SlideShare una empresa de Scribd logo
1 de 25
Euclid Creek Pump Station -
Lakeshore Boulevard Relief
Sewer Project
Community Meeting
May 16, 2013
EXISTING INFRASTRUCTURE
EUCLID CREEK
PUMP STATION
LAKESHORE BLVD.
INTERCEPTOR
FLOODING COMPLAINTS MADE TO CLEVELAND’S DIVISION OF WATER
POLLUTION CONTROL FROM 2009 TO MARCH 2012
Euclid Creek Tunnel Overview
LAKESHORE BLVD.
RELIEF SEWER
Benefits
• Reduced CSO discharges to Euclid Creek
and Lake Erie
– Today: 40
– When complete: ≤ 2
• To handle “5-year, 6-hour storm”
• Reduced basement flooding
Alignment Facts
• By the numbers:
– 4890’ sewer from Triangle Park to intersection of
Lakeshore Blvd. & Rosecliff Ave.
• Diameter: 27” to 66”
– 1230’ sewer from East Park Dr. to Dorchester Dr.
• Diameter: 24”
– 330’ sewer along Crestland Rd.
• Diameter: 18”
Construction largely in
public right-of-way.
KEY:
--- Lakeshore Blvd. Relief Sewer
--- Euclid Creek Tunnel
EUCLID CREEK
PUMP STATION
Construction Facts
• New Shaft (4-1A) Constructed
– 22’ excavation diameter, 16’ finished diameter
– 70’ deep
New Shaft
Construction
Construction Facts, cont.
• Triangle Park  New Shaft by Pump Station
– Trenchless sewer construction
– 70’ deep
– No impact to Louis Stokes Bridge
Trenchless Construction
(a.k.a. Microtunneling)
Construction Facts, cont.
• Lakeshore Blvd. from New Shaft  Rosecliff Ave.
– Open cut construction
– 15’-25’ deep
• New Shaft  Crestland Rd.
– Open cut construction in westbound (north)
lanes of Lakeshore Blvd.
– Parallel to existing Lakeshore Blvd. Interceptor
Construction Facts, cont.
• Crestland Rd.  Rosecliff Ave.
– Open cut construction in eastbound (south)
lanes of Lakeshore Blvd.
– Existing Lakeshore Blvd. Interceptor replaced by
new Lakeshore Blvd. Relief Sewer
Open Cut Construction
EXISTING
LAKESHORE BLVD.
INTERCEPTOR
NEW LAKESHORE BLVD.
RELIEF SEWER
New Relief Sewer vs.
Existing Interceptor Sewer
EXISTING
LAKESHORE BLVD.
INTERCEPTOR
NEW LAKESHORE
BLVD. RELIEF
SEWER
New Relief Sewer vs.
Existing Interceptor Sewer
• Regulators will divert wet weather from
existing interceptor to new relief sewer
– Marcella Rd., Neff Rd. & Harland Ave.
Who is the Contractor?
• McNally/Kiewit ECT JV (Euclid Creek Tunnel
contractor) will perform trenchless work
– Triangle Park to EC Pump Station
– Start date: Summer 2013
– Duration: 18 months
• Advertise remainder of project fall 2013
– Lakeshore Blvd., East Park Dr. & Crestland Rd.
– Start date: Early 2014
– Duration: 18 months
LBRS
4-1A
CSO
239
LAKESHORE BLVD. INTERCEPTOR
PROFILE OF RELIEF SEWER AT TRANSITION FROM OPEN CUT TO
TRENCHLESS CONSTRUCTION
ECPS/LBRS
CONTRACT
ECT
CONTRACT
SOIL
BEDROCK
MAINTENANCE OF TRAFFIC DURING CONSTRUCTION OF SHAFT 4-1A
Anticipated Construction Schedule
• July 2013  January 2015
– Trenchless construction from Triangle Park to
new shaft by pump station
– Contractor: McNally/Kiewit ECT JV
• March 2014  September 2015
– Open cut construction on Lakeshore Blvd.,
East Park Dr. & Crestland Rd.
– Contractor: TBD
Euclid Creek Pump
Station Renovations
• New roof, gutters and downspouts
• Improved site drainage
• New driveway
• New pumps and piping system
• New HVAC system
• New interior stairwells
• New interior paint
Post-Construction Features
• Lakeshore Blvd. resurfaced from Louis Stokes
Bridge to Rosecliff Ave.
Stay Informed
• Blog
– EuclidCreek.blogspot.com
• Collinwood Observer
– Ads and articles
• Semi-Monthly Newsletter
– E-mail distribution
– eltingj@neorsd.org to be added to the list
How to Reach Us
Social Media
facebook.com/yoursewerdistrict
@neorsd | @wallywaterdrop
Customer Service
(216) 881-8247
Emergencies: NEORSD ECT Field Office
(216) 268-5469
Ryan Sullivan, sullivanr@neorsd.org
Jenn Elting, eltingj@neorsd.org

