Implementation of Reliability Engineering in Merisol RSA
Reliability engineering is a relatively new concept in the field of engineering, despite this
reliability engineering is on an up rise in all environments. The importance of reliable
equipment has been acknowledge by top management and the implementation of reliability
programs and advanced maintenance strategies are now a priority.
The main purpose of this report is to inform the reader about the vital importance of reliability
engineering and to guide the reader in understanding reliability engineering. We will also
discuss some of the tools available, for example RCM, RCA and MTBF to help you reach
reliability in the plant environment. We will also look at Merisol in terms of reliability and the
status of equipment in terms of availability. This directly leads to the equipment uptime.
With a well-rounded reliability program in place, using the previously stated tools the following
improvements may be observed:
 5-10% improvement in availability
 10-20% decrease in maintenance costs
 25-35% increase in equipment uptime.
Areas where reliability in Merisol was investigated;
1. Plant availability
2. Identifying critical equipment
3. Preventive maintenance
4. Predictive maintenance
5. Spare parts management
6. Skill enhancement
7. Equipment history
Recommendations on areas of improvements:
1. Set Plant availability goals
 Operations, Maintenance and Technical must establish the availability goals for each
plant based on the required production targets and equipment utilisation.
 To put perspective on your availability goals and current availability it is wise to group
together availability, capacity and utilisation.
2. Identify critical equipment
 Update the procedure of identifying critical equipment. This ensures that equipment
that has a large impact on production does not slip through. Reliability Centred
Maintenance may reduce safety risks.
 It is highly recommended to implement RCM `s.
3. Preventive/Predictive maintenance
 Must move away from reactive maintenance which is a very expensive practise to
follow.
 Predict failures with the aim of preventing them.
 Equipment should receive condition monitoring - allows us to predict when equipment
will fail and prevent future failures. A life cycle analysis tool may be used. We will be
able measure the performance of equipment in terms of the amount of production time
and failures.
Gear Ratios of new spares
New spares were ordered on a gearbox; the supplier changed the driver gear with no manual.
The driver gear has changed in size and amount of teeth. Both the old gears had the same
amount of teeth. How does the increase of size and amount of teeth of the driver gear effect
the system.
Rotating Equipment Preventative Maintenance Strategy
Merisol required preventative maintenance strategies to increase both the reliability and
availability of the critical rotating equipment. The objective was to look at a practical and
efficient solution and keeping in mind the financial implication.
Pump Inspection Permit System
To investigate changing the pump inspection philosophy and to propose an alternate
solution to increase the frequency of pumps inspections if applicable. The Sasol Group
Procedure for Work Permits (SSC-SAF-GPR-00003) outlines the necessary rules to
exempt pump inspections from the permit process.
F7101B Containment Area
An investigation into the F7101B (Value CA) tank containment area was carried out.
This was to verify that the concrete containment walls will be suitable, to contain a
leak, overfilling or rupture from F7101B. The capacity of the current concrete
containment walls was measured and compared to the maximum and operating
capacity of the tank.
FER – Analytical Report
Sasol Infrachem Merisol has an FER severity index 10 times higher than the overall Sasol
Infrachem Business Units. This is unacceptable. This report aims to decrease the severity and
frequency of FER incidents by identifying the common failure modes through FER data
analysis.
From the data captured (Sasol FER Severity Calculator) thus far, we were able to identify the
following as possible high priority areas for the Merisol business to focus on:
 Lines left open
 Corrosion
 Gasket failures
Additional investigation indicated the following:
Leaving process lines open, display a steady reoccurrence in accordance to the data captured.
Lines left open is a result of valves or drains open to atmosphere, where an unintended release
takes place. There has been a steady decline in gasket related failures throughout the four
years analysed. Corrosion related failures are on the rise overall.
Figure 13 is a more detail set of data, for the current year (2013). This allows us to see what
the relevant incidents are and their impact on the overall FER severity index.
Prior to the analysis of the FER data, it was assumed that gasket failures were a major
contributor to the high FERs at Merisol. However, after analysis it was evident that gasket
failures should not given a high priority to their role in FERs as it only appears twice during
2013. Corrosion has shown a steady decline in 2013. Whereas, process lines being left open
is on a slow rise in frequency.
This gave us the data we needed to identify that Lines left open and corrosion are the main
and most relevant contributing factors to the high FER severity index and is where priority
should be given.
To solve the current and most relevant contributing factor that is lines being left open; would
be to review problematic standard operating procedures, provide appropriate training to
operators where applicable, ensure competency of the operators before being allowed to
operate the plant and review that the correct check lists are in place to ensure that no lines
have been left open unintentionally. Prioritising this as a problem correctly, could result in a
32% reduction in the FER index.
Integrity of C43164 due to crystallisation of E29 overheads
During Value CA mode the E29 Overhead steam needs to be routed to the feed tank F5113A.If
this is forgotten or overlooked the product in C43164 might crystallise on the shell side due to
the high content of phenol and ortho-cresol. The crystallization point of the mixture is < 37 °C.

