Antares Launch Vehicle Overview
Currently Under Contract
to Support NASA
International Space Station
(ISS) Re-supply Missions
Thru 2024
VEHICLE PARAMETERS
• Gross Liftoff Mass: 290,000 – 310,000 kg
• Vehicle Length: 42.5 m
• Vehicle Diameter: 3.9 m
STAGE 1
• Liquid Oxygen/RP-1 fueled
• Two Energomash RD-181 engines with Independent
Thrust Vectoring
• 3.9 meter Aluminum Booster
STAGE 2
• Orbital ATK CASTOR® 30XL Solid Motor with
Active Thrust Vectoring
• Orbital MACH avionics module
• Cold-gas 3-axis Attitude Control System
PAYLOAD FAIRING
• 3.9 meter diameter by 9.9 meter envelope
• Composite Construction
• Non-contaminating Separation Systems
Available Commercially
7000 Kg to 200 Km x 38o
~3500 kg to SSO from WFF
Medium Lift Performance
2
Antares 230 Configuration and CRS1 Manifest
Payload
Fairing
Avionics
Module
Castor 30XL
2nd Stage
LO2 Tank
Intertank
RP-1
TankAft
Bay
2x RD-181
Main
Engines
Downcomer
Interstage
Fairing Extension
Cylinder & Adapter
Motor
Cone
Fairing
Jettison
Cylinder
Thrust
Adapter
Mission Configuration
COTS Test Flight 110
COTS-Demo 110
Orb-1 120
Orb-2 120
Orb-3 130
OA-4 Atlas V
OA-6 Atlas V
OA-5 230
OA-7 Atlas V
OA-8 230
OA-9 230
OA-10 230
OA-11 230
Baseline Core, AJ26 Engines, CASTOR 30 110
Baseline Core, AJ26 Engines, CASTOR 30B 120
Baseline Core, AJ26 Engines, CASTOR 30XL 130
Baseline Core, RD-181 Engines, CASTOR 30XL 230
Antares Configuration Key
Antares 230 Configuration was Developed by Upgrading
Main Engines to RD-181 and Adapting other Vehicle and
Ground Systems to Accommodate the New Engines
3
Antares 230 Stage Test Summary
4
Antares 230 Stage Test Overview
 The Antares 230 Stage Test was the major system-level verification activity prior to
the OA-5 return to flight mission
 Similar to the Stage Test conducted in 2013 prior to the first flight of Antares, the test
article was comprised of the integrated first stage of the Antares 230 launch vehicle
 The Test was performed at Pad 0A at Wallops Flight Facility
 Operation/Test objectives & description summary
 The Wet Dress Rehearsal verified and demonstrated all processes and operations
required to properly configure the test article for engine ignition
 The Hot Fire test verified operation and performance of the integrated Antares 230
first stage featuring the upgraded RD-181 propulsion system
− The Hot Fire test featured a 30 second duration firing of both RD-181 main engines at
flight thrust levels
− Mixture ratio excursions and TVC profiles were commanded during the Hot Fire test
5
Stage Test Overview (Pad Rollout)
6
Stage Test Completed 31 May 2016
7
OA-5 Mission Data Review Summary
8
Orbital ATK Combined Antares/Cygnus Team
Has Heritage From Five Prior Flights
9
OA-5 Mission Summary
 OA-5 launched successfully from Wallops Flight Facility at 7:45pm EDT on 17 Oct
2016 within a 5 minute window
 Launch occurred on the first launch attempt
 All Antares mission requirements were achieved, including:
 Orbit insertion requirements
 Payload separation requirements
 Payload ground and flight environments
 In summary, OA-5 was a very successful mission with no identified flight anomalies
10
OA-5 Cygnus Mission Performance
 Excellent launch and injection from Antares
 First flight with two TriDARs
 Second flight of the NRCSD-E
 Second flight of NASA Saffire Experiment
 Cygnus successfully rendezvoused and berthed with ISS
 Stayed attached to ISS for 30 days
 Deployed four cubesats post departure
 100 km above ISS
 No anomalies are being tracked
 Excellent Cygnus performance throughout the mission
11
OA-5 Mission
Liftoff
OA-5 Mission
Ascent – Second Stage Burn
OA-5 Mission
Cygnus Grappled
OA-5 Mission
Welcome S.S. Alan Poindexter!
Antares Future Manifest
16
Mission Launch Date Launch Vehicle
Configuration
OA-5 Oct 2016 Antares 230
OA-8 Jun 2017 Antares 230
OA-9 Oct 2017 Antares 230
OA-10 Mar 2018 Antares 230
OA-11 Dec 2018 Antares 230
NOTE: CRS2 Missions are Yet to be Awarded (2019 – 2024)
Summary
 Orbital ATK has completed development of the new Antares 230 configuration
 Features new RD-181 main engines
 RD-181 main engines completed certification for use on Antares
 Stage test completed successfully on 31 May 2016
 Antares returned to flight with the OA-5 mission on 17 Oct 2016
 Data review has shown all systems performed very well
 Key engineering models on Stage 1 and Stage 2 were verified
 Antares performance to orbit slightly better than expected – will enable more
performance on future flights
 Orbital ATK has been selected for the follow on CRS2 contract
 Period of Performance (2019 – 2024)
 Missions have yet to be awarded (6 minimum missions)
17
The OA-5 Mission Was a Spectacular Success and Has
Returned Antares to Flight Operations!
Thank You for Attending!
18

