WEIGHT CONDITION
• Weight condition means loadability of a
commodity inside the wagon.
• Commodities will be charged at the PCC of
Wagon under three routes, CC+8, CC+6 or
Excepted Route. (RC-28-11).
• In case of wagons loaded with containers the
marked CC of wagon shall be its PCC. (RB
TC-1/2006/109/6-Pt-2 dated 14-11-2008).
• PCC of BLL/BFK/BFC wagons for movement
of containers by are given in (RC-5-15)
ROUTES FOR CHARGING
• CC +6 : Universalised Routes (All routes in Indian
railways are CC+6) except those notified as Excepted.
• Excepted Routes: Those Notified routes
• CC+8 : Those identified routes
• CC+8 routes has enhanced PCC when loaded with
notified commodities (Ores, Gypsum, Limestone,
Dolomite, Stones, Clinker, Cement, Slag , All types of
Coal DAP and NPK fertilizers) in different types of
wagons.
FACTORS DETERMINING
CHARGEABLE WEIGHT (PCC OF WAGON)
1. ROUTE IN WHICH IT IS BOOKED
( CC+8/ CC+6/ ER)
2. THE COMMODITY BOOKED
( Coal/Ores/Cement/Urea/Rice, etc;)
3. TYPE OF WAGON
( BCX/BCN/BOX/BOXN, etc;)
CHARGING UNDER VARIOUS ROUTES
When traffic is booked via routes which involves two or more of
different routes viz. Excepted routes, CC+6 routes and CC+8 routes,
the chargeable weight will be the permissible carrying capacity of the
route for which is most restrictive.
ILLUSTRATION:
Chargeable weight for A to F = PCC of Excepted routes
Chargeable weight for B to F = PCC of CC+6 routes
Chargeable weight for B to C = PCC of CC+8 routes
Chargeable weight for B to E = PCC of Excepted routes
A B C
EXC. R CC +8
CC +6
EXC.R
D
F
CC+6
E
W E I G H M E N T (RC-86-06)
• Sender has to record the weight of the consignment
in F. Note.
• All Wagons should be mandatorily weighed on the
weigh bridge unless exempted.
• Loading point will prepare VG in duplicate duly
indicating whether wagons are weighed or not to
Guard .
• If not weighed at loading point, due indication to be
made on VG for weighment at alternate weigh
bridge.
• Weigh bridge clerk will communicate the weighment
details to the loading point.
ISSUE OF RR
• The RR shall be prepared based on the
weighment details furnished by weigh bridge
within 24 hours of loading.
• If the RR cannot be prepared within 24 hours
from the time of loading, DCM can permit
another 24 hours time for preparation of RR
based on the weight furnished by the
alternate weigh bridge.
• If the weighment details are not received
within 48 hours, RR should be prepared
based on sender’s weight.
EXEMPTIONS FOR WEIGHMENT
• Wagons loaded with standard bags of uniform
size are exempted from mandatory weighment.
(RC-61-07)
• At least 5% of rakes to be weighed in a month.
(RC-32-11)
EXEMPTIONS FOR WEIGHMENT
• HR Coils and other Steel products which are
preweighed on certified Mill –Scales and bears
marking of central /Excise/Custom dep‘t.
• However 5% of the wagons loaded to be
weighed in a month.(RC-32-12)
• Containerised EXIM traffic is exempted from
100% mandatory weighment (RC-37-12)
ISSUE OF RR
• One RR can be issued Per Wagon
• A Maximum of 12 RR can be issued Per
Wagon.
• However for every additional RR issued a
charge of Rs. 300/- is levied.(RC-31-12).
• No Duplicate RR Can be Issued.
LATEST INSTRUCTIONS ON
OVERLOADING OF WAGONS
• JPO 2010 – For weighment, functioning of weighbridges and
dealing with overloading of rake.
• (RC- 19-12) – Punitive Charges for overloading
• (RC-32-11) – A penalty of Rs.5,000/- as detention charges will
be levied on each overloaded wagon in case of detention of a
rake after weighment warranting load adjustment at the
originating station itself.
• In addition to the above, demurrage and other charges (Engine
haulage/Shunting) for such adjustments will continue to be
levied as per extant rules.
• (RC- 39-12) – CCM in consultation with COM can conduct
random checks on wagon(s), that had undergone load
adjustment by consignors or by their agencies, and if
overloading is detected on such wagon(s) punitive charges of
Rs.1 Lakh per wagon will be levied.
CLARIFICATIONS RC-32-11
• What are the charges to be levied for
overloaded wagons at the loading point
itself, also for the time taken for load
adjustment, movement of rake from
weighment point to loading point and back?
• A penalty of Rs.5,000/- as detention charges will be
levied on each overloaded wagon.
• Demurrage and other charges (Shunting) as per
extant rules.
• (Ref Rly Board: TC1/2006/109/3 dated 30/4/13 and
2/4/14)
CLARIFICATIONS RC-32-11
• Due to operation reasons, if the party is not
allowed to carry out load adjustment at the
loading point and the rake was allowed to
move, What are the charges to be collected.
• Such decision is prima facie not in order. Party should
be allowed to carry load adjustment.
• Only Punitive charges for overloading to be collected.
• (Ref Rly Board: TC1/2012/108/19 dated 8/1/13)
CLARIFICATIONS RC-32-11
• What charges will be collected when the
wagons are offered for booking after
multiple weighment and load adjustments at
the weighbridges of sidings?
• Since weighment and load adjustment of the rake is
carried out prior to offering for booking, only
demurrage and other charges if any are to be
collected.
• (Ref Rly Board: TC1/2010/108/4 dtd 26/9/13)
PROVISIONS UNDER SEC-73
• What charges will be collected when the
wagons are weighed at associate
weighbridge/alternate weigh bridge, not
located at the loading point?
• Punitive charges shall be recovered for the entire
distance travelled by the train irrespective of point of
detection. (RC-19-12)
• In case Off-Loading /detachment of wagon is carried,
DC and other charges (Shunting/ Unloading charges)
as per extant rules. (Sec -73 Rly Act)
CLARIFICATION ON
PROVISIONS OF SEC-73
V. Yagneswaran
Sr Instructor Comml
ZRTI – Moulaali
SC Railway