Más contenido relacionado

La actualidad más candente

andersonl-resume-2 (larry anderson) (1)
andersonl-resume-2 (larry anderson) (1)andersonl-resume-2 (larry anderson) (1)
andersonl-resume-2 (larry anderson) (1)
Larry Anderson
 
STM_Autumn2015 Article Publication
STM_Autumn2015 Article PublicationSTM_Autumn2015 Article Publication
STM_Autumn2015 Article Publication
Ewart Cox
 
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Mike Poland, CMRP
 
Gil Hernandez Resume 2016
Gil Hernandez  Resume 2016 Gil Hernandez  Resume 2016
Gil Hernandez Resume 2016
Gil Hernandez
 

La actualidad más candente (18)

PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 
Ipea api579
Ipea api579Ipea api579
Ipea api579
 
TRIAGE - Advanced Pipeline Risk Assessment - Internal Corrosin
TRIAGE - Advanced Pipeline Risk Assessment - Internal CorrosinTRIAGE - Advanced Pipeline Risk Assessment - Internal Corrosin
TRIAGE - Advanced Pipeline Risk Assessment - Internal Corrosin
 
Replacing a Stack Gas Flow Hardware Device with PEMS
Replacing a Stack Gas Flow Hardware Device with PEMSReplacing a Stack Gas Flow Hardware Device with PEMS
Replacing a Stack Gas Flow Hardware Device with PEMS
 
Battery Maintenance Solutions for Critical Facilities: Costs and Causes of Do...
Battery Maintenance Solutions for Critical Facilities: Costs and Causes of Do...Battery Maintenance Solutions for Critical Facilities: Costs and Causes of Do...
Battery Maintenance Solutions for Critical Facilities: Costs and Causes of Do...
 
Ffs assessment
Ffs assessmentFfs assessment
Ffs assessment
 
An appropriate methodology to achieve a clear vision of the valves and proper...
An appropriate methodology to achieve a clear vision of the valves and proper...An appropriate methodology to achieve a clear vision of the valves and proper...
An appropriate methodology to achieve a clear vision of the valves and proper...
 
andersonl-resume-2 (larry anderson) (1)
andersonl-resume-2 (larry anderson) (1)andersonl-resume-2 (larry anderson) (1)
andersonl-resume-2 (larry anderson) (1)
 
STM_Autumn2015 Article Publication
STM_Autumn2015 Article PublicationSTM_Autumn2015 Article Publication
STM_Autumn2015 Article Publication
 
Evolution of maintenance_practices
Evolution of maintenance_practicesEvolution of maintenance_practices
Evolution of maintenance_practices
 
GE_RFF Engineer Resume
GE_RFF Engineer ResumeGE_RFF Engineer Resume
GE_RFF Engineer Resume
 
2015 Resume
2015 Resume2015 Resume
2015 Resume
 
Comparison of PEMS and CEMS
Comparison of PEMS and CEMSComparison of PEMS and CEMS
Comparison of PEMS and CEMS
 
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
Australian-Offshore-Drilling-Fleet-Transformed-from-OutofCompliance-to-World-...
 
Gil Hernandez Resume 2016
Gil Hernandez  Resume 2016 Gil Hernandez  Resume 2016
Gil Hernandez Resume 2016
 
Boeing - Reliability Centered Maintenance
Boeing - Reliability Centered MaintenanceBoeing - Reliability Centered Maintenance
Boeing - Reliability Centered Maintenance
 
Internship report
Internship reportInternship report
Internship report
 
Wisg Overview
Wisg OverviewWisg Overview
Wisg Overview
 

Destacado

2013 WIT Forum - Knowing Yourself & Knowing Others
2013 WIT Forum - Knowing Yourself & Knowing Others2013 WIT Forum - Knowing Yourself & Knowing Others
2013 WIT Forum - Knowing Yourself & Knowing Others
WITLacey
 
D. Summary of work experience at Merisol (SASOL)
D. Summary of work experience at Merisol (SASOL)D. Summary of work experience at Merisol (SASOL)
D. Summary of work experience at Merisol (SASOL)
Wynand Holtzhausen
 

Destacado (7)

Indicadores Industriais | Setembro | Divulgação 08/11/2013
Indicadores Industriais | Setembro | Divulgação 08/11/2013Indicadores Industriais | Setembro | Divulgação 08/11/2013
Indicadores Industriais | Setembro | Divulgação 08/11/2013
 