Más contenido relacionado

La actualidad más candente

Blue Origin: Powered by Rocket Fuel & AWS
Blue Origin: Powered by Rocket Fuel & AWSBlue Origin: Powered by Rocket Fuel & AWS
Blue Origin: Powered by Rocket Fuel & AWSAmazon Web Services
 
CME Slide Presentation
CME Slide PresentationCME Slide Presentation
CME Slide PresentationNick Picone
 
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail Adaptive Corporation
 
State space analysis mechanical
State space analysis  mechanicalState space analysis  mechanical
State space analysis mechanicalCharlton Inao
 
Fluid Mechanics Unit-4 (vk-ssm)
Fluid Mechanics Unit-4  (vk-ssm) Fluid Mechanics Unit-4  (vk-ssm)
Fluid Mechanics Unit-4 (vk-ssm) Dr. Kandavel V
 
Smart mobility homepage localization
Smart mobility homepage localizationSmart mobility homepage localization
Smart mobility homepage localizationhabbang
 
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Sergio A. Guerra
 
1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and TrackingATUL RAJ
 
Design of 9 story frame
Design of 9 story frameDesign of 9 story frame
Design of 9 story frameaileencv
 
C-GeoSPARQL: Streaming geospatial support on C-SPARQL
C-GeoSPARQL: Streaming geospatial support on C-SPARQLC-GeoSPARQL: Streaming geospatial support on C-SPARQL
C-GeoSPARQL: Streaming geospatial support on C-SPARQLAlexander Dejonghe
 
Isro’s advanced technology vehicle (atv) – light rockets for many experiments
Isro’s advanced technology vehicle (atv) – light rockets for many experimentsIsro’s advanced technology vehicle (atv) – light rockets for many experiments
Isro’s advanced technology vehicle (atv) – light rockets for many experimentshindujudaic
 
Challenging Paraglide Control System
Challenging Paraglide Control SystemChallenging Paraglide Control System
Challenging Paraglide Control SystemCLES-FACIL
 
Reliability Assessment of L40 Stage GSLV Mk II
Reliability Assessment of L40 Stage GSLV Mk IIReliability Assessment of L40 Stage GSLV Mk II
Reliability Assessment of L40 Stage GSLV Mk IIIRJET Journal
 

La actualidad más candente (20)

Blue Origin: Powered by Rocket Fuel & AWS
Blue Origin: Powered by Rocket Fuel & AWSBlue Origin: Powered by Rocket Fuel & AWS
Blue Origin: Powered by Rocket Fuel & AWS
 
CME Slide Presentation
CME Slide PresentationCME Slide Presentation
CME Slide Presentation
 
Richard Parker
Richard ParkerRichard Parker
Richard Parker
 
Masters Report
Masters ReportMasters Report
Masters Report
 
Tutorial #1 - SACS Basic
Tutorial #1 - SACS BasicTutorial #1 - SACS Basic
Tutorial #1 - SACS Basic
 
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
 
State space analysis mechanical
State space analysis  mechanicalState space analysis  mechanical
State space analysis mechanical
 
Fluid Mechanics Unit-4 (vk-ssm)
Fluid Mechanics Unit-4  (vk-ssm) Fluid Mechanics Unit-4  (vk-ssm)
Fluid Mechanics Unit-4 (vk-ssm)
 
Smart mobility homepage localization
Smart mobility homepage localizationSmart mobility homepage localization
Smart mobility homepage localization
 
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
Evaluation of the Theoretical Problems with Building Downwash Using A New Met...
 