Más contenido relacionado

La actualidad más candente

Rake maintenance (C&W Depot AGC ) Indian Railways
Rake maintenance (C&W Depot AGC )  Indian RailwaysRake maintenance (C&W Depot AGC )  Indian Railways
Rake maintenance (C&W Depot AGC ) Indian RailwaysDeewan singh
 
Revised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdfRevised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdfmajjisatish
 
Revised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trainsRevised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trainsSrinivasaRao Guduru
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship reportrahul waghmare
 
CONCEPT AND WORKING OF WILD (Wheel Impact Load Detector)
CONCEPT AND WORKING OF WILD (Wheel Impact Load Detector)CONCEPT AND WORKING OF WILD (Wheel Impact Load Detector)
CONCEPT AND WORKING OF WILD (Wheel Impact Load Detector)Vipin Kumar
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduJogendra Yadvendu
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training ReportVishal Singh
 
Power pack block of locomotive diesel engine ppppppt
Power pack block of locomotive diesel engine pppppptPower pack block of locomotive diesel engine ppppppt
Power pack block of locomotive diesel engine pppppptkundan singh
 
Indian railway report main
Indian railway report mainIndian railway report main
Indian railway report mainVicky Gupta
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~ihaxxo24
 
Maintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysMaintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysSwapnil Pawar
 
Wheel Slide Protection System in LHB FIAT Railway Coaches
Wheel Slide Protection System in LHB FIAT Railway  CoachesWheel Slide Protection System in LHB FIAT Railway  Coaches
Wheel Slide Protection System in LHB FIAT Railway CoachesJogendra Yadvendu
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~ihaxxo24
 
Railway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bdRailway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bdMd. Sultan Ali
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...haxxo24
 

La actualidad más candente (20)

Bogie
BogieBogie
Bogie
 
Rake maintenance (C&W Depot AGC ) Indian Railways
Rake maintenance (C&W Depot AGC )  Indian RailwaysRake maintenance (C&W Depot AGC )  Indian Railways
Rake maintenance (C&W Depot AGC ) Indian Railways
 