Más contenido relacionado

La actualidad más candente

LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...
LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...
LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...Pont Samuel-De Champlain Bridge
 
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...Pont Samuel-De Champlain Bridge
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Fairfax County
 
Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationFairfax County
 
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations ProjectFairfax County
 
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...Pont Samuel-De Champlain Bridge
 
Federal Projects - USFW Region 3
Federal Projects - USFW Region 3Federal Projects - USFW Region 3
Federal Projects - USFW Region 3jschelkoph
 
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationPike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationFairfax County
 
Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15Ryan Johnson
 
Powerpoint - Langley School Pump Station and Force Main Project
Powerpoint  -  Langley School Pump Station and Force Main ProjectPowerpoint  -  Langley School Pump Station and Force Main Project
Powerpoint - Langley School Pump Station and Force Main ProjectFairfax County
 
Cedarvale & Forest Hill CLC - Construction Update - Oct 25, 2017
Cedarvale & Forest Hill CLC - Construction Update - Oct 25, 2017Cedarvale & Forest Hill CLC - Construction Update - Oct 25, 2017
Cedarvale & Forest Hill CLC - Construction Update - Oct 25, 2017Crosstown TO
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationFairfax County
 
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Black & Veatch
 
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerOld Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerFairfax County
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Crosstown TO
 
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Crosstown TO
 
Little Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationLittle Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationFairfax County
 
Mhna – epe meeting 08112015
Mhna – epe meeting 08112015Mhna – epe meeting 08112015
Mhna – epe meeting 08112015elpasonaturally
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017Crosstown TO
 

La actualidad más candente (20)

LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...
LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...
LaSalle Overpass & May Street - Meeting of the Verdun / Sud-Ouest Good Neighb...
 
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...
Meeting of the Verdun / Sud-Ouest Good Neighbourly Relations Committee - Apri...
 
Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1Integrated Sewer Metering Project 1
Integrated Sewer Metering Project 1
 
Belle View Pump Station Rehabilitation
Belle View Pump Station RehabilitationBelle View Pump Station Rehabilitation
Belle View Pump Station Rehabilitation
 
Kps profile
Kps profileKps profile
Kps profile
 
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project  High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
High Ridge Lakevale Estates Langley Oaks and Weid Pump Stations Project
 
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...
Gaétan Laberge sector mobility scenario - Meeting of the Verdun / Sud-Ouest G...
 
Federal Projects - USFW Region 3
Federal Projects - USFW Region 3Federal Projects - USFW Region 3
Federal Projects - USFW Region 3
 
Pike Branch at Wilton Road Presentation
Pike Branch at Wilton Road PresentationPike Branch at Wilton Road Presentation
Pike Branch at Wilton Road Presentation
 
Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15Town of Scitutate job story Underground Construction 10-1-15
Town of Scitutate job story Underground Construction 10-1-15
 
Powerpoint - Langley School Pump Station and Force Main Project
Powerpoint  -  Langley School Pump Station and Force Main ProjectPowerpoint  -  Langley School Pump Station and Force Main Project
Powerpoint - Langley School Pump Station and Force Main Project
 
Cedarvale & Forest Hill CLC - Construction Update - Oct 25, 2017
Cedarvale & Forest Hill CLC - Construction Update - Oct 25, 2017Cedarvale & Forest Hill CLC - Construction Update - Oct 25, 2017
Cedarvale & Forest Hill CLC - Construction Update - Oct 25, 2017
 
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 ImplementationDulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
Dulles Corridor Metrorail Project - Silver Line Phase 2 Implementation
 
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
Resolving Project Boundary Challenges to Streamline FERC Hydropower Dam Relic...
 