1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking1 MW solar Power plant project Scheduling and Tracking
1 MW solar Power plant project Scheduling and Tracking
 
Design of 9 story frame
Design of 9 story frameDesign of 9 story frame
Design of 9 story frame
 
C-GeoSPARQL: Streaming geospatial support on C-SPARQL
C-GeoSPARQL: Streaming geospatial support on C-SPARQLC-GeoSPARQL: Streaming geospatial support on C-SPARQL
C-GeoSPARQL: Streaming geospatial support on C-SPARQL
 
Isro’s advanced technology vehicle (atv) – light rockets for many experiments
Isro’s advanced technology vehicle (atv) – light rockets for many experimentsIsro’s advanced technology vehicle (atv) – light rockets for many experiments
Isro’s advanced technology vehicle (atv) – light rockets for many experiments
 
Challenging Paraglide Control System
Challenging Paraglide Control SystemChallenging Paraglide Control System
Challenging Paraglide Control System
 
Tutorial #5 - SACS Basic
Tutorial #5 - SACS BasicTutorial #5 - SACS Basic
Tutorial #5 - SACS Basic
 
Tangguh LNG Project
Tangguh LNG ProjectTangguh LNG Project
Tangguh LNG Project
 
Ares I Integration Approach
Ares I Integration ApproachAres I Integration Approach
Ares I Integration Approach
 
Atlas v usersguide2010
Atlas v usersguide2010Atlas v usersguide2010
Atlas v usersguide2010
 
Reliability Assessment of L40 Stage GSLV Mk II
Reliability Assessment of L40 Stage GSLV Mk IIReliability Assessment of L40 Stage GSLV Mk II
Reliability Assessment of L40 Stage GSLV Mk II
 

Destacado

Antares presentation cowen2014
Antares presentation cowen2014Antares presentation cowen2014
Antares presentation cowen2014rymankoly
 
Virginia Economic Development - Wallops Island Regional Alliance
Virginia Economic Development - Wallops Island Regional AllianceVirginia Economic Development - Wallops Island Regional Alliance
Virginia Economic Development - Wallops Island Regional AllianceWallopsIslandRegionalAlliance
 
WIRA 3rd Q VA SPACE Update
WIRA 3rd Q VA SPACE UpdateWIRA 3rd Q VA SPACE Update
WIRA 3rd Q VA SPACE UpdateKaren Muth
 
Island Access - February 2015 - Wallops Island Regional Alliance
Island Access - February 2015 - Wallops Island Regional AllianceIsland Access - February 2015 - Wallops Island Regional Alliance
Island Access - February 2015 - Wallops Island Regional AllianceWallopsIslandRegionalAlliance
 
WIRA 3rd Q NASA Update
WIRA 3rd Q NASA UpdateWIRA 3rd Q NASA Update
WIRA 3rd Q NASA UpdateKaren Muth
 
Astronauts and Robots 2015: Frank Culbertson, Orbital ATK
Astronauts and Robots 2015: Frank Culbertson, Orbital ATKAstronauts and Robots 2015: Frank Culbertson, Orbital ATK
Astronauts and Robots 2015: Frank Culbertson, Orbital ATKAmerican Astronautical Society
 
Miami University 2016 Cleveland Research Company Stock Pitch Competition Winner
Miami University 2016 Cleveland Research Company Stock Pitch Competition WinnerMiami University 2016 Cleveland Research Company Stock Pitch Competition Winner
Miami University 2016 Cleveland Research Company Stock Pitch Competition WinnerMichael T. Loffredo
 
Brochure_Antares_USA_V1
Brochure_Antares_USA_V1Brochure_Antares_USA_V1
Brochure_Antares_USA_V1Roberto Vitale
 
Lockheed Martin Case Study_Final Draft
Lockheed Martin Case Study_Final DraftLockheed Martin Case Study_Final Draft
Lockheed Martin Case Study_Final DraftZach Kloska
 

Destacado (15)

Antares presentation cowen2014
Antares presentation cowen2014Antares presentation cowen2014
Antares presentation cowen2014
 
Virginia Economic Development - Wallops Island Regional Alliance
Virginia Economic Development - Wallops Island Regional AllianceVirginia Economic Development - Wallops Island Regional Alliance
Virginia Economic Development - Wallops Island Regional Alliance
 