Revised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdfRevised Wagon Maintenance Manual.pdf
Revised Wagon Maintenance Manual.pdf
 
Revised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trainsRevised maintenance pattern of Coaching trains
Revised maintenance pattern of Coaching trains
 
ICF Bogie
ICF BogieICF Bogie
ICF Bogie
 
central railway internship report
central railway internship reportcentral railway internship report
central railway internship report
 
CONCEPT AND WORKING OF WILD (Wheel Impact Load Detector)
CONCEPT AND WORKING OF WILD (Wheel Impact Load Detector)CONCEPT AND WORKING OF WILD (Wheel Impact Load Detector)
CONCEPT AND WORKING OF WILD (Wheel Impact Load Detector)
 
Fiat bogie
Fiat bogieFiat bogie
Fiat bogie
 
ICF Bogie Details by Yadvendu
ICF Bogie Details by YadvenduICF Bogie Details by Yadvendu
ICF Bogie Details by Yadvendu
 
Coach &amp
Coach &ampCoach &amp
Coach &amp
 
Railway Training Report
Railway Training ReportRailway Training Report
Railway Training Report
 
Power pack block of locomotive diesel engine ppppppt
Power pack block of locomotive diesel engine pppppptPower pack block of locomotive diesel engine ppppppt
Power pack block of locomotive diesel engine ppppppt
 
Indian railway report main
Indian railway report mainIndian railway report main
Indian railway report main
 
Indian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~iIndian railways mechanical vocational training report 1 haxxo24 i~i
Indian railways mechanical vocational training report 1 haxxo24 i~i
 
Loco bogies clw
Loco bogies clwLoco bogies clw
Loco bogies clw
 
Maintenance and Manufacturing of Railways
Maintenance and Manufacturing of RailwaysMaintenance and Manufacturing of Railways
Maintenance and Manufacturing of Railways
 
Wheel Slide Protection System in LHB FIAT Railway Coaches
Wheel Slide Protection System in LHB FIAT Railway  CoachesWheel Slide Protection System in LHB FIAT Railway  Coaches
Wheel Slide Protection System in LHB FIAT Railway Coaches
 
Indian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~iIndian railways mechanical vocational training report 2 haxxo24 i~i
Indian railways mechanical vocational training report 2 haxxo24 i~i
 
Railway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bdRailway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bd
 
South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...South east central railway (secr) bilaspur mechanical vocational training rep...
South east central railway (secr) bilaspur mechanical vocational training rep...
 

Similar a Pcc weighment-overloading

Freight_Incentives_ease_of_doing_Business.pptx
Freight_Incentives_ease_of_doing_Business.pptxFreight_Incentives_ease_of_doing_Business.pptx
Freight_Incentives_ease_of_doing_Business.pptxPiyushKumar529574
 
5. Certification of speed on bridges April 20.pptx
5. Certification of speed on bridges April 20.pptx5. Certification of speed on bridges April 20.pptx
5. Certification of speed on bridges April 20.pptxNaresh Prasad Keshari
 
Landscape Ontario
Landscape OntarioLandscape Ontario
Landscape OntarioCorrine S
 
Transport in Open Pits______SM_MI10415MI
Transport in Open Pits______SM_MI10415MITransport in Open Pits______SM_MI10415MI
Transport in Open Pits______SM_MI10415MIRomil Mishra
 
Irp presentation 1
Irp presentation 1Irp presentation 1
Irp presentation 1Athar Riaz
 
Mine locomotive ppt (under ground transport system )
Mine locomotive ppt (under ground transport system )Mine locomotive ppt (under ground transport system )
Mine locomotive ppt (under ground transport system )AMIT SAHU
 

Similar a Pcc weighment-overloading (15)

Freight_Incentives_ease_of_doing_Business.pptx
Freight_Incentives_ease_of_doing_Business.pptxFreight_Incentives_ease_of_doing_Business.pptx
Freight_Incentives_ease_of_doing_Business.pptx
 