2013 WIT Forum - Knowing Yourself & Knowing Others
2013 WIT Forum - Knowing Yourself & Knowing Others2013 WIT Forum - Knowing Yourself & Knowing Others
2013 WIT Forum - Knowing Yourself & Knowing Others
 
24/01 - Indicador de Custos Industriais - Nº01 jul-set 2012
24/01 -  Indicador de Custos Industriais - Nº01 jul-set 201224/01 -  Indicador de Custos Industriais - Nº01 jul-set 2012
24/01 - Indicador de Custos Industriais - Nº01 jul-set 2012
 
INEC | Outubro 2012
INEC | Outubro 2012INEC | Outubro 2012
INEC | Outubro 2012
 
D. Summary of work experience at Merisol (SASOL)
D. Summary of work experience at Merisol (SASOL)D. Summary of work experience at Merisol (SASOL)
D. Summary of work experience at Merisol (SASOL)
 
Windows xp
Windows xpWindows xp
Windows xp
 
PPWeb
PPWebPPWeb
PPWeb
 

Similar a D. Summary of work experience at Merisol (SASOL)

3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-32937903 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
Jose Quintero
 
An optimised approach for the inspection of aboveground
An optimised approach for the inspection of abovegroundAn optimised approach for the inspection of aboveground
An optimised approach for the inspection of aboveground
Patrick Schüller
 
In plant visibility in process manu (final published)
In plant visibility in process manu (final published)In plant visibility in process manu (final published)
In plant visibility in process manu (final published)
Alex Chatha
 
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Jonathan Lloyd
 

Similar a D. Summary of work experience at Merisol (SASOL) (20)

3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-32937903 steps-to-ensuring-mechanical-asset-integrity-en-3293790
3 steps-to-ensuring-mechanical-asset-integrity-en-3293790
 
Sasmos Report
Sasmos ReportSasmos Report
Sasmos Report
 
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilitiesAsset Integrity Management for purpose-built FPSOs and subsea system facilities
Asset Integrity Management for purpose-built FPSOs and subsea system facilities
 
Oil & Gas Maintenance Guide
Oil & Gas Maintenance GuideOil & Gas Maintenance Guide
Oil & Gas Maintenance Guide
 
Seminar Reliability
Seminar ReliabilitySeminar Reliability
Seminar Reliability
 
Konecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White PaperKonecranes Overhead Crane Preventive Maintenance White Paper
Konecranes Overhead Crane Preventive Maintenance White Paper
 
4 FACILITY LAYOUT.ppt
4  FACILITY LAYOUT.ppt4  FACILITY LAYOUT.ppt
4 FACILITY LAYOUT.ppt
 
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...Improving the Availability of Lift Stations through Optimized Redundant / Bac...
Improving the Availability of Lift Stations through Optimized Redundant / Bac...
 
Optimizing Petroleum Refining FCC Unit Operations Training
Optimizing Petroleum Refining FCC Unit Operations TrainingOptimizing Petroleum Refining FCC Unit Operations Training
Optimizing Petroleum Refining FCC Unit Operations Training
 
PE230516_Flowserve_WC_presentation_FINAL.pdf
PE230516_Flowserve_WC_presentation_FINAL.pdfPE230516_Flowserve_WC_presentation_FINAL.pdf
PE230516_Flowserve_WC_presentation_FINAL.pdf
 
An optimised approach for the inspection of aboveground
An optimised approach for the inspection of abovegroundAn optimised approach for the inspection of aboveground
An optimised approach for the inspection of aboveground
 
Rcm
RcmRcm
Rcm
 
In plant visibility in process manu (final published)
In plant visibility in process manu (final published)In plant visibility in process manu (final published)
In plant visibility in process manu (final published)
 
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
Ageing of Industrial Plant (BPPT_Jakarta_06-08-2003)
 
Refining Process Equipment Troubleshooting
Refining Process Equipment Troubleshooting Refining Process Equipment Troubleshooting
Refining Process Equipment Troubleshooting
 
Rams 2007 paper pdf
Rams 2007 paper pdfRams 2007 paper pdf
Rams 2007 paper pdf
 
Viziya
ViziyaViziya
Viziya
 
Process Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh RajputProcess Safety Awareness | PSM | Gaurav Singh Rajput
Process Safety Awareness | PSM | Gaurav Singh Rajput
 
A Guide to Instrumentation for Ethanol Fuel Production
A Guide to Instrumentation for Ethanol Fuel ProductionA Guide to Instrumentation for Ethanol Fuel Production
A Guide to Instrumentation for Ethanol Fuel Production
 