WIRA 3rd Q VA SPACE Update
WIRA 3rd Q VA SPACE UpdateWIRA 3rd Q VA SPACE Update
WIRA 3rd Q VA SPACE Update
 
Q1 2017 WIRA CBBT Presentation Tom Anderson
Q1 2017 WIRA CBBT Presentation Tom AndersonQ1 2017 WIRA CBBT Presentation Tom Anderson
Q1 2017 WIRA CBBT Presentation Tom Anderson
 
Q1 2017 WIRA NAVY Update CDR Jeff Lock
Q1 2017 WIRA NAVY Update CDR Jeff LockQ1 2017 WIRA NAVY Update CDR Jeff Lock
Q1 2017 WIRA NAVY Update CDR Jeff Lock
 
Q1 2017 WIRA NASA Update Bill Wrobel
Q1 2017 WIRA NASA Update Bill WrobelQ1 2017 WIRA NASA Update Bill Wrobel
Q1 2017 WIRA NASA Update Bill Wrobel
 
Island Access - February 2015 - Wallops Island Regional Alliance
Island Access - February 2015 - Wallops Island Regional AllianceIsland Access - February 2015 - Wallops Island Regional Alliance
Island Access - February 2015 - Wallops Island Regional Alliance
 
WIRA 3rd Q NASA Update
WIRA 3rd Q NASA UpdateWIRA 3rd Q NASA Update
WIRA 3rd Q NASA Update
 
Q1 2017 WIRA NOAA Update
Q1 2017 WIRA NOAA UpdateQ1 2017 WIRA NOAA Update
Q1 2017 WIRA NOAA Update
 
Q1 2017 WIRA VA SPACE Update Dale Nash
Q1 2017 WIRA VA SPACE Update Dale NashQ1 2017 WIRA VA SPACE Update Dale Nash
Q1 2017 WIRA VA SPACE Update Dale Nash
 
ObritalATK
ObritalATKObritalATK
ObritalATK
 
Astronauts and Robots 2015: Frank Culbertson, Orbital ATK
Astronauts and Robots 2015: Frank Culbertson, Orbital ATKAstronauts and Robots 2015: Frank Culbertson, Orbital ATK
Astronauts and Robots 2015: Frank Culbertson, Orbital ATK
 
Miami University 2016 Cleveland Research Company Stock Pitch Competition Winner
Miami University 2016 Cleveland Research Company Stock Pitch Competition WinnerMiami University 2016 Cleveland Research Company Stock Pitch Competition Winner
Miami University 2016 Cleveland Research Company Stock Pitch Competition Winner
 
Brochure_Antares_USA_V1
Brochure_Antares_USA_V1Brochure_Antares_USA_V1
Brochure_Antares_USA_V1
 
Lockheed Martin Case Study_Final Draft
Lockheed Martin Case Study_Final DraftLockheed Martin Case Study_Final Draft
Lockheed Martin Case Study_Final Draft
 

Similar a WIRA Q1 2017 Antares Update

Indian Space Transportation Systems : Present and Future Scenarios
Indian Space Transportation Systems : Present and Future ScenariosIndian Space Transportation Systems : Present and Future Scenarios
Indian Space Transportation Systems : Present and Future ScenariosKurup Kurup
 
Rockets and Missile Technology AEROSPACE.pptx
Rockets and Missile Technology AEROSPACE.pptxRockets and Missile Technology AEROSPACE.pptx
Rockets and Missile Technology AEROSPACE.pptxPIYUSHNIGAM15
 
AIAA-2009-4948
AIAA-2009-4948AIAA-2009-4948
AIAA-2009-4948Phil Eaton
 
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...IRJET Journal
 
Centurion - OTV Presentation
Centurion - OTV PresentationCenturion - OTV Presentation
Centurion - OTV PresentationJay Mulakala
 
An Update on the Airbus Military Tanker, May 2013
An Update on the Airbus Military Tanker, May 2013An Update on the Airbus Military Tanker, May 2013
An Update on the Airbus Military Tanker, May 2013ICSA, LLC
 
Aircraft Design Proposal 2016
Aircraft Design Proposal 2016Aircraft Design Proposal 2016
Aircraft Design Proposal 2016Francisco Davila
 