Old Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity SewerOld Keene Mill Emergency Gravity Sewer
Old Keene Mill Emergency Gravity Sewer
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
 
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
 
Little Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station RehabilitationLittle Hunting Creek Pump Station Rehabilitation
Little Hunting Creek Pump Station Rehabilitation
 
Mhna – epe meeting 08112015
Mhna – epe meeting 08112015Mhna – epe meeting 08112015
Mhna – epe meeting 08112015
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
 

Similar a Lakeshore boulevard relief sewer presentation

Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationAttleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationThomasSexton8
 
JC RESUME 08-08-15
JC RESUME 08-08-15JC RESUME 08-08-15
JC RESUME 08-08-15john coombe
 
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects City of Corona
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectFairfax County
 
River Road Meeting 3-10-05
River Road Meeting 3-10-05River Road Meeting 3-10-05
River Road Meeting 3-10-05HartTWI
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementFairfax County
 
Glenbrook Road Sanitary Sewer Extension and Improvement Project
Glenbrook Road Sanitary Sewer Extension and Improvement ProjectGlenbrook Road Sanitary Sewer Extension and Improvement Project
Glenbrook Road Sanitary Sewer Extension and Improvement ProjectFairfax County
 
2015 State College Borough Construction Projects
2015 State College Borough Construction Projects2015 State College Borough Construction Projects
2015 State College Borough Construction ProjectsCourtney Hayden
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingCrosstown TO
 
Finishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestFinishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestPhilip Tunnah
 
Project List
Project ListProject List
Project ListJim Ryan
 
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020Fairfax County
 
MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16Mark Williams
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2Ismael Vazquez, LSIT
 
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...TWCA
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectFairfax County
 
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Fairfax County
 

Similar a Lakeshore boulevard relief sewer presentation (20)

Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station RehabilitationAttleboro Luther's Reservoir Dam & Pump Station Rehabilitation
Attleboro Luther's Reservoir Dam & Pump Station Rehabilitation
 
JC RESUME 08-08-15
JC RESUME 08-08-15JC RESUME 08-08-15
JC RESUME 08-08-15
 
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
Jan. 21, 2015 City Council Presentation 2015 Capital Improvement Projects
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
River Road Meeting 3-10-05
River Road Meeting 3-10-05River Road Meeting 3-10-05
River Road Meeting 3-10-05
 
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank ReplacementLong Branch & New Alexandria Pump Station Fuel Tank Replacement
Long Branch & New Alexandria Pump Station Fuel Tank Replacement
 
Glenbrook Road Sanitary Sewer Extension and Improvement Project
Glenbrook Road Sanitary Sewer Extension and Improvement ProjectGlenbrook Road Sanitary Sewer Extension and Improvement Project
Glenbrook Road Sanitary Sewer Extension and Improvement Project
 
PermanentPumps_Jul13_FINAL2
PermanentPumps_Jul13_FINAL2PermanentPumps_Jul13_FINAL2
PermanentPumps_Jul13_FINAL2
 
2015 State College Borough Construction Projects
2015 State College Borough Construction Projects2015 State College Borough Construction Projects
2015 State College Borough Construction Projects
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
 
Finishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes DigestFinishing Strong_July 2014_Water & Wastes Digest
Finishing Strong_July 2014_Water & Wastes Digest
 
Project List
Project ListProject List
Project List
 
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
Little River Turnpike, Backlick Rd. Emergency Sewer Repair Sept 2020
 
MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16MW Project Experience Updated 7-24-16
MW Project Experience Updated 7-24-16
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2
 
Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
 
Merrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation ProjectMerrywood Force Main Rehabilitation Project
Merrywood Force Main Rehabilitation Project
 
Brookwood Parkway Improvement
Brookwood Parkway ImprovementBrookwood Parkway Improvement
Brookwood Parkway Improvement
 
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020Tucker Avenue Neighborhood - Community Meeting 3-11-2020
Tucker Avenue Neighborhood - Community Meeting 3-11-2020
 

Más de Northeast Ohio Regional Sewer District

Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...Northeast Ohio Regional Sewer District
 
Water tweetment: How personality can help public services better engage, educ...
Water tweetment: How personality can help public services better engage, educ...Water tweetment: How personality can help public services better engage, educ...
Water tweetment: How personality can help public services better engage, educ...Northeast Ohio Regional Sewer District
 
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...Northeast Ohio Regional Sewer District
 
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwater
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwaterWhole lotta green: Hotel lot, roof in University Circle helps manage stormwater
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwaterNortheast Ohio Regional Sewer District
 