ASP-Final-E-version
ASP-Final-E-versionASP-Final-E-version
ASP-Final-E-version
 

D. Summary of work experience at Merisol (SASOL)

  • 1. Work experience at Merisol RSA (SASOL) Implementation of Reliability Engineering in Merisol RSA Reliability engineering is a relatively new concept in the field of engineering, despite this reliability engineering is on an up rise in all environments. The importance of reliable equipment has been acknowledge by top management and the implementation of reliability programs and advanced maintenance strategies are now a priority. The main purpose of this report is to inform the reader about the vital importance of reliability engineering and to guide the reader in understanding reliability engineering. We will also discuss some of the tools available, for example RCM, RCA and MTBF to help you reach reliability in the plant environment. We will also look at Merisol in terms of reliability and the status of equipment in terms of availability. This directly leads to the equipment uptime. With a well-rounded reliability program in place, using the previously stated tools the following improvements may be observed:  5-10% improvement in availability  10-20% decrease in maintenance costs  25-35% increase in equipment uptime. Areas where reliability in Merisol was investigated; 1. Plant availability 2. Identifying critical equipment 3. Preventive maintenance 4. Predictive maintenance 5. Spare parts management 6. Skill enhancement
  • 2. 7. Equipment history Recommendations on areas of improvements: 1. Set Plant availability goals  Operations, Maintenance and Technical must establish the availability goals for each plant based on the required production targets and equipment utilisation.  To put perspective on your availability goals and current availability it is wise to group together availability, capacity and utilisation. 2. Identify critical equipment  Update the procedure of identifying critical equipment. This ensures that equipment that has a large impact on production does not slip through. Reliability Centred Maintenance may reduce safety risks.  It is highly recommended to implement RCM `s. 3. Preventive/Predictive maintenance  Must move away from reactive maintenance which is a very expensive practise to follow.  Predict failures with the aim of preventing them.  Equipment should receive condition monitoring - allows us to predict when equipment will fail and prevent future failures. A life cycle analysis tool may be used. We will be able measure the performance of equipment in terms of the amount of production time and failures.
  • 3. Gear Ratios of new spares New spares were ordered on a gearbox; the supplier changed the driver gear with no manual. The driver gear has changed in size and amount of teeth. Both the old gears had the same amount of teeth. How does the increase of size and amount of teeth of the driver gear effect the system. Rotating Equipment Preventative Maintenance Strategy Merisol required preventative maintenance strategies to increase both the reliability and availability of the critical rotating equipment. The objective was to look at a practical and efficient solution and keeping in mind the financial implication. Pump Inspection Permit System To investigate changing the pump inspection philosophy and to propose an alternate solution to increase the frequency of pumps inspections if applicable. The Sasol Group Procedure for Work Permits (SSC-SAF-GPR-00003) outlines the necessary rules to exempt pump inspections from the permit process. F7101B Containment Area An investigation into the F7101B (Value CA) tank containment area was carried out. This was to verify that the concrete containment walls will be suitable, to contain a leak, overfilling or rupture from F7101B. The capacity of the current concrete containment walls was measured and compared to the maximum and operating capacity of the tank.
  • 4. FER – Analytical Report Sasol Infrachem Merisol has an FER severity index 10 times higher than the overall Sasol Infrachem Business Units. This is unacceptable. This report aims to decrease the severity and frequency of FER incidents by identifying the common failure modes through FER data analysis. From the data captured (Sasol FER Severity Calculator) thus far, we were able to identify the following as possible high priority areas for the Merisol business to focus on:  Lines left open  Corrosion  Gasket failures Additional investigation indicated the following: Leaving process lines open, display a steady reoccurrence in accordance to the data captured. Lines left open is a result of valves or drains open to atmosphere, where an unintended release takes place. There has been a steady decline in gasket related failures throughout the four years analysed. Corrosion related failures are on the rise overall. Figure 13 is a more detail set of data, for the current year (2013). This allows us to see what the relevant incidents are and their impact on the overall FER severity index. Prior to the analysis of the FER data, it was assumed that gasket failures were a major contributor to the high FERs at Merisol. However, after analysis it was evident that gasket failures should not given a high priority to their role in FERs as it only appears twice during 2013. Corrosion has shown a steady decline in 2013. Whereas, process lines being left open is on a slow rise in frequency. This gave us the data we needed to identify that Lines left open and corrosion are the main and most relevant contributing factors to the high FER severity index and is where priority should be given. To solve the current and most relevant contributing factor that is lines being left open; would be to review problematic standard operating procedures, provide appropriate training to operators where applicable, ensure competency of the operators before being allowed to operate the plant and review that the correct check lists are in place to ensure that no lines
  • 5. have been left open unintentionally. Prioritising this as a problem correctly, could result in a 32% reduction in the FER index. Integrity of C43164 due to crystallisation of E29 overheads During Value CA mode the E29 Overhead steam needs to be routed to the feed tank F5113A.If this is forgotten or overlooked the product in C43164 might crystallise on the shell side due to the high content of phenol and ortho-cresol. The crystallization point of the mixture is < 37 °C.