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...Dave Callen
 
Fighter jet design and performance calculations by using the case studies.
Fighter jet design and performance calculations by using the case studies.Fighter jet design and performance calculations by using the case studies.
Fighter jet design and performance calculations by using the case studies.Mani5436
 
Stratospheric satellitesjun01
Stratospheric satellitesjun01Stratospheric satellitesjun01
Stratospheric satellitesjun01Clifford Stone
 

Similar a WIRA Q1 2017 Antares Update (20)

Indian Space Transportation Systems : Present and Future Scenarios
Indian Space Transportation Systems : Present and Future ScenariosIndian Space Transportation Systems : Present and Future Scenarios
Indian Space Transportation Systems : Present and Future Scenarios
 
Rockets and Missile Technology AEROSPACE.pptx
Rockets and Missile Technology AEROSPACE.pptxRockets and Missile Technology AEROSPACE.pptx
Rockets and Missile Technology AEROSPACE.pptx
 
Von Braun Symposium 2008: SpaceX
Von Braun Symposium 2008: SpaceXVon Braun Symposium 2008: SpaceX
Von Braun Symposium 2008: SpaceX
 
AIAA-2009-4948
AIAA-2009-4948AIAA-2009-4948
AIAA-2009-4948
 
GPS II F12
GPS II F12GPS II F12
GPS II F12
 
Visits tomarsjun02
Visits tomarsjun02Visits tomarsjun02
Visits tomarsjun02
 
The Ares Projects: Back to the Future
The Ares Projects: Back to the FutureThe Ares Projects: Back to the Future
The Ares Projects: Back to the Future
 
Hybrid Team Final Report
Hybrid Team Final ReportHybrid Team Final Report
Hybrid Team Final Report
 
Constellation: The New Vision for Space Exploration
Constellation: The New Vision for Space ExplorationConstellation: The New Vision for Space Exploration
Constellation: The New Vision for Space Exploration
 
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...
Propulsion System in Hypersonic Spacecraft Rocket: A Review of Recent Develop...
 
Centurion - OTV Presentation
Centurion - OTV PresentationCenturion - OTV Presentation
Centurion - OTV Presentation
 
X-69
X-69X-69
X-69
 
Astronaut hotelsjun01
Astronaut hotelsjun01Astronaut hotelsjun01
Astronaut hotelsjun01
 
An Update on the Airbus Military Tanker, May 2013
An Update on the Airbus Military Tanker, May 2013An Update on the Airbus Military Tanker, May 2013
An Update on the Airbus Military Tanker, May 2013
 
Aircraft Design Proposal 2016
Aircraft Design Proposal 2016Aircraft Design Proposal 2016
Aircraft Design Proposal 2016
 
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
Briefing - The Atlast V Aft Bulkhead Carrier Update - Past Missions, Upcoming...
 
Fighter jet design and performance calculations by using the case studies.
Fighter jet design and performance calculations by using the case studies.Fighter jet design and performance calculations by using the case studies.
Fighter jet design and performance calculations by using the case studies.
 
Stratospheric satellitesjun01
Stratospheric satellitesjun01Stratospheric satellitesjun01
Stratospheric satellitesjun01
 
FINAL PRESENTATION AERO 485
FINAL PRESENTATION AERO 485FINAL PRESENTATION AERO 485
FINAL PRESENTATION AERO 485
 
Spaceplanes
SpaceplanesSpaceplanes
Spaceplanes
 

Más de WallopsIslandRegionalAlliance

NASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce UnderwoodNASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce UnderwoodWallopsIslandRegionalAlliance
 
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...WallopsIslandRegionalAlliance
 
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15WallopsIslandRegionalAlliance
 
Goddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris ScoleseGoddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris ScoleseWallopsIslandRegionalAlliance
 
NAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. RobinsonNAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. RobinsonWallopsIslandRegionalAlliance
 
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...WallopsIslandRegionalAlliance
 
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...WallopsIslandRegionalAlliance
 
Virginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional AllianceVirginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional AllianceWallopsIslandRegionalAlliance
 

Más de WallopsIslandRegionalAlliance (16)

Q2 2017 WIRA NAVY Update Commander Jeff Lock
Q2 2017 WIRA NAVY Update Commander Jeff LockQ2 2017 WIRA NAVY Update Commander Jeff Lock
Q2 2017 WIRA NAVY Update Commander Jeff Lock
 
Q2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill WrobelQ2 2017 WIRA NASA Update Bill Wrobel
Q2 2017 WIRA NASA Update Bill Wrobel
 
