopsIslandRegionalAlliance
 
Virginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional AllianceVirginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional AllianceWallopsIslandRegionalAlliance
 
Virginia Economic Development - Wallops Island Regional Alliance
Virginia Economic Development - Wallops Island Regional AllianceVirginia Economic Development - Wallops Island Regional Alliance
Virginia Economic Development - Wallops Island Regional AllianceWallopsIslandRegionalAlliance
 
Island Access - February 2015 - Wallops Island Regional Alliance
Island Access - February 2015 - Wallops Island Regional AllianceIsland Access - February 2015 - Wallops Island Regional Alliance
Island Access - February 2015 - Wallops Island Regional AllianceWallopsIslandRegionalAlliance
 

Más de WallopsIslandRegionalAlliance (20)

Q2 2017 WIRA NAVY Update Commander Jeff Lock
Q2 2017 WIRA NAVY Update Commander Jeff LockQ2 2017 WIRA NAVY Update Commander Jeff Lock
Q2 2017 WIRA NAVY Update Commander Jeff Lock
 
Q2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill WrobelQ2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill Wrobel
 
Q1 2017 WIRA CBBT Presentation Tom Anderson
Q1 2017 WIRA CBBT Presentation Tom AndersonQ1 2017 WIRA CBBT Presentation Tom Anderson
Q1 2017 WIRA CBBT Presentation Tom Anderson
 
Q1 2017 WIRA NOAA Update
Q1 2017 WIRA NOAA UpdateQ1 2017 WIRA NOAA Update
Q1 2017 WIRA NOAA Update
 
Q1 2017 WIRA NASA Update Bill Wrobel
Q1 2017 WIRA NASA Update Bill WrobelQ1 2017 WIRA NASA Update Bill Wrobel
Q1 2017 WIRA NASA Update Bill Wrobel
 
Q1 2017 WIRA VA SPACE Update Dale Nash
Q1 2017 WIRA VA SPACE Update Dale NashQ1 2017 WIRA VA SPACE Update Dale Nash
Q1 2017 WIRA VA SPACE Update Dale Nash
 
Q1 2017 WIRA NAVY Update CDR Jeff Lock
Q1 2017 WIRA NAVY Update CDR Jeff LockQ1 2017 WIRA NAVY Update CDR Jeff Lock
Q1 2017 WIRA NAVY Update CDR Jeff Lock
 
WIRA Update Q2 2016
WIRA Update Q2 2016WIRA Update Q2 2016
WIRA Update Q2 2016
 
NASA Update WIRA Q2 April 12 2016
NASA Update WIRA Q2 April 12 2016NASA Update WIRA Q2 April 12 2016
NASA Update WIRA Q2 April 12 2016
 
VA SPACE Update WIRA Q2 April 12 2016
VA SPACE Update WIRA Q2 April 12 2016VA SPACE Update WIRA Q2 April 12 2016
VA SPACE Update WIRA Q2 April 12 2016
 
NAVY Update WIRA Q2 April 12 2016
NAVY Update WIRA Q2 April 12 2016NAVY Update WIRA Q2 April 12 2016
NAVY Update WIRA Q2 April 12 2016
 
Wallops Flight Facility: Bill Wrobel. 7.21.15
Wallops Flight Facility: Bill Wrobel. 7.21.15Wallops Flight Facility: Bill Wrobel. 7.21.15
Wallops Flight Facility: Bill Wrobel. 7.21.15
 
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
 
Goddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris ScoleseGoddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris Scolese
 
NAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. RobinsonNAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. Robinson
 
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
 
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
 
Virginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional AllianceVirginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional Alliance
 
Virginia Economic Development - Wallops Island Regional Alliance
Virginia Economic Development - Wallops Island Regional AllianceVirginia Economic Development - Wallops Island Regional Alliance
Virginia Economic Development - Wallops Island Regional Alliance
 
Island Access - February 2015 - Wallops Island Regional Alliance
Island Access - February 2015 - Wallops Island Regional AllianceIsland Access - February 2015 - Wallops Island Regional Alliance
Island Access - February 2015 - Wallops Island Regional Alliance
 

Último

Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?Antenna Manufacturer Coco
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 

Último (20)

Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 

Antares Status, Presented by Dan Givens

  • 1. Antares Status Dan Givens Wallops Site Manager 12 January 2016
  • 2. CRS Return To Flight Plan  The Orbital ATK Plan Has the Following Elements:  Return Antares to Flight Using New, In- Production RD-181 Engines  Launch Cygnus on the Atlas V 401 Launch Vehicle during the Antares Down-time − No Significant Atlas Modifications are Required  Increased Capability of Atlas V and the New Antares With RD-181 Engines Allow the Remaining 13,100kg Obligation to be Delivered in 4 Missions  1 Fewer Than the Original Planned 5 Missions  Subsequent to the Above Plan, We Jointly Decided With NASA to Convert the OA-6 Mission to an Atlas V Mission as Well  Increases Cargo Delivery to ISS During This Critical Resupply Period by 300kg 2
  • 3. Orbital ATK Return to Flight Planning Launch Dates 3 Mission Orbital Working Launch Dates Launch Vehicle Original Planned Upmass (kg) Current Planned Upmass (kg) OA-4* December 2015 Atlas V 2630 3500 OA-6* March 2016 Atlas V 2620 3500 OA-5 May-June 2016 Antares 2620 3200 OA-7 October 2016 Antares 2620 3200 OA-8 June 2017 Antares 2620 3200 OA-9 October 2017 Antares N/A 3200 OA-10 March 2018 Antares N/A 3200 Original CRS1 Contract 4 Missions Deliver 13,100 kg (28,880 lbs) CRS1 Contract Extension Period * - OA-6 converted from an Antares to an Atlas V to enable increased cargo deliveries to the ISS OA-11 2018 Antares N/A Competition OA-12 … Antares N/A Sensitive CRS2 Contract 2018 – 2024 To Be Awarded NLT 30 Jan 2016 * - Launched successfully
  • 4. Cygnus Cargo Resupply Vehicle Cygnus Evolution to a New Configuration  Pressurized Cargo Module (PCM) Heritage: Multi-Purpose Logistics Module (ISS); ATV Total Payload Mass: 2,300 kg (Standard), 3200-3500 kg (Enhanced) Pressurized Volume: 18.7 m3, 27 m3  Service Module (SM) Heritage: Orbital ATK GEO and LEO missions Power Generation: 2 Fixed Wing Solar Arrays, 3.5 kW Compatible with multiple LVs Standard Cygnus 4 Enhanced Cygnus
  • 5. Antares 230 Configuration Development Status Update  Orbital ATK (OA) has developed a new configuration of Antares – the Antares 230 configuration – that features new stage 1 rocket engines  RD-181 engines were selected as an ideal replacement for prior AJ26 engines  Decision was made in consultation with our NASA customer and is now publicly disclosed  Directly addresses Orb-3 AIB corrective action #1  The Antares 230 configuration will be capable of launching a 7000kg Cygnus (carrying 3200kg of cargo) to ISS as early as May 2016  Will use existing Stage 1 Core tanks with minor modifications necessary to accommodate new RD-181 engines – and same upper stack used on Orb-3 with minor avionics changes  RD-181 engine development is complete and production is well underway − Certification testing program complete − First three flight engines completed acceptance testing and were delivered in July 2015 ◦ Acceptance test profile is flight duration at flight power levels, which directly addresses Orb-3 AIB corrective action #2  A hot fire Stage Test at Launch Pad 0A in March 2016 will be the major system level verification activity prior to the OA-5 mission − The Stage Test will verify operation of the integrated first stage 5
  • 6. Antares 230 Stage Test Overview 6  Stage Test Plan For The Upgraded Antares 230 is the Major Verification Activity Prior to the OA-5 Return to Flight Mission  The Stage Test Features Two Main Activities  One Wet Dress Rehearsal (WDR)  Verify And Demonstrate All Processes And Operations Required To Properly Configure The Test Article For Engine Ignition  One Hot Fire Test  Verify Operation And Performance Of Integrated First Stage Featuring Upgraded Propulsion System  Test Planning (Test Configuration, Schedule, Documentation, Operations, Etc) Is Underway, Schedule Forecast: March 2016  Test Article Assembly Has Begun  Major Partners (NASA, MARS, Energomash, Yuzhnoye, Etc) Have Been Briefed On Test Plan, And Are Working With Antares Program In Various Roles To Prepare For The Test Test Article Mounted To Pad
  • 7. Pad 0A Repairs and Upgrades Completed  All Concrete Structure Damage Has Been Repaired, Lightning Masts Replaced and Repair of Damaged Fueling and Pressure System Piping is Complete.  Modifications Required to Support RD-181 are Complete  Modification and Testing of Transporter/Erector Launcher and Hydraulic Systems Complete  Performance Testing of Pad Systems Completed 7
  • 8. Antares Integration - HIF High Bay 8 Currently Processing Two Vehicles Stage Test/OA-7 & OA-5
  • 9. Stage Test/OA-7 Mission RD-181 Engines Mated to 0.6 Core at Wallops Island 9
  • 10. 10 OA-5 Mission Vehicle Integration Status 0000.7 Core Unpacked and Ready for Lift to Rails for Transfer to Dollies 0000.7 Core Transfer to Dollies
  • 11. OA-5 Mission Vehicle Integration Status Aft Bay Removed RD4A & RD5A Engines Unpacked at HIF 11
  • 12. Summary  Orbital ATK is Meeting its Commitment to NASA Under the CRS-1 Contract:  Deliver the Remaining Cargo Obligation on the Original Contract by the End of 2016  Deliver Additional Cargo in 2017 Via Extension Missions  Purchase of Atlas V Missions Restarted Cargo Deliveries to ISS While Antares Upgrade to the 230 Configuration is Completed  Antares 230 configuration incorporates new-built RD-181 engines that are an ideal replacement for the previous AJ26 engines  RD-181 certification testing program has completed successfully  RD-181 flight engines will be acceptance tested through a flight-representative profile  Replacement of the AJ26 engines with the RD-181 engines fully addresses the AIB recommended corrective actions  Antares 230 and Pad 0A schedules support the Stage Test in March 2016 followed by the OA-5 mission in 2Q2016 and OA-7 mission in 4Q2016 12 Orbital ATK Will Be Ready to Restart Cargo Deliveries to the ISS with Antares Later This Year