Lease brief
Lease briefLease brief
Lease brief
 
GCT PPT VER 2.0(2).pptx
GCT PPT VER 2.0(2).pptxGCT PPT VER 2.0(2).pptx
GCT PPT VER 2.0(2).pptx
 
5. Certification of speed on bridges April 20.pptx
5. Certification of speed on bridges April 20.pptx5. Certification of speed on bridges April 20.pptx
5. Certification of speed on bridges April 20.pptx
 
Shivendra singh
Shivendra singhShivendra singh
Shivendra singh
 
re_capitol
re_capitolre_capitol
re_capitol
 
Landscape Ontario
Landscape OntarioLandscape Ontario
Landscape Ontario
 
2023 CalAPA Spring Conference presentation by CARB
2023 CalAPA Spring Conference presentation by CARB2023 CalAPA Spring Conference presentation by CARB
2023 CalAPA Spring Conference presentation by CARB
 
himanshu (1)
himanshu (1)himanshu (1)
himanshu (1)
 
Circular-No-02-2021.pdf
Circular-No-02-2021.pdfCircular-No-02-2021.pdf
Circular-No-02-2021.pdf
 
Transport in Open Pits______SM_MI10415MI
Transport in Open Pits______SM_MI10415MITransport in Open Pits______SM_MI10415MI
Transport in Open Pits______SM_MI10415MI
 
Irp presentation 1
Irp presentation 1Irp presentation 1
Irp presentation 1
 
Prashant patel
Prashant patelPrashant patel
Prashant patel
 
english-85609722.pdf
english-85609722.pdfenglish-85609722.pdf
english-85609722.pdf
 
Mine locomotive ppt (under ground transport system )
Mine locomotive ppt (under ground transport system )Mine locomotive ppt (under ground transport system )
Mine locomotive ppt (under ground transport system )
 