Your Sewer District and social media? How @neorsd is using it, learning from ...
Your Sewer District and social media? How @neorsd is using it, learning from ...Your Sewer District and social media? How @neorsd is using it, learning from ...
Your Sewer District and social media? How @neorsd is using it, learning from ...Northeast Ohio Regional Sewer District
 

Más de Northeast Ohio Regional Sewer District (17)

Green Infrastructure Policy: An overview
Green Infrastructure Policy: An overviewGreen Infrastructure Policy: An overview
Green Infrastructure Policy: An overview
 
Sewer University #SewerU presented by @neorsd
Sewer University #SewerU presented by @neorsdSewer University #SewerU presented by @neorsd
Sewer University #SewerU presented by @neorsd
 
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
Project Clean Lake, Appendix 3 Green Infrastructure Anticipated Co-Benefits A...
 
Water tweetment: How personality can help public services better engage, educ...
Water tweetment: How personality can help public services better engage, educ...Water tweetment: How personality can help public services better engage, educ...
Water tweetment: How personality can help public services better engage, educ...
 
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
[PICS] After the storm: The regional impacts of a Northeast Ohio storm May 12...
 
7 ways wastewater treatment is like the first day back to school
7 ways wastewater treatment is like the first day back to school7 ways wastewater treatment is like the first day back to school
7 ways wastewater treatment is like the first day back to school
 
Collinwood Nottingham Dev Corp 072313
Collinwood Nottingham Dev Corp 072313Collinwood Nottingham Dev Corp 072313
Collinwood Nottingham Dev Corp 072313
 
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwater
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwaterWhole lotta green: Hotel lot, roof in University Circle helps manage stormwater
Whole lotta green: Hotel lot, roof in University Circle helps manage stormwater
 
Whole lot of green: Hotel roof, lot help manage stormwater
Whole lot of green: Hotel roof, lot help manage stormwaterWhole lot of green: Hotel roof, lot help manage stormwater
Whole lot of green: Hotel roof, lot help manage stormwater
 
Euclid creek tunnel ppt apr2013
Euclid creek tunnel ppt apr2013Euclid creek tunnel ppt apr2013
Euclid creek tunnel ppt apr2013
 
Dwirs overview handout
Dwirs overview handoutDwirs overview handout
Dwirs overview handout
 
Euclid creek tunnel ppt mar2013
Euclid creek tunnel ppt mar2013Euclid creek tunnel ppt mar2013
Euclid creek tunnel ppt mar2013
 
Euclid creek tunnel ppt feb2013
Euclid creek tunnel ppt feb2013Euclid creek tunnel ppt feb2013
Euclid creek tunnel ppt feb2013
 
Your Sewer District and social media? How @neorsd is using it, learning from ...
Your Sewer District and social media? How @neorsd is using it, learning from ...Your Sewer District and social media? How @neorsd is using it, learning from ...
Your Sewer District and social media? How @neorsd is using it, learning from ...
 
Euclid Creek Tunnel Community Meeting Nov2012
Euclid Creek Tunnel Community Meeting Nov2012Euclid Creek Tunnel Community Meeting Nov2012
Euclid Creek Tunnel Community Meeting Nov2012
 
Euclid Creek Tunnel Community Update Dec2012
Euclid Creek Tunnel Community Update Dec2012Euclid Creek Tunnel Community Update Dec2012
Euclid Creek Tunnel Community Update Dec2012
 
#successatwork tweetable tips for social media
#successatwork tweetable tips for social media#successatwork tweetable tips for social media
#successatwork tweetable tips for social media
 

Último

Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdfChristopherTHyatt
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century educationjfdjdjcjdnsjd
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdflior mazor
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Enterprise Knowledge
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 

Último (20)

Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 

Lakeshore boulevard relief sewer presentation

  • 1. Euclid Creek Pump Station - Lakeshore Boulevard Relief Sewer Project Community Meeting May 16, 2013
  • 2. EXISTING INFRASTRUCTURE EUCLID CREEK PUMP STATION LAKESHORE BLVD. INTERCEPTOR
  • 3. FLOODING COMPLAINTS MADE TO CLEVELAND’S DIVISION OF WATER POLLUTION CONTROL FROM 2009 TO MARCH 2012
  • 4. Euclid Creek Tunnel Overview LAKESHORE BLVD. RELIEF SEWER
  • 5. Benefits • Reduced CSO discharges to Euclid Creek and Lake Erie – Today: 40 – When complete: ≤ 2 • To handle “5-year, 6-hour storm” • Reduced basement flooding
  • 6. Alignment Facts • By the numbers: – 4890’ sewer from Triangle Park to intersection of Lakeshore Blvd. & Rosecliff Ave. • Diameter: 27” to 66” – 1230’ sewer from East Park Dr. to Dorchester Dr. • Diameter: 24” – 330’ sewer along Crestland Rd. • Diameter: 18” Construction largely in public right-of-way.
  • 7. KEY: --- Lakeshore Blvd. Relief Sewer --- Euclid Creek Tunnel EUCLID CREEK PUMP STATION
  • 8. Construction Facts • New Shaft (4-1A) Constructed – 22’ excavation diameter, 16’ finished diameter – 70’ deep
  • 10. Construction Facts, cont. • Triangle Park  New Shaft by Pump Station – Trenchless sewer construction – 70’ deep – No impact to Louis Stokes Bridge
  • 12. Construction Facts, cont. • Lakeshore Blvd. from New Shaft  Rosecliff Ave. – Open cut construction – 15’-25’ deep • New Shaft  Crestland Rd. – Open cut construction in westbound (north) lanes of Lakeshore Blvd. – Parallel to existing Lakeshore Blvd. Interceptor
  • 13. Construction Facts, cont. • Crestland Rd.  Rosecliff Ave. – Open cut construction in eastbound (south) lanes of Lakeshore Blvd. – Existing Lakeshore Blvd. Interceptor replaced by new Lakeshore Blvd. Relief Sewer
  • 15. EXISTING LAKESHORE BLVD. INTERCEPTOR NEW LAKESHORE BLVD. RELIEF SEWER New Relief Sewer vs. Existing Interceptor Sewer
  • 16. EXISTING LAKESHORE BLVD. INTERCEPTOR NEW LAKESHORE BLVD. RELIEF SEWER New Relief Sewer vs. Existing Interceptor Sewer • Regulators will divert wet weather from existing interceptor to new relief sewer – Marcella Rd., Neff Rd. & Harland Ave.
  • 17. Who is the Contractor? • McNally/Kiewit ECT JV (Euclid Creek Tunnel contractor) will perform trenchless work – Triangle Park to EC Pump Station – Start date: Summer 2013 – Duration: 18 months • Advertise remainder of project fall 2013 – Lakeshore Blvd., East Park Dr. & Crestland Rd. – Start date: Early 2014 – Duration: 18 months
  • 19. PROFILE OF RELIEF SEWER AT TRANSITION FROM OPEN CUT TO TRENCHLESS CONSTRUCTION ECPS/LBRS CONTRACT ECT CONTRACT SOIL BEDROCK
  • 20. MAINTENANCE OF TRAFFIC DURING CONSTRUCTION OF SHAFT 4-1A
  • 21. Anticipated Construction Schedule • July 2013  January 2015 – Trenchless construction from Triangle Park to new shaft by pump station – Contractor: McNally/Kiewit ECT JV • March 2014  September 2015 – Open cut construction on Lakeshore Blvd., East Park Dr. & Crestland Rd. – Contractor: TBD
  • 22. Euclid Creek Pump Station Renovations • New roof, gutters and downspouts • Improved site drainage • New driveway • New pumps and piping system • New HVAC system • New interior stairwells • New interior paint
  • 23. Post-Construction Features • Lakeshore Blvd. resurfaced from Louis Stokes Bridge to Rosecliff Ave.
  • 24. Stay Informed • Blog – EuclidCreek.blogspot.com • Collinwood Observer – Ads and articles • Semi-Monthly Newsletter – E-mail distribution – eltingj@neorsd.org to be added to the list
  • 25. How to Reach Us Social Media facebook.com/yoursewerdistrict @neorsd | @wallywaterdrop Customer Service (216) 881-8247 Emergencies: NEORSD ECT Field Office (216) 268-5469 Ryan Sullivan, sullivanr@neorsd.org Jenn Elting, eltingj@neorsd.org

Notas del editor

  1. 3 ½ miles longCapacity 60.5 million gallons24’ finished diameterMore than 50% complete
  2. Again mention reduced basement flooding. I promise you that this will be one of three key important take-aways for residents.Reduced basement floodingBetter beachesTraffic headaches