WIRA Update Q2 2016
WIRA Update Q2 2016WIRA Update Q2 2016
WIRA Update Q2 2016
 
NASA Update WIRA Q2 April 12 2016
NASA Update WIRA Q2 April 12 2016NASA Update WIRA Q2 April 12 2016
NASA Update WIRA Q2 April 12 2016
 
VA SPACE Update WIRA Q2 April 12 2016
VA SPACE Update WIRA Q2 April 12 2016VA SPACE Update WIRA Q2 April 12 2016
VA SPACE Update WIRA Q2 April 12 2016
 
NAVY Update WIRA Q2 April 12 2016
NAVY Update WIRA Q2 April 12 2016NAVY Update WIRA Q2 April 12 2016
NAVY Update WIRA Q2 April 12 2016
 
NASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce UnderwoodNASA Wallops Flight Facility, Presented by Bruce Underwood
NASA Wallops Flight Facility, Presented by Bruce Underwood
 
MARS Update, Presented by Dale Nash
MARS Update, Presented by Dale NashMARS Update, Presented by Dale Nash
MARS Update, Presented by Dale Nash
 
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
HRMFFA: Federal Presence in Hampton Roads: The Next 5 - 10 Yrs, Presented by ...
 
Wallops Flight Facility: Bill Wrobel. 7.21.15
Wallops Flight Facility: Bill Wrobel. 7.21.15Wallops Flight Facility: Bill Wrobel. 7.21.15
Wallops Flight Facility: Bill Wrobel. 7.21.15
 
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
Nasa Langley RC Presentation: Charles Cockrell. 7.21.15
 
Goddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris ScoleseGoddard Space Flight Ctr. Presentation by Chris Scolese
Goddard Space Flight Ctr. Presentation by Chris Scolese
 
NAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. RobinsonNAVSEA SCSC Command Presentation by Capt. J. P. Robinson
NAVSEA SCSC Command Presentation by Capt. J. P. Robinson
 
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
Wallops Research Park Phase1 Construction January 13, 2015 Wallops Island Reg...
 
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
Virginia Economic Development, Liz Povar January 13, 2015 Wallops Island Regi...
 
Virginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional AllianceVirginia Space Update January 13, 2015 Wallops Island Regional Alliance
Virginia Space Update January 13, 2015 Wallops Island Regional Alliance
 

Último

Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Dipal Arora
 
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...nservice241
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)Congressional Budget Office
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...Hemant Purohit
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30JSchaus & Associates
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29JSchaus & Associates
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxtsionhagos36
 

Último (20)

Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Chakan Call Me 7737669865 Budget Friendly No Advance Booking
 
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Balaji Nagar Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl mohali 7001035870 Enjoy Call Girls With Our Escorts
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
 
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)The U.S. Budget and Economic Outlook (Presentation)
The U.S. Budget and Economic Outlook (Presentation)
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...Human-AI Collaborationfor Virtual Capacity in Emergency Operation Centers (E...
Human-AI Collaboration for Virtual Capacity in Emergency Operation Centers (E...
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
2024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 292024: The FAR, Federal Acquisition Regulations - Part 29
2024: The FAR, Federal Acquisition Regulations - Part 29
 
Expressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptxExpressive clarity oral presentation.pptx
Expressive clarity oral presentation.pptx
 