Pcc weighment-overloading

  • 1. PCC OF WAGONS OVERLOADING PENAL PROVISIONS- IR Presentation Year 2014 Compiled by V Yagneswaran Sr Instructor ZRTI Moula Ali SC Railway
  • 2. WEIGHT CONDITION • Weight condition means loadability of a commodity inside the wagon. • Commodities will be charged at the PCC of Wagon under three routes, CC+8, CC+6 or Excepted Route. (RC-28-11). • In case of wagons loaded with containers the marked CC of wagon shall be its PCC. (RB TC-1/2006/109/6-Pt-2 dated 14-11-2008). • PCC of BLL/BFK/BFC wagons for movement of containers by are given in (RC-5-15)
  • 3. ROUTES FOR CHARGING • CC +6 : Universalised Routes (All routes in Indian railways are CC+6) except those notified as Excepted. • Excepted Routes: Those Notified routes • CC+8 : Those identified routes • CC+8 routes has enhanced PCC when loaded with notified commodities (Ores, Gypsum, Limestone, Dolomite, Stones, Clinker, Cement, Slag , All types of Coal DAP and NPK fertilizers) in different types of wagons.
  • 4. FACTORS DETERMINING CHARGEABLE WEIGHT (PCC OF WAGON) 1. ROUTE IN WHICH IT IS BOOKED ( CC+8/ CC+6/ ER) 2. THE COMMODITY BOOKED ( Coal/Ores/Cement/Urea/Rice, etc;) 3. TYPE OF WAGON ( BCX/BCN/BOX/BOXN, etc;)
  • 5.
  • 6. CHARGING UNDER VARIOUS ROUTES When traffic is booked via routes which involves two or more of different routes viz. Excepted routes, CC+6 routes and CC+8 routes, the chargeable weight will be the permissible carrying capacity of the route for which is most restrictive. ILLUSTRATION: Chargeable weight for A to F = PCC of Excepted routes Chargeable weight for B to F = PCC of CC+6 routes Chargeable weight for B to C = PCC of CC+8 routes Chargeable weight for B to E = PCC of Excepted routes A B C EXC. R CC +8 CC +6 EXC.R D F CC+6 E
  • 7. W E I G H M E N T (RC-86-06) • Sender has to record the weight of the consignment in F. Note. • All Wagons should be mandatorily weighed on the weigh bridge unless exempted. • Loading point will prepare VG in duplicate duly indicating whether wagons are weighed or not to Guard . • If not weighed at loading point, due indication to be made on VG for weighment at alternate weigh bridge. • Weigh bridge clerk will communicate the weighment details to the loading point.
  • 8.
  • 9.
  • 10. ISSUE OF RR • The RR shall be prepared based on the weighment details furnished by weigh bridge within 24 hours of loading. • If the RR cannot be prepared within 24 hours from the time of loading, DCM can permit another 24 hours time for preparation of RR based on the weight furnished by the alternate weigh bridge. • If the weighment details are not received within 48 hours, RR should be prepared based on sender’s weight.
  • 11. EXEMPTIONS FOR WEIGHMENT • Wagons loaded with standard bags of uniform size are exempted from mandatory weighment. (RC-61-07) • At least 5% of rakes to be weighed in a month. (RC-32-11)
  • 12. EXEMPTIONS FOR WEIGHMENT • HR Coils and other Steel products which are preweighed on certified Mill –Scales and bears marking of central /Excise/Custom dep‘t. • However 5% of the wagons loaded to be weighed in a month.(RC-32-12) • Containerised EXIM traffic is exempted from 100% mandatory weighment (RC-37-12)
  • 13. ISSUE OF RR • One RR can be issued Per Wagon • A Maximum of 12 RR can be issued Per Wagon. • However for every additional RR issued a charge of Rs. 300/- is levied.(RC-31-12). • No Duplicate RR Can be Issued.
  • 14. LATEST INSTRUCTIONS ON OVERLOADING OF WAGONS • JPO 2010 – For weighment, functioning of weighbridges and dealing with overloading of rake. • (RC- 19-12) – Punitive Charges for overloading • (RC-32-11) – A penalty of Rs.5,000/- as detention charges will be levied on each overloaded wagon in case of detention of a rake after weighment warranting load adjustment at the originating station itself. • In addition to the above, demurrage and other charges (Engine haulage/Shunting) for such adjustments will continue to be levied as per extant rules. • (RC- 39-12) – CCM in consultation with COM can conduct random checks on wagon(s), that had undergone load adjustment by consignors or by their agencies, and if overloading is detected on such wagon(s) punitive charges of Rs.1 Lakh per wagon will be levied.
  • 15. CLARIFICATIONS RC-32-11 • What are the charges to be levied for overloaded wagons at the loading point itself, also for the time taken for load adjustment, movement of rake from weighment point to loading point and back? • A penalty of Rs.5,000/- as detention charges will be levied on each overloaded wagon. • Demurrage and other charges (Shunting) as per extant rules. • (Ref Rly Board: TC1/2006/109/3 dated 30/4/13 and 2/4/14)
  • 16. CLARIFICATIONS RC-32-11 • Due to operation reasons, if the party is not allowed to carry out load adjustment at the loading point and the rake was allowed to move, What are the charges to be collected. • Such decision is prima facie not in order. Party should be allowed to carry load adjustment. • Only Punitive charges for overloading to be collected. • (Ref Rly Board: TC1/2012/108/19 dated 8/1/13)
  • 17. CLARIFICATIONS RC-32-11 • What charges will be collected when the wagons are offered for booking after multiple weighment and load adjustments at the weighbridges of sidings? • Since weighment and load adjustment of the rake is carried out prior to offering for booking, only demurrage and other charges if any are to be collected. • (Ref Rly Board: TC1/2010/108/4 dtd 26/9/13)
  • 18. PROVISIONS UNDER SEC-73 • What charges will be collected when the wagons are weighed at associate weighbridge/alternate weigh bridge, not located at the loading point? • Punitive charges shall be recovered for the entire distance travelled by the train irrespective of point of detection. (RC-19-12) • In case Off-Loading /detachment of wagon is carried, DC and other charges (Shunting/ Unloading charges) as per extant rules. (Sec -73 Rly Act)
  • 20. V. Yagneswaran Sr Instructor Comml ZRTI – Moulaali SC Railway