WIRA Q1 2017 Antares Update

  • 1. Antares Status Update Dan Givens, Antares Site Manager for Wallops Flight Facility January 2017
  • 2. Antares Launch Vehicle Overview Currently Under Contract to Support NASA International Space Station (ISS) Re-supply Missions Thru 2024 VEHICLE PARAMETERS • Gross Liftoff Mass: 290,000 – 310,000 kg • Vehicle Length: 42.5 m • Vehicle Diameter: 3.9 m STAGE 1 • Liquid Oxygen/RP-1 fueled • Two Energomash RD-181 engines with Independent Thrust Vectoring • 3.9 meter Aluminum Booster STAGE 2 • Orbital ATK CASTOR® 30XL Solid Motor with Active Thrust Vectoring • Orbital MACH avionics module • Cold-gas 3-axis Attitude Control System PAYLOAD FAIRING • 3.9 meter diameter by 9.9 meter envelope • Composite Construction • Non-contaminating Separation Systems Available Commercially 7000 Kg to 200 Km x 38o ~3500 kg to SSO from WFF Medium Lift Performance 2
  • 3. Antares 230 Configuration and CRS1 Manifest Payload Fairing Avionics Module Castor 30XL 2nd Stage LO2 Tank Intertank RP-1 TankAft Bay 2x RD-181 Main Engines Downcomer Interstage Fairing Extension Cylinder & Adapter Motor Cone Fairing Jettison Cylinder Thrust Adapter Mission Configuration COTS Test Flight 110 COTS-Demo 110 Orb-1 120 Orb-2 120 Orb-3 130 OA-4 Atlas V OA-6 Atlas V OA-5 230 OA-7 Atlas V OA-8 230 OA-9 230 OA-10 230 OA-11 230 Baseline Core, AJ26 Engines, CASTOR 30 110 Baseline Core, AJ26 Engines, CASTOR 30B 120 Baseline Core, AJ26 Engines, CASTOR 30XL 130 Baseline Core, RD-181 Engines, CASTOR 30XL 230 Antares Configuration Key Antares 230 Configuration was Developed by Upgrading Main Engines to RD-181 and Adapting other Vehicle and Ground Systems to Accommodate the New Engines 3
  • 4. Antares 230 Stage Test Summary 4
  • 5. Antares 230 Stage Test Overview  The Antares 230 Stage Test was the major system-level verification activity prior to the OA-5 return to flight mission  Similar to the Stage Test conducted in 2013 prior to the first flight of Antares, the test article was comprised of the integrated first stage of the Antares 230 launch vehicle  The Test was performed at Pad 0A at Wallops Flight Facility  Operation/Test objectives & description summary  The Wet Dress Rehearsal verified and demonstrated all processes and operations required to properly configure the test article for engine ignition  The Hot Fire test verified operation and performance of the integrated Antares 230 first stage featuring the upgraded RD-181 propulsion system − The Hot Fire test featured a 30 second duration firing of both RD-181 main engines at flight thrust levels − Mixture ratio excursions and TVC profiles were commanded during the Hot Fire test 5
  • 6. Stage Test Overview (Pad Rollout) 6
  • 7. Stage Test Completed 31 May 2016 7
  • 8. OA-5 Mission Data Review Summary 8
  • 9. Orbital ATK Combined Antares/Cygnus Team Has Heritage From Five Prior Flights 9
  • 10. OA-5 Mission Summary  OA-5 launched successfully from Wallops Flight Facility at 7:45pm EDT on 17 Oct 2016 within a 5 minute window  Launch occurred on the first launch attempt  All Antares mission requirements were achieved, including:  Orbit insertion requirements  Payload separation requirements  Payload ground and flight environments  In summary, OA-5 was a very successful mission with no identified flight anomalies 10
  • 11. OA-5 Cygnus Mission Performance  Excellent launch and injection from Antares  First flight with two TriDARs  Second flight of the NRCSD-E  Second flight of NASA Saffire Experiment  Cygnus successfully rendezvoused and berthed with ISS  Stayed attached to ISS for 30 days  Deployed four cubesats post departure  100 km above ISS  No anomalies are being tracked  Excellent Cygnus performance throughout the mission 11
  • 13. OA-5 Mission Ascent – Second Stage Burn
  • 15. OA-5 Mission Welcome S.S. Alan Poindexter!
  • 16. Antares Future Manifest 16 Mission Launch Date Launch Vehicle Configuration OA-5 Oct 2016 Antares 230 OA-8 Jun 2017 Antares 230 OA-9 Oct 2017 Antares 230 OA-10 Mar 2018 Antares 230 OA-11 Dec 2018 Antares 230 NOTE: CRS2 Missions are Yet to be Awarded (2019 – 2024)
  • 17. Summary  Orbital ATK has completed development of the new Antares 230 configuration  Features new RD-181 main engines  RD-181 main engines completed certification for use on Antares  Stage test completed successfully on 31 May 2016  Antares returned to flight with the OA-5 mission on 17 Oct 2016  Data review has shown all systems performed very well  Key engineering models on Stage 1 and Stage 2 were verified  Antares performance to orbit slightly better than expected – will enable more performance on future flights  Orbital ATK has been selected for the follow on CRS2 contract  Period of Performance (2019 – 2024)  Missions have yet to be awarded (6 minimum missions) 17 The OA-5 Mission Was a Spectacular Success and Has Returned Antares to Flight